Search NASA⌕ Search

SEARCH · Search NASA

Results for “linear programming problem”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

A linear programming manual

Computer solutions of linear programming problems are outlined. Information covers vector spaces, convex sets, and matrix algebra elements for solving simultaneous linear equations. Dual problems, reduced cost analysis, ranges, and error analysis are illustrated.

Tuey, R. C.↗

SU-E-T-258: Parallel Optimization of Beam Configurations for CyberKnife Treatments

Purpose: The CyberKnife delivers a large number of beams originating at different non-planar positions and with different orientation. We study how much the quality of treatment plans depends on the beams considered during plan optimization. Particularly, we evaluate a new approach to search for optimal treatment plans in parallel by running optimization steps concurrently. Methods: So far, no deterministic, complete and efficient method to select the optimal beam configuration for robotic SRS/SBRT is known. Considering a large candidate beam set increases the likelihood to achieve a good plan, but the optimization problem becomes large and impractical to solve. We have implemented an approach that parallelizes the search by solving multiple linear programming problems concurrently while iteratively resampling zero weighted beams. Each optimization problem contains the same set of constraints but different variables representing candidate beams. The search is synchronized by sharing the resulting basis variables among the parallel optimizations. We demonstrate the utility of the approach based on an actual spinal case with the objective to improve the coverage. Results: The objective function is falling and reaches a value of 5000 after 49, 31, 25 and 15 iterations for 1, 2, 4, and 8 parallel processes. This corresponds to approximately 97% coverage in 77%, 59%, and 36% of the mean number of iterations with one process for 2, 4, and 8 parallel processes, respectively. Overall, coverage increases from approximately 91.5% to approximately 98.5%. Conclusion: While on our current computer with uniform memory access the reduced number of iterations does not translate into a similar speedup, the approach illustrates how to effectively parallelize the search for the optimal beam configuration. The experimental results also indicate that for complex geometries the beam selection is critical for further plan optimization.

07 ISOTOPE AND RADIATION SOURCES↗

Aerospace applications on integer and combinatorial optimization

Research supported by NASA Langley Research Center includes many applications of aerospace design optimization and is conducted by teams of applied mathematicians and aerospace engineers. This paper investigates the benefits from this combined expertise in formulating and solving integer and combinatorial optimization problems. Applications range from the design of large space antennas to interior noise control. A typical problem. for example, seeks the optimal locations for vibration-damping devices on an orbiting platform and is expressed as a mixed/integer linear programming problem with more than 1500 design variables.

Padula, S. L.↗

Aerospace Applications of Integer and Combinatorial Optimization

Research supported by NASA Langley Research Center includes many applications of aerospace design optimization and is conducted by teams of applied mathematicians and aerospace engineers. This paper investigates the benefits from this combined expertise in formulating and solving integer and combinatorial optimization problems. Applications range from the design of large space antennas to interior noise control. A typical problem, for example, seeks the optimal locations for vibration-damping devices on an orbiting platform and is expressed as a mixed/integer linear programming problem with more than 1500 design variables.

Padula, S. L.↗

Aerospace applications of integer and combinatorial optimization

Research supported by NASA Langley Research Center includes many applications of aerospace design optimization and is conducted by teams of applied mathematicians and aerospace engineers. This paper investigates the benefits from this combined expertise in solving combinatorial optimization problems. Applications range from the design of large space antennas to interior noise control. A typical problem, for example, seeks the optimal locations for vibration-damping devices on a large space structure and is expressed as a mixed/integer linear programming problem with more than 1500 design variables.

