Search NASA⌕ Search

SEARCH · Search NASA

Results for “james webb space telescope”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Science with the James Webb Space Telescope

The James Webb Space Telescope is the scientific successor to the Hubble and Spitzer Space Telescopes. It will be a large (6.6m) cold (50K) telescope launched into orbit around the second Earth-Sun lagrange point. It is a partnership of NASA with the European and Canadian Space Agencies. The science goals for JWST include the formation of the first stars and galaxies in the early universe; the chemical, morphological and dynamical buildup of galaxies and the formation of stars and planetary systems. Recently, the goals have expanded to include studies of dark energy, dark matter, active galactic nuclei, exoplanets and Solar System objects. Webb will have four instruments: The Near-Infrared Camera, the Near-Infrared multi-object Spectrograph, and the Near-Infrared Imager and Slitiess Spectrograph will cover the wavelength range 0.6 to 5 microns, while the Mid-Infrared Instrument will do both imaging and spectroscopy from 5 to 28.5 microns. The observatory is confirmed for launch in 2018; the design is complete and it is in its construction phase. Recent progress includes the completion of the mirrors, the delivery of the first flight instrument(s) and the start of the integration and test phase.

Gardner, Jonathan P.↗

The James Webb Space Telescope

The James Webb Space Telescope is the scientific successor to the Hubble and Spitzer Space Telescopes. It will be a large (6.6m) cold (SDK) telescope launched into orbit around the second Earth-Sun Lagrange point. It is a partnership of NASA with the European and Canadian Space Agencies. The science goals for JWST include the formation of the first stars and galaxies in the early universe; the chemical, morphological and dynamical buildup of galaxies and the formation of stars and planetary systems. Recently, the goals have expanded to include studies of dark energy, dark matter, active galactic nuclei, exoplanets and Solar System objects. Webb will have four instruments: The Near-Infrared Camera, the Near-Infrared multi-object Spectrograph, and the Near-Infrared Imager and Slitless Spectrograph will cover the wavelength range 0.6 to S microns, while the Mid-Infrared Instrument will do both imaging and spectroscopy from 5 to 28.5 microns. The observatory is confirmed for launch in 2018; the design is complete and it is in its construction phase. Recent progress includes the completion of the mirrors, the delivery of the first flight instruments and the start of the integration and test phase.

Gardner, Jonathan P.↗

Studies of Supernovae, SNR, and Dust with the James Webb Space Telescope

The james Webb Space Telescope (JWST) will provide breakthrough capabilities for the study of supernovae and supernova remnants, as well as many other science objectives. JWST is a large aperture, cryogenic, infrared-optimized general purpose space observatory under construction by NASA, ESA, and CSA for launch in 2018. The JWST instrumentation will provide imaging, coronagraphy, and spectroscopy between 6000A to 29 microns. This spectral region contains many atomic, molecular, and particulate diagnostics that are especially relevant for the study of dust formation. The spectroscopic capabilities include velocity resolution down to approx. 100 km/sec, a near-IR multi-object spectrograph with a approx. 3x3 arcmin field of view array of approx. 250,000 addressable shutters, and near-IR and mid-IR approx. 3x3 arcsec integral field units. The JWST telescope will have a 6.5m-diameter segmented primary mirror and will be diffraction-limited at 2 microns (PSF FWHM - 0.07 arcsec). The imaging and spectroscopic sensitivities will be about 100x lower than previous capabilities in the near- and mid-IR. The JWST observatory will be placed in a L2 orbit by an Ariane 5 launch vehicle provided by ESA. The JWST telescope and instruments will be passively cooled to approx. 40K by a sunshield that will be unfolded after launch. The sunshield geometry limits the JWST pointing on the sky to be between 85 deg and 135 deg from the Sun. The observatory is designed for a 5-year prime science mission, with consumables for 10 years of science operations, and a Target of Opportunity response time of 48 hours.

Sonneborn, George↗

Operations Concept for Moving Target Observations with the James Webb Space Telescope

The James Webb Space Telescope (JWST) will provide breakthrough capabilities for the study of Solar System objects. JWST is a large aperture, cryogenic, infrared-optimized, general purpose space observatory under construction by NASA, ESA, and CSA for launch in 2018. The JWST instrumentation will provide imaging. coronagraphy, and spectroscopy between 6000A to 29 microns. This spectral region contains many atomic, molecular, and particulate diagnostics that are especially relevant for the study of gaseous, rocky and icy bodies in the Solar System. This talk describes the concept for observations of moving targets, including the system design for acquiring and tracking guide stars to hold the science target fIxed in the instrument field of view.

