Chemical Forms of Mercury in Pyrite: Implications for Predicting Mercury Releases in Acid Mine Drainage Settings
Abstract not provided
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided
We report a complete genome sequence of Acidithiobacillus ferridurans JAGS, determined using PacBio single-molecule real-time (SMRT) sequencing. The circular genome of JAGS (2,933,811 bp; GC content, 58.57%) contains 3,001 protein-coding sequences, 46 tRNAs, and 6 rRNAs. Predicted genes indicate the potential to fix CO 2 and N 2 and to utilize Fe 2+ , S0, and H 2 as energy sources.
In this research effort, three core technologies were evaluated for REE concentration and recovery: (1) Nanofiltration (NF), (2) Electrically conductive membranes for induced rare earth oxide (REO) precipitation, (3) dendrimer-based sorbents for REE capture. The NF showed excellent selectivity between REE components and monovalent ionic salts such as K and Na. For all AMD samples, iron selectivity is a critical challenge since it is the highest concentration bulk constituent. Membrane electrodeposition approach shows promise for scandium and cerium recovery, but iron selectivity not observed. This technology may therefore be more appropriate REE recovery technology for non-iron rich streams such as coal ash. P-dendrimer derived sorbent shows promise for aqueous application, with high sorption capacity for iron demonstrated, and pH tunable selectivity against REE sorption. Although in some cases excellent selectivity for REE was observed, the REE concentrations from all four AMD sites was low enough that the 2wt% final goal was not attained.
Phase 1 research identified a two-step refining train, acid leaching of AMD precipitate feed followed by solvent extraction (SX), to produce a 2% TREE product. For the Phase 2 bench scale system, the objective was to get the acid leaching step to operate in batch-mode with sufficient storage capacity to feed an aqueous, enriched REE liquor to a pilot SX plant operating in continuous-mode at a feed rate capable of producing 3 g/hr 2% TREE. Important process variables included feed rate, extractant makeup, flowsheet configuration, and stripping conditions. Operating parameters were optimized through a feedback-capable SCADA system configured for the SX bench scale plant. These conditions were met and exceeded. TREE grades approaching 90% were produced while our Techno-Economic Assessment indicated highly favorable economic returns. The project led to the design of a pilot facility for producing roughly 500 kg/TREE/year. That plant is now in the procurement stage with constructed expected to begin in late 2020.
Phase 1 research identified a two-step refining train, acid leaching of AMD precipitate feed followed by solvent extraction (SX), to produce a 2% TREE product. For the Phase 2 bench scale system, the objective was to get the acid leaching step to operate in batch-mode with sufficient storage capacity to feed an aqueous, enriched REE liquor to a pilot SX plant operating in continuous-mode at a feed rate capable of producing 3 g/hr 2% TREE. Important process variables included feed rate, extractant makeup, flowsheet configuration, and stripping conditions. Operating parameters were optimized through a feedback-capable SCADA system configured for the SX bench scale plant. These conditions were met and exceeded. TREE grades approaching 90% were produced while our Techno-Economic Assessment indicated highly favorable economic returns. The project led to the design of a pilot facility for producing roughly 500 kg/TREE/year. That plant is now in the procurement stage with constructed expected to begin in late 2020.
Resource Sustainability Project Review Meeting, Pittsburgh, PA, October 25-27, 2022
In this study, micro-X-ray Fluorescence and micro/bulk X-ray Adsorption Near Edge Spectroscopy were collected at Stanford Synchrotron Radiation Lightsource and the Advanced Photon Source to: (1) gain a detailed characterization of critical minerals in Fe/Mn (hydr)oxide host phases; and (2) investigate the Co/Ni coordination and redox speciation associated with Fe/Mn (hydr)oxides phases in AMD solids with diverse composition (e.g., Al-rich, Mn-rich, Al/Mn/Fe-rich). Preliminary results show co-location of Co/Ni within Mn-rich hotspots, while Fe-rich hotspots were associated with heavy REEs. In Al-rich solids, Mn speciation was mostly comprised of Mn+3/+4 oxides, while the Mn-rich solids contain predominately Mn+4. These results suggest the AMD matrix plays an important role in how Co/Ni are coordinated, which aids in evaluating the efficacy to utilize AMD solids as a resource, and informs other novel sorbent and recovery technologies.
This study investigates Co adsorption on synthesized birnessites over a wide pH range and in sulfate-rich solution to simulate CMD treatment conditions. Langmuir and Freundlich adsorption isotherms of Co at pH values of 3.5, 4.5, and 6.5 at 25°C onto Na-and H-birnessite were generated. Cobalt concentrations in supernatants were determined by ICP-MS and chelation ion chromatography. Mineralogy and morphology of pre- and post-adsorption experiment solids characterization by X-ray diffraction and scanning electron microscopy will be presented. These experiments suggest that cobalt sulfate complexes and pH of CMD, as well as the Mn-oxide mineral structures present in treatment beds, will impact cobalt adsorption in CMD solids, and can be used as calibration points for equilibrium and kinetic modeling approaches that are critical for developing effective and implementable remediation processes and to better inform future Co recovery efforts from CMD solids.
Design, construct, and operate a first-of-a-kind demonstration facility capable of producing rare earth elements (REEs) and select critical minerals (CMs) from domestic feedstocks.
Explore the source record for details and available documents.
38th Annual International Pittsburgh Coal Conference, Virtual, September 20-23, 2021
2022 International Pittsburgh Coal Conference, Pittsburgh, PA, September 19-22, 2022
Brazilian Coal Association, Pittsburgh, PA, June 17, 2022
2022 International Pittsburgh Coal Conference, Pittsburgh, PA, September 19-22, 2022
2022 DOE Project Review Meeting, Pittsburgh PA, October 25-27, 2022
For presentation at the Geological Society of America Annual Meeting, October 15-18, 2023.
Abstract not provided
The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.