Failure detection and recovery in the assembly/contingency subsystem

The Assembly/Contingency Subsystem (ACS) is the primary communications link on board the Space Station. Any failure in a component of this system or in the external devices through which it communicates with ground-based systems will isolate the Station. The ACS software design includes a failure management capability (ACFM) that provides protocols for failure detection, isolation, and recovery (FDIR). The the ACFM design requirements as outlined in the current ACS software requirements specification document are reviewed. The activities carried out in this review include: (1) an informal, but thorough, end-to-end failure mode and effects analysis of the proposed software architecture for the ACFM; and (2) a prototype of the ACFM software, implemented as a C program under the UNIX operating system. The purpose of this review is to evaluate the FDIR protocols specified in the ACS design and the specifications themselves in light of their use in implementing the ACFM. The basis of failure detection in the ACFM is the loss of signal between the ground and the Station, which (under the appropriate circumstances) will initiate recovery to restore communications. This recovery involves the reconfiguration of the ACS to either a backup set of components or to a degraded communications mode. The initiation of recovery depends largely on the criticality of the failure mode, which is defined by tables in the ACFM and can be modified to provide a measure of flexibility in recovery procedures.

Gantenbein, Rex E.↗

ISS Fiber Optic Failure Investigation Root Cause Report

In August of 1999, Boeing Corporation (Boeing) engineers began investigating failures of optical fiber being used on International Space Station flight hardware. Catastrophic failures of the fiber were linked to a defect in the glass fiber. Following several meetings of Boeing and NASA engineers and managers, Boeing created and led an investigation team, which examined the reliability of the cable installed in the U.S. Lab. NASA Goddard Space Flight Center's Components Technologies and Radiation Effects Branch (GSFC) led a team investigating the root cause of the failures. Information was gathered from: regular telecons and other communications with the investigation team, investigative trips to the cable distributor's plant, the cable manufacturing plant and the fiber manufacturing plant (including a review of build records), destructive and non-destructive testing, and expertise supplied by scientists from Dupont, and Lucent-Bell Laboratories. Several theories were established early on which were not able to completely address the destructive physical analysis and experiential evidence. Lucent suggested hydrofluoric acid (HF) etching of the glass and successfully duplicated the "rocket engine" defect. Strength testing coupled with examination of the low strength break sites linked features in the polyimide coating with latent defect sites. The information provided below explains what was learned about the susceptibility of the pre-cabled fiber to failure when cabled as it was for Space Station and the nature of the latent defects.

Leidecker, Henning↗

Study Of Corrosion Of Lead-Sheathed Cables

Report presents statistical analysis of corrosion failures of lead-sheathed cables that serve as primary communication links at Kennedy Space Center. In study, corrosion-failure data analyzed by use of Weibull distribution in effort to assess effectiveness of cathodic protection and to predict future failures.

Lee, Rupert U.↗

On the Use of Surface Porosity to Reduce Unsteady Lift

An innovative application of existing technology is proposed for attenuating the effects of transient phenomena, such as rotor-stator and rotor-strut interactions, linked to noise and fatigue failure in turbomachinery environments. A computational study was designed to assess the potential of passive porosity technology as a mechanism for alleviating interaction effects by reducing the unsteady lift developed on a stator airfoil subject to wake impingement. The study involved a typical high bypass fan Stator airfoil (solid baseline and several porous configurations), immersed in a free field and exposed to the effects of a transversely moving wake. It was found that, for the airfoil under consideration, the magnitude of the unsteady lift could be reduced more than 18% without incurring significant performance losses.

Tinetti, Ana F.↗

2011 Mars Science Laboratory Launch Period Design

The Mars Science Laboratory mission, set to launch in the fall of 2011, has the primary objective of landing the most advanced rover to date to the surface of Mars to assess whether Mars ever was, or still is today, able to sustain carbon-based life. Arriving at Mars in August 2012, the Mars Science Laboratory will also demonstrate the ability to deliver large payloads to the surface of Mars, land more accurately (than previous missions) in a 20-km by 25-km ellipse, and traverse up to 20 km. Following guided entry and parachute deployment, the spacecraft will descend on a parachute and a Powered Descent Vehicle to safely land the rover on the surface of Mars. The launch/arrival strategy is driven by several key requirements, which include: launch vehicle capability, atmosphere-relative entry speed, communications coverage during Entry, Descent and Landing, latitude accessibility, and dust storm season avoidance. Notable among these requirements is maintaining a telecommunications link from atmospheric entry to landing plus one minute, via a Direct-To-Earth X-band link and via orbital assets using an UHF link, to ensure that any failure during Entry, Descent and Landing can be reconstructed in case of a mission anomaly. Due to concerns related to the lifetime of the relay orbiters, two additional launch/arrival strategies have been developed to improve Entry, Descent, and Landing communications. This paper discusses the final launch/arrival strategy selected prior to the launch period down-selection that is scheduled to occur in August 2011. It is also important to note that this paper is an update to Ref. 1 in that it includes two new Type 1 launch periods and drops the Type 2 launch period that is no longer considered.

