Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch vehicle performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Space Launch System Mobile Launcher Modal Pretest Analysis

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation from the Vehicle Assembly Building out to the launch pad, and provides the launch platform at the launch pad. The previous Saturn/Apollo and Space Shuttle programs had integrated vehicle ground vibration tests of their integrated launch vehicles performed with simulated free-free boundary conditions to experimentally anchor and validate structural and flight controls analysis models. For the Space Launch System program, the Mobile Launcher will be used as the modal test fixture for the ground vibration test of the first Space Launch System flight vehicle, Artemis 1, programmatically referred to as the integrated vehicle modal test. The integrated vehicle modal test of the Artemis 1 integrated launch vehicle will have its core and second stages unfueled while mounted to the Mobile Launcher while inside the Vehicle Assembly Building, which is currently scheduled for the summer of 2020. The Space Launch System program has implemented a building block approach for dynamic model validation. The modal test of the Mobile Launcher is an important part of this building block approach in supporting the integrated vehicle modal test since the Mobile Launcher will serve as a structurally dynamic test fixture whose modes will couple with the modes of the Artemis 1 integrated vehicle. The Mobile Launcher modal test will further support understanding the structural dynamics of the Mobile Launcher and Space Launch System during rollout to the launch pad, which will play a key role in better understanding and prediction of the rollout forces acting on the launch vehicle. The Mobile Launcher modal test is currently scheduled for the summer of 2019. Due to a very tight modal testing schedule, this independent Mobile Launcher modal pretest analysis has been performed to ensure there is a high likelihood of successfully completing the modal test (i.e. identify the primary target modes) using the planned instrumentation, shakers, and excitation types. This paper will discuss this Mobile Launcher modal pretest analysis for its three test configurations and the unique challenges faced due to the Mobile Launcher’s size and weight, which are typically not faced when modal testing aerospace structures.

Akers, James C.↗

COBE On-Orbit Engineering Performance, volume 1

The Cosmic Background Explorer (COBE) was successfully launched on Nov. 18, 1989. The Delta Launch Vehicle performed flawlessly, and observatory deployments occurred as planned. The dewar cover successfully deployed on day 4, as planned, and the cryogen temperature is currently at 1.41 K. All three instruments are operating and acquiring science data, and the Payload Operational Control Center (POCC)/Network support has been excellent. Various performance aspects of the COBE are presented in view graph form.

Source record↗

Seismic Exploration of Small Bodies

As a result of the Phase I study, we have demonstrated that a mission to a smallbody (asteroid, comet) whose objective is to conduct a seismic experiment to understandthe interior structure, can be accomplished with small (<200 kg) spacecraft launched on asmall launch vehicle (Athena IIc).We modeled the seismic response of a small body and calculated that the energynecessary to propagate through the body and be detected by a seismometer. Thesecalculations provide guidance as to the type of energy source that is required. A simpleenergy source similar to a NASA standard initiator (NSI) can be used, although a singleNSI is insufficient. An NSI is an explosive pyrotechnic that is used to sever connectionson spacecraft. Use of such an energy source has illustrated two additional areas of study -anchoring of the source and sensor to the surface and understanding the efficiency ofenergy propagation from the source into the surface.The spacecraft has the ability to carry and deploy a series of source/sensors toconduct the experiment by placing them on the surface. We identified a suite of candidatenear-Earth asteroids as targets and used one 1991VG as the target to calculate the missiontrajectory and ∆V requirements. Spacecraft and launch vehicle performance are launchthat any of the candidates could be reached with appropriate mass and launch margins.Sources and sensors are deployed from arm attached to the spacecraft. Thespacecraft maneuvers next to the target body and presses the sensor against the surfaceand releases it. After emplacing all of the surface packages, the sensors are monitored fora period of time to measure the seismic noise. Finally, the active seismic experiment isconducted.The work conducted during Phase I demonstrates that a small mission can be designed to conduct an active seismic experiment on a small near-Earth body. Whileother targets may require more performance, the basic architecture is viable for anytarget.We have identified a number of specific technical areas that require more detailed study. Those areas are largely focused on the detailed analysis and design of the source mechanism and anchoring it to the surface. Such topics will be part of a Phase IIproposal.

