Large-scale optimal control of interconnected natural gas and electrical transmission systems

We present a detailed optimal control model that captures spatiotemporal interactions between gas and electric transmission networks. We use the model to study flexibility and economic opportunities provided by coordination. A large-scale case study in the Illinois system reveals that coordination can enable the delivery of significantly larger amounts of natural gas to the power grid. In particular, under a coordinated setting, gas-fired generators act as distributed demand response resources that can be controlled by the gas pipeline operator. This enables more efficient control of pressures and flows in space and time and overcomes delivery bottlenecks. We demonstrate that the additional flexibility not only can benefit the gas operator but can also lead to more efficient power grid operations and results in increased revenue for gas-fired power plants. We also use the optimal control model to analyze computational issues arising in these complex models. We demonstrate that the interconnected Illinois system with full physical resolution gives rise to a highly nonlinear optimal control problem with 4400 differential and algebraic equations and 1040 controls that can be solved with a state-of-the-art sparse optimization solver. (C) 2016 Elsevier Ltd. All rights reserved.

Chiang, Nai-Yuan↗

Operating Reserve Implication of Alternative Implementations of an Energy Imbalance Service on Wind Integration in the Western Interconnection: Preprint

During the past few years, there has been significant interest in alternative ways to manage power systems over a larger effective electrical footprint. Large regional transmission organizations in the Eastern Interconnection have effectively consolidated balancing areas, achieving significant economies of scale that result in a reduction in required reserves. Conversely, in the WesternInterconnection there are many balancing areas, which will result in challenges if there is significant wind and solar energy development in the region. A recent proposal to the Western Electricity Coordinating Council suggests a regional energy imbalance service (EIS). To evaluate this EIS, a number of analyses are in process or are planned. This paper describes one part of an analysis of theEIS's implication on operating reserves under several alternative scenarios of the market footprint and participation. We improve on the operating reserves method utilized in the Eastern Wind Integration and Transmission Study and apply this modified approach to data from the Western Wind and Solar Integration Study.

17 WIND ENERGY↗

Mitigating Interconnection Challenges of the High Penetration Utility-Interconnected Photovoltaic (PV) in the Electrical Distribution Systems: Cooperative Research and Development Final Report, CRADA Number CRD-14-563

Various interconnection challenges exist when connecting distributed PV into the electrical distribution grid in terms of safety, reliability, and stability of the electric power systems. Some of the urgent areas for research, as identified by inverter manufacturers, installers and utilities, are potential for transient overvoltage from PV inverters, multi-inverter anti-islanding, impact of smart inverters on volt-VAR support, impact of bidirectional power flow, and potential for distributed generation curtailment solutions to mitigate grid stability challenges. Under this project, NREL worked with SolarCity to address these challenges through research, testing and analysis at the Energy System Integration Facility (ESIF). Inverters from different manufacturers were tested at ESIF and NREL's unique power hardware-in-the-loop (PHIL) capability was utilized to evaluate various system-level impacts. Through the modeling, simulation, and testing, this project eliminated critical barriers on high PV penetration and directly supported the Department of Energy's SunShot goal of increasing the solar PV on the electrical grid.

14 SOLAR ENERGY↗

Small Hydropower Interconnections: Best Practices

Small hydropower projects have been the predominant source of capacity growth of U.S. hydropower for more than a decade, and they present the most cost-effective and environmentally permissible avenues for hydropower growth (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier due to cost surprises and schedule overruns. As a culmination to research into the status and requirements of small hydropower interconnection across the United States, this paper presents the best practices for setting interconnection standards that can improve the process for small hydropower developers. As part of the analysis, the interconnection costs are compared between small hydropower, solar, and wind. The analysis of the small hydropower interconnection landscape across the United States was carried out by Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) with support from the U.S. Department of Energy Water Power Technologies Office. The research team was guided by a Technical Advisory Group (TAG) and gleaned data from publicly available sources, such as the HydroSource database (ORNL 2020) and interconnection queues hosted by utilities, balancing authorities, independent system operators (ISOs), and regional transmission organizations (RTOs). The results of this work are shared in a series of papers detailing the state of small hydropower in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”), the variety of state interconnection processes to connect power generators with the grid (“Small Hydropower Interconnections: State Interconnection Processes”), and an analysis of the interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”). In this, the final paper in the series, best practices for interconnection processes (“Small Hydropower Interconnections: Best Practices”) are identified from the solar energy and distributed wind energy industries that are transferrable to small hydropower development. This information will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