mission design↗

Adding a Second Ku-Band Antenna to the International Space Station

The International Space Station, as originally developed, used the Ku-Band Tracking and Data Relay Satellite System communications link to transmit non-critical data to the ground. Since becoming operational, the use for the link evolved to include additional services that, although also not critical, were deemed to be necessary for the crew. The external Ku-Band Antennas were designed for transport to the ISS in the shuttle cargo bay and thus are not suitable for manifesting on any current cargo vehicle. The original intent was to stow two spare antennas on orbit in a protective container until such time as they were needed to replace a failing unit which is a long and complicated process due to the complexity of the removal and replacement procedure. The Boeing Company proposed manifesting one of those spare antennas in an operable configuration eliminating the need for an Extravehicular Activity (EVA) to correct the first failure and as such minimizing the time to hours rather than weeks required to restore the Ku-Band communications link after failures. After the first failure, an EVA would be scheduled to replace the failed antenna with the stowed spare antenna. Because the hot spare is activated internal to the ISS, the replacement of the failed unit can be done when convenient rather than in haste. This paper describes the methodology used to locate a suitable site to add a new antenna mast to the ISS as well the process followed to fabricate, deliver and install the new interface hardware. Because this was not planned when the ISS was originally designed, structural, power, data and Intermediate Frequency signal connections had to be found for use. With the movement of the P6 solar array element from the initial location in the center zenith location of the ISS to the end of the port side of the truss and concurrent relocation of one string of S-Band communications assets, there were candidate power, data and structural connections available on the Z1 Truss. The engineering team evaluated these residual interfaces for use and designed cabling and structural elements for the candidate interfaces. The antenna was recently installed on ULF-4 and has completed a preliminary checkout. Included in this check out were evaluation of the power level received from the TDRS and evaluation of the gimbal position feedback for consideration in the static bias pointing matrix. This process demonstrates the ability to modify and upgrade manned space vehicles as either need or technology requires.

DuSold, Chuck↗

Software-Implemented Fault Tolerance in Communications Systems

Software-implemented fault tolerance (SIFT) is used in many computer-based command, control, and communications (C(3)) systems to provide the nearly continuous availability that they require. In the communications subsystem of Space Station Alpha, SIFT algorithms are used to detect and recover from failures in the data and command link between the Station and its ground support. The paper presents a review of these algorithms and discusses how such techniques can be applied to similar systems found in applications such as manufacturing control, military communications, and programmable devices such as pacemakers. With support from the Tracking and Communication Division of NASA's Johnson Space Center, researchers at the University of Wyoming are developing a testbed for evaluating the effectiveness of these algorithms prior to their deployment. This testbed will be capable of simulating a variety of C(3) system failures and recording the response of the Space Station SIFT algorithms to these failures. The design of this testbed and the applicability of the approach in other environments is described.

