Search NASA⌕ Search

SEARCH · Search NASA

Results for “national security”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Unmanned Aircraft Systems Integration in the National Airspace System Project - Phase 2 Abstracts - FY2017 to FY2019

There is an increasing need to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) to perform missions of vital importance to national security and defense, emergency management, science, and to enable commercial applications. However, routine access by UAS into the NAS remains unrealized. The UAS community needs routine access to the global airspace for all classes of UAS. Based upon that need, the National Aeronautics and Space Administration (NASA) Aeronautics Research Mission Directorate (ARMD) Integrated Aviation Systems Program (IASP) UAS Integration in the NAS Project identified the following goal: To Provide research findings, utilizing simulation and flight tests, to support the development and validation of Detect and Avoid (DAA) and Command and Control (C2) technologies necessary for integrating UAS into the NAS. Because this is such a broad reaching challenge facing the UAS community, the UAS-NAS Project recognizes the importance of working together with others in Industry and Other Government Agencies to overcome the technical, operational, and public perception barriers.

bibliographic report↗

Unmanned Aircraft Systems Integration in the National Airspace System Project: Phase 2 Abstracts - FY2017 to FY2020

There is an increasing need to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) to perform missions of vital importance to national security and defense, emergency management, science, and to enable commercial applications. However, routine access by UAS into the NAS remains unrealized. The UAS community needs routine access to the global airspace for all classes of UAS. Based upon that need, the National Aeronautics and Space Administration (NASA) Aeronautics Research Mission Directorate (ARMD) Integrated Aviation Systems Program (IASP) UAS Integration in the NAS Project identified the following goal: To Provide research findings, utilizing simulation and flight tests, to support the development and validation of Detect and Avoid (DAA) and Command and Control (C2) technologies necessary for integrating UAS into the NAS. Because this is such a broad reaching challenge facing the UAS community, the UAS-NAS Project recognizes the importance of working together with others in Industry and Other Government Agencies to overcome the technical, operational, and public perception barriers.

Jamie Marie Turner↗

UAS-NAS Stakeholder Feedback Report

The need to fly UAS in the NAS to perform missions of vital importance to national security and defense, emergency management, science, and to enable commercial applications has been continually increasing over the past few years. To address this need, the NASA Aeronautics Research Mission Directorate (ARMD) Integrated Aviation Systems Program (IASP) formulated and funded the Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project (hereafter referred to as UAS‐NAS Project) from 2011 to 2016. The UAS‐NAS Project identified the following need statement: The UAS community needs routine access to the global airspace for all classes of UAS. The Project identified the following goal: To provide research findings to reduce technical barriers associated with integrating UAS into the NAS utilizing integrated system level tests in a relevant environment. This report provides a summary of the collaborations between the UAS-NAS Project and its primary stakeholders and how the Project applied and incorporated the feedback.

pilotless aircraft↗

Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project: KDP-A for Phase 2 Minimum Operational Performance Standards

UAS Integration in the NAS Project has: a) Developed Technical Challenges that are crucial to UAS integration, aligned with NASA's Strategic Plan and Thrusts, and support FAA standards development. b) Demonstrated rigorous project management processes through the execution of previous phases. c) Defined Partnership Plans. d) Established path to KDP-C. Request approval of Technical Challenges, execution of partnerships and plans, and execution of near-term FY17 activities. There is an increasing need to fly UAS in the NAS to perform missions of vital importance to National Security and Defense, Emergency Management, and Science. There is also an emerging need to enable commercial applications such as cargo transport (e.g. FedEx). Unencumbered NAS Access for Civil/Commercial UAS. Provide research findings, utilizing simulation and flight tests, to support the development and validation of DAA and C2 technologies necessary for integrating Unmanned Aircraft Systems into the National Airspace System.