Spacecraft↗

The Galileo Delta-VEGA mission to Jupiter

Project Galileo is to perform a more comprehensive investigation of the Jupiter system than was possible with Voyager. The Galileo spacecraft consists of both a planetary Orbiter and an atmospheric entry Probe. In connection with budgetary considerations and schedule problems, plans concerning the implementation of the project were changed a number of times. For the first seven months of 1982, the project Galileo was baselined as a Delta-VEGA transfer to be launched in 1985 by the Space Shuttle using the U.S. Air Force two-stage IUS as the upper stage augmented by a spacecraft Injection Module. The new mission and systems aspects of this 1985 Galileo Delta-VEGA baseline are compared to the prior 1985 Centaur direct transfer baseline. The techniques developed to virtually restore all the mission science in spite of greatly reduced launch vehicle performance are discussed. In July 1982, the U.S. Government reinstated the Centaur development and stipulated that Galileo be launched by Shuttle/Centaur in 1986.

Oneil, W. J.↗

Algorithm for Determination of Orion Ascent Abort Mode Achievability

For human spaceflight missions, a launch vehicle failure poses the challenge of returning the crew safely to earth through environments that are often much more stressful than the nominal mission. Manned spaceflight vehicles require continuous abort capability throughout the ascent trajectory to protect the crew in the event of a failure of the launch vehicle. To provide continuous abort coverage during the ascent trajectory, different types of Orion abort modes have been developed. If a launch vehicle failure occurs, the crew must be able to quickly and accurately determine the appropriate abort mode to execute. Early in the ascent, while the Launch Abort System (LAS) is attached, abort mode selection is trivial, and any failures will result in a LAS abort. For failures after LAS jettison, the Service Module (SM) effectors are employed to perform abort maneuvers. Several different SM abort mode options are available depending on the current vehicle location and energy state. During this region of flight the selection of the abort mode that maximizes the survivability of the crew becomes non-trivial. To provide the most accurate and timely information to the crew and the onboard abort decision logic, on-board algorithms have been developed to propagate the abort trajectories based on the current launch vehicle performance and to predict the current abort capability of the Orion vehicle. This paper will provide an overview of the algorithm architecture for determining abort achievability as well as the scalar integration scheme that makes the onboard computation possible. Extension of the algorithm to assessing abort coverage impacts from Orion design modifications and launch vehicle trajectory modifications is also presented.

Tedesco, Mark B.↗

Orbit Optimization For The Geospace Electrodynamics Connections (GEC) Mission

Part of NASA's Solar Terrestrial Probe line of missions, the Geospace Electrodynamics Connections (GEC) mission will deploy a formation of three spacecraft to perform in-situ atmospheric research in the low Ionosphere-Thermosphere region. These spacecraft will fly together in a %tring-of-pearls formation with variable spacings ranging from 10 seconds to one-quarter of an orbit at perigee. Over the course of its two-year mission, the three spacecraft will perform ten, 1-week dipping campaigns whereby they maneuver to lower their perigee to near 134 km. Using available launch vehicle performance data, an optimal parking orbit of 222 x 1525 km was found to maximize the dry mass available while providing enough propellant to perform the ten deep-dipping campaigns over its two-year mission. The results were used to create multi-variable contour plots containing the orbit perigee, the orbit apogee, spacecraft dry mass, propellant mass, and T500 (a science data collection figure of merit that tabulates the cumulative time spent below 500 km). These plots illustrate how the mission can trade off science return relative to the cost in dry mass and propellant. Other optimal solutions such as minimum propellant or maximum T500 were found to either limit the science data collection or to be dry mass limiting, respectively. Sensitivity analyses were performed to find new optimal (maximum dry mass) solutions if the number of campaigns changed, if the coefficient of drag (CD) were different, and if the propellant specific impulse were increased. A surprising result showed that the dry mass and T500 were both increased if the number of campaigns decreased. Changes in CD provided the expected results - raising CD lowered both the dry mass and T500 while lowering CD raised both the dry mass and T500. Increases in the propellant specific impulse had the expected outcome of raising the dry mass and lowering the propellant load but there was no change in the T500 figure of merit. The orbit optimization was performed parametrically using a Matlab(TradeMark) script and validated using FreeFlyer(TradeMark), a commercial orbit analysis tool. ,

