Search NASA⌕ Search

SEARCH · Search NASA

Results for “modernization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Modernizing the Nuclear Industry and New Ways of Working

Nuclear energy is recognized as the most feasible energy source towards achieving nation-wide net-zero goals (COP 208, MIT). Additionally, the demand for reliable, consistent energy supply is soaring with the construction of energy hungry data centers and AI tools. This means the construction of new nuclear and the continuation of current nuclear are a high national priority. However, this leaves the nuclear industry with a workforce challenge. The rising demand for nuclear power is threatened by an underpopulated workforce. There exist a few contributors to the decreased workforce such as skewed workforce demographics resulting in large-scale workforce retirement. Also, some plants have observed difficulty hiring and retaining skill sets that typically comprise the nuclear power workforce – specifically skilled craftsman. Those who are graduating with desirable skills are seeking employment in sectors that are more modern and culturally more aligned with younger generational values. Lastly, within the nuclear sector, skilled employees will be a competitive commodity as advanced plants come online offering work environments that incorporate modern technologies, skill sets, and opportunities for career advancement. These factors emphasize the need for legacy plants to modernize with a focus on the workplace environment and culture that meets younger generations’ skills, cultural expectations, and desire for advancement opportunities. Nuclear plants are actively engaged in deploying advancements that improve the management of systems, structures, and components as well as process improvements and technologies that can reduce the costs of operation and maintenance. However, the advancements must also be analyzed, reviewed and deployed in a manner that considers the impact on how people within the organization collaborate, communicate, make decisions, and solve problems. Neglecting to consider the cultural impact of modernization risks poor adoption, unrealized opportunities, or insignificant change toward helping attract new employees. The traditional way of working is not necessarily the way new generations want to engage with their employer. For instance, in a survey performed by North American Young Generation in Nuclear the top three reasons for younger nuclear employees to seek other job opportunities was seeking better work-life balance, a lack of advancement opportunities, and work culture and leadership style differences (Smyth et al. 2022). Integrated Operations for Nuclear (ION) is an approach for the nuclear industry to create long-term strategic modernization plans and analyze each advancement for the impact on people and processes and measure how those impacts flow up to support high-level, long-term plant goals and requirements. One principle of ION is to replace the current labor-centric operation style in legacy nuclear plants with data-centric collaborative operation styles. This paper will explain how transitioning operations to leverage centralized skills and responsibility, multi-skilled teams, and collaborative decision making can flatten the hierarchical structure in plants, enable greater individual efficacy while also offering more experiences and advancement opportunities to staff. Adopting the ION way of working shifts the industry mind-set towards more networked, collaborative, and modern way of working that will attract skilled, next-generation workers to operate the legacy nuclear fleet.

99 - GENERAL AND MISCELLANEOUS↗

AMPX: A Modern cross section processing system for generating nuclear data libraries - 14619

Nuclear data libraries are essential for nuclear analysis code systems like SCALE. AMPX has been continuously developed since the early 1970's and is used to generate these data libraries for SCALE. Recently, Oak Ridge National Laboratory (ORNL) initiated a major modernization effort to position AMPX for continued development and deployment on modern computing platforms. An important step toward modernization has been to merge AMPX under the SCALE continuous integration (CI) development framework. As a result, AMPX is now developed under the SCALE software quality assurance plan, providing increased confidence in the quality of data libraries developed and deployed by AMPX. This merge allowed us to develop novel methods to generate self-shielding factors that combine SCALE's resonance self-shielding capabilities with the AMPX library-generation capabilities. AMPX processes Evaluated Nuclear Data Format (ENDF/B) files. The ENDF community is working to develop a more modern format that will replace the existing ENDF/B format. Due to strict space and memory requirements when AMPX was first developed, the original AMPX processing and reading of ENDF data were tightly integrated. On newer computer systems, this is no longer necessary. Now there is a separation between reading and processing which allows for simultaneous support of current and new ENDF formats. As a result, AMPX is positioned to adopt any new ENDF format when available. For end users, the modernization effort has resulted in improved processing capabilities for generating nuclear data libraries. The objective of the paper is to document the latest AMPX cross-section processing capabilities and provide the current status of the AMPX modernization effort. (authors)

42 ENGINEERING↗

Alternative Ratemaking in the US: A Prerequisite for Grid Modernization or an Unwarranted Shift of Risk to Customers?

