SOMAS: a platform for data-driven material discovery in redox flow battery development

Abstract Aqueous organic redox flow batteries offer an environmentally benign, tunable, and safe route to large-scale energy storage. The energy density is one of the key performance parameters of organic redox flow batteries, which critically depends on the solubility of the redox-active molecule in water. Prediction of aqueous solubility remains a challenge in chemistry. Recently, machine learning models have been developed for molecular properties prediction in chemistry and material science. The fidelity of a machine learning model critically depends on the diversity, accuracy, and abundancy of the training datasets. We build a comprehensive open access organic molecular database “Solubility of Organic Molecules in Aqueous Solution” (SOMAS) containing about 12,000 molecules that covers wider chemical and solubility regimes suitable for aqueous organic redox flow battery development efforts. In addition to experimental solubility, we also provide eight distinctive quantum descriptors including optimized geometry derived from high-throughput density functional theory calculations along with six molecular descriptors for each molecule. SOMAS builds a critical foundation for future efforts in artificial intelligence-based solubility prediction models.

25 ENERGY STORAGE↗

Data-driven prediction of scaling and ignition of inertial confinement fusion experiments

Recent advances in inertial confinement fusion (ICF) at the National Ignition Facility (NIF), including ignition and energy gain, are enabled by a close coupling between experiments and high-fidelity simulations. Neither simulations nor experiments can fully constrain the behavior of ICF implosions on their own, meaning pre- and postshot simulation studies must incorporate experimental data to be reliable. Linking past data with simulations to make predictions for upcoming designs and quantifying the uncertainty in those predictions has been an ongoing challenge in ICF research. We have developed a data-driven approach to prediction and uncertainty quantification that combines large ensembles of simulations with Bayesian inference and deep learning. The approach builds a predictive model for the statistical distribution of key performance parameters, which is jointly informed by past experiments and physics simulations. The prediction distribution captures the impact of experimental uncertainty, expert priors, design changes, and shot-to-shot variations. We have used this new capability to predict a 10× increase in ignition probability between Hybrid-E shots driven with 2.05 MJ compared to 1.9 MJ, and validated our predictions against subsequent experiments. We describe our new Bayesian postshot and prediction capabilities, discuss their application to NIF ignition and validate the results, and finally investigate the impact of data sparsity on our prediction results.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A large millikelvin platform at Fermilab for quantum computing applications

The need for larger mK cooling platforms is being driven by the desire to host ever growing numbers of cryogenic qubits in quantum computing platforms. As part of the Superconducting Quantum Materials and Systems Center at Fermilab funded through the Department of Energy under the National Quantum Initiative, we are developing a cryogenic platform capable of reaching millikelvin temperatures in an experimental volume of 2 meters diameter by approximately 1.5 meters in height. The platform is intended to host a three-dimensional qubit architecture based on superconducting radiofrequency accelerator cavity technologies. This paper describes the baseline design of the platform, along with the expected key performance parameters.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Simons Observatory: characterizing the Large Aperture Telescope Receiver with radio holography

Here, we present near-field radio holography measurements of the Simons Observatory Large Aperture Telescope Receiver optics. These measurements demonstrate that radio holography of complex millimeter-wave optical systems comprising cryogenic lenses, filters, and feed horns can provide detailed characterization of wave propagation before deployment. We used the measured amplitude and phase, at 4 K, of the receiver near-field beam pattern to predict two key performance parameters: 1) the amount of scattered light that will spill past the telescope to 300 K and 2) the beam pattern expected from the receiver when fielded on the telescope. These cryogenic measurements informed the removal of a filter, which led to improved optical efficiency and reduced sidelobes at the exit of the receiver. Holography measurements of this system suggest that the spilled power past the telescope mirrors will be less than 1%, and the main beam with its near sidelobes are consistent with the nominal telescope design. This is the first time such parameters have been confirmed in the lab prior to deployment of a new receiver. This approach is broadly applicable to millimeter and submillimeter instruments.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