Mesarch, Michael A.↗

Commercial Research and Development: Power to Explore, Opportunities from Discovery

The technical and economic goals of commercial use of space are laudable, and are addressed as a high priority by almost every national space program and most major aerospace companies the world over. Yet, the focus of most organizational agendas and discussions tends to focus on one or two very narrow enabling aspects of this potentially large technological and economic opportunity. While government sponsored commercial launch activities and private space platforms are an integral part of efforts to leverage the commercial use of space, these activities are possibly one of the smallest parts of creating, a viable and sustainable market for the commercial use of space. Most of the current programs usually do not appropriately address some of the critical issues of the current, already interested, potential space user communities. Current programs place the focus of the majority of the user requirements on the vehicle payload weight and mass performance considerations as the primary payload economical factor in providing a commercial market with a stimulating price for gaining access to the space environment. The larger user challenges of transformation from Earth-based research and development approaches to space environment approaches are not addressed early enough in programs to impact the new business considerations of potential users. Currently, space-based research and development user activities require a large user investment in time, in development of new areas of support expertise, in development of new systems, in risk of schedule to completion, and in long term capital positioning. The larger opportunities for stimulating a strong market driven interest in commercial use of space that could result from the development of vehicle payload "leap ahead technologies" for users are being missed, and there is a real risk of limiting the potentially broader market base to support a more technologically advanced and economically lucrative outcome. A major driving force for strengthening the commercial space activities is not only the technological advances in launch vehicle, or newer satellites, but the myriad of enabling payloads technologies that could, as a goal, result in an almost transparent facilitation to regular CD a, -n access to space and microgravity environments by the future users from the existing Earth-based research and development organizations market segments. Rather than focusing only on developing high lift performance launch vehicles and then developing payloads to fit them, the real focus from a business model perspective should to be on the customer payloads requirements, and on designing launch vehicles and platforms systems for a space transportation and facility infrastructure to support all aspects of the business model for the user market. To harness the full potential of space commercialization, new efforts need to be made to comprehensively examine all the critical business model areas for commercial research, development, and manufacturing in space so as to identify specific products and efforts; to determine how such operations must be both similar to and different from current Earth-based activities; to evaluate the enabling technological devices, processes and efforts so that like efforts can be addressed in a synergistic fashion for maximum user cost effectiveness; to delineate the services that are both needed and can be provided by such activities; and to use this information to drive design and development of space commercialization efforts and policy.

Casas, Joseph C.↗

An Up-Close Look at Ares I-X

On October 28, 2009, one day later than the originally planned launch date, the Ares I-X suborbital test flight roared into the Florida sky. Flying its preplanned parabolic arc over the Atlantic, the development test vehicle for the Ares I crew launch vehicle performed as advertised, executing a perfect liftoff, 90-degree roll maneuver, ascent, and separation before its upper and lower stages descended into the ocean 150 miles downrange. This test flight, while carrying no astronauts, marked a major milestone for NASA, which had not flown a test launch of a human-rated rocket since the first flight of the Space Shuttle in 1981. During the flight, over 700 sensors collected over 900 measurements, which NASA will apply to validating the engineering models they used to design the vehicle in the first place. That data, telemetered to the ground and stored in a flight recorder onboard, was the primary "payload" of the mission.

