Search NASA⌕ Search

SEARCH · Search NASA

Results for “levelized cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Photovoltaic (PV) System Levelized Cost of Energy (LCOE) Evaluation with Grid Support Function Valuation and Service Lifetime Estimation

Photovoltaic (PV) systems play a critical role in renewable energy resource grid integration, and levelized cost of energy (LCOE) is commonly used to evaluate PV system feasibility in modern power grids. In this work, a revised PV system LCOE calculation model is derived to quantify the potential of LCOE reduction. Particularly, the grid support functions are valuated to offset the investment and operation costs of PV systems, which thereby reduces the LCOE. Meanwhile, PV system service lifetime is also estimated with the derived PV inverter reliability model, considering the critical components (i.e., semiconductor devices and capacitors). The case studies with field datasets are conducted to validate the effectiveness of the developed LCOE calculation model.

Zhao, Shijia↗

LOWERING THE LEVELIZED COST OF ELECTRICITY OF A CONCENTRATING SOLAR POWER TOWER WITH A SUPERCRITICAL CARBON DIOXIDE POWER CYCLE

In order to maintain viability as a future power-generating technology, concentrating solar power (CSP) must reduce its levelized cost of electricity (LCOE). The cost of CSP is assessed with the System Advisor Model (SAM) from the National Renewable Energy Laboratory (NREL). The performance of an integrally geared compressor-expander recuperated recompression cycle with supercritical carbon dioxide (sCO2) as the working fluid is modeled. A comparison of the cycle model to the integrated SAM cycle performance is made. The cycle model incorporates innovative cycle control methods to improve the range of efficiency, including inventory control. The SAM model is modified to accommodate the predicted cycle performance. The ultimate goal of minimizing the LCOE is targeted through multiple approaches, including the cost of the power block, the impact of system scale, the sizing of the thermal system relative to the power block system, the operating approach for changes in ambient temperature and availability of sunlight. Through reduced power block cost and a detailed cycle model, the LCOE is modeled to be 5.98 ¢/kWh, achieving targeted techno-economic performance. The LCOE of the CSP system is compared to the cost of hybrid solar and fossil-fired systems. An analysis is made on the efficacy of a fossil backup system with CSP and how that relates to potential future costs of carbon dioxide emissions

schmitt, josh↗

A System-Level Cost Modeling Framework for Design for Remanufacturing: A Case Study of an Agricultural Machine Transmission

Remanufacturing offers significant environmental and economic benefits by restoring end-of-life products to as-new conditions. Although extensive research has been conducted on the topic, the adoption of remanufacturing practices remains limited across various industries. A primary barrier to broader implementation is the substantial upfront investment required, which necessitates reliable cost modeling to justify potential future savings. Most existing models treat components independently and ignore inter-component dependencies. We develop a probabilistic, system-level cost modeling framework that integrates reliability, reusability, and a dependency matrix to capture cascading effects across components over multiple life cycles. Our model identifies those critical components that maximize remanufacturing benefits across a product's many lives. A toy example and an industry case study (John Deere PowrQuad transmission subassembly) illustrate how design alternatives affect cumulative cost. Using a Monte Carlo simulation (MCS) to perform life cycle cost analysis on the system with different design changes, we show the normalized average cost savings after three remanufacturing cycles. Accounting for dependencies meaningfully alters cost projections and ignoring them underestimates accumulated cost by up to 20% in our examples. Furthermore, the results of our study confirm that accounting for component interdependencies is necessary to produce cost estimates that meet industry standards.

Life Cycle Analysis and Design↗

Levelized cost of charging of extreme fast charging with stationary LMO/LTO batteries

Extreme DC fast charging for electric vehicles (EVs) could be competitive with the internal combustion engine refueling experience and enable longer-distance travel, which could help with EV adoption and decarbonization, but these systems have high capital costs and extremely variable high-power demands. Behind-the-meter systems (BTMS) could support extreme-fast-charging (XFC) stations to increase nationwide adoption of EVs. Here, this study examines the optimal break-even levelized cost of charging (LCOC) across 96 BTMS scenarios to enable low-wait XFC stations providing 200 miles of charge in 10 min. This research simulates LCOC via synthetic XFC-capable EV loads, machine-learned battery life models from testing data, and nonlinear optimal controls, co-minimizing complex utility costs and battery replacements. An aggregate optimal BTMS design treating each EV load as equal likely gives an optimal LCOC per utility rate, the average of which is $\$$0.59/kWh. In addition, the sensitivity of optimal and off-optimal design factors, the long-life LMO/LTO chemistry, and optimized controls are analyzed. The battery control model, based on battery stressors to compare chemistries, optimizes LMO/LTO resting state of charge and cycle depth without compromising cost reduction, which enables greater flexibility in operation. The LCOC savings due to replacement reduction are small, up to $\$$0.035/kWh (6%), with an average of $\$$0.02/kWh (3.5%). Compared with gasoline stations, the aggregate XFC station design achieves comparable speed, experience of service, and cost at $\$$3.81/gal gasoline, showing that EVs can replace gasoline vehicles even for longer-distance travel.

25 ENERGY STORAGE↗

Evaluating commercial feasibility of a new tall wind tower design concept using a stochastic levelized cost of energy model

Wind power generation has seen a dramatic increase in the 21st century and the Department of Energy (DOE) envisions that wind energy will become a much larger part of overall power generation in the U.S. by 2050. Wind turbines have continued to grow in size during the last few decades with towers commonly built at a height of 80 m for typical utility-scale turbines in the Unites States, and this is accompanied by certain transportation and logistics challenges. The newly proposed tall tower technology has been designed to be cost-effective in assembling towers as high as 140 m from precast concrete module components that are capable of transport on the U.S. road system. This paper presents an alternative wind tower design with potential for reducing the overall levelized cost of energy (LCOE); it evaluates a hexagonal precast concrete wind tower solution that facilitates use of a taller wind turbine generator for harvesting stronger, steadier, and more frequent wind resources to increase wind energy production and lower the overall LCOE. An integrated team of industry experts was consulted to support development of a stochastic life cycle cost model using a parametric estimate of the cost and fabrication and assembly schedules of this new wind tower design concept as well as forecasting the projected revenue to be created by the new technology. The study concludes that this new design concept is a commercially viable solution, with an estimated LCOE savings ranging from 2% to 4% compared with the typical 80 m turbine deployed in the United States, and it also provides wind power potential to previously untapped regions in the country. This article helps to inform energy developers, manufacturers, and policy makers, both regionally and nationally, of a possible economically feasible wind tower design solution.

17 WIND ENERGY↗

Techno-economic analyses of several redox flow batteries using levelized cost of energy storage

Development of inexpensive long-duration energy storage supports widespread deployment of variable renewable energy resources onto the electricity grid. Flow batteries are a promising class of devices for long-duration energy storage. Techno-economic modeling is needed to evaluate commercial feasibility of existing technologies and to help guide research and development of new technologies. Levelized cost of storage is a useful metric that accounts for capital and operating costs and energy throughput over the life of a project. This metric is used to compare the economic prospects of lithium ion to eight aqueous and two hypothetical nonaqueous flow batteries in four use cases. Finally, flow batteries with inexpensive active materials are favored in long-duration applications.

25 ENERGY STORAGE↗

Control co-design of 13 MW downwind two-bladed rotors to achieve 25% reduction in levelized cost of wind energy

Wind energy is recognized worldwide as cost-effective and environmentally friendly and is among the fastest-growing sources of electrical energy. To further decrease the cost of wind energy, wind turbines are being designed at ever larger scales, which is challenging due to greater structural loads and deflections. Large-scale systems such as modern wind turbines increasingly require a control co-design approach, whereby the system design and control design are performed in a more integrated fashion. We overview a two-bladed downwind morphing rotor concept that is expected to lower the cost of energy at wind turbine sizes beyond 13 megawatts (MW) compared with continued upscaling of traditional three-bladed upwind rotor designs. We describe an aero-structural-control co-design process that we have used in designing such extreme-scale wind turbines, and we discuss how we were able to achieve a 25% reduction in levelized cost of energy for our final turbine design compared to a conventional upwind three-bladed rotor design.

17 WIND ENERGY↗

Modeling Annual Electricity Production and Levelized Cost of Energy from the US East Coast Offshore Wind Energy Lease Areas

Offshore wind energy development along the East Coast of the US is proceeding quickly as a result of large areas with an excellent wind resource, low water depths and proximity to large electricity markets. Careful planning of wind turbine deployments in these offshore wind energy lease areas (LA) is required to maximize power output and to minimize wake losses between neighboring wind farms as well as those internal to each wind farm. Here, we used microscale wind modeling with two wake parameterizations to evaluate the potential annual energy production (AEP) and wake losses in the different LA areas, and we developed and applied a levelized cost of energy (LCoE) model to quantify the impact of different wind turbine layouts on LCoE. The modeling illustrated that if the current suite of LA is subject to deployment of 15 MW wind turbines at a spacing of 1.85 km, they will generate 4 to 4.6% of total national electricity demand. The LCoE ranged from $68 to $102/MWh depending on the precise layout selected, which is cost competitive with many other generation sources. The scale of the wind farms that will be deployed greatly exceed those currently operating and mean that wake-induced power losses are considerable but still relatively poorly constrained. AEP and LCoE exhibited significant dependence on the precise wake model applied. For the largest LA, the AEP differed by over 10% depending on the wake model used, leading to a $10/MWh difference in LCoE for the wind turbine layout with 1.85 km spacing.

58 GEOSCIENCES↗

Levelized Cost of Energy Analysis of Marine and Hydrokinetic Reference Models: Preprint

In 2010 the U.S. Department of Energy initiated the development of six marine energy converter reference models. The reference models are point designs of well-known marine energy converters. Each device was designed to operate in a specific marine resource, instead of a generic device that can be deployed at any location. This method allows each device to be used as a benchmark for future reference model to benchmark future devices. The six designs consist of three current energy converters and three wave energy converters. The reference model project has generated both technical and economic data sets that are available in the public domain. The methodology to calculate the levelized cost of energy for the reference model project and an overall comparison of the cost of energy from these six reference-model designs are presented in this paper.

13 HYDRO ENERGY↗

Concentrating photovoltaic retrofit for existing parabolic trough solar collectors: Design, experiments, and levelized cost of electricity

Photovoltaics and concentrating solar thermal power are two ways for generating electricity from sunlight, albeit through different methods. Parabolic trough style powerplants represent 3.6 GW of electricity production, but many of these plants are aging and being replaced with photovoltaics. An alternative option that could be employed to leverage the sunk capital cost associated with the primary optics would be the design of a pure photovoltaic retrofit working within the existing plant architecture. Here, a secondary optical concentrator is designed to use the existing primary optics of a parabolic trough type solar thermal powerplant. The design is a v-shaped secondary concentrator resulting in a predicted concentration ratio on a 20 mm wide target of 94. The concentrating photovoltaic receiver for retrofit of an RP-3 based parabolic trough has been constructed using multi-junction concentrator photovoltaic cells and experimentally demonstrated here for the first time. Calculated performance of the cells based on cell specifications should result in 31% efficiency at 85 °C. On-sun efficiencies were measured at an average value of 21% with operational temperatures between 55 and 120 °C. Levelized cost of electricity calculations predict the system to have the potential to be below 7¢/kWh based on predicted efficiencies and 13¢/kWh based on the measured values at cell costs of $5/cm 2 .

14 SOLAR ENERGY↗

Exploring Renewable Energy Opportunities in Select Southeast Asian Countries: A Geospatial Analysis of the Levelized Cost of Energy of Utility-Scale Wind and Solar Photovoltaics

The costs of renewable energy-based electricity generation have fallen precipitously in recent years to levels that are increasingly competitive with traditional generation such as fossil fuel-based generation. As these costs become increasingly competitive, private developers, policymakers, and energy system planners are searching for opportunities to harness high-quality renewable energy resources. Developing economies are setting ambitious targets and exploring how cost-effective, grid-connected renewable energy options can help power economic growth and meet growing electricity demands. This includes the member states of the Association of Southeast Asian Nations (ASEAN) that are determined to reach a target of 23% of renewable energy in the region's total primary energy supply by 2025. A critical gap to identifying opportunities and scaling up renewable energy is the lack of quality data and analyses to support decisions on the investment and deployment of renewables - including wind and solar photovoltaics (PV). This work supports decision making by providing high-quality data and spatial analysis of the cost of utility-scale wind and solar PV generation in select countries of Southeast Asia - specifically, the ASEAN member states. Generation costs are expressed as the levelized cost of energy (LCOE) - a commonly used metric that represents the net present value of the unit cost of electricity during the lifetime of a particular electricity generation technology. This is the first spatial estimate of LCOE for these technologies within the ASEAN member states - providing insights into the roles that renewable energy resource quality and other factors may play in generation costs.

14 SOLAR ENERGY↗

Levelized cost and carbon intensity of solar hydrogen production via water splitting using a scalable and intrinsically safe photocatalytic Z-scheme raceway system

Generating hydrogen from local energy resources such as solar or wind would unlock a low-carbon energy carrier that could be used to reduce greenhouse gas emissions in sectors such as industry and transportation. Yet, the allocation of new or existing power generation solely to hydrogen production remains contentious due to disputes regarding emissions accounting. Photocatalytic (PC) hydrogen production technologies offer a unique solution, as hydrogen is produced directly from solar energy and water, without the need for electricity generation. However, cost projections for all photocatalytic designs to date have suggested that they are not cost competitive compared to conventional electrolysis systems manufactured at scale. Herein, we offer the first illustrative benchmark of cost and carbon intensity of hydrogen produced in a type 2 “Z-scheme” photocatalytic reactor design, which employs suspended semiconducting nanoconductor particles organized into two stacked volumes in a raceway design. The “Z-scheme” system utilizes two separate photoabsorber particles, tuned to drive either the hydrogen evolution reaction or the oxygen evolution reaction individually, connected via a reversible, charge transfer redox couple in solution. Furthermore, the results suggest a highly competitive and scalable technology, that justifies further experimental validation and prototyping in the field.

Carbon↗

Survey of State-Level Cost and Benefit Estimates of Renewable Portfolio Standards

Most renewable portfolio standards (RPS) have five or more years of implementation experience, enabling an assessment of their costs and benefits. Understanding RPS costs and benefits is essential for policymakers evaluating existing RPS policies, assessing the need for modifications, and considering new policies. This study provides an overview of methods used to estimate RPS compliance costs and benefits, based on available data and estimates issued by utilities and regulators. Over the 2010-2012 period, average incremental RPS compliance costs in the United States were equivalent to 0.8% of retail electricity rates, although substantial variation exists around this average, both from year-to-year and across states. The methods used by utilities and regulators to estimate incremental compliance costs vary considerably from state to state and a number of states are currently engaged in processes to refine and standardize their approaches to RPS cost calculation. The report finds that state assessments of RPS benefits have most commonly attempted to quantitatively assess avoided emissions and human health benefits, economic development impacts, and wholesale electricity price savings. Compared to the summary of RPS costs, the summary of RPS benefits is more limited, as relatively few states have undertaken detailed benefits estimates, and then only for a few types of potential policy impacts. In some cases, the same impacts may be captured in the assessment of incremental costs. For these reasons, and because methodologies and level of rigor vary widely, direct comparisons between the estimates of benefits and costs are challenging.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar Photovoltaics Resilient Fasteners Levelized Cost of Energy (LCOE) Tool

Solar photovoltaics (PV) module fasteners are one of the most common structural failure points on PV systems, particularly in high winds and coastal areas with ocean spray. Some fastener types have been shown to survive these conditions at higher rates than others. The fastener type, material, quantity, and placement all impact performance. Fasteners that fail less often typically have a higher upfront cost, but this investment can pay off in savings from less frequent torque audits (which reduces O&M costs), reduced system damage, and decreased system downtime. We developed an Excel-based tool to evaluate different module fasteners for a PV system - either a new or retrofit project - and compare differences in upfront and outyear costs to determine the expected life cycle costs and simple payback periods of different fastener options. The tool is site-specific, with inputs including system attributes (such as system size, location, price of power) and fastener attributes (such as design, washer type, nut type, use of locking hardware, materials, installation time, and torque audit requirements). A baseline fastener scenario can be compared to up to four proposed fastener scenarios. In addition to presenting expected life cycle cost implications of the different fastener options, the tool produces results showing the reductions in outyear costs needed to offset any initial cost premiums for more reliable fasteners across four categories: preventative O&M, avoided damage, reduced downtime, and reduced insurance premiums. These numbers can serve as decision aids for users when considering fastener options on new or existing projects. This poster will present the tool, methodology, and scenarios using example sites to highlight the tool capabilities and how it can inform different fastener decisions on different projects. Future work includes incorporating lifetime expected damage costs by embedding damage function curves that the authors are developing from field data.

14 SOLAR ENERGY↗

Estimating the Impact of Residual Value for Electricity Generation Plants on Capital Recovery, Levelized Cost of Energy, and Cost to Consumers

There is often a benefit to continue operating electricity generating assets after their initial contracts expire. This report discusses these benefits and associated risks, using data and illustrative calculations. The key findings are: the realized operational lives of generation technologies before retirement are typically much longer than typical measures of economic lives. The cost impact of a life extension can be comparable to the impact of other factors considered for generation investment decisions, and suggests that R&D and commercial efforts to extend generator life may be valuable. Refurbishment has a useful and economic role, but the option is often neglected during initial investment. Estimating follow-on value at the time of the original investment is complex and often neglected, but may be valuable.

24 POWER TRANSMISSION AND DISTRIBUTION↗