DIRECT RF SAMPLING BASED LLRF CONTROL SYSTEM FOR C-BAND LINEAR ACCELERATOR

Low Level RF (LLRF) control systems of linear accel- erators (LINACs) are typically implemented with hetero- dyne based architectures, which have complex analog RF mixers for up and down conversion. The Gen 3 Radio Fre- quency System-on-Chip (RFSoC) device from AMD Xilinx integrates data converters with maximum RF frequency of 6 GHz. This enables direct RF sampling of C-band LLRF signal typically operated at 5.712 GHz without any analogue mixers, which can significantly simplify the system architec- ture. The data converters sample RF signals in higher order Nyquist zones and then up or down convert digitally by the integrated data path in RFSoC. The closed-loop feedback control firmware implemented in FPGA integrated in RF- SoC can process the base-band signal from the ADC data path and calculate the updated phase and amplitude to be up- mixed by the DAC data path. We have developed a C-band LLRF control RFSoC platform with direct RF sampling, which targets Cool Copper Collider (𝐶3) and other C or S band LINAC research and development projects. In this paper, the architecture of the platform will be described. We have optimized the configuration of the data converter and characterized performance of them with RF pulses. The test results for some of the key performance parameters for the LLRF platform with our custom solid-state amplifier, such as phase and amplitude stability, will be discussed in this paper.

Liu, C↗

Enhancement of EM Pump Performance through Modeling and Testing

Liquid sodium has seen development as a nuclear reactor coolant in the United States for over 50 years. While sodium has many desirable characteristics as a heat transfer fluid, its reactivity poses numerous engineering challenges for even the most basic plant components like pumps. Despite the challenges, mechanical pumps have seen success in sodium service albeit at the expense of simplicity and flexibility. In fact, significant failures of these pumps have been recorded which can be attributed to their complexity. Notwithstanding the complexity, mechanical pumps are still widely proposed for the main circuit pump of sodium cooled reactors. However, an alternative to mechanical pumps are Electromagnetic Induction Pumps (EMIPs) which use the principle of the Lorentz Force. EMIPs avoid mechanically moving parts in contact with sodium which simplifies the design by avoiding mechanical wear and seals. Therefore, these pumps are generally safer and more reliable than their mechanical counterparts. That being said, EMIPs suffer from relatively low efficiencies that range from 5% to 45%. Some of the inefficiencies are inherent to the EMIPs pumps; namely, inefficiencies arise in the form of resistive heating losses in the fluid itself. However, other inefficiencies arise from Edge Effects which include Finite Length and Finite Width effects. Due to the significant safety advantages EMIPs have compared to mechanical pumps, there is a strong motivation to integrate these technologies into the design of Generation IV liquid-metal-cooled nuclear power plants. However, EMIPs have low efficiencies partly attributed to Edge Effects. Much of the literature focusing on Edge Effects is dated or simply does not exist in the public domain. More recently, numerical models of EMIPs have shown promising results. However, these models are often custom solvers or use complex software suits which limit their application. This report describes the work completed to understand Edge Effects in two EMIPs designs. These designs are the Annular Linear Induction Pump (ALIP) and Permanent Magnet Induction Pump (PMIP) also known as a Moving Magnet Pump (MMP). The methodology developed during this project aim at measuring key performance parameters (pressure-flowrate and efficiency-slip performance) using high temperature liquid-sodium. Baseline experimental measurements were then used to verify the accuracy of numerical models developed in the software suit ANSYS/FLUENT. On the experimental side, instrumentation was developed to characterize the pressure-flowrate and efficiency-slip performance of both the ALIP and PMIP in high-temperature liquid-sodium. Additionally, instrumentation was developed to measure potential output pressure pulsations and the magnetic field distributions. Moreover, a specialized ALIP was constructed to study the impacts magnetic field tapering, also known as coil grading, on the Finite Length Effect. Lastly, experimental performance curves of the PMIP were collected at 300 oC and 600 oC and compared to analytical theory which accounted for Finite Width Effects. These results showed that the Finite Width Effect and non-uniform magnetic field in a PMIP impact the performance. On the numerical side, models were developed using the software suit FLUENT/ANSYS. These methods were initially compared against a simple MHD flow in a Permanent Magnet Electromagnet Flowmeter (PMEMFM). The results were significant in that they showed agreeance between the numerical model and demonstrated that PMEMFM’s could be calibrated numerically. These modeling methods were then applied to a prototypic PMIP. Results showed that this simple model provided reasonably accurate results of the PMIP p-Q performance.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Numerical and Analytical Modeling of the Effect of Cracks on the Self-Inductance of a COTS YJ-41003-TC Toroid