Sonneborne, George↗

Overview of the James Webb Space Telescope

The James Webb Space Telescope (JWST) is a large aperture (6.5 meter), cryogenic space telescope with a suite of near and mid-infrared instruments covering the wavelength range of 0.6 microns to 28 microns. JWST's primary science goal is to detect and characterize the first galaxies. It will also study the assembly of galaxies, star formation, protoplanetary systems, and the formation of evolution of planetary systems. We will review recent progress in the design of JWST' s observatory architecture leading up to JWST's recent Mission Preliminary Design Review (PDR). In particular, we will discuss the status of JWST's optical system, the current status of the telescope mirror fabrication effort, the final design of the observatory sunshield and the plans for integration and test. In this context, we will discuss the expected scientific performance of the observatory.

Clampin, Mark↗

Stationkeeping Monte Carlo Simulation for the James Webb Space Telescope

The James Webb Space Telescope (JWST) is scheduled to launch in 2018 into a Libration Point Orbit (LPO) around the Sun-Earth/Moon (SEM) L2 point, with a planned mission lifetime of 10.5 years after a six-month transfer to the mission orbit. This paper discusses our approach to Stationkeeping (SK) maneuver planning to determine an adequate SK delta-V budget. The SK maneuver planning for JWST is made challenging by two factors: JWST has a large Sunshield, and JWST will be repointed regularly producing significant changes in Solar Radiation Pressure (SRP). To accurately model SRP we employ the Solar Pressure and Drag (SPAD) tool, which uses ray tracing to accurately compute SRP force as a function of attitude. As an additional challenge, the future JWST observation schedule will not be known at the time of SK maneuver planning. Thus there will be significant variation in SRP between SK maneuvers, and the future variation in SRP is unknown. We have enhanced an earlier SK simulation to create a Monte Carlo simulation that incorporates random draws for uncertainties that affect the budget, including random draws of the observation schedule. Each SK maneuver is planned to optimize delta-V magnitude, subject to constraints on spacecraft pointing. We report the results of the Monte Carlo simulations and discuss possible improvements during flight operations to reduce the SK delta-V budget.

Stationkeepting↗

A New Large Vibration Test Facility Concept for the James Webb Space Telescope

The James Webb Space Telescope consists of three main components, the Integrated Science Instrument Module (ISIM) Element, the Optical Telescope Element (OTE), and the Spacecraft Element. The ISIM and OTE are being assembled at the National Aeronautics and Space Administration's Goddard Spaceflight Center (GSFC). The combined OTE and ISIM Elements, called OTIS, will undergo sine vibration testing before leaving Goddard. OTIS is the largest payload ever tested at Goddard and the existing GSFC vibration facilities are incapable of performing a sine vibration test of the OTIS payload. As a result, a new large vibration test facility is being designed. The new facility will consist of a vertical system with a guided head expander and a horizontal system with a hydrostatic slip table. The project is currently in the final design phase with installation to begin in early 2015 and the facility is expected to be operational by late 2015. This paper will describe the unique requirements for a new large vibration test facility and present the selected final design concepts.

test facilities↗

Ambient Optomechanical Alignment and Pupil Metrology for the Flight Instruments Aboard the James Webb Space Telescope

The James Webb Space Telescope science instruments are in the final stages of being integrated into the Integrated Science Instrument Module (ISIM) element. Each instrument is tied into a common coordinate system through mechanical references that are used for optical alignment and metrology within ISIM after element-level assembly. In addition, a set of ground support equipment (GSE) consisting of large, precisely calibrated, ambient, and cryogenic structures are used as alignment references and gauges during various phases of integration and test (I&T). This GSE, the flight instruments, and ISIM structure feature different types of complimentary metrology targeting. These GSE targets are used to establish and track six degrees of freedom instrument alignment during I&T in the vehicle coordinate system (VCS). This paper describes the optomechanical metrology conducted during science instrument integration and alignment in the Spacecraft Systems Development and Integration Facility (SSDIF) cleanroom at NASA Goddard Space Flight Center (GSFC). The measurement of each instrument's ambient entrance pupil location in the telescope coordinate system is discussed. The construction of the database of target locations and the development of metrology uncertainties is also discussed.

Optomechanical Alignment↗

A New Large Vibration Test Facility Concept for the James Webb Space Telescope

The James Webb Space Telescope consists of three main components, the Integrated Science Instrument Module (ISIM) Element, the Optical Telescope Element (OTE), and the Spacecraft Element. The ISIM and OTE are being assembled at the National Aeronautics and Space Administration's Goddard Spaceflight Center (GSFC). The combined OTE and ISIM Elements, called OTIS, will undergo sine vibration testing before leaving Goddard. OTIS is the largest payload ever tested at Goddard and the existing GSFC vibration facilities are incapable of performing a sine vibration test of the OTIS payload. As a result, a new large vibration test facility is being designed. The new facility will consist of a vertical system with a guided head expander and a horizontal system with a hydrostatic slip table. The project is currently in the final design phase with installation to begin in early 2015 and the facility is expected to be operational by late 2015. This paper will describe the unique requirements for a new large vibration test facility and present the selected final design concepts.

