Search NASA⌕ Search

SEARCH · Search NASA

Results for “mission phases”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Atmospheric constraint statistics for the Space Shuttle mission planning

The procedures used to establish statistics of atmospheric constraints of interest to the Space Shuttle mission planning are presented. The statistics considered are for the frequency of occurrence, runs, and time conditional probabilities of several atmospheric constraints for each of the Space Shuttle mission phases. The mission phases considered are (1) prelaunch, (2) launch operations, (3) return to launch site, (4) abort once around landing, and (5) end of mission landing. Previously announced in STAR as N82-33417

Smith, O. E.↗

Protocol for Communication Networking for Formation Flying

An application-layer protocol and a network architecture have been proposed for data communications among multiple autonomous spacecraft that are required to fly in a precise formation in order to perform scientific observations. The protocol could also be applied to other autonomous vehicles operating in formation, including robotic aircraft, robotic land vehicles, and robotic underwater vehicles. A group of spacecraft or other vehicles to which the protocol applies could be characterized as a precision-formation- flying (PFF) network, and each vehicle could be characterized as a node in the PFF network. In order to support precise formation flying, it would be necessary to establish a corresponding communication network, through which the vehicles could exchange position and orientation data and formation-control commands. The communication network must enable communication during early phases of a mission, when little positional knowledge is available. Particularly during early mission phases, the distances among vehicles may be so large that communication could be achieved only by relaying across multiple links. The large distances and need for omnidirectional coverage would limit communication links to operation at low bandwidth during these mission phases. Once the vehicles were in formation and distances were shorter, the communication network would be required to provide high-bandwidth, low-jitter service to support tight formation-control loops. The proposed protocol and architecture, intended to satisfy the aforementioned and other requirements, are based on a standard layered-reference-model concept. The proposed application protocol would be used in conjunction with conventional network, data-link, and physical-layer protocols. The proposed protocol includes the ubiquitous Institute of Electrical and Electronics Engineers (IEEE) 802.11 medium access control (MAC) protocol to be used in the datalink layer. In addition to its widespread and proven use in diverse local-area networks, this protocol offers both (1) a random- access mode needed for the early PFF deployment phase and (2) a time-bounded-services mode needed during PFF-maintenance operations. Switching between these two modes could be controlled by upper-layer entities using standard link-management mechanisms. Because the early deployment phase of a PFF mission can be expected to involve multihop relaying to achieve network connectivity (see figure), the proposed protocol includes the open shortest path first (OSPF) network protocol that is commonly used in the Internet. Each spacecraft in a PFF network would be in one of seven distinct states as the mission evolved from initial deployment, through coarse formation, and into precise formation. Reconfiguration of the formation to perform different scientific observations would also cause state changes among the network nodes. The application protocol provides for recognition and tracking of the seven states for each node and for protocol changes under specified conditions to adapt the network and satisfy communication requirements associated with the current PFF mission phase. Except during early deployment, when peer-to-peer random access discovery methods would be used, the application protocol provides for operation in a centralized manner.

Jennings, Esther↗

Phase Change Materials for Photonics in NASA Science and Space Missions

Phase change materials (PCMs) such as Ge2Sb2Te5, Ge2Sb2Se4Te1, and Sb2S3have recently emerged as a promising platform to control light on-chip due to their fast, dramatic, and reversible change in refractive index. Significant technical progress in the field has been achieved in terms of improving optical transparency, controlling PCMs both optically and electrically, and integrating with complex photonic circuits, leading to exciting applications. When PCMs are mated with metasurfaces, devices are capable of controlling the phase and amplitude of propagating light with arrays of subwavelength structures. These enhance tunability and reconfigurability and continue to redefine the boundaries of optical sciences. PCM-based metasurface optics also help to accelerate the adoption of new architectures with reduced size, weight, and power (SWaP) for science and space mission platforms at NASA. In this talk, I will introduce two NASA-lead PCM photonic projects: 1. P-ACTIVE (PCM-based actively tunable filter) for broad imaging and sensing applications – from probing molecular vibrations in chemical species to detecting radiant thermal signatures of the space launch system. 2. PROWESS (Phase change reconfigurable optical wavefront synthesis system) as a beam steerer for both Earth and space LiDAR and free space optical communication applications. From this seminar, the attendees will be exposed not only to PCM-based photonic technologies but also NASA missions including the MISSE (Materials on the International Space Station Experiment) test campaign that was conducted to expose PCMs and PCM-based metasurfaces in space for 6 months in 2022.

