Search NASA⌕ Search

SEARCH · Search NASA

Results for “master planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Improving the effectiveness of planning EIA (PEIA) in China: Integrating planning and assessment during the preparation of Shenzhen's Master Urban Plan

The enactment and implementation of the 2003 EIA Law in China institutionalised the role of plan environmental impact assessment (PEIA). While the philosophy, methodology and mechanisms of PEIA have gradually permeated through the various levels of government with a positive effect on the process and outcome of urban planning, only a few cities in China have so far carried out PEIA as a Strategic Environmental Assessment (SEA)-type procedure. One such case is the southern city of Shenzhen. During the past three decades, Shenzhen has grown from a small town to a large and booming city as China has successfully and rapidly developed its economy by adopting the 'reform and open door' policy. In response to the challenges arising from the generally divergent processes of rapid urbanisation, economic transformation and environment protection, Shenzhen has incrementally adopted the SEA concept in developing the city's Master Urban Plan. As such, this paper reviews the effectiveness of PEIA in three ways: {center_dot}as a tool and process for achieving more sustainable and strategic planning; {center_dot}to determine the level of integration of SEA within the planning system; and, {center_dot}its effectiveness vis-a-vis implementation. The implementation of PEIA within Shenzhen's Master Urban Plan offers important insights into the emergence of innovative practices in undertaking PEIA as well as theoretical contributions to the field, especially in exploring the relationship between PEIA and SEA and highlighting the central role of local governing institutions in SEA development.

54 ENVIRONMENTAL SCIENCES↗

Hood River and Pelton Ladder Evaluation Studies, Annual Report 2000-2001.

The Bonneville Power Administration (BPA) funded the development of two master plans which outline the rationale, and general approach, for implementing a defined group of projects that are an integral part of a comprehensive watershed goal to 'Protect, enhance and restore wild and natural populations of anadromous and resident fish within the Hood River Subbasin'. The Hood River Production Master Plan and the Pelton Ladder Master Plan were completed in 1991 and subsequently approved by the Northwest Power Planning Council in 1992. Action items identified in the two master plans, as well as in a later document entitled 'Hood River/Pelton Ladder Master Agreement' (ODFW and CTWSRO Undated), are designed to achieve two biological fish objectives: (1) to increase production of wild summer and winter steelhead (Oncorhynchus mykiss) to levels commensurate with the subbasins current carrying capacity and (2) re-establishing a self-sustaining population of spring chinook salmon (Oncorhynchus tshawytscha). Numerical fish objectives for subbasin escapement, spawner escapement, and subbasin harvest are defined for each of these species in Coccoli (2000). Several projects are presently funded by the BPA to achieve the Hood River subbasin's numerical fish objectives for summer and winter steelhead and spring chinook salmon. They include BPA project numbers 1998-021-00 (Hood River Fish Habitat), 1998-053-03 (Hood River Production Program - CTWSRO: M&E), 1998-053-07 (Parkdale Fish Facility), 1998-053-08 (Powerdale/Oak Springs O&M), and 1998-053-12 (Hood River Steelhead Genetics Study). Collectively, they are implemented under the umbrella of what has come to be defined as the Hood River Production Program (HRPP). The HRPP is jointly implemented by the Oregon Department of Fish and Wildlife (ODFW) and The Confederated Tribes of the Warm Springs Reservation of Oregon (CTWSRO). Strategies for achieving the HRPP's biological fish objectives for the Hood River subbasin were initially devised based on various assumptions about (1) subbasin carrying capacity, (2) survival rates for selected life history stages, and (3) historic and current escapements of wild, natural, and hatchery stocks of anadromous salmonids to the Hood River subbasin. The Oregon Department of Fish and Wildlife began funding a monitoring and evaluation (M&E) project in December 1991 to collect the quantitative biological information needed to (1) more accurately assess the validity of these assumptions and (2) evaluate the proposed hatchery supplementation component of the HRPP. Bonneville Power Administration assumed funding of the M&E project in August 1992. The M&E project was initially confined to sampling anadromous salmonids escaping to an adult trapping facility operated at Powerdale Dam; which is located at River Mile (RM) 4.5 on the mainstem of the Hood River. Stock specific life history and biological data was collected to (1) monitor subbasin spawner escapements and (2) collect pre-implementation data critical to evaluating the newly proposed HRPP's potential biological impact on indigenous populations of resident fish. The scope of the M&E project was expanded in 1994 to collect the data needed to quantify (1) subbasin smolt production and carrying capacity, (2) smolt to adult survival rates, and (3) the spatial distribution of indigenous populations of summer and winter steelhead, spring and fall chinook salmon, and coho salmon. A creel was incorporated into the M&E project in December 1996 to evaluate the HRPP with respect to its defined subbasin and spawner escapement objectives for Hood River stocks of wild and hatchery summer and winter steelhead and for natural and Deschutes stock hatchery spring chinook salmon. In 1996, the M&E project also began monitoring streamflow at various locations in the Hood River subbasin. Streamflow data will be used to correlate subbasin smolt production with summer streamflows. Data collected from 1991-1999 is reported in the following annual progress reports: Olsen et al. (1994), Olsen et al. (1995), Olsen and French (1996), Olsen et al. (1996), Olsen and French (1999), and Olsen and French (2000). The annual progress reports document information collected on (1) rearing densities of indigenous fish, (2) subbasin steelhead smolt production, (3) post-release survival of acclimated and direct released hatchery summer and winter steelhead smolts, (4) smolt to adult anadromous salmonid survival rates, (5) jack and adult anadromous salmonid escapements and harvest, (6) spatial distribution of adult anadromous salmonid holding in the Hood River subbasin, (7) selected life history patterns and morphological and meristic characteristics of wild, natural, and hatchery resident and anadromous salmonids, and (8) summer streamflows.