vibration↗

Titan Science with the James Webb Space Telescope

The James Webb Space Telescope (JWST), scheduled for launch in 2018, is the successor to the Hubble Space Telescope (HST) but with a signicantly larger aperture (6.5 m) and advanced instrumentation focusing on infrared science (0.6-28.0 microns). In this paper, we examine the potential for scientic investigation of Titan using JWST, primarily with three of the four instruments: NIRSpec, NIRCam, and MIRI, noting that science with NIRISS will be complementary. Five core scientic themes are identied: (1) surface (2) tropospheric clouds (3) tropospheric gases (4) stratospheric composition, and (5) stratospheric hazes. We discuss each theme in depth, including the scientic purpose, capabilities, and limitations of the instrument suite and suggested observing schemes. We pay particular attention to saturation, which is a problem for all three instruments, but may be alleviated for NIRCam through use of selecting small sub-arrays of the detectorssufcient to encompass Titan, but with signicantly faster readout times. We nd that JWST has very signicant potential for advancing Titan science, with a spectral resolution exceeding the Cassini instrument suite at near-infrared wavelengths and a spatial resolution exceeding HST at the same wavelengths. In particular, JWST will be valuable for time-domain monitoring of Titan, given a ve- to ten-year expected lifetime for the observatory, for example, monitoring the seasonal appearance of clouds. JWST observations in the post-Cassini period will complement those of other large facilities such as HST, ALMA, SOFIA, and next-generation ground-based telescopes (TMT, GMT, EELT).

Nixon, Conor A.↗

Characterizing Exoplanet Atmospheres with the James Webb Space Telescope

The James Webb Space Telescope (JWST) will have numerous modes for acquiring photometry and spectra of stars, planets, galaxies, and other astronomical objects over wavelengths of 0.6 - 28 microns. Several of these modes are well-suited for observing atomic and molecular features in the atmospheres of transiting or spatially resolved exoplanets. I will present basic information on JWST capabilities, highlight modes that are well-suited for observing exoplanets, and give examples of what may be learned from JWST observations. This will include simulated spectra and expected retrieved chemical abundance, composition, equilibrium, and thermal information and uncertainties. JWST Cycle 1 general observer proposals are expected to be due in March 2018 with launch in October 2018, and the greater scientific community is encouraged to propose investigations to study exoplanet atmospheres and other topics.

space telescopes↗

Data Processing for High-Contrast Imaging with the James Webb Space Telescope

The James Webb Space Telescope (JWST) will probe circumstellar environments at an unprecedented sensitivity.However, the performance of high-contrast imaging instruments is limited by the residual light from the star at close separations (<2-3”), where the incidence of exoplanets increases rapidly. There is currently no solution to get rid of the residual light down to the photon noise level at those separations, which may prevent some crucial discoveries. JWST’s debut is planned for October 2021 for a baseline mission lifetime of only five years. Thus,it is crucial to find a solution to this problem before its launch. We are further developing and implementing an innovative approach of post-processing built on a Bayesian framework that provides a more robust determination of faint astrophysical structures around a bright source. This approach uses a model of high-contrast imaging instrument that takes advantage of prior information, such as data from wavefront sensing (WFS) operations on JWST, to estimate simultaneously instrumental aberrations and the circumstellar environment. With this approach, our goal is to further improve the contrast gain over the contrast that can be achieved with JWST instruments, starting with NIRCam imaging and coronagraphic imaging. This work will pave the way for the future space-based high-contrast imaging instruments such as the Nancy Grace Roman Space Telescope Coronagraph Instrument (Roman CGI). This technique will be crucial to make the best use of the telemetry data that will be collected during the CGI operations.

Jewell, Jeffrey B.↗

Planning and Execution of the Three Mid-Course Correction Maneuvers for the James Webb Space Telescope

The James Webb Space Telescope (JWST) was successfully launched on December 25, 2021 12:20 UTC on an Ariane 5 rocket out of Kourou, French Guiana on a direct, lower energy manifold transfer out to the Sun Earth-Moon (SEM) L2 point. Three mid-course correction (MCC) maneuvers, designated MCC-1, MCC-1b, and MCC-2, were required to provide the energy necessary to reach L2 due to a purposeful biasing down of the launch vehicle. This paper will document the prelaunch preparation, nominal planning, contingency preparation, and successful execution of the three mid-course correction maneuvers.