COTS inductors and transformers often contain partial cracks whose effect on inductance, a key performance parameter, have not been carefully studied. In this report, the effects of both partial and complete cracks on the self-inductance of a 100 turn square cross section COTS YJ-41003-TC toroid comprised of J Material was comprehensively investigated using both analytically derived closed form expressions and 3D computational techniques employing commercial codes. Both partial (half-penny) and complete (air gap) cracks of 10 and 25 μm were investigated. The crack is defined as the physical distance between two faces of the toroid's magnetic core, such that the surface normal of either face is along the Φ-direction, in alignment with the B-field. For the purposes of validation, two different approaches were incorporated for both the analytical and numerical models. The two analytical methods are comprised of a first principles approach based on the physics of electromagnetics, as well as linear circuit theory. The former directly utilizes the integral form of Maxwell's equations while the latter exploits the interchangeable relationship between electric and magnetic circuits. Validation within the computational scheme is realized through a code-to-code comparison between commercial solvers, COMSOL Multiphysics and CST, with the former employing the Finite Element Method (FEM) and the latter the Finite Difference Time Domain (FDTD) technique. Sound agreement between all four methods (ie., two analytical and two numerical) is observed, with results indicating that only a perturbation in self-inductance occurs for the half-penny cracks, while a substantial reduction takes place for the case of complete cracks. It is important to note that even though a static μ r is applied, representing the linear region of the BH curve (based on manufacturer specifications), the complete crack results still place a lower conservative bound on the inductance. This follows from the fact that even in the case of a half-penny crack, if the magnetic core portion of the crack approaches saturation, the crack begins to behave like an air gap, or complete crack. When an air gap is introduced into a magnetic core, a substantial reduction in inductance can occur due to the significant difference in permeabilities between the two mediums (ie., μ core >> μ air ). The once intact bulk magnetic core of the toroid essentially begins to behave like an air core.

36 MATERIALS SCIENCE↗

Summary of the CeC Experiment in RHIC Run 21

The coherent electron cooling (CeC) experiment at RHIC is crucial for determining the feasibility of this technique for cooling the hadron beam in the electron-ion collider (EIC) and reaching the luminosity of 10 34 cm -1 s -1 . During RHIC Run 21, various progresses have been made including successfully commissioning the time resolved diagnostic beam line (TRDBL), achieving the key performance parameters (KPP) of the system and the development of novel methods for accurate alignment of the electron beam with the ion beam. While the longitudinal cooling of the ion beam with cooling time of 100 hours was observed during Run 21, it was related to the traditional electron cooling since the cooling rate was not as sensitive to the energy of the electron beam as what one would expect from the CeC. In Run 21, we were not able to observe the longitudinal cooling of the ion beam caused by CeC and the main challenges are identified as the insufficient stability of the electrons' energy. The sources of the energy jitter have been identified and we are making improvements to the stability of the CeC system for Run 22.