A review of United States energy-only generator interconnection service policy and considerations for reform

Grid interconnection has emerged as a significant obstacle to the development of new electricity resources. There is growing interest in energy-only interconnection, which is an interconnection service option meant to allow the interconnection of new generators without ensuring their energy deliverability during all hours through the transmission system to customers. This approach potentially avoids upfront congestion-related transmission upgrades but could increase curtailment risk. Interest in energy-only interconnection is shaped by incomplete understanding of how interconnection policy functions in different jurisdictions, a knowledge gap that makes it difficult to determine how energy-only interconnection might be better used or re-designed. In this paper, we provide a regulatory review of energy-only interconnection in U.S. interconnection policy and practice, identifying jurisdictions in which rules are close to -or farther from-the theoretical concept of energy-only interconnection service. We find substantial jurisdictional differences in how energy-only interconnection is implemented, driven by differences in resource adequacy frameworks, real-time transmission operations, and state-level procurement practices. U.S. regulators have preferred local jurisdictional flexibility over federal prescription of interconnection study methods and procedures, which also contributes to differences among regions. Such findings raise fundamental questions about whether competition policies in electricity markets should extend beyond spot energy markets and into more prescriptive guidelines around interconnection rules and market entry. This paper sheds light on tensions that energy-only interconnection raises in allowing generators to access the transmission system on an as available basis and discusses how controlling thresholds for congestion-related network upgrades may be a barrier to electricity market entry.

Gorman, Will↗

Evaluating the Role of Pre-Application Reports in Improving Distributed Generation Interconnection Processes

Several tools have emerged in recent years to increase data exchange and transparency in the distributed generation interconnection process with the goal of reducing interconnection costs. One example is pre-application reports. These reports are generated by a utility at the request of prospective interconnection applicants to provide technical information about a specific point of interconnection. Formal pre-application report processes have been established in 12 states at the distribution system level as well as at the transmission level by the Federal Energy Regulatory Commission. These reports are a relatively low-cost method of informing applicants of grid conditions and potential interconnection limitations early in the interconnection process. Thus, this information may encourage interconnection in locations with little to no detrimental impact to the grid and low interconnection costs. Increasing transparency of these grid conditions may also enable applicants to better plan for interconnection costs and requirements, such as system modifications and complex engineering studies. By providing these benefits, pre-application reports are expected to reduce the number of canceled interconnection applications. This report evaluates this hypothesis by quantifying the impact pre-application report processes have on application approval rate. To evaluate this hypothesis this analysis uses utility-reported distributed generation interconnection data from four utilities in Massachusetts. The analysis considers a four-year time period before and a five-year period after pre-application report process were implemented. The results indicate that once pre-application reports were required for projects 500 kilowatts and larger the approval rate of applications increased by 24%. This suggests that pre-application reports may decrease the percentage of canceled projects. However, due to data and other limitations, these results do not necessarily connote causation. This analysis is an important first step and a prerequisite for future analyses regarding the impact of pre-application reports. Other potential impacts also recognized during this analysis included reducing sunk costs and reducing the number of projects requiring a complex review. Collection of additional data would allow for forming more robust conclusions about these impacts in the future. Such data include circuit-level data, interconnection cost data, policy and regulatory background, national-level data, and utility and developer attributes. These data provide necessary context to account for interrelated factors while evaluating pre-application reports. Filling such knowledge gaps ultimately aids regulators in applying best practices within the industry. As more and more distributed energy resources are interconnected, these best practices will become an integral aspect of efficiently transitioning to an electric grid capable of meeting the needs of the 21st century.