Gantenbein, Rex E.↗

Real-Time Wireless Data Acquisition System

Current and future aerospace requirements demand the creation of a new breed of sensing devices, with emphasis on reduced weight, power consumption, and physical size. This new generation of sensors must possess a high degree of intelligence to provide critical data efficiently and in real-time. Intelligence will include self-calibration, self-health assessment, and pre-processing of raw data at the sensor level. Most of these features are already incorporated in the Wireless Sensors Network (SensorNet(TradeMark)), developed by the Instrumentation Group at Kennedy Space Center (KSC). A system based on the SensorNet(TradeMark) architecture consists of data collection point(s) called Central Stations (CS) and intelligent sensors called Remote Stations (RS) where one or more CSs can be accommodated depending on the specific application. The CS's major function is to establish communications with the Remote Stations and to poll each RS for data and health information. The CS also collects, stores and distributes these data to the appropriate systems requiring the information. The system has the ability to perform point-to-point, multi-point and relay mode communications with an autonomous self-diagnosis of each communications link. Upon detection of a communication failure, the system automatically reconfigures to establish new communication paths. These communication paths are automatically and autonomously selected as the best paths by the system based on the existing operating environment. The data acquisition system currently under development at KSC consists of the SensorNet(TradeMark) wireless sensors as the remote stations and the central station called the Radio Frequency Health Node (RFHN). The RFF1N is the central station which remotely communicates with the SensorNet(TradeMark) sensors to control them and to receive data. The system's salient feature is the ability to provide deterministic sensor data with accurate time stamps for both time critical and non-time critical applications. Current wireless standards such as Zigbee(TradeMark) and Bluetooth(Registered TradeMark) do not have these capabilities and can not meet the needs that are provided by the SensorNet technology. Additionally, the system has the ability to automatically reconfigure the wireless communication link to a secondary frequency if interference is encountered and can autonomously search for a sensor that was perceived to be lost using the relay capabilities of the sensors and the secondary frequency. The RFHN and the SensorNet designs are based on modular architectures that allow for future increases in capability and the ability to expand or upgrade with relative ease. The RFHN and SensorNet sensors .can also perform data processing which forms a distributed processing architecture allowing the system to pass along information rather than just sending "raw data points" to the next higher level system. With a relatively small size, weight and power consumption, this system has the potential for both spacecraft and aircraft applications as well as ground applications that require time critical data.

Valencia, Emilio J.↗

Micromolecular modeling

A reaction kinetics based model of the photodegradation process, which measures all important rate constants, and a computerized model capable of predicting the photodegradation rate and failure modes of a 30 year period, were developed. It is shown that the computerized photodegradation model for polyethylene correctly predicts failure of ELVAX 15 and cross linked ELVAX 150 on outdoor exposure. It is indicated that cross linking ethylene vinyl acetate (EVA) does not significantly change its degradation rate. It is shown that the effect of the stabilizer package is approximately equivalent on both polymers. The computerized model indicates that peroxide decomposers and UV absorbers are the most effective stabilizers. It is found that a combination of UV absorbers and a hindered amine light stabilizer (HALS) is the most effective stabilizer system.

Guillet, J. E.↗

Operation of an ADR Using Helium Exchange Gas as a Substitute for a Failed Heat Switch

The Soft X-ray Spectrometer (SXS) is one of four instruments on the Japanese Astro-H mission, which is currently planned for launch in late 2015. The SXS will perform imaging spectroscopy in the soft X-ray band (0.3-12 keV) using a 6 6 pixel array of microcalorimeters cooled to 50 mK. The detectors are cooled by a 3-stage adiabatic demagnetization refrigerator (ADR) that rejects heat to either a superfluid helium tank (at 1.2 K) or to a 4.5 K Joule-Thomson (JT) cryocooler. Four gas-gap heat switches are used in the assembly to manage heat flow between the ADR stages and the heat sinks. The engineering model (EM) ADR was assembled and performance tested at NASA/GSFC in November 2011, and subsequently installed in the EM dewar at Sumitomo Heavy Industries, Japan. During the first cooldown in July 2012, a failure of the heat switch that linked the two colder stages of the ADR to the helium tank was observed. Operation of the ADR requires some mechanism for thermally linking the salt pills to the heat sink, and then thermally isolating them. With the failed heat switch unable to perform this function, an alternate plan was devised which used carefully controlled amounts of exchange gas in the dewar's guard vacuum to facilitate heat exchange. The process was successfully demonstrated in November 2012, allowing the ADR to cool the detectors to 50 mK for hold times in excess of 10 h. This paper describes the exchange-gas-assisted recycling process, and the strategies used to avoid helium contamination of the detectors at low temperature.

Adiabatic demagnetization↗

Experimental Reexamination of Transverse Tensile Strength for IM7/8552 Tape-Laminate Composites

Due to the observed dependence of transverse-tensile strength, YT, on test geometry and specimen size, there is no consensus regarding a test method that can uniquely measure YT. This study reexamines characterization of YT by comparing results from established flexure tests with results from a new tensile test that exhibits consistent failure in the gage region. Additionally, the effects of surface preparation and direction of transverse fracture are investigated. Results show that YT is inversely proportional to specimen volume and surface roughness, and is insensitive to direction of transverse fracture. The relationship between specimen volume and YT is adequately captured by Weibull strength-scaling theory, except at the tails of the YT distributions. However, specimens exhibited microcracking prior to failure, which violates the “weak-link” assumptions of the Weibull theory. These findings highlight the challenges of using deterministic YT values in progressive damage analysis.