43 PARTICLE ACCELERATORS↗

Combined Cycle Integrated Thermal Energy Storage “CiTES” (Final Scientific/Technical Report)

The Phase I of this project confirmed the technical feasibility of a Combined Cycle integrated Thermal Energy Storage “CiTES” system, calculated the key performance parameters like power efficiency and costs, and proved its commercial value with full-year simulations for several US electricity markets with high degree of variable renewable generation and volatile hourly electricity prices. The core element of this project is the Electro Thermal Energy Storage (ETES) technology from Siemens Gamesa Renewable Energy GmbH, using thermally stable and inexpensive volcanic rocks as storage material and air as heat transfer medium. This technology is backed by more than 10 years of experience and a 440MMBTU (130MWh-th) pilot plant in Hamburg, Germany, which is in operation since 2019. The integration of this thermal storage in an existing combined cycle power plant (CCPP) is typical power plant technology without any major technology risks. It allows the storage of inexpensive renewable energy during times of surplus renewable generation and the discharge of this energy in times of high energy demand when the fossil plant is in operation. This supplements the fossil power generation with CO2-emission-free energy. The secondary effect of the CiTES system is that a small part of the stored thermal energy is used to keep the heat recovery steam generator (HRSG) and steam turbine (ST) of the combined cycle power plant in hot and ready-to-start condition. This enables the plant to start rapidly when fossil generation is required to satisfy demand as soon variable generation drops off in the evenings or during cloud cover and calm wind periods. Without pre-warming of the HRSG and ST, the CCPP would need several hours for a cold or warm start, burn a lot of gas and release high NOx emissions during start and wouldn’t be able to use the short times of high energy prices in an efficient or economical manner. The economic parameters of CiTES were determined by a full year “8760” simulation using a data set calculation for each of the hours of the year, and historical electricity and gas prices. For consistency, the simulations were focused on the pre-COVID year 2019. The financially most attractive markets were in the Energy Reliability Council of Texas (ERCOT) region, which allowed substantial value generation with arbitrage (charge with cheap energy during renewable surplus times and discharge when energy is needed and expensive). The improvement of flexibility with the CiTES system by pre-heating and warm-keeping of the CCPP allowed for additional power generation during short time periods when demand is high but renewable generation is down; when the hourly energy prices are highest in these markets. The simulations are based on 2019 data, when ERCOT had 27GW of installed photovoltaic (PV) and wind generation. They showed that the created revenue with the prototypically sized CiTES system of 1,000MMBTU (300MWh-th) falls a little bit short of what is expected from a commercially viable investment. The system has optimization opportunities for cost reduction and increased effectiveness which will be realized during a potential Phase II Pre-FEED study following this project. Furthermore, it is safe to assume that a lot of renewable generation capacity will be added all over the US in the coming years. As an example, ERCOT is predicting to more than double its renewable generation from 27GW in 2019 to a forecasted 63GW in 2023. This will increase the amount of renewable overproduction exponentially. This rapid increase of local overproduction and the need to curtail renewable generation is well documented by the California ISO (www.CAISO.com / managing oversupply). However, the simulations also revealed a weakness in the structure of the electricity markets in the US. More specifically, when electricity prices are very low and approaching negative levels, the owners of Variable Renewable Energy (VRE) will curtail a part of their facility to stabilize the price by reducing supply. This results in a situation in which storage facilities, which are integrated in existing fossil assets and don’t have the behind-the-meter benefit of a VRE, won’t be able to purchase low cost – otherwise curtailed – renewable energy off the grid. A special tariff, which motivates VRE owners to sell otherwise curtailed renewable energy to storage facilities (Hydrogen, thermal, pumped hydro, etc.) can solve this issue. The implementation of such a regulating tariff by Independent System Operators, thus avoiding renewable curtailment, is a pre condition for successful commercialization for renewable energy storage technologies. With this advancement of design and technology and improvements in the market environment, it can be expected that the Combined Cycle integrated Thermal Energy Storage proves itself as an important innovation to keep highly efficient, natural gas-based power generation economically successful and relevant for the power industry in the United States of America.

