The Advanced Microwave Sounding Unit-A: Antenna Number 2 Bearing Assembly Life Test

Four bearing assemblies, lubricated with Apiezon C oil with 5% lead naphthenate (PbNp), were life tested in support of the Advanced Microwave Sounding Unit-A (AMSU-A). These assemblies were tested continuously for five to six years using the scanning pattern of the flight instrument. A post-life-test analysis was performed on two of the assemblies to evaluate the lubricant behavior and wear in the bearings.

Powers, Charles E.↗

Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Test Report, Electromagnetic Interference (EMI)/Electromagnetic Radiation(EMR) and Electromagnetic Capability (EMC) for the EOS/AMSU-A1

This document contains the procedure and the test results of the Advanced Microwave Sounding Unit-A (AMSU-A) Earth Observing System (EOS) Project, assembly part number 1356008-1, serial number 202, Electromagnetic Interference (EMI) and Electromagnetic Susceptibility (EMC) qualification test. The test was conducted in accordance with the approved EMI/EMC Test Plan/Procedure, Specification number AE-26151/8B, dated 10 September 1998. Aerojet intends that the presentation and submittal of this document, prepared in accordance with the objectives established by the aforementioned Test Plan/Procedure, document number AE-26151/8B, will satisfy the data requirement with respect to the AMSU-A/EOS instrument operational compliance of the EMI/EMC test requirement. Test for the AMSU-A/EOS instrument have been completed and all the requirements per General Interface Requirement Document (GIRD), GSFC 422-11-12-01, for EOS Common Spacecraft/Instruments, paragraph 10.11, were met with the exceptions of the test methods CE03, RE01, and RE02, as described in this document.

Paliwoda, L.↗

Earth Observing System/Advanced Microwave Sounding Unit-A (EOS/AMSU-A): Reliability prediction report for module A1 (channels 3 through 15) and module A2 (channels 1 and 2)

This report documents the final reliability prediction performed on the Earth Observing System/Advanced Microwave Sounding Unit-A (EOS/AMSU-A). The A1 Module contains Channels 3 through 15, and is referred to herein as 'EOS/AMSU-A1'. The A2 Module contains Channels 1 and 2, and is referred herein as 'EOS/AMSU-A2'. The 'specified' figures were obtained from Aerojet Reports 8897-1 and 9116-1. The predicted reliability figure for the EOS/AMSU-A1 meets the specified value and provides a Mean Time Between Failures (MTBF) of 74,390 hours. The predicted reliability figure for the EOS/AMSU-A2 meets the specified value and provides a MTBF of 193,110 hours.

Geimer, W.↗

Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A): Instrumentation interface control document

This Interface Control Document (ICD) defines the specific details of the complete accomodation information between the Earth Observing System (EOS) PM Spacecraft and the Advanced Microwave Sounding Unit (AMSU-A)Instrument. This is the first submittal of the ICN: it will be updated periodically throughout the life of the program. The next update is planned prior to Critical Design Review (CDR).

Source record↗

Earth Observing System/Meteorological Satellite (EOS/METSAT). Advanced Microwave Sounding Unit-A (AMSU-A) Contamination Control Plan

This Contamination Control Plan is submitted in response the Contract Document requirements List (CDRL) 007 under contract NAS5-32314 for the Earth Observing System (EOS) Advanced Microwave Sounding Unit A (AMSU-A). In response to the CDRL instructions, this document defines the level of cleanliness and methods/procedures to be followed to achieve adequate cleanliness/contamination control, and defines the required approach to maintain cleanliness/contamination control through shipping, observatory integration, test, and flight. This plan is also applicable to the Meteorological Satellite (METSAT) except where requirements are identified as EOS-specific. This plan is based on two key factors: a. The EOS/METSAT AMSU-A Instruments are not highly contamination sensitive. b. Potential contamination of other EOS Instruments is a key concern as addressed in Section 9/0 of the Performance Assurance Requirements for EOS/METSAT Integrated Programs AMSU-A Instrument (MR) (NASA Specification S-480-79).

Fay, M.↗

High spatial resolution passive microwave sounding systems

Two extensive series of flights aboard the ER-2 aircraft were conducted with the MIT 118 GHz imaging spectrometer together with a 53.6 GHz nadir channel and a TV camera record of the mission. Other microwave sensors, including a 183 GHz imaging spectrometer were flown simultaneously by other research groups. Work also continued on evaluating the impact of high-resolution passive microwave soundings upon numerical weather prediction models.

Staelin, D. H.↗

Integrated Advanced Microwave Sounding Unit-A (AMSU-A. Engineering Report: Electromagnetic Interface (EMI)/Electromagnetic Radiation (EMR) and Electromagnetic Compatibility (EMC), for the METSAT/METOP AMSU-A1

This document contains the procedure and the test results of the Advanced Microwave Sounding Unit-A (AMSU-A) Electromagnetic Interference (EMI), Electromagnetic Susceptibility, and Electromagnetic Compatibility (EMC) qualification test for the Meteorological Satellite (METSAT) and the Meteorological Operation Platform (METOP) projects. The test was conducted in accordance with the approved EMI/EMC Test Plan/Procedure, Specification number AE-26151/5D. This document describes the EMI/EMC test performed by Aerojet and it is presented in the following manner: Section-1 contains introductory material and a brief summary of the test results. Section 2 contains more detailed descriptions of the test plan, test procedure, and test results for each type of EMI/EMC test conducted. Section 3 contains supplementary information that includes test data sheets, plots, and calculations collected during the qualification testing.

Valdez, A.↗

Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Performance Verification Report: Final Comprehensive Performance Test Report, P/N 1331720-2TST, S/N 105/A1

This is the Performance Verification Report, Final Comprehensive Performance Test (CPT) Report, for the Integrated Advanced Microwave Sounding Unit-A (AMSU-A). This specification establishes the requirements for the CPT and Limited Performance Test (LPT) of the AMSU-1A, referred to here in as the unit. The sequence in which the several phases of this test procedure shall take place is shown.