With increasing frequency, investor-owned electric utilities are requesting preferred cost recovery for "grid modernization" in multiple forms, from multi-year rate plans to riders. Utilities' claims that massive grid investment is necessary, and that exceptional investment requires exceptional cost recovery, are typically accepted by policymakers with little challenge. It is difficult for policymakers to resist the siren call of grid modernization's perceived outcomes, from improved reliability and resilience to reduced risks to safety and new customer technology adoption (electric vehicles, distributed energy resources, and more). This paper provides a contrarian viewpoint that is virtually absent as policymakers consider alternative ratemaking practices. It introduces the possibility that excess grid investment in the name of modernization is not only possible, and economically harmful, but has already occurred, encouraged by alternative ratemaking. It provides examples of common grid modernization expenditures the authors have identified as cost-ineffective in the course of their work. It also describes traditional grid planning practices with proven ability to address changing requirements over time, calling into question the need for exceptional grid modernization investment plans. Most important, the paper explains the moral hazard inherent in alternative ratemaking, and the fundamental shift in ratemaking risks and responsibilities from utilities to customers that results. The perspectives this paper presents are critical for policymakers to understand before adopting, extending, or expanding alternative ratemaking practices in their respective jurisdictions.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Modernization and optimization of a legacy open-source CFD code for high-performance computing architectures

Legacy codes remain a crucial element of today's simulation-based engineering ecosystem due to the extensive validation process and investment in such software. The rapid evolution of high-performance computing architectures necessitates the modernization of these codes. One approach to modernization is a complete overhaul of the code. However, this could require extensive investments, such as rewriting in modern languages, new data constructs, etc., which will necessitate systematic verification and validation to re-establish the credibility of the computational models. The current study advocates using a more incremental approach and is a culmination of several modernization efforts of the legacy code MFIX, which is an open-source computational fluid dynamics code that has evolved over several decades, widely used in multiphase flows and still being developed by the National Energy Technology Laboratory. Two different modernization approaches,‘bottom-up’ and ‘top-down’, are illustrated. Here, preliminary results show up to 8.5x improvement at the selected kernel level with the first approach, and up to 50% improvement in total simulated time with the latter were achieved for the demonstration cases and target HPC systems employed.

97 MATHEMATICS AND COMPUTING↗

Baseline Human Factors and Ergonomics in Support of Control Room Modernization at Nuclear Power Plants

As part of control room modernization at a nuclear power plant, a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model . These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—meant to catalog final products—rather than formative—meant to guide the overall modernization process. In this report, we highlight two crucial formative subelements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two subelements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomic baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and help ensure that control room modernization represents the successful evolution of the control system.

99 GENERAL AND MISCELLANEOUS↗

Baseline Evaluations to Support Control Room Modernization at Nuclear Power Plants

For any major control room modernization activity at a commercial nuclear power plant (NPP) in the U.S., a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model. These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—intended to catalog final products—rather than formative—intended to guide the overall modernization process. In this paper, we highlight two crucial formative sub-elements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two sub-elements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomics baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and subsequent summative benchmarking activities that help ensure that control room modernization represents a successful evolution of the control system.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Constraining the oxygen requirements for modern microbial eukaryote diversity

Eukaryotes originated prior to the establishment of modern marine oxygen (O 2 ) levels. According to the body fossil and lipid biomarker records, modern (crown) microbial eukaryote lineages began diversifying in the ocean no later than ~800 Ma. While it has long been predicted that increasing atmospheric O 2 levels facilitated the early diversification of microbial eukaryotes, the O 2 levels needed to permit this diversification remain unconstrained. Using time-resolved geochemical parameter and gene sequence information from a model marine oxygen minimum zone spanning a range of dissolved O 2 levels and redox states, we show that microbial eukaryote taxonomic richness and phylogenetic diversity remain the same until O 2 declines to around 2 to 3% of present atmospheric levels, below which these diversity metrics become significantly reduced. Our observations suggest that increasing O 2 would have only directly promoted early crown-eukaryote diversity if atmospheric O 2 was below 2 to 3% of modern levels when crown-eukaryotes originated and then later met or surpassed this range as crown-eukaryotes diversified. If atmospheric O 2 was already consistently at or above 2 to 3% of modern levels by the time that crown-eukaryotes originated, then the subsequent diversification of modern microbial eukaryotes was not directly driven by atmospheric oxygenation.