13 HYDRO ENERGY↗

Higher Education Energy Planning: Review and Summary

A review of 45 campus energy master plans, climate action plans, and sustainability master plans from different colleges and universities in the U.S., summarizing the differences and similarities and pulling out best practices.

Higher Education, college, university, climate act↗

Accelerating the Deployment of Advanced Energy Communities: The Oakland EcoBlock A Zero Net Energy, Low Water Use Retrofit Neighborhood Demonstration Project

This report describes the design development process and recommendations of a Community-Scale Zero Net Energy Master Plan for a residential block in Oakland, the Oakland EcoBlock. The recommended master plan includes an integrated system of energy efficiency retrofits, a direct current solar/storage/electric vehicle microgrid, alternating/direct current houses, and water efficiency retrofits with rainwater capture. The recommended master plan is projected to be close to zero-net energy (95 percent) for homes, reduce carbon emissions by 65 percent at the block scale (including transportation), and reduce water use 60–70 percent. The integrated system of energy efficiency and a direct current solar/storage/electric vehicle (EV) charging microgrid is the first of its kind at the residential block scale. This breakthrough because the deep energy efficiency retrofit savings free up enough capacity in the solar supply and storage to enable residents to switch from natural gas to electricity for heating and domestic hot water and to provide EV charging for 33 percent of vehicle miles traveled. The savings in household transportation costs are a game changer because when combined with savings in the electric and water utility bills, the total cash flow savings are projected to fund the capital improvements of the proposed systems. This project’s benefits include lower and more predictable utility bills; greater resiliency because the system can operate during outages, and vastly improved indoor air quality by reducing natural gas consumption. The local energy storage reduces peak demand for the utility. California benefits from a model that exceeds the targets for reductions in energy consumption and carbon emissions and the reductions in water use address California’s severe water challenges. The Oakland EcoBlock is a transformative model for accelerating the rapid deployment of advanced energy communities.

decarbonization codes↗

Future operational plans for the National Space Transportation System

In March 1985, the NASA/DOD Space Transportation System Master Plan was published. This document establishes objectives and plans for operating the Space Transportation System (STS) for the next decade. In the present paper, some key points are discussed, and the significance of the weather forecasting capability is indicated. The STS is to become fully operational by the later 1980's and is to support fully the national needs into the mid-1990's. Attention is given to NASA/DOD STS coordination, NASA/DOD STS Master Plan Traffic Models, the Orbiter Launch-Rate Capability, Launch-Rate Capabilities for Shuttle Processing Facilities at Kennedy Space Center, and Launch-Rate Capabilities for Shuttle Processing Facilities at Vandenberg Air Force Base.