Arndt, Caitlin M.↗

Foil Bearing Starting Considerations and Requirements for Rotorcraft Engine Applications

Foil gas bearings under development for rotorcraft-sized, hot core engine applications have been susceptible to damage from the slow acceleration and rates typically encountered during the pre-ignition stage in conventional engines. Recent laboratory failures have been assumed to be directly linked to operating foil bearings below their lift-off speed while following conventional startup procedures for the engines. In each instance, the continuous sliding contact between the foils and shaft was believed to thermally overload the bearing and cause the engines to fail. These failures highlight the need to characterize required acceleration rates and minimum operating speeds for these applications. In this report, startup experiments were conducted with a large, rotorcraft engine sized foil bearing under moderate load and acceleration rates to identify the proper start procedures needed to avoid bearing failure. The results showed that a bearing under a 39.4 kPa static load can withstand a modest acceleration rate of 500 rpm/s and excessive loitering below the bearing lift-off speed provided an adequate solid lubricant is present.

Radil, Kevin C.↗

Failure recovery control for space robotic systems

The problem of controlling a failed joint of a space manipulator is addressed. It is shown that failure-recovery control is possible when dynamic coupling exists between the link whose joint has failed and some other link whose joint is working and when the system inertia matrix is invariant with respect to the failed joint angle. A failure-recovery control technique is developed and applied to two simple examples.

Papadopoulos, Evangelos↗

Fatigue Crack Measurement in Composite Materials by Ultrasonic Methods

The nondestructive detection of intra-ply microcracking in unlined pressure vessels fabricated from composite materials is critical to ensuring mission success. Microcracking in composite structures due to combined fatigue and cryogenic thermal loading can be very troublesome to detect in-service and when it begins to link through the thickness can cause leakage and failure of the structure. These leaks may lead to loss of pressure/propellant, increased risk of explosion and possible cryo-pumping. The work presented herein develops a method and an instrument to locate and measure intraply fatigue cracking through the thickness of laminated composite material by means of correlation with ultrasonic resonance. Resonant ultrasound spectroscopy provides measurements which are, sensitive to both the microscopic and macroscopic properties of an object. Elastic moduli, acoustic attenuation, and geometry can all be probed. The approach is based on the premise of half-wavelength resonance. The method injects a broadband ultrasonic wave into the test structure using a swept frequency technique. This method provides dramatically increased energy input into the test article, as compared to conventional spike pulsed ultrasonics. This relative energy increase improves the ability to measure finer details in the materials character, such as micro-cracking and porosity. As the micro-crack density increases, more interactions occur with the higher frequency (small wavelength) components of the signal train causing the spectrum to shift toward lower frequencies. Preliminary experiments have verified a measurable effect on the resonance spectrum of the ultrasonic data to detect microcracking. Methods involving self organizing neural networks and other clustering algorithms show that the resonance ultrasound signatures from composites vary with the degree of microcracking and can be separated and identified.

Walker, James L.↗

Operational Stability Limits in Rotating Detonation Engine Numerical Simulations

An instability is described which arises in computational fluid dynamic (CFD) simulations of semi-idealized rotating detonation engines (RDE) configured with a throat at the exit. Its existence is verified by examining output from two independently developed CFD codes simulating the same configuration and producing solutions that agree well. The instability is shown to be thermo-acoustic in that a spatial integral of the product of pressure and heat release fluctuations develops a regular oscillation which grows in time. The instability can become severe enough to cause detonation failure. Its onset is shown to be closely linked to the size of the exit throat and the size of the inlet restriction; both parameters that strongly influence RDE performance. It is shown that the instability places a cap on ideal RDEperformance, but that an optimized exhaust throat and inlet restriction combination still yields substantial pressure gain. Other parametric sensitivities are also examined in terms ofinstability growth. These include axial length, inlet manifold pressure, and air-fuel ratio.