Wolf, Thorsten↗

Direct Laser Impulse (DLI) System Alignment: Requirements Engineering Project

The National Ignition Facility (NIF) is the world’s largest and most energetic laser, and it is comprised of 192 laser beams that must align onto one target for the purpose of learning about Internal Confinement Fusion (ICF) and High Energy Density (HED) physics. A new NIF capability under development is the Direct Laser Impulse (DLI). The DLI capability will provide a test environment where high pulsed laser energy is delivered to a three-dimensional target. Achieving this delivery to target relies on a precision alignment and positioning of the two redirected NIF beams, as shown in Figure 1. When aligned, the two combined beams—with a frequency converted from infrared (IR) to green laser light, at a fluence (energy per unit area) of roughly 20 joules per square centimeter—will be capable of delivering up to 30 kilojoules of direct, unfocused energy to a one cubic foot target. The 40-cm x 40-cm aligned impulse area at the DLI target interaction plane (TIP) is achieved by using a beam path comprised of pickoff and transport mirrors, frequency conversion crystals, optics serving as environmental barriers, and debris shields. A separate aligned diagnostic beam path is also required for impulse to TIP characterization. Final in-situ alignment is required for the two populated diverted NIF beam paths onto the DLI target as well as the diagnostic optical beam path. Existing NIF alignment subsystems do not offer references that meet DLI’s unique demand. The new DLI Red Box, which has been designed to allow for alignment, has been shown to require deviation from the intended configuration and operational use case to obtain adequate functionality. A systems engineering evaluation has identified a solution that meets the stakeholder requirements while optimizing key performance parameters. The solution, referred to in this document as the Red Box “+” Rotated, was determined to be an improved version of the current DLI Red Box. This system offers improved system repeatability and alignment stability while maintaining similar interfaces and decreasing the demand for engineer/operator interaction.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Application Results on Early Exascale Hardware

This Exascale Computing Project (ECP) milestone report summarizes the status of 27 of the 31 ECP Applications Development (AD) subprojects at the end of FY21. In November and December of 2021, a comprehensive assessment of AD projects was conducted by the ECP leadership along with external subject matter experts (SMEs). (NNSA application projects are reviewed separately using the ASC milestone process.) The AD review committee—consisting of the AD lead, AD deputy, Level 3 (L3), and at least one external project SME—was tasked with evaluating each project’s progress relative to ECP project goals specified in the FY21 timeline. Key areas of focus were code maturity and performance on pre-exascale systems, an in-depth analysis of final key performance parameter (KPP) verification contracts, and future R&D priorities in the final year of ECP and beyond. As such, this report contains not only an accurate snapshot of each subproject’s current status but also represents a broad account of successes and challenges in porting large scientific applications to DOE’s next-generation high-performance computing architectures – the Frontier and Aurora systems.

97 MATHEMATICS AND COMPUTING↗

LAMP Technical Readiness Evaluation Report (Rev. 1)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed. Corresponding Technical Readiness Levels (TRLs) were also determined for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Only two subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

Concrete Thermal Energy Storage Enabling Flexible Operation without Coal Plant Cycling