Neubauer, C. H., Jr.↗

Chapter 8: Planning Tools to Simulate and Optimize Neighborhood Energy Systems

This section introduces different energy modeling tools available in Europe and the USA for community energy master planning process varying from strategic Urban Energy Planning to more detailed Local Energy Planning. Two modeling tools used for Energy Master Planning of primarily residential communities, the 3D city model with CityGML, and the Net Zero Planner tool developed for the US Department of Defense installations are described in more details.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Comprehensive Land Use and Environmental Stewardship

Comprehensive Land Use and Environmental Stewardship (CLUES) Report serves as a summary document of the land use and environmental stewardship activities occurring on the Idaho National Laboratory (INL) Site (Desert) and the Research and Education Campus (REC) within Idaho Falls. Land and facility use planning and decisions at the INL Site are guided by a comprehensive planning process in accordance with the United States (U.S.) Department of Energy (DOE) Order 430.1C, “Real Property Asset Management,” which states "Establish a data-driven, risk-informed, performance-based approach to the life-cycle management of real property assets that aligns the real property portfolio with DOE mission needs; acquire, manage, positively account for, and dispose of real property assets in a safe, secure, cost-effective, and sustainable manner; and ensure the real property portfolio is appropriately sized, aligned, and in the proper condition to support efficient mission execution." Land use planning, like Campus Master Planning and 5-Year Facility Planning, provides a means for better, more sustainable use of the INL Site in a coordinated effort to ensure current and future mission needs are met, including acquisition, recapitalization, maintenance, disposition, real property utilization and long-term stewardship. This document and all functions of INL are guided by the DOE Vision for INL and the INL Mission and builds on the baseline established in the FY 2015 CLUES Report. However, it delivers a revised structure with focus on new resource management zones, which provide organization of key management considerations and access restrictions to optimize land use and environmental stewardship. A new set of thematic Guiding Principles presented in this report provide the intent and sustainable management direction to protect the INL Site natural environment. They demonstrate that the mission and vision of DOE and INL can be realized with inclusion of first of a kind technology, private sector development, and globally recognized testing and demonstration. This CLUES Report encourages comprehensive management decision-making with additional resource discussions for sustainability, the built environment, and the ecological landscape at the INL Site. Enhanced resource considerations and trends emphasize the importance of air, land use, environmental, subsurface, and cultural resources. The INL Site supports exceptional and interdependent resources. A diversity of bat species are accommodated by culturally significant caves distributed around the Site. Big game species like elk, deer, and moose seek vegetation communities which are protected by long-term stewardship and monitoring programs.

99 GENERAL AND MISCELLANEOUS↗

Integration of Open-Source URBANopt and Dragonfly Energy Modeling Capabilities into Practitioner Workflows for District-Scale Planning and Design