Leahy, Bart↗

Planetary and deep space requirements for photovoltaic solar arrays

In the past 25 years, the majority of interplanetary spacecraft have been powered by nuclear sources. However, as the emphasis on smaller, low cost missions gains momentum, the majority of missions now being planned will use photovoltaic solar arrays. This will present challenges to the solar array builders, inasmuch as planetary requirements usually differ from earth orbital requirements. In addition, these requirements often differ greatly, depending on the specific mission; for example, inner planets vs. outer planets, orbiters vs. flybys, spacecraft vs. landers, and so on. Also, the likelihood of electric propulsion missions will influence the requirements placed on solar array developers. The paper will discuss representative requirements for a range of planetary missions now in the planning stages. Insofar as inner planets are concerned, a Mercury orbiter is being studied with many special requirements. Solar arrays would be exposed to high temperatures and a potentially high radiation environment, and will need to be increasingly pointed off sun as the vehicle approaches Mercury. Identification and development of cell materials and arrays at high incidence angles will be critical to the design. Missions to the outer solar system that have been studied include a Galilean orbiter and a flight to the Kuiper belt. While onboard power requirements would be small (as low as 10 watts), the solar intensity will require relatively large array areas. As a result, such missions will demand extremely compact packaging and low mass structures to conform to launch vehicle constraints. In turn, the large are, low mass designs will impact allowable spacecraft loads. Inflatable array structures, with and without concentration, and multiband gap cells will be considered if available. In general, the highest efficiency cell technologies operable under low intensity, low temperature conditions are needed. Solar arrays will power missions requiring as little as approximately 100 watts, up to several kilowatts (at Earth) in the case of solar electric propulsion missions. Thus, mass and stowage volume minimization will be required over a range of array sizes. Concentrator designs, inflatable structures, and the combination of solar arrays with the telecommunications system have been proposed. Performance, launch vehicle constraints, an cost will be the principal parameters in the design trade space. Other special applications will also be discussed, including requirements relating to planetary landers and probes. In those cases, issues relating to shock loads on landing, operability in (possibly dusty) atmospheres, and extreme temperature cycles must be considered, in addition to performance, stowed volume, and costs.

Bankston, C. P.↗

Guidelines for Developing Spacecraft Structural Requirements: A Thermal and Environmental Perspective

Spacecraft are typically designed with a primary focus on weight in order to meet launch vehicle performance parameters. However, for pressurized and/or man-rated spacecraft, it is also necessary to have an understanding of the vehicle operating environments to properly size the pressure vessel. Proper sizing of the pressure vessel requires an understanding of the space vehicle's life cycle and compares the physical design optimization (weight and launch "cost") to downstream operational complexity and total life cycle cost. This paper will provide an overview of some major environmental design drivers and provide examples for calculating the optimal design pressure versus a selected set of design parameters related to thermal and environmental perspectives. In addition, this paper will provide a generic set of cracking pressures for both positive and negative pressure relief valves that encompasses worst case environmental effects for a variety of launch / landing sites. Finally, several examples are included to highlight pressure relief set points and vehicle weight impacts for a selected set of orbital missions.

Holladay, Jon↗

Auxiliary propulsion technology for advanced Earth-to-orbit vehicles

The payload which can be delivered to orbit by advanced Earth-to-Orbit vehicles is significantly increased by advanced subsystem technology. Any weight which can be saved by advanced subsystem design can be converted to payload at Main Engine Cut Off (MECO) given the same launch vehicle performance. The auxiliary propulsion subsystem and the impetus for the current hydrogen/oxygen technology program is examined. A review of the auxiliary propulsion requirements of advanced Earth-to-Orbit (ETO) vehicles and their proposed missions is given first. Then the performance benefits of hydrogen/oxygen auxiliary propulsion are illustrated using current shuttle data. The proposed auxiliary propulsion subsystem implementation includes liquid hydrogen/liquid oxygen (LH2/LO2) primary Reaction Control System (RCS) engines and gaseous hydrogen/gaseous oxygen (GH2/GO2) vernier RCS engines. A distribution system for the liquid cryogens to the engines is outlined. The possibility of providing one dual-phase engine that can operate on either liquid or gaseous propellants is being explored, as well as the simultaneous firing of redundant primary RCS thrusters to provide Orbital Maneuvering System (OMS) level impulse. Scavenging of propellants from integral main engine tankage is proposed to utilize main engine tank residuals and to combine launch vehicle and subsystem reserves.

Schneider, Steven J.↗

Advanced heavy lift launch vehicles

The performance requirements of advanced technology-incorporating, next-generation heavy lift launch vehicles (HLLVs) for LEO missions are discussed, and the configurational features facilitated by those technologies are evaluated. These 1990s 'cargo' vehicles will capitalize on advanced avionics, software and automation, novel hot structure and thermal insulation materials, and more powerful liquid-fuel rockets employing either hydrogen or hydrocarbons. The configurations considered include a winged booster. The use of Space Shuttle components is a major cost-minimization strategy in many of these HLLV design efforts.