Padula, S. L.↗

LEISURE: Load-Balanced Network-Wide Traffic Measurement and Monitor Placement

We report that network-wide traffic measurement is of interest to network operators to uncover global network behavior for the management tasks of traffic accounting, debugging or troubleshooting, security, and traffic engineering. Increasingly, sophisticated network measurement tasks such as anomaly detection and security forensic analysis are requiring in-depth fine-grained flow-level measurements. However, performing in-depth per-flow measurements (e.g., detailed payload analysis) is often an expensive process. Given the fast-changing Internet traffic landscape and large traffic volume, a single monitor is not capable of accomplishing the measurement tasks for all applications of interest due to its resource constraint. Moreover, uncovering global network behavior requires network-wide traffic measurements at multiple monitors across the network since traffic measured at any single monitor only provides a partial view and may not be sufficient or accurate. These factors call for coordinated measurements among multiple distributed monitors. In this paper, we present a centralized optimization framework, LEISURE (Load- EqualIzed meaSUREment), for load-balancing network measurement workloads across distributed monitors. Specifically, we consider various load-balancing problems under different objectives and study their extensions to support both fixed and flexible monitor deployment scenarios. We formulate the latter flexible monitor deployment case as an MILP (Mixed Integer Linear Programming) problem and propose several heuristic algorithms to approximate the optimal solution and reduce the computation complexity. We evaluate LEISURE via detailed simulations on Abilene and GEANT network traces to show that LEISURE can achieve much better load-balanced performance (e.g., 4.75 × smaller peak workload and 70 × smaller variance in workloads) across all coordinated monitors in comparison to a naive solution (uniform assignment) to accomplish network-wide traffic measurement tasks under the fixed monitor deployment scenario. Lastly, we also show that under the flexible monitor deployment setting, our heuristic solutions can achieve almost the same load-balancing performance as the optimal solution while reducing the computation times by a factor up to 22.5 × in Abilene and 800 × in GEANT.

42 ENGINEERING↗

Optimal rejection of persistent disturbances, robust stability, and mixed sensitivity minimization

The problem of optimal disturbance rejection of bounded persistent disturbances is solved in the general nonsquare case. The minimum value of the objective function can be obtained by solving a semiinfinite linear programming problem, and an iterative procedure for obtaining approximate solutions is introduced. Application of the l1-optimal problem to robustness is discussed. A mixed sensitivity problem is formulated and shown to guarantee good disturbance rejection in the presence of plant perturbations.

Dahleh, Munther A.↗

Complete Assembly of Circular and Chloroplast Genomes Based on Global Optimization

This paper focuses on the last two stages of genome assembly, namely scaffolding and gap-filling, and shows that they can be solved as part of a single optimization problem. Our approach is based on modeling genome assembly as a problem of finding a simple path in a specific graph that satisfies as many as possible of the distance constraints encoding the insert-size information. We formulate it as a mixed-integer linear programming problem and apply an optimization solver to find the exact solutions on a benchmark of chloroplasts. We show that the presence of repetitions in the set of unitigs is the main reason for the existence of multiple equivalent solutions that are associated to alternative subpaths. We also describe two sufficient conditions and we design efficient algorithms for identifying these subpaths. Comparisons of the results achieved by our tool with the ones obtained with recent assemblers are presented.

59 BASIC BIOLOGICAL SCIENCES↗

Hydropower flexibility valuation tool for flow requirement evaluation

Timing of generation is becoming more and more valuable. This creates greater potential tension between environmental and power system objectives since both systems require their own flow patterns. Identifying win–win outcomes in this context requires being able to discuss the value of flexibility across stakeholder groups. This research proposes a two-stage optimization method to understand hydropower flexibility to meet both environmental and power system requirements. The tool simulates the two-settlement market process in the U.S. by maximizing revenues from both the day-ahead and real-time markets, subject to plant operational limits, regulatory flow and ramping requirements, and uncertainties associated with water availability and market prices. The model is formulated as linear programming problems and solved using IBM ILOG CPLEX optimizer. By examining a range of flow requirements, ramping constraints, and storage capacities, the proposed tool shows how to make more informed decisions to weigh the cost of specific flow requirements in the context of the overall license requirements. Results from the case study show that revenue is more sensitive to the ramping constraints than the minimum flow constraints. We also demonstrate that removing flow constraints in a dry month increases monthly revenue by up to 118%, as opposed to only 1% in a wet month. In addition, our results suggest that using a learning-based water flow forecast results in an increase of monthly revenue up to 6.4% compared with persistence forecast.