59 BASIC BIOLOGICAL SCIENCES↗

Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: Increasing safety at Boulder Canyon Hydro Increasing protection of the Boulder Creek environment Modernizing and integrating control equipment into Boulder's municipal water supply system, and Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to the National Register of Historic Places due in part to its unique engineering features and innovative construction techniques. Special efforts were directed toward documenting the (largely original) interior of the plant and installing new equipment without modifying the power plant exterior in order to preserve the historical significance of the facility. In addition, a significant portion of the historical equipment within the power plant was preserved in place. The modernization project began with DOE grant award on January 1, 2010, and the project was completed on December 31, 2012. In addition to city engineering and hydroelectric staff, major project participants included AECOM (design/engineering) Canyon Industries (turbine/generator manufacture), Gracon Corporation (general construction contractor), Exponential Engineering Company (electrical engineering) and URS Corporation (historical documentation), as well as numerous other subcontractors and consultants.

13 HYDRO ENERGY↗

Guidance on Including Social, Organizational and Technical Influences in Nuclear Utility and Plant Modernization Plans

The objective of this report is to provide the nuclear power industry with guidance on including socio-technical issues in plans developed for current and future modernization efforts. Socio-technical issues of concern include social, organizational and related technical aspects of modernized systems. These can be addressed using a set of systematic analysis and design methods developed to address socio-technical issues of the sort facing the nuclear power industry. The next phase of this work will involve developing and implementing a modernization plan that includes socio-technical tools and methods identified and discussed in a report by Dainoff and colleagues (2020). The plan is expected to be developed and implemented in cooperation with a nuclear utility that has expressed interest in participating. The Dainoff et al report provides the foundation for the present effort and presents a methodological tool set for analyzing socio-technical issues applicable to many modernization efforts. The tools described by Dainoff et al are based on principles of human factors engineering, safety engineering, and systems engineering and are discussed within the specific context of nuclear utility modernization and transformation efforts. It is expected that the plan and the concepts described in the current report will be developed and implemented with a nuclear utility partner. The plan developed with the nuclear utility partner will have a substantially higher level of detail than the guidance provided in this report, particularly with regard to details of plan logistics, etc.

99 GENERAL AND MISCELLANEOUS↗

Benefit-Cost Analysis for Utility-Facing Grid Modernization Investments: Trends, Challenges, and Considerations

In recent years, many electric utilities have submitted grid modernization plans for review by state public utility commissions. A central objective of these plans is to demonstrate that grid modernization investments will provide net benefits to customers, be reasonable and be in the public interest. The plans typically include some form of benefit-cost analysis, but the assumptions, methodologies and frameworks vary considerably between utilities. This report: -Describes utility-facing technologies and projects for modernizing distribution systems, including interdependencies of grid components -Highlights benefit-cost considerations related to grid modernization -Summarizes recent trends in benefit-cost analysis for grid modernization based on a review of 21 plans by U.S. electric utilities -Discusses challenges state public utility commissions face in reviewing utility plans and provides options for addressing challenges

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modernization and unification: Strategic goals for NASA STI program

Information is increasingly becoming a strategic resource in all societies and economies. The NASA Scientific and Technical Information (STI) Program has initiated a modernization program to address the strategic importance and changing characteristics of information. This modernization effort applies new technology to current processes to provide near-term benefits to the user. At the same time, we are developing a long-term modernization strategy designed to transition the program to a multimedia, global 'library without walls.' Notwithstanding this modernization program, it is recognized that no one information center can hope to collect all the relevant data. We see information and information systems changing and becoming more international in scope. We are finding that many nations are expending resources on national systems which duplicate each other. At the same time that this duplication exists, many useful sources of aerospace information are not being collected because of resource limitations. If nations cooperate to develop an international aerospace information system, resources can be used efficiently to cover expanded sources of information. We must consider forming a coalition to collect and provide access to disparate, multidisciplinary sources of information, and to develop standardized tools for documenting and manipulating this data and information. In view of recent technological developments in information science and technology, as well as the reality of scarce resources in all nations, it is time to explore the mutually beneficial possibilities offered by cooperation and international resource sharing. International resources need to be mobilized in a coordinated manner to move us towards this goal. This paper reviews the NASA modernization program and raises for consideration new possibilities for unification of the various aerospace database efforts toward a cooperative international aerospace database initiative that can optimize the cost/benefit equation for all participants.