Paxson, Daniel E.↗

Performance Characterization of Digital Optical Data Transfer Systems for Use in the Space Radiation Environment

Radiation effects in photonic and microelectronic components can impact the performance of high-speed digital optical data link in a variety of ways. This segment of the short course focuses on radiation effects in digital optical data links operating in the MHz to GHz regime. (Some of the information is applicable to frequencies above and below this regime) The three basic component level effects that should be considered are Total Ionizing Dose (TID), Displacement Damage Dose (DDD) and Single Event Effects (SEE). In some cases the system performance degradation can be quantified from component level tests, while in others a more holistic characterization approach must be taken. In Section 2.0 of this segment of the Short Course we will give a brief overview of the space radiation environment follow by a summary of the basic space radiation effects important for microelectronics and photonics listed above. The last part of this section will give an example of a typical mission radiation environment requirements. Section 3.0 gives an overview of intra-satellite digital optical data link systems. It contains a discussion of the digital optical data link and it's components. Also, we discuss some of the important system performance metrics that are impacted by radiation effects degradation of optical and optoelectronic component performance. Section 4.0 discusses radiation effects in optical and optoelectronic components. While each component effect will be discussed, the focus of this section is on degradation of passive optical components and SEE in photodiodes (other mechanisms are covered in segment II of this short course entitled "Photonic Devices with Complex and Multiple Failure Modes"). Section 5.0 will focus on optical data link system response to the space radiation environment. System level SEE ground testing will be discussed. Then we give a discussion of system level assessment of data link performance when operating in the space radiation environment.

Reed, Robert A.↗

Port-O-Sim Object Simulation Application

Port-O-Sim is a software application that supports engineering modeling and simulation of launch-range systems and subsystems, as well as the vehicles that operate on them. It is flexible, distributed, object-oriented, and realtime. A scripting language is used to configure an array of simulation objects and link them together. The script is contained in a text file, but executed and controlled using a graphical user interface. A set of modules is defined, each with input variables, output variables, and settings. These engineering models can be either linked to each other or run as standalone. The settings can be modified during execution. Since 2001, this application has been used for pre-mission failure mode training for many Range Safety Scenarios. It contains range asset link analysis, develops look-angle data, supports sky-screen site selection, drives GPS (Global Positioning System) and IMU (Inertial Measurement Unit) simulators, and can support conceptual design efforts for multiple flight programs with its capacity for rapid six-degrees-of-freedom model development. Due to the assembly of various object types into one application, the application is applicable across a wide variety of launch range problem domains.

Lanzi, Raymond J.↗

Assessment of Crew Time for Maintenance and Repairs Activities for Lunar Surface Missions

NASA is currently evaluating different methods to predict how much time crewmembers will spend conducting repair and maintenance activities on future space missions. As mission scope and spacecraft architectures change, it will be necessary to understand how crew repair and maintenance timelines are impacted by mission operations and technology changes. Past work has been done using historical ISS data to accurately predict crew habitation and operation timelines, resulting in the development of NASA’s Exploration Crew Time Model (ECTM). However, understanding crew maintenance and repair requirements has posed a unique challenge due to the complexity of available datasets, the probabilistic nature of sub-system failures, and the impacts of reliability growth on failure rates. This paper presents a methodology to collect and condition empirical repair and maintenance time data from available data sets, to extrapolate from that data to estimate projected maintenance and repair times for a lunar Surface Habitat, and to assess how uncertainty in repair time could impact utilization time on the lunar surface. NASA International Space Station (ISS) maintenance and crew time data are logged into two central databases, the Maintenance Data Collection (MDC) and the Operations Planning Timeline Integration System (OPTimIS) respectively. Separately, each of these two datasets capture only portions of the complete set of data required to generate an accurate assessment of crew time spent on maintenance activities at a sub-system level. MDC provides a detailed catalog of failure events and an overview of the failure’s required maintenance and OPTimIS provides a description of crew activities and crew time durations dedicated to maintenance. To create a more useful crew time estimate for maintenance timelines, the authors developed a methodology to capture relevant data from each set and combine and utilize that data by linking crew time requirements to specific components. The authors compare the failure logs in the MDC to crew activity logs pulled from OPTimIS and then process the data to estimate required repair times for each failure event. Data is also classified by the outcome of each repair event, whether the failed component was replaced or whether it was repaired in place. The entire maintenance activity dataset is then categorized based on the class of failed component to allow for a statistically significant sample size for each class and to provide accurate crew time estimates for any components lacking relevant data. This resultant component repair time data can be used in the future to generate Mean Time To Repair (MTTR) estimates and confidence intervals for each class of component based on a probabilistic distribution of documented maintenance events. These improved MTTR values can then be applied to candidate element sub-system architectures, along with component Mean Time Between Failure (MTBF) data to generate distributions for potential required system crew repair time estimates for a given mission. Repair time distributions can then be used to develop more accurate crew schedules and to assess potential available utilization time.