High-performance districts and communities offer opportunities for reducing energy use, emissions, and costs, and can be instrumental in helping cities achieve their climate goals. The design of such communities requires identification of opportunities early on and their re-evaluation throughout the planning process. There is a need for energy modeling tools that connect 3D Computer-Aided Design (CAD) platforms to simulation engines, enabling detailed energy analysis of districts within the workflows and tools used by practitioners. This paper introduces the Dragonfly and URBANoptTM combined toolset that supports the creation of urban models from a range of geometry formats typically used by designers and planners, and provides an integrated pathway to simulate district-scale energy systems. The toolset is piloted by a global architecture and master planning firm to evaluate several key urban-scale technical questions for the design of a district in Chicago. The findings indicate that, while energy savings can be achieved through traditional architectural studies and enhancements to individual building efficiency, the modeling toolset helps identify additional savings and insights that can be achieved when considering district-scale energy systems. Finally, this study demonstrates how the Dragonfly/URBANopt toolset can integrate with master planning workflows, thereby enabling an iterative performance-based design process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L.96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). The UBNPMEP is coordinated with two Oregon Department of Fish and Wildlife (ODFW) research projects that also monitor and evaluate the success of the Umatilla Fisheries Restoration Plan. This project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 1990-005-00, Umatilla Hatchery M & E) and smolt outmigration (project No. 1989-024-01, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan, the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (CTUIR and ODFW 2006). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPCC 2004). The Umatilla Basin M&E plan developed along with efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha), coho salmon (O. kisutch), and enhance summer steelhead (O. mykiss). The need for restoration began with agricultural development in the early 1900's that extirpated salmon and reduced steelhead runs (Bureau of Reclamation, BOR 1988). The most notable development was the construction and operation of Three Mile Falls Dam (TMD) and other irrigation projects which dewatered the Umatilla River during salmon migrations. CTUIR and ODFW developed the Umatilla Hatchery Master Plan to restore fisheries to the basin. The plan was completed in 1990 and included the following objectives which were updated in 1999: (1) Establish hatchery and natural runs of Chinook and coho salmon. (2) Enhance existing summer steelhead populations through a hatchery program. (3) Provide sustainable tribal and non-tribal harvest of salmon and steelhead. (4) Maintain the genetic characteristics of salmonids in the Umatilla River Basin. (5) Increase annual returns to Three Mile Falls Dam to 31,500 adult salmon and steelhead. In the past the M&E project conducted long-term monitoring activities as well as two and three-year projects that address special needs for adaptive management. Examples of these projects include adult passage evaluations, habitat assessment surveys (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998), and genetic monitoring (Currens & Schreck 1995, Narum et al. 2004). The project's goal is to provide quality information to managers and researchers working to restore anadromous salmonids to the Umatilla River Basin. The status of completion of each of BPA's standardized work element was reported in 'Pisces'(March 2008) and is summarized.

13 HYDRO ENERGY↗

Computational Safeguards Analysis of PWR Spent Nuclear Fuel in Dry Storage - 17435

The master plan for spent nuclear fuel (SNF) management in Korea recently adopted by Korean atomic energy promotion council. According to the master plan, the detailed practical and R and D strategies for SNF transferring, storage and disposal should be determined in the near future. Besides, it is also necessary to make plan how to secure SNF at each step in terms of nuclear safeguards, safety, security and nonproliferation. Several nondestructive analysis (NDA) techniques have been studied for assuring the safety of SNF in PWR methods. Obviously, gamma-ray is most dominant radiation emitted by SNF so several gamma-ray measurement methods have been developed and applied for the purpose of SNF monitoring. Those methods, however, suffer from a lack of nuclear data and interfering background radiation. To date, several neutron measurement methods have been developed as a solution to the problem of gamma-ray methods. Korea Institute of Nuclear Nonproliferation and Control (KINAC) currently develops a new novel technique of fast neutron detection for spent fuel monitoring at dry spent fuel storage facilities. As the first step, a computational program has been developed in order to evaluate neutron flux on the surface of PWR dry storage cask and study for some potential sabotage events. Typically, neutron flux on the surface of dry storage cask can be evaluated via two steps. The source term, based on burn-up rate of SNF, its cooling time and others related to operation condition at nuclear power plants, can be firstly defined by ORIGEN code. The surface flux can be then evaluated via MCNP code. These two separated steps are complicated and time consuming so KINAC developed a new algorithm and user-interface, coupled ORIGEN and MCNP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