The work described in this report is responsive to the Office of Fossil Energy program “Energy Storage for Fossil Power Generation.” The pilot plant built as a result of this project demonstrated the feasibility and performance of a concrete thermal energy storage (CTES) system integrated with a supercritical coal power plant. The 10 MWh electrical (>25 MWh thermal) CTES unit, developed by Storworks Power, was designed to enable flexible operation of coal plants without cycling damage. The project's key technical achievements showcase a significant advancement in energy storage technology. A modular CTES system using 42 “Bolderblocs” units was successfully designed and constructed at Alabama Power’s Plant Gaston Unit 5, with each block containing embedded stainless-steel coils in specialized, cost-effective high-temperature concrete. The system interfaced seamlessly with the plant's 3500 psig (241 barg), 1000°F (538°C) supercritical steam, demonstrating operational flexibility. Over 86 full cycles, the CTES exhibited rapid charging and discharging capabilities, effectively mimicking steam turbine feed conditions and handling varying load profiles and storage durations. Performance validation confirmed the system's ability to consistently meet design target steam conditions of 75 bar-a and ~400°C for nominal baseline discharge. The concrete material withstood repeated thermal cycling without degradation, validating earlier lab-scale tests. Integration of balance of plant components, including a condensate management system with storage tank and air-cooled condenser, minimized plant interfaces and water consumption. A robust control scheme ensured safe, automated operation across various scenarios. Key learnings from the project were invaluable: 1. Initial concrete drying and commissioning procedures were refined for future deployments, enhancing efficiency in subsequent installations. 2. System flexibility exceeded expectations, with rapid response to changing conditions. 3. Design improvements were identified including optimized insulation and piping that will enhance overall system efficiency in future deployments 4. Full cycle thermal roundtrip efficiencies exceeded 88%. While the roundtrip electrical efficiency was somewhat limited by known challenges using input steam, such constraints may be mitigated by swapping steam for hot air as thermal input. 5. A summary of key performance parameters for the pilot test and predicted performance of a full scale commercial system with specified improvements determined from the pilot are shown in Section 8. The project faced challenges, including COVID-19 delays and host plant availability constraints. However, these were overcome through adaptive planning and execution. The successful management of these obstacles demonstrated the resilience and adaptability of the project team and the robustness of the CTES technology. This successful pilot demonstrates the potential for CTES to enhance coal plant flexibility, supporting grid stability as renewable penetration increases. The validated design and operational data provide a solid foundation for scaling up to utility-scale implementations, potentially transforming how thermal plants operate in evolving energy landscapes. The system's ability to rapidly respond to changing grid conditions while maintaining high efficiency makes it a promising solution for balancing intermittent renewable energy sources. Furthermore, the project highlighted the potential for even greater efficiencies in future iterations. The use of air as an input medium could potentially eliminate the limitations observed with steam input, opening new possibilities for energy storage applications beyond coal plant integration. In conclusion, this pilot project not only achieved its primary goals but also uncovered additional benefits and potential applications of the CTES technology. It represents a significant step forward in addressing the challenges of grid stability and flexibility in an increasingly renewable-driven energy landscape.

01 COAL, LIGNITE, AND PEAT↗

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

Post-DTL Beam Delivery

Ensuring that the beam delivered from the upgraded Front-End (FE) meets the Key Performance Parameters (KPPs) at each user facility is critical to the success of the LANSCE Accelerator Modernization Project (LAMP). For a high-intensity, multi-user facility like LANSCE, compliance with beam loss and radiation thresholds is as important as the charge delivered to each target. While early LAMPF/LANSCE operations relied on iterative tuning to minimize losses from beam halo and tail particles, the new FE may introduce different beam distributions and loss modes—making predictive modeling essential. To manage this, the F2E (Front-End to End) effort is developing detailed particle-tracking models that reflect realistic beamline conditions, including halo formation and expected diagnostic readings. These "snapshot" simulations aim to benchmark live machine performance at a given moment. This will help quantify how beam quality from the new FE will propagate downstream through the facility. Only by validating these models can we confidently assess and mitigate the potential impacts of the LAMP FE on beam delivery. Post-DTL, the beam splits to serve five major user facilities. Historically, low-energy beam transport has been modeled using TRACE, and higher-energy sections with TRANSPORT. These have now been unified into MAD-X format and validated with codes such as Elegant, pyOrbit, XSuite, Impact-Z, and HPSim. The primary focus now is on accurate modeling of full particle distributions (including beam halo) as they traverse the accelerator and beamlines to each experimental station. All models are at various stages of validation with empirical data.