Shelton, Billy W.↗

A study of unmanned mission opportunities to comets and asteroids

Several unmanned multiple-target mission opportunities to comets and asteroids were studied. The targets investigated include Grigg-Skjellerup, Giacobini-Zinner, Tuttle-Giacobini-Kresak, Borrelly, Halley, Schaumasse, Geographos, Eros, Icarus, and Toro, and the trajectories consist of purely ballistic flight, except that powered swingbys and deep space burns are employed when necessary. Optimum solar electric rendezvous trajectories to the comets Giacobini-Zinner/85, Borrelly/87, and Temple (2)/83 and /88 employing the 8.67 kw Sert III spacecraft modified for interplanetary flight were also investigated. The problem of optimizing electric propulsion heliocentric trajectories, including the effects of geocentric launch asymptote declination on launch vehicle performance capability, was formulated, and a solution developed using variational calculus techniques. Improvements were made to the HILTOP trajectory optimization computer program. An error analysis of high-thrust maneuvers involving spin-stabilized spacecraft was developed and applied to a synchronous meteorological satellite mission.

Mann, F. I.↗

Planetary exploration - Earth's new horizon /12th von Karman Lecture/

The article gives an account of the history of unmanned exploration of the planets of the solar system, including both earthbound exploration and exploration with spacecraft. Examples of images of the Martian surface are presented along with images obtained in Jupiter and Mercury flybys. Data are presented on the growth of US launch vehicle performance capability, navigation performance, and planetary data rate capability. Basic information regarding the nature of the scientific experiments aboard the Pioneer and Viking spacecraft is given. A case is put forward for the ongoing exploration of the planets as a worthwhile endeavor for man.

Schurmeier, H. M.↗

Advanced space power requirements and techniques. Task 1: Mission projections and requirements. Volume 3: Appendices

Contents: (1) general study guidelines and assumptions; (2) launch vehicle performance and cost assumptions; (3) satellite programs 1959 to 1979; (4) initiative mission and design characteristics; (5) satellite listing; (6) spacecraft design model; (7) spacecraft cost model; (8) mission cost model; and (9) nominal and optimistic budget program cost summaries.

Wolfe, M. G.↗

LANDSAT-4 post launch report 1

LANDSAT-4 (formerly LANDSAT-D) was launched successfully at 1:59 p.m. EDT on July 16, 1982, from Vandenberg Air Force Base. The Delta 3920 launch vehicle performed flawlessly and placed the satellite into the planned three sigma low orbit of 694 km. The lower orbit was selected to eliminate a retrograde maneuver for the orbit adjust burns necessary to place the satellite into its planned operational 16-day repeat track at 705 km. Spacecraft separation and the initiation of solar array depolyment occurred, over the Indian Ocean tracking station. Spacecraft attitude rates at separation were low, allowing the Earth sensor to immediately acquire the Earth with the momentum wheels and without use of the propulsion system. All systems activated as of noon on July 18, 1982, are performing well with no significant discrepancies reported.

Source record↗

Monte Carlo simulation of launchsite winds at Kennedy Space Center

This paper develops and validates an easily implemented model for simulating random horizontal wind profiles over the Kennedy Space Center (KSC) at Cape Canaveral, Florida. The model is intended for use in Monte Carlo launch vehicle simulations of the type employed in mission planning, where the large number of profiles needed for statistical fidelity of such simulation experiments makes the use of actual wind measurements impractical. The model is based on measurements made at KSC and represents vertical correlations by a decaying exponential model which is parameterized via least-squares parameter optimization against the sample data. The validity of the model is evaluated by comparing two Monte Carlo simulations of an asymmetric, heavy-lift launch vehicle. In the first simulation, the measured wind profiles are used, while in the second, the wind profiles are generated using the stochastic model. The simulations indicate that the use of either the measured or simulated wind field results in similar launch vehicle performance.

Queen, Eric M.↗