phase change material↗

Orion Project Crew Module Analyses Summary

This slide presentation reviews the efforts at analyzing the Crew Module (CM) for the Orion Project. The Integrated Thermal Model is described, and the on-orbit analysis for the 4 different mission phases is also described. The four mission phases are: Mission phase (1) Low Earth Orbit (LEO) International Space Station (ISS) mission (2) ISS docked (3) LEO, lunar mission and (4) Low Lunar Orbit (LLO).

Alvarez-Hernandez, Angel↗

Magnetospheric Multiscale (MMS) Mission Commissioning Phase Orbit Determination Error Analysis

The Magnetospheric MultiScale (MMS) mission commissioning phase starts in a 185 km altitude x 12 Earth radii (RE) injection orbit and lasts until the Phase 1 mission orbits and orientation to the Earth-Sun li ne are achieved. During a limited time period in the early part of co mmissioning, five maneuvers are performed to raise the perigee radius to 1.2 R E, with a maneuver every other apogee. The current baseline is for the Goddard Space Flight Center Flight Dynamics Facility to p rovide MMS orbit determination support during the early commissioning phase using all available two-way range and Doppler tracking from bo th the Deep Space Network and Space Network. This paper summarizes th e results from a linear covariance analysis to determine the type and amount of tracking data required to accurately estimate the spacecraf t state, plan each perigee raising maneuver, and support thruster cal ibration during this phase. The primary focus of this study is the na vigation accuracy required to plan the first and the final perigee ra ising maneuvers. Absolute and relative position and velocity error hi stories are generated for all cases and summarized in terms of the ma ximum root-sum-square consider and measurement noise error contributi ons over the definitive and predictive arcs and at discrete times inc luding the maneuver planning and execution times. Details of the meth odology, orbital characteristics, maneuver timeline, error models, and error sensitivities are provided.

Chung, Lauren R.↗

Automatic Command Sequence Generation

Automatic Sequence Generator (Autogen) Version 3.0 software automatically generates command sequences for the Mars Reconnaissance Orbiter (MRO) and several other JPL spacecraft operated by the multi-mission support team. Autogen uses standard JPL sequencing tools like APGEN, ASP, SEQGEN, and the DOM database to automate the generation of uplink command products, Spacecraft Command Message Format (SCMF) files, and the corresponding ground command products, DSN Keywords Files (DKF). Autogen supports all the major multi-mission mission phases including the cruise, aerobraking, mapping/science, and relay mission phases. Autogen is a Perl script, which functions within the mission operations UNIX environment. It consists of two parts: a set of model files and the autogen Perl script. Autogen encodes the behaviors of the system into a model and encodes algorithms for context sensitive customizations of the modeled behaviors. The model includes knowledge of different mission phases and how the resultant command products must differ for these phases. The executable software portion of Autogen, automates the setup and use of APGEN for constructing a spacecraft activity sequence file (SASF). The setup includes file retrieval through the DOM (Distributed Object Manager), an object database used to store project files. This step retrieves all the needed input files for generating the command products. Depending on the mission phase, Autogen also uses the ASP (Automated Sequence Processor) and SEQGEN to generate the command product sent to the spacecraft. Autogen also provides the means for customizing sequences through the use of configuration files. By automating the majority of the sequencing generation process, Autogen eliminates many sequence generation errors commonly introduced by manually constructing spacecraft command sequences. Through the layering of commands into the sequence by a series of scheduling algorithms, users are able to rapidly and reliably construct the desired uplink command products. With the aid of Autogen, sequences may be produced in a matter of hours instead of weeks, with a significant reduction in the number of people on the sequence team. As a result, the uplink product generation process is significantly streamlined and mission risk is significantly reduced. Autogen is used for operations of MRO, Mars Global Surveyor (MGS), Mars Exploration Rover (MER), Mars Odyssey, and will be used for operations of Phoenix. Autogen Version 3.0 is the operational version of Autogen including the MRO adaptation for the cruise mission phase, and was also used for development of the aerobraking and mapping mission phases for MRO.