43 PARTICLE ACCELERATORS↗

LAMP Emittance Budget, Rev. 1

This report summarizes the performance limits of the LANSCE Coupled-Cavity Linac (CCL). These results are captured or summarized directly from the references cited. This report was written in support of the LANSCE Modernization Project (LAMP). This brief report summarizes the emittance budget for the LANSCE Modernization Project (LAMP). While the project Key Performance Parameters (KPPs) specify threshold and objective requirements for charge delivered to each experimental area, no upper limits on beam emittances are specified. To maintain low losses in the high-energy section of the LANSCE linac and hands-on maintenance, some upper limits on beam emittance need to be specified for the new LAMP front-end performance. The scope of the LAMP project replaces the injector section and drift-tube linac (DTL) up to 100 MeV of the existing LANSCE linac. This new design replacement will be integrated with the remaining coupled cavity linac (CCL) which makes up most of the accelerator at LANSCE and accelerates the beam to a final energy of 800 MeV. The initial approach that has been used to define an emittance budget for the new LAMP front end is based on recent and historical measured beam emittances at 100 MeV for the three beam types accelerated at LANSCE: H+ (protons for isotope production), LBEG (H- beam for delivery to proton radiography and to the Lujan neutron spallation target, and MPEG (H- beam for delivery to the Weapons Neutron Research facility). The emittance budget (upper limit) for each beam type has been selected to maintain the losses in the CCL to a level approximately equivalent to those observed in present operations to first order. However, the goal of the LAMP project is to improve the quality of the beams injected into the CCL, if possible, thus allowing for higher average current operation while also lowering beam losses and activation at high beam energies. The table below summarizes the beam measurements evaluated and used to establish a conservative emittance budget for LAMP based on known historical beam losses and activation. However, based on estimates of the CCL admittance and the Isotope Production Facility (IPF) beamline acceptance, a more relaxed transverse emittance upper limit of 0.095 π-cm-mrad, rms, normalized may be acceptable at 100 MeV while still meeting the LAMP performance requirements for charge delivery to each LANSCE experimental area and maintaining hands-on maintenance. This upper limit is supported by a recent analysis of operational data. Additionally, the present conceptual LAMP front-end design meets this requirement.

43 PARTICLE ACCELERATORS↗

ALICE-USA Barrel Tracking Upgrade (Project Final Report)

The ALICE-USA Barrel Tracking Upgrade (BTU) project began in 2015 to participate in a major upgrade of the Time Projection Chamber (TPC) and the Inner Tracking System (ITS) of the ALICE Experiment at CERN in Geneva, Switzerland. This upgrade increased the maximum readout rate of the ALICE detector to accommodate the increased heavy ion interaction rates following Long Shutdown 2 of the Large Hadron Collider, and greatly improved the vertexing performance of the detector. The original scope was completed and reviewed in November 2019. The BTU project document BTU.19.v1 "ALICE Barrel Tracking Upgrade Project Closeout / Transition to Operations (2019)" from November 2019 describes the status in detail and is attached as Appendix 1 below. At that point, all delivery milestones had been met on time, all Key Performance Parameters (KPPs) of the project had been satisfied, and the project was under budget. Several subsequent No Cost Extensions (NCEs) supported integration and pre-commissioning of the BTU project deliverables at CERN, as well as study and assessment of performance with Pb-Pb collisions at 50 kHz. The BTU project was successfully completed on 30 September 2024.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

ASEAN Technical Exchange Workshop for System Operators, Regulators, and Policymakers

This presentation provides an in-depth exploration of power system planning, cross-border electricity trading, and battery energy storage systems (BESS), offering actionable insights for system operators, regulators, and policymakers. The first section delves into power system planning and analysis, focusing on capacity expansion models and resource adequacy studies, including their role in optimizing system efficiency, managing emissions, and addressing system reliability risks. Key considerations, such as integration of transmission into generation planning and the forecasting versus optimization of customer distributed energy resources (DER) technologies, are explored. The session highlights critical trade-offs in spatial granularity and model runtimes, as well as the feasibility of aligning distribution investments with capacity expansion efforts. The second section examines cross-border electricity trading, with an emphasis on resource adequacy concepts such as reliability targets, loss of load expectation (LOLE), and planning reserve margins (PRM). Case studies on reserve market design and coordination across US regions provide insights into improving reserve deliverability and managing interregional power balance and congestion. This section also addresses market-to-market congestion management, including advanced strategies for high-voltage direct current (HVDC) optimization and ancillary service delivery. Finally, the presentation covers the rapid evolution of Battery Energy Storage Systems (BESS), highlighting their operational growth, regulatory frameworks, and use cases in grid flexibility, energy storage, and reliability. The discussion focuses on the benefits of BESS for system stability, resilience, and integration of renewable energy, offering insights into its role as a vital component in the transition toward a more sustainable and flexible grid. Key performance parameters, such as throughput, round-trip efficiency, and state of charge, are also examined.