From Zero Energy Buildings to Zero Energy Districts

Some U.S. cities are planning advanced districts that have goals for zero energy, water, waste, and/or greenhouse gas emissions. From an energy perspective, zero energy districts present unique opportunities to cost-effectively achieve high levels of energy efficiency and renewable energy penetration across a collection of buildings that may be infeasible at the individual building scale. These high levels of performance are accomplished through district energy systems that harness renewable and wasted energy at large scales and flexible building loads that coordinate with variable renewable energy supply. Unfortunately, stakeholders face a lack of documented processes, tools, and best practices to assist them in achieving zero energy districts. The National Renewable Energy Laboratory (NREL) is partnering on two new district projects in Denver: the National Western Center and the Sun Valley Neighborhood. We are working closely with project stakeholders in their zero energy master planning efforts to develop the resources needed to resolve barriers and create replicable processes to support future zero energy district efforts across the United States. Initial results of these efforts include the identification and description of key zero energy district design principles (maximizing building efficiency, solar potential, renewable thermal energy, and load control), economic drivers, and master planning principles. The work has also resulted in NREL making initial enhancements to the U.S. Department of Energy's open source building energy modeling platform (OpenStudio and EnergyPlus) with the long-term goal of supporting the design and optimization of energy districts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SU-F-P-46: Comparative Study Between Two Normalization Prescriptions for Accelerated Partial Breast Irradiation: A Dosimetric Study

Purpose: To compare the Accelerated Partial Breast Irradiation (APBI) plan with the normalized basal dose points and 5mm box prescription. Methods: Five patients of APBI were planned twice in Oncentra Master planning TPS (Version 4.3) using TG-43 algorithm. The number of catheters for all the patients was 10 to 16 and implant plane 2 to 3. For planning all catheters were reconstructed. Source loading was done as per HR-CTV contoured. The HR-CTV volume range was from 75cc to 182cc. Plans were normalized in two methods. First all plans were normalized on Basal dose points (PlanA) and second all the plan were normalized on 5mm box (PlanB). The prescription dose (PD) was 35Gy in 10 fractions. All the plans were completely based on normalization and without optimization. Plan evaluation was based on certain parameters coverage Index (CI), dose homogeneity index (DHI), conformity index (COIN), over dose volume index (OI). Results: The average and median of CI for planA was 0.835 and 0.8154, for planB 0.82 and 0.799 respectively. The median and average of DHI for planA was 0.66 and 0.6062, for planB 0.67 and 0.62 respectively. The range of COIN for planA and planB was from 0.58 to 0.65 respectively. The range of OI was from 0.083 to 0.169 for planA and planB. The treatment time in planA was in average 1.13 times more than planB as V150% of HR-CTV in planA was 4–6% more. The ipsilateral lung was getting 30% of PD which was 0.6% to 3.5%. Conclusion: Treatment Planning should be individualized based on implants characteristics. Planning with prescription to basal dose points should be preferred to 5mm box prescription, in order to achieve better DHI and less treatment time.

60 APPLIED LIFE SCIENCES↗

Environmental Investigations at Former CCC/USDA Facilities: Master Work Plan (Vols 1 and 2)

The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides the CCC/USDA with technical assistance for site characterization investigations and remediation efforts at its former grain storage facilities in Kansas, Nebraska, and Missouri (and possible other states), where carbon tetrachloride is the contaminant of primary concern. Argonne’s environmental investigations at these facilities are based on an expedited approach to site characterization that Argonne developed, which became the basis for Standard D6235-98 (now Standard D62351-18; revised in 2004 and 2018) of the American Society for Testing and Materials (ASTM 2018).

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Yakima/Klickitat Fisheries Project Monitoring and Evaluation, Final Report For the Performance Period May 1, 2008 through April 30, 2009.