Blados, W.↗

Modernization of B-2 Data, Video, and Control Systems Infrastructure

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Spacecraft Propulsion Research Facility, commonly referred to as B-2, is NASA s third largest thermal-vacuum facility with propellant systems capability. B-2 has completed a modernization effort of its facility legacy data, video and control systems infrastructure to accommodate modern integrated testing and Information Technology (IT) Security requirements. Integrated systems tests have been conducted to demonstrate the new data, video and control systems functionality and capability. Discrete analog signal conditioners have been replaced by new programmable, signal processing hardware that is integrated with the data system. This integration supports automated calibration and verification of the analog subsystem. Modern measurement systems analysis (MSA) tools are being developed to help verify system health and measurement integrity. Legacy hard wired digital data systems have been replaced by distributed Fibre Channel (FC) network connected digitizers where high speed sampling rates have increased to 256,000 samples per second. Several analog video cameras have been replaced by digital image and storage systems. Hard-wired analog control systems have been replaced by Programmable Logic Controllers (PLC), fiber optic networks (FON) infrastructure and human machine interface (HMI) operator screens. New modern IT Security procedures and schemes have been employed to control data access and process control flows. Due to the nature of testing possible at B-2, flexibility and configurability of systems has been central to the architecture during modernization.

Cmar, Mark D.↗

Modernization of B-2 Data, Video, and Control Systems Infrastructure

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Spacecraft Propulsion Research Facility, commonly referred to as B-2, is NASA's third largest thermal-vacuum facility with propellant systems capability. B-2 has completed a modernization effort of its facility legacy data, video and control systems infrastructure to accommodate modern integrated testing and Information Technology (IT) Security requirements. Integrated systems tests have been conducted to demonstrate the new data, video and control systems functionality and capability. Discrete analog signal conditioners have been replaced by new programmable, signal processing hardware that is integrated with the data system. This integration supports automated calibration and verification of the analog subsystem. Modern measurement systems analysis (MSA) tools are being developed to help verify system health and measurement integrity. Legacy hard wired digital data systems have been replaced by distributed Fibre Channel (FC) network connected digitizers where high speed sampling rates have increased to 256,000 samples per second. Several analog video cameras have been replaced by digital image and storage systems. Hard-wired analog control systems have been replaced by Programmable Logic Controllers (PLC), fiber optic networks (FON) infrastructure and human machine interface (HMI) operator screens. New modern IT Security procedures and schemes have been employed to control data access and process control flows. Due to the nature of testing possible at B-2, flexibility and configurability of systems has been central to the architecture during modernization.

Cmar, Mark D.↗

Application of Modern Fortran to Spacecraft Trajectory Design and Optimization

In this paper, applications of the modern Fortran programming language to the field of spacecraft trajectory optimization and design are examined. Modern object-oriented Fortran has many advantages for scientific programming, although many legacy Fortran aerospace codes have not been upgraded to use the newer standards (or have been rewritten in other languages perceived to be more modern). NASA's Copernicus spacecraft trajectory optimization program, originally a combination of Fortran 77 and Fortran 95, has attempted to keep up with modern standards and makes significant use of the new language features. Various algorithms and methods are presented from trajectory tools such as Copernicus, as well as modern Fortran open source libraries and other projects.

Trajectory Optimizatio↗

Viral Enumeration Using Cost-Effective Wet-Mount Epifluorescence Microscopy for Aquatic Ecosystems and Modern Microbialites

Enumeration is a fundamental measure of community ecology in which viruses represent the most numerous biological identities. Epifluorescence microscopy (EFM) has been the gold standard method for environmental viral enumeration for over 25 years. Currently, standard EFM methods using the Anodisc filters are no longer cost-effective (>$15 per slide) and have yet to be applied to modern microbialites. Microbialites are microbially driven benthic organosedimentary deposits that have been present for most of Earth’s history. We present a cost-effective method for environ mental viral enumeration from aquatic samples, microbial mats, and exopolymeric substances (EPSs) within modern microbialites using EFM. Our integrated approach, which includes filtration, differential centrifugation, chloroform treatment, glutaralde hyde fixation, benzonase nuclease treatment, probe sonication (EPS and mat only), SYBR Gold staining, wet mounting, and imaging, provides a robust method for modern microbialites and aquatic samples. Viral abundances of modern microbialites and aquatic samples collected from Fayetteville Green Lake (FGL) and Great Salt Lake (GSL) did not differ across ecosystems by sample type. EPS and microbial mat samples had an order of magnitude higher viral-like particle abundance when compared to water regardless of the ecosystem (107 vs 106). Viral enumeration allows for estimates of total viral numbers and weights. The entire weight of all the viruses in FGL and GSL are ~598 g and ~2.2 kg, respectively. Further development of EFM methods and software is needed for viral enumeration. Our method provides a robust and cost-effective (~$0.75 per sample) viral enumeration within modern microbialites and aquatic ecosystems.

Madeline Bellanger↗

Ergonomic Safety and Health Activities to Support Commercial Nuclear Power Plant Control Room Modernization in the United States

Affordable, abundant, and reliable electricity generation is essential to fueling a nation’s robust and globally competitive economy. In the United States (U.S.), commercial nuclear power plants (NPPs) account for approximately 19% of reliable and cost-competitive baseload electricity generation. Other technologies that reduce reliance on fossil fuels and provide baseload electricity cost-competitively at a national scale are still under development. Thus, without suitable replacements for nuclear power, the generating capacity of nuclear energy in the U.S. must be continued through the safe and efficient operation of commercial NPPs. The U.S. De-partment of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) research and development (R&D) program provides the technical bases for the long-term, safe, and economical operation of NPPs. One area in the LWRS program is the Plant Modernization pathway, which includes human factors R&D, human factors engineering (HFE), and ergonomics to enable the modernization of the instrumentation and control (I&C) technologies in NPP main control rooms (MCRs). DOE researchers, including ergonomics specialists at Idaho National Laboratory (INL) have collaborated with nu-merous commercial NPP utilities over the last few years on control room modernization. This paper summarizes recent ergonomics safety and health R&D and HFE performed in collaboration with a U.S. commercial utility to modernize their NPP MCRs.

99 GENERAL AND MISCELLANEOUS↗

Addressing Human and Organizational Factors in Nuclear Industry Modernization: An Operationally Focused Approach to Process and Methodology

Utility owners and operators of commercial nuclear power plants in the United States (U.S.) are and will be modernizing their nuclear power plants by performing a digital transformation involving design of an integrated set of systems that together enable a technology centric operating plant. The Plant Modernization Pathway of the U.S. Department of Energy Light Water Reactor Sustainability Program has a strategic action plan that lays the groundwork for a digital transformation of the nuclear industry. The model for this transformation is an advanced concept of operations, with an end point vision, “To achieve the maximum aggregate benefit enabled by this digital transformation.” To achieve this, the digital infrastructure for a nuclear plant must be designed as an integrated set of systems that together enable a technology centric operating model. The digital transformation process obviously needs to involve technology considerations and systems engineering, but it also needs to include human and organizational expertise. Thus, human and organizational factors, including sociotechnical systems methods and techniques (e.g., Cognitive Systems Engineering, Systems Theoretic Accident Modeling and Processes, human systems integration, and Macroergonomics) need to be considered for digital transformation projects in order to effectively integrate human and organizational expertise efforts into the new work system that results from nuclear power plant digital modernization. That is, the work system is the basic unit of sociotechnical systems analysis and contains three components: personnel, technical, and organization and management. These components should be jointly optimized with respect to the interdependence of systems performance criteria of effectiveness, efficiency and safety. Joint optimization can be achieved through the application of three human and organization functions: knowledge representation, knowledge elicitation, and cross-functional integration. This report provides a strategic framework for effective integration of human and organizational expertise within nuclear power plant digital modernization efforts.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Review of Irrigation Modernization and Conduit Hydropower Funding and Support Programs

This memo reviews and evaluates existing funding mechanisms that support off-farm irrigation modernization and conduit hydropower projects. Irrigation modernization projects, both on and off-farm, can be challenging to move through planning, permitting, development and installation processes and some evidence indicates that funding mechanisms can be a barrier to successful deployments. This memo is important because access to equitably and efficiently deployed project planning and development funding may be a key pre-requisite to increasing the pace and scale of irrigation modernization project deployments that incorporate hydropower. We evaluated an array of federal and state funding programs and took a close look at Energy Trust of Oregon’s funding mechanisms due to the organization’s apparent success in increasing the pace and scale of modernization in its state.

13 HYDRO ENERGY↗