pilotless aircraft↗

Ares V: Enabling Unprecedented Payloads for Space in the 21st Century

Numerous technical and programmatic studies since the U.S. space program began in the 1960s has emphasized the need for a heavy lift capability for exploration beyond low Earth orbit (LEO). The Saturn V once embodied that capability until it was retired. Now the Ares V cargo launch vehicle (CaLV) promises to restore and improve on that capability, providing unprecedented opportunities for human and robotic exploration, science, national security and commercial uses. This paper provides an overview of the capabilities of Ares V, both as an opportunity for payloads of increased mass and/or volume, and as a means of reducing risk in the payload design process. The Ares V is part of NASA s Constellation Program, which also includes the Ares I crew launch vehicle (CLV), Orion crew exploration vehicle (CEV), and Altair lunar lander. This architecture is designed to carry out the national space policy goals of completing the International Space Station (ISS), retiring the Space Shuttle fleet, and expanding human exploration beyond LEO. The Ares V is designed to loft upper stages and/or cargo, such as the Altair lander, into LEO. The Ares I is designed to put Orion into LEO with a crew of up to four for rendezvous with the ISS or with the Ares V Earth departure stage for journeys to the Moon. While retaining the goals of heritage hardware and commonality, the Ares V configuration continues to be refined through a series of internal trades. The current reference configuration was recommended by the Ares Projects and approved by the Constellation Program during the Lunar Capabilities Concept Review (LCCR) June 2008. The reference configuration defines the Ares V as 381 feet (116m) tall with a gross lift-off mass (GLOM) of 8.1 million pounds (3,704.5 mT). Its first stage will generate 11 million pounds of sea-level liftoff thrust. It will be capable of launching 413,800 pounds (187.7 mT) to LEO, 138,500 pounds (63 mT) direct to the Moon or 156,700 pounds (71.1 mT) in its dual-launch architecture role with Ares I. It could also launch 123,100 pounds (55.8 mT) to Sun-Earth L2. Assessment of astronomy payload requirements since Spring 2008 has indicated that Ares V has the potential to support a range of payloads and missions. Some of these missions were impossible in the absence of Ares V s capabilities. Collaborative design/architecture inputs, exchanges, and analyses have already begun between scientists and payload developers. A 2008 study by a National Research Council (NRC) panel, as well as analyses presented by astronomers and planetary scientists at two weekend conferences in 2008, support the position that Ares V has benefit to a broad range of planetary and astronomy missions. This early dialogue with Ares V engineers is permitting the greatest opportunity for payload/transportation/mission synergy and with the least financial impact to Ares V development. In addition, independent analyses suggest that Ares V has the opportunity to enable more cost-effective mission design. 1

Creech, Steve↗

Reusable launch vehicle: Technology development and test program

The National Aeronautics and Space Administration (NASA) requested that the National Research Council (NRC) assess the Reusable Launch Vehicle (RLV) technology development and test programs in the most critical component technologies. At a time when discretionary government spending is under close scrutiny, the RLV program is designed to reduce the cost of access to space through a combination of robust vehicles and a streamlined infrastructure. Routine access to space has obvious benefits for space science, national security, commercial technologies, and the further exploration of space. Because of technological challenges, knowledgeable people disagree about the feasibility of a single-stage-to-orbit (SSTO) vehicle. The purpose of the RLV program proposed by NASA and industry contractors is to investigate the status of existing technology and to identify and advance key technology areas required for development and validation of an SSTO vehicle. This report does not address the feasibility of an SSTO vehicle, nor does it revisit the roles and responsibilities assigned to NASA by the National Transportation Policy. Instead, the report sets forth the NRC committee's findings and recommendations regarding the RLV technology development and test program in the critical areas of propulsion, a reusable cryogenic tank system (RCTS), primary vehicle structure, and a thermal protection system (TPS).

Source record↗

Humans to Mars: The Greatest Adventure in Human History

The reasons for a human mission to Mars are many and include (1) World technological leadership, (2) Enhanced national security, (3) Enhanced economic vitality, (4) The human urge to explore new and distant frontiers, (5) Scientific discovery (how did Mars evolve from an early Earth-like, hospitable planet to its present inhospitable state? Is there life on Mars?) (6) Inspiring the American public and the next generation of scientists and engineers (following the launch of Sputnik I by the USSR on October 4, 1957, the U. S. and the rest of the world witnessed a significant increase in the number of students going into science and engineering), (7) Develop new technologies for potential non-space spin-off applications, and, (8) Enhanced national prestige, etc. Other reasons for colonizing the Red Planet are more catastrophic in nature, including Mars as a safe haven for the survival of the human species in the event of an impact with a large asteroid (remember the demise of the dinosaurs 65-million years as a result of an asteroid impact!). Some have also suggested that the colonization of Mars may be a solution to the global exponential population explosion on our planet! A human mission to and the colonization of the Red Planet requires multi-disciplined expertise in many areas including engineering, technology, science, human health and medicine and the human psychological and behavior. To capture the relevant areas of needed expertise, we have invited a group of more than 70 U. S. and foreign experts in these areas, including astronauts, scientists, engineers, technologists, medical doctors, psychologists and economists to share their views and thoughts on a human mission to Mars.