Fisher, Forest↗

Integrated payload and mission planning, phase 3. Volume 1: Integrated payload and mission planning process evaluation

The integrated payload and mission planning process for STS payloads was defined, and discrete tasks which evaluate performance and support initial implementation of this process were conducted. The scope of activity was limited to NASA and NASA-related payload missions only. The integrated payload and mission planning process was defined in detail, including all related interfaces and scheduling requirements. Related to the payload mission planning process, a methodology for assessing early Spacelab mission manager assignment schedules was defined.

Sapp, T. P.↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning, and actual results of the the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector (LP) as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning and actual results of the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

Moon Base Transportation - Deliveries to the Lunar Surface

Development of the Moon Base will enable a home away from home for astronauts who will live and work at humanity’s first lunar outpost. In this effort, NASA’s Moon Transportation Office is responsible for enabling the transformational missions required to deliver habitats, supplies, science payloads, and all other elements needed to cultivate a permanent presence on the Lunar Surface. The Mission Concept (MC) is characterized through evaluation of an end-to-end architecture that can successfully deliver a generalized heavy large-volume payload, in excess of 4000 kg, to a precision landing and touchdown on the lunar surface. The mission architecture utilizes a single launch configuration of a Lunar Lander (LL) with a unique propellant system. The LL has an integral orbital transfer capability and features jettisonable elements. The design circumvents the need for prop transfer on orbit and multiple launch configurations. The launch vehicle (LV) for this work will assume the capability to deliver a payload in excess of 40,000 kg to orbit, affording multiple LV solutions. Considerations for the LL and payload deployment from the fairing are assumed to be handled through compliance with a launch providers’ Interface Requirements Document (IRD). The MC will span from launch at Kennedy Space Center (KSC) to terminal descent and touchdown on the lunar surface, requiring a total ΔV on the order of 6 km/s beyond what is required to get the vehicle stack to a 200 km circular Low Earth Orbit (LEO). Major mission phases include: launch and launch vehicle separation, transfer operations, pre-landing navigation, and lunar descent and touchdown. A Concept of Operations (ConOps) is used as the primary design driver for defining architecture of the vehicles necessary to achieve final payload delivery. Numerous ground rules and assumptions will be provided for each phase of the mission. Concept designs for the LL is presented. An emphasis of the design maximizes a feasible path for maturation, manufacturing, and operation. A self-imposed practical consideration for this effort is the incorporation of legacy designed hardware to minimize expensive, time-intensive, and high-risk hardware development cycles. The propulsion system of the LL adopts a conventional storable bipropellant configuration of monomethyl hydrazine (MMH) and mixed oxides of nitrogen (MON3). This effort will showcase a unique propellant delivery system to minimize the reliance on propellant management devices (PMDs) during descent. Numerous key constraints have been considered, across the multiple segments of the mission. These include the unique aspects of center of gravity (CG) management, thruster plume effects including self-impingement, propulsion system hardware limitations, navigation during multiple mission phases, and landing gear geometry for uneven terrain. These constraints shape the trades necessary for precision landing of heavy cargo and ensure compatibility with broader Moon Base Transportation concepts. The resulting insights inform future transportation strategies for the Moon and beyond; directly contributing to the development of cargo‑delivery standards that will support the long‑term buildup of a sustainable, continuously inhabited Moon Base.

Lunar Habitat↗

Integrated payload and mission planning, phase 3. Volume 3: Ground real-time mission operations

The payloads tentatively planned to fly on the first two Spacelab missions were analyzed to examine the cost relationships of providing mission operations support from onboard vs the ground-based Payload Operations Control Center (POCC). The quantitative results indicate that use of a POCC, with data processing capability, to support real-time mission operations is the most cost effective case.