13 HYDRO ENERGY↗

Design and analysis of optimal pre-cooling in residential buildings

Existing pre-cooling strategies provide a means of shifting or reducing the peak demand and/or energy cost in residential buildings. However, majority of them are rule-based and therefore may not be optimal in terms of cost saving, leaving room for improvement. In this paper, an integer linear programming problem that accounts for the thermal properties of a specific home, HVAC system capacity, utility rate structure, and weather conditions and makes use of a home thermal model is formulated. This problem determines the HVAC on/off control signal that minimizes the 24-h energy cost while maintaining thermal comfort and calculates the corresponding optimal indoor air temperature. The model is constructed using home thermal properties identified via data training in real-time. Through simulation, the energy performance of the proposed optimal pre-cooling strategy is investigated and compared with three rule-based operation strategies from the literature. It is found that the optimal strategy requires the least energy consumption without sacrificing thermal comfort. The superb energy performance of the optimal strategy is attributed to a longer runtime of the HVAC system in cool outdoor air conditions and to the elimination of deadband in HVAC operation, which is required by the rule-based strategies, to allow the indoor air temperature to stay near the thermal comfort upper bound as much as possible. In terms of energy cost, the rule-based operation strategies require 3.52, 1.90, and 2.79, respectively, while the optimal strategy only requires 1.52. These figures represent a saving of 56.82%, 20.00%, and 45.52%, respectively. The results suggest that the optimal strategy is indeed significantly more effective than the existing rule-based operation strategies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Impact of heating and cooling loads on battery energy storage system sizing in extreme cold climates

Efficient operation of battery energy storage systems requires that battery temperature remains within a specific range. Current techno-economic models neglect the parasitic loads heating and cooling operations have on these devices, assuming they operate at constant temperature. In this work, these effects are investigated considering the optimal sizing of battery energy storage systems when deployed in cold environments. Here, a peak shaving application is presented as a linear programming problem which is then formulated in the PYOMO optimization programming language. The building energy simulation software EnergyPlus is used to model the heating, ventilation, and air conditioning load of the battery energy storage system enclosure. Case studies are conducted for eight locations in the United States considering a nickel manganese cobalt oxide lithium ion battery type and whether the power conversion system is inside or outside the enclosure. The results show an increase of 42% to 300% in energy capacity size, 43% to 217% in power rating, and 43% to 296% increase in capital cost dependent on location. This analysis shows that the heating, ventilation, and air conditioning load can have a large impact on the optimal sizes and cost of a battery energy storage system and merit consideration in techno-economic studies.

25 ENERGY STORAGE↗

Rolling Optimization of Transmission Network Recovery and Load Restoration Considering Hybrid Wind-Storage System and Cold Load Pickup

A common solution to deal with the stochasticity introduced by fast-ramping wind power integration is to equip wind farms (WFs) with energy storage systems (ESSs) to formulate hybrid WF-ESSs. In addition to leveling off wind power fluctuations during normal operations, a hybrid WF-ESS can be a flexible power source to accumulate the power system restoration. In this paper, we propose a rolling optimization model for transmission network recovery and load restoration considering the contributions of WF-ESSs. The proposed model is formulated as a mixed integer linear programming problem that simultaneously optimizes the amount and location of restorable load blocks as well as the restoration lines. The cold load pickup features of interrupted loads considering the outage duration are modeled in detail. A chance-constrained method is employed to deal with the uncertainty of wind power, and a rolling horizon-based framework is adopted to reduce the influence of forecast error. Case studies are conducted on both New England 39-bus system and part of a provincial power system in China. The results show that the load restoration process can be significantly accelerated by employing the proposed method and contributions of hybrid WF-ESSs to power system restoration are validated.

chance-constrained optimization↗

A scalable planning framework of energy storage systems under frequency dynamics constraints