Levine, Joel S.↗

Prospective Futures of Distance Education

Society is in the midst of IT, Bio, Nano, Quantum and Energetics Technology Revolutions, which have changed and are changing econometrics, national security, health, transportation, shopping, travel, cost of living, socialization, commerce, employment, and education. We are now beyond the Industrial Age, are in the IT Age and heading rapidly into the Virtual Age.In that process we are changing from physical activities to virtual activities, developing and embracing tele-everything including tele-commuting, tele-work, tele-travel, tele-education, tele-shopping, tele-medicine, tele-commerce, tele-socialization, tele-politics and with on-site printing manufacture, tele-manufacturing. The gig economy, largely on the web and operated virtually, is a large and increasing portion of the national economy. Tele-everything took a great leap forward during the COVID pandemic response

Dennis M. Bushnell↗

Affordable Development and Demonstration of a Small Nuclear Thermal Rocket (NTR) Engine and Stage: How Small Is Big Enough?

The Nuclear Thermal Rocket (NTR) derives its energy from fission of uranium-235 atoms contained within fuel elements that comprise the engine's reactor core. It generates high thrust and has a specific impulse potential of approximately 900 specific impulse - a 100 percent increase over today's best chemical rockets. The Nuclear Thermal Propulsion (NTP) project, funded by NASA's Advanced Exploration Systems (AES) program, includes five key task activities: (1) Recapture, demonstration, and validation of heritage graphite composite (GC) fuel (selected as the Lead Fuel option); (2) Engine Conceptual Design; (3) Operating Requirements Definition; (4) Identification of Affordable Options for Ground Testing; and (5) Formulation of an Affordable Development Strategy. During fiscal year (FY) 2014, a preliminary Design Development Test and Evaluation (DDT&E) plan and schedule for NTP development was outlined by the NASA Glenn Research Center (GRC), Department of Energy (DOE) and industry that involved significant system-level demonstration projects that included Ground Technology Demonstration (GTD) tests at the Nevada National Security Site (NNSS), followed by a Flight Technology Demonstration (FTD) mission. To reduce cost for the GTD tests and FTD mission, small NTR engines, in either the 7.5 or 16.5 kilopound-force thrust class, were considered. Both engine options used GC fuel and a common fuel element (FE) design. The small approximately 7.5 kilopound-force criticality-limited engine produces approximately157 thermal megawatts and its core is configured with parallel rows of hexagonal-shaped FEs and tie tubes (TTs) with a FE to TT ratio of approximately 1:1. The larger approximately 16.5 kilopound-force Small Nuclear Rocket Engine (SNRE), developed by Los Alamos National Laboratory (LANL) at the end of the Rover program, produces approximately 367 thermal megawatts and has a FE to TT ratio of approximately 2:1. Although both engines use a common 35-inch (approximately 89-centimeters) -long FE, the SNRE's larger diameter core contains approximately 300 more FEs needed to produce an additional 210 thermal megawatts of power. To reduce the cost of the FTD mission, a simple one-burn lunar flyby mission was considered to reduce the liquid hydrogen (LH2) propellant loading, the stage size and complexity. Use of existing and flight proven liquid rocket and stage hardware (e.g., from the RL10B-2 engine and Delta Cryogenic Second Stage) was also maximized to further aid affordability. This paper examines the pros and cons of using these two small engine options, including their potential to support future human exploration missions to the Moon, near Earth asteroids (NEA), and Mars, and recommends a preferred size. It also provides a preliminary assessment of the key activities, development options, and schedule required to affordably build, ground test and fly a small NTR engine and stage within a 10-year timeframe.

Spacecraft design↗

Heavy Lift for Exploration: Options and Utilization

Every study of