White, W. J.↗

Cognitive Performance in ISS Astronauts on 6-Month Low Earth Orbit Missions

Introduction: Current and future astronauts will endure prolonged exposure to spaceflight hazards and environmental stressors that could compromise cognitive functioning, yet cognitive performance in current missions to the International Space Station remains critically under-characterized. We systematically assessed cognitive performance across 10 cognitive domains in astronauts on 6-month missions to the ISS. Methods: Twenty-five professional astronauts were administered the Cognition Battery as part of National Aeronautics and Space Administration (NASA) Human Research Program Standard Measures Cross-Cutting Project. Cognitive performance data were collected at five mission phases: pre-flight, early flight, late flight, early post-flight, and late post-flight. We calculated speed and accuracy scores, corrected for practice effects, and derived z-scores to represent deviations in cognitive performance across mission phases from the sample’s mean baseline (i.e., pre-flight) performance. Linear mixed models with random subject intercepts and pairwise comparisons examined the relationships between mission phase and cognitive performance. Results: Cognitive performance was generally stable over time with some differences observed across mission phases for specific subtests. There was slowed performance observed in early flight on tasks of processing speed, visual working memory, and sustained attention. We observed a decrease in risk-taking propensity during late flight and post-flight mission phases. Beyond examining group differences, we inspected scores that represented a significant shift from the sample’s mean baseline score, revealing that 11.8% of all flight and post-flight scores were at or below 1.5 standard deviations below the sample’s baseline mean. Finally, exploratory analyses yielded no clear pattern of associations between cognitive performance and either sleep or ratings of alertness. Conclusions: There was no evidence for a systematic decline in cognitive performance for astronauts on a 6-month missions to the ISS. Some differences were observed for specific subtests at specific mission phases, suggesting that processing speed, visual working memory, sustained attention, and risk-taking propensity may be the cognitive domains most susceptible to change in Low Earth Orbit for high performing, professional astronauts. We provide descriptive statistics of pre-flight cognitive performance from 25 astronauts, the largest published preliminary normative database of its kind to date, to help identify significant performance decrements in future samples.

Data curation↗

Forming Human-Robot Teams Across Time and Space

NASA pushes telerobotics to distances that span the Solar System. At this scale, time of flight for communication is limited by the speed of light, inducing long time delays, narrow bandwidth and the real risk of data disruption. NASA also supports missions where humans are in direct contact with robots during extravehicular activity (EVA), giving a range of zero to hundreds of millions of miles for NASA s definition of "tele". . Another temporal variable is mission phasing. NASA missions are now being considered that combine early robotic phases with later human arrival, then transition back to robot only operations. Robots can preposition, scout, sample or construct in advance of human teammates, transition to assistant roles when the crew are present, and then become care-takers when the crew returns to Earth. This paper will describe advances in robot safety and command interaction approaches developed to form effective human-robot teams, overcoming challenges of time delay and adapting as the team transitions from robot only to robots and crew. The work is predicated on the idea that when robots are alone in space, they are still part of a human-robot team acting as surrogates for people back on Earth or in other distant locations. Software, interaction modes and control methods will be described that can operate robots in all these conditions. A novel control mode for operating robots across time delay was developed using a graphical simulation on the human side of the communication, allowing a remote supervisor to drive and command a robot in simulation with no time delay, then monitor progress of the actual robot as data returns from the round trip to and from the robot. Since the robot must be responsible for safety out to at least the round trip time period, the authors developed a multi layer safety system able to detect and protect the robot and people in its workspace. This safety system is also running when humans are in direct contact with the robot, so it involves both internal fault detection as well as force sensing for unintended external contacts. The designs for the supervisory command mode and the redundant safety system will be described. Specific implementations were developed and test results will be reported. Experiments were conducted using terrestrial analogs for deep space missions, where time delays were artificially added to emulate the longer distances found in space.