14 SOLAR ENERGY↗

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Small Hydropower Interconnections: Small Hydropower in the United States

Small hydropower projects, which we define as generators below 20 MW in capacity have been the predominant source of hydropower growth over the past decade and create the most cost-effective and environmentally permissible avenues for new hydropower installation in the United States (DOE 2016; Johnson et al. 2018). Small hydropower developers across the United States have found that interconnecting these projects with the grid can be challenging due to unexpected costs and schedule overruns. Understanding the interconnection challenges and improving the process may allow more small hydropower projects to be successful. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. To begin to analyze the existing interconnection processes and challenges facing small hydropower, the state of small hydropower development in the U.S. must first be described to understand the characteristics of the industry. The first in a series, this paper presents the state of small hydropower projects in the U.S. to describe their type, location, and size based on data extracted from the HydroSource database (ORNL 2020). The following papers in the series will detail the variety of state interconnection processes to connect power generators with the grid (“Small Hydropower Interconnections: State Interconnection Processes”), analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”), and present best practices in interconnection processes (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

Interconnecting PV on New York City's Secondary Network Distribution System

The U.S. Department of Energy (DOE) has teamed with cities across the country through the Solar America Cities (SAC) partnership program to help reduce barriers and accelerate implementation of solar energy. The New York City SAC team is a partnership between the City University of New York (CUNY), the New York City Mayor s Office of Long-term Planning and Sustainability, and the New York City Economic Development Corporation (NYCEDC).The New York City SAC team is working with DOE s National Renewable Energy Laboratory (NREL) and Con Edison, the local utility, to develop a roadmap for photovoltaic (PV) installations in the five boroughs. The city set a goal to increase its installed PV capacity from1.1 MW in 2005 to 8.1 MW by 2015 (the maximum allowed in 2005). A key barrier to reaching this goal, however, is the complexity of the interconnection process with the local utility. Unique challenges are associated with connecting distributed PV systems to secondary network distribution systems (simplified to networks in this report). Although most areas of the country use simpler radial distribution systems to distribute electricity, larger metropolitan areas like New York City typically use networks to increase reliability in large load centers. Unlike the radial distribution system, where each customer receives power through a single line, a network uses a grid of interconnected lines to deliver power to each customer through several parallel circuits and sources. This redundancy improves reliability, but it also requires more complicated coordination and protection schemes that can be disrupted by energy exported from distributed PV systems. Currently, Con Edison studies each potential PV system in New York City to evaluate the system s impact on the network, but this is time consuming for utility engineers and may delay the customer s project or add cost for larger installations. City leaders would like to streamline this process to facilitate faster, simpler, and less expensive distributed PV system interconnections. To assess ways to improve the interconnection process, NREL conducted a four-part study with support from DOE. The NREL team then compiled the final reports from each study into this report. In Section 1 -- PV Deployment Analysis for New York City -- we analyze the technical potential for rooftop PV systems in the city. This analysis evaluates potential PV power production in ten Con Edison networks of various locations and building densities (ranging from high density apartments to lower density single family homes). Next, we compare the potential power production to network loads to determine where and when PV generation is most likely to exceed network load and disrupt network protection schemes. The results of this analysis may assist Con Edison in evaluating future PV interconnection applications and in planning future network protection system upgrades. This analysis may also assist other utilities interconnecting PV systems to networks by defining a method for assessing the technical potential of PV in the network and its impact on network loads. Section 2. A Briefing for Policy Makers on Connecting PV to a Network Grid presents an overview intended for nontechnical stakeholders. This section describes the issues associated with interconnecting PV systems to networks, along with possible solutions. Section 3. Technical Review of Concerns and Solutions to PV Interconnection in New York City summarizes common concerns of utility engineers and network experts about interconnecting PV systems to secondary networks. This section also contains detailed descriptions of nine solutions, including advantages and disadvantages, potential impacts, and road maps for deployment. Section 4. Utility Application Process Review -- looks at utility interconnection application processes across the country and identifies administrative best practices for efficient PV interconnection.

14 SOLAR ENERGY↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