Maneuver Planning↗

Planning and Execution of the Three Mid-Course Correction Maneuvers for the James Webb Space Telescope

The James Webb Space Telescope (JWST) was successfully launched on December 25, 2021 12:20 UTC on an Ariane 5 rocket out of Kourou, French Guiana on a direct, lower energy manifold transfer out to the Sun Earth-Moon (SEM) L2 point. Three mid-course correction (MCC) maneuvers, designated MCC-1, MCC-1b, and MCC-2, were required to provide the energy necessary to reach L2 due to a purposeful biasing down of the launch vehicle. This paper will document the prelaunch preparation, nominal planning, contingency preparation, and successful execution of the three mid-course correction maneuvers.

Jeremy Peterson↗

The Design, Verification and Performance of the James Webb Space Telescope

The James Webb Space Telescope (JWST) is NASA’s flagship mission successor to the highly successful Hubble Space Telescope. It is an infrared observatory featuring a cryogenic 6.6 m aperture, deployable Optical Telescope Element (OTE) with a payload of four science instruments (SIs) assembled into an Integrated Science Instrument Module (ISIM) that provide imagery and spectroscopy in the near-infrared band between 0.6 and 5 μm and in the mid-infrared band between 5 and 28.1 μm. JWST was successfully launched on 2021 December 25 aboard an Ariane 5 launch vehicle. All 50 major deployments were successfully completed on 2022 January 8. The observatory performed all midcourse correction maneuvers and achieved its operational mission orbit around the Sun–Earth second Lagrange point (L2). All commissioning and calibration activities have been completed, and JWST has begun its science mission. This paper will provide a description of the driving requirements and their technical challenges, the engineering processes involved in the design formulation, the resulting observatory design, the verification programs that proved it to be flightworthy, and the measured on-orbit performance of the observatory. Since companion papers will describe the details of the OTE and SIs, this paper will concentrate on describing the key features of the observatory architecture that accommodates these elements, particularly those features and capabilities associated with accommodating the radiometric and image-quality performance.

Galaxy evolution↗

Status of the James Webb Space Telescope Observatory

The James Webb Space Telescope (JWST) is the largest cryogenic, space telescope ever built, and will address a broad range of scientific goals from first light in the universe and re-ionization, to characterization of the atmospheres of extrasolar planets. Recently, significant progress has been made in the construction of the observatory with the completion of all 21 flight mirrors that comprise the telescope's optical chain, and the start of flight instrument deliveries to the Goddard Space Flight Center. In this paper we discuss the design of the observatory, and focus on the recent milestone achievements in each of the major observatory sub-systems.

James Webb Space Telescope (JWST)↗

Alignment and Testing of Critical Interface Fixtures for the James Webb Space Telescope

NASA's James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy. The JWST Observatory architecture includes the Primary Mirror Backplane Support Structure (PMBSS) and Integrated Science Instrument Module (ISIM) Electronics Compartment (IEC) which is designed to integrate to the spacecraft bus via six cup/cone interfaces. Prior to integration to the spacecraft bus the JWST observatory must undergo environmental testing, handling, and transportation. Multiple fixtures were developed to support these tasks including the vibration fixture and handling and integration fixture (HIF). This work reports on the development of the nominal alignment of the six interfaces and metrology operations performed for the JWST observatory to safely integrate them for successful environmental testing.

technology development↗

Progress in the Fabrication and Testing of Telescope Mirrors for the James Webb Space Telescope

The telescope of the James Webb Space Telescope (JWST) is an f/20, three mirror anastigmat design, passively cooled (40K) in an L2 orbit. The design provides diffraction limited performance (Strehl > or = 0.8) at .=2 m. To fit within the launch vehicle envelope (Arianne V), the 6.6 meter primary mirror and the secondary mirror support structure are folded for launch, then deployed and aligned in space. The primary mirror is composed of 18 individual, 1.3 meter (flat flat) hexagonal segments, each adjustable in seven degrees of freedom (six rigid body + radius of curvature) provided by a set of high precision actuators. The actuated secondary mirror (approx.0.74m) is similarly positioned in six degrees of rigid body motion. The approx..70x.51m, fixed tertiary and approx. 0.17m, flat fine steering mirror complete the telescope mirror complement. The telescope is supported by a composite structure optimized for performance at cryogenic temperatures. All telescope mirrors are made of Be with substantial light-weighting (21 kg for each 1.3M primary segment). Additional Be mounting and supporting structure for the high precision (approx.10nm steps) actuators are attached to the primary segments and secondary mirror. All mirrors undergo a process of thermal stabilization to reduce stress. An extensive series of interferometric measurements guide each step of the polishing process. Final polishing must account for any deformation between the ambient temperature of polishing and the cryogenic, operational temperature. This is accomplished by producing highly precise, cryo deformation target maps of each surface which are incorporated into the final polishing cycle. All flight mirrors have now completed polishing, coating with protected Au and final cryo testing, and the telescope is on track to meet all system requirements. We here review the measured performance of the component mirrors and the predicted performance of the flight telescope.

Bowers, Charles↗