Hambuchen, Kimberly↗

Shuttle unified navigation filter, revision 1

Equations designed to meet the navigation requirements of the separate shuttle mission phases are presented in a series of reports entitled, Space Shuttle GN and C Equation Document. The development of these equations is based on performance studies carried out for each particular mission phase. Although navigation equations have been documented separately for each mission phase, a single unified navigation filter design is embodied in these separate designs. The purpose of this document is to present the shuttle navigation equations in a form in which they would most likely be coded-as the single unified navigation filter used in each mission phase. This document will then serve as a single general reference for the navigation equations replacing each of the individual mission phase navigation documents (which may still be used as a description of a particular navigation phase).

Muller, E. S., Jr.↗

James Webb Space Telescope Orbit Determination Analysis

The James Webb Space Telescope (JWST) is designed to study and answer fundamental astrophysical questions from an orbit about the Sun-Earth/Moon L2 libration point, 1.5 million km away from Earth. This paper describes the results of an orbit determination (OD) analysis of the JWST mission emphasizing the challenges specific to this mission in various mission phases. Three mid-course correction (MCC) maneuvers during launch and early orbit phase and transfer orbit phase are required for the spacecraft to reach L2. These three MCC maneuvers are MCC-1a at Launch+12 hours, MCC-1b at L+2.5 days and MCC-2 at L+30 days. Accurate OD solutions are needed to support MCC maneuver planning. A preliminary analysis shows that OD performance with the given assumptions is adequate to support MCC maneuver planning. During the nominal science operations phase, the mission requires better than 2 cm/sec velocity estimation performance to support stationkeeping maneuver planning. The major challenge to accurate JWST OD during the nominal science phase results from the unusually large solar radiation pressure force acting on the huge sunshield. Other challenges are stationkeeping maneuvers at 21-day intervals to keep JWST in orbit around L2, frequent attitude reorientations to align the JWST telescope with its targets and frequent maneuvers to unload momentum accumulated in the reaction wheels. Monte Carlo analysis shows that the proposed OD approach can produce solutions that meet the mission requirements.

Libration Point Orbit↗

The feasibility study and evaluation of applying expert system techniques to the mission operations for the AXAF-I spacecraft

Advanced X-ray Astrophysics Facility - Imaging (AXAF-I) is a spacecraft for X-ray emitting sources observation and has been tentatively scheduled for a space shuttle launch in late 1998 at the Kennedy Space Center. Its main objectives are 'to determine the nature of astronomical objects ranging from normal stars to quasars, to understand the nature of the physical processes which take place in and between astronomical objects, and to add to our understanding of the history and evolution of the universe.' The AXAF-I will have an expected five year life time for the science mission phase. During the science mission phase, the monitoring and management operation of the flight and ground systems is personnel intensive, requiring system experts on duty around the clock. The purpose of the expert system presented in this report is intended to reduce the level of expertise, training, and personnel requirement for the mission operation. The telemetry data from the spacecraft can be divided into two categories: the science observation data and the engineering status data. The science data contains the outputs from the X-ray sensing devices and will be forwarded to the AXAF-I Science Center for interpretation; while the engineering status data will be monitored by the Operation Control Center (OCC) for the operation diagnosis of the spacecraft. The expert system is designed to assist the operation controllers at the OCC to perform the daily mission operations. Since there are hundreds of engineering telemetry data points and the interpretation of the telemetry depends on many factors, e.g., sun or eclipse, the monitoring of the AXAF-I is not a trivial task. In this phase of expert system development, the focus has been limited to the engineering data interpretation, i.e., warnings will be provided to the operation controllers to signal any anomaly. The system is hosted in a Silicon Graphics Indigo-2 workstation running the IRIX operating system. The expert system tool used is the G2 system from Gensym (Gensy).

Chang, Kai H.↗

Space shuttle guidance, navigation and control design equations. Volume 3: Orbital operations

Revised specifications are presented of the equations necessary to perform the guidance, navigation, and control onboard computation functions for the space shuttle orbiter vehicle. The orbital operations covered include: (1) orbital coast, (2) orbital powered flight, (3) rendezvous mission phase, (4) station keeping mission phase, (5) docking and undocking, and (6) docked operations.

Source record↗