The Yakima-Klickitat Fisheries Project (YKFP) is a joint project of the Yakama Nation (lead entity) and the Washington State Department of Fish and Wildlife (WDFW) and is sponsored in large part by the Bonneville Power Administration (BPA) with oversight and guidance from the Northwest Power and Conservation Council (NPCC). It is among the largest and most complex fisheries management projects in the Columbia Basin in terms of data collection and management, physical facilities, habitat enhancement and management, and experimental design and research on fisheries resources. Using principles of adaptive management, the YKFP is attempting to evaluate all stocks historically present in the Yakima subbasin and apply a combination of habitat restoration and hatchery supplementation or reintroduction, to restore the Yakima Subbasin ecosystem with sustainable and harvestable populations of salmon, steelhead and other at-risk species. The original impetus for the YKFP resulted from the landmark fishing disputes of the 1970s, the ensuing legal decisions in United States versus Washington and United States versus Oregon, and the region's realization that lost natural production needed to be mitigated in upriver areas where these losses primarily occurred. The YKFP was first identified in the NPCC's 1982 Fish and Wildlife Program (FWP) and supported in the U.S. v Oregon 1988 Columbia River Fish Management Plan (CRFMP). A draft Master Plan was presented to the NPCC in 1987 and the Preliminary Design Report was presented in 1990. In both circumstances, the NPCC instructed the Yakama Nation, WDFW and BPA to carry out planning functions that addressed uncertainties in regard to the adequacy of hatchery supplementation for meeting production objectives and limiting adverse ecological and genetic impacts. At the same time, the NPCC underscored the importance of using adaptive management principles to manage the direction of the Project. The 1994 FWP reiterated the importance of proceeding with the YKFP because of the added production and learning potential the project would provide. The YKFP is unique in having been designed to rigorously test the efficacy of hatchery supplementation. Given the current dire situation of many salmon and steelhead stocks, and the heavy reliance on artificial propagation as a recovery tool, YKFP monitoring results will have great region-wide significance. Supplementation is envisioned as a means to enhance and sustain the abundance of wild and naturally-spawning populations at levels exceeding the cumulative mortality burden imposed on those populations by habitat degradation and by natural cycles in environmental conditions. A supplementation hatchery is properly operated as an adjunct to the natural production system in a watershed. By fully integrating the hatchery with a naturally-producing population, high survival rates for the component of the population in the hatchery can raise the average abundance of the total population (hatchery component + naturally-producing component) to a level that compensates for the high mortalities imposed by human development activities and fully seeds the natural environment. The objectives of the YKFP are to: use Ecosystem Diagnosis and Treatment (EDT) and other modeling tools to facilitate planning for project activities, enhance existing stocks, re-introduce extirpated stocks, protect and restore habitat in the Yakima Subbasin, and operate using a scientifically rigorous process that will foster application of the knowledge gained about hatchery supplementation and habitat restoration throughout the Columbia River Basin. The YKFP is still in the early stages of evaluation, and as such the data and findings presented in this report should be considered preliminary until results are published in the peer-reviewed literature. The following is a brief summary of current YKFP activities by species.

13 HYDRO ENERGY↗

KTF Sub-Area Plan: Overview & Summary

The KTF Sub-Area Plan is currently under development. Finalization awaits decisions regarding the long-term future of the site. The sub-area plan will build upon previous master plans, facilities and infrastructure (F&I) revitalization plans, and building studies. Planning concepts under consideration are: (1) Replace facilities with a combination of new permanent and non-permanent space; and (2) Complete deferred maintenance at remaining facilities.

99 GENERAL AND MISCELLANEOUS↗

TTR Sub-Area Plan: Overview & Summary

The TTR Sub-Area Plan is currently under development and is significantly influenced by National Nuclear Security Administration (NNSA) decisions about permitting and environmental regulatory compliance issues. The sub-area plan will build upon previous draft master plans, F&I revitalization plans, and building studies. Planning concepts under consideration are: Continue to use and preserve large tracts of land for large-scale mission-related testing; Identify investments to protect, sustain, and recapitalize infrastructure, facilities, and equipment assets; Identify opportunities to dispose of obsolete facilities and consolidate common functions in order to reduce operating costs.

99 GENERAL AND MISCELLANEOUS↗