As the penetration of renewables increases in power systems, the declining system inertia can cause frequency stability issues. Battery energy storage systems (BESSs) respond fast and therefore can relieve the low inertia difficulty but need to be appropriately sized considering the associated cost. This paper presents a novel stochastic optimization model for economically planning BESS capacity while considering the spatial–temporal correlation of wind generation and generator outages under frequency stability constraints, which include the rate-of-change of frequency (RoCoF), frequency nadir (FN), and quasi-steady-state (QSS) frequency. A set of new FN constraints that can be easily linearized is developed. To account for renewable uncertainties, a realistic uncertainty modeling approach, Random Field, is adopted to generate wind generation scenarios by considering both spatial and temporal evolutions of wind speed profiles. The ESS sizing is formulated as a mixed-integer linear programming problem and solved by using a scalable decomposition-and-coordination approach, Surrogate Absolute Value Lagrangian Relaxation (SAVLR). To further improve the scalability and reduce computational burdens, a rolling-horizon-based update is developed and incorporated into SAVLR for providing a practical solution to the long-term planning of very large-scale power systems. Finally, a modified IEEE 118-bus system and the Polish system are used to validate the effectiveness and scalability of the model and solution methodology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Accelerating flux balance calculations in genome-scale metabolic models by localizing the application of loopless constraints

Abstract Background Genome-scale metabolic network models and constraint-based modeling techniques have become important tools for analyzing cellular metabolism. Thermodynamically infeasible cycles (TICs) causing unbounded metabolic flux ranges are often encountered. TICs satisfy the mass balance and directionality constraints but violate the second law of thermodynamics. Current practices involve implementing additional constraints to ensure not only optimal but also loopless flux distributions. However, the mixed integer linear programming problems required to solve become computationally intractable for genome-scale metabolic models. Results We aimed to identify the fewest needed constraints sufficient for optimality under the loopless requirement. We found that loopless constraints are required only for the reactions that share elementary flux modes representing TICs with reactions that are part of the objective function. We put forth the concept of localized loopless constraints (LLCs) to enforce this minimal required set of loopless constraints. By combining with a novel procedure for minimal null-space calculation, the computational time for loopless flux variability analysis (ll-FVA) is reduced by a factor of 10–150 compared to the original loopless constraints and by 4–20 times compared to the current fastest method Fast-SNP with the percent improvement increasing with model size. Importantly, LLCs offer a scalable strategy for loopless flux calculations for multi-compartment/multi-organism models of large sizes, for example, shortening the CPU time for ll-FVA from 35 h to less than 2 h for a model with more than104 reactions. Availability and implementation Matlab functions are available in the Supplementary Material or at https://github.com/maranasgroup/lll-FVA Supplementary information Supplementary data are available at Bioinformatics online.

Chan, Siu H. J. (ORCID:000000027707656X)↗

Architectures and Control of Submodule Integrated DC-DC Converters for Photovoltaic Applications

This paper describes photovoltaic (PV) module architectures with parallel-connected submodule-integrated dc-dc converters (subMICs) that improve efficiency of energy capture in the presence of partial shading or other mismatch conditions. The subMICs are bidirectional isolated dc-dc converters capable of injecting or subtracting currents to balance the module substring voltages. When no mismatches are present, the subMICs are simply shut down, resulting in zero insertion losses. It is shown that the objective of minimum subMIC power processing can be solved as a linear programming problem. A simple close-to-optimal distributed control approach is presented that allows autonomous subMIC control without the need for a central controller or any communication among the subMICs. Furthermore, the proposed control approach is well suited for an isolated-port architecture, which yields additional practical advantages including reduced subMIC power and voltage ratings. The architectures and the control approach are validated by simulations and experimental results using three bidirectional flyback subMICs attached to a standard 180-W, 72-cell PV module, yielding greater than 98% module-level power processing efficiency for a mismatch less than 25%.

Olalla, C↗

Fuzzy Energy and Reserve Co-optimization With High Penetration of Renewable Energy

In this study, we propose a fuzzy-based energy and reserve co-optimization model with consideration of high penetration of renewable energy. Under the assumption of a fixed uncertainty set of renewables, a two-stage robust model is proposed for clearing energy and reserves in the first stage and checking the feasibility and robustness of re-dispatches in the second stage. Fuzzy sets and their membership functions are introduced into the optimization model to represent the satisfaction degree of the variable uncertainty sets. The lower bound of the uncertainty set is expressed as fuzzy membership functions. The solutions are obtained by transforming the fuzzy mathematical programming formulation into traditional mixed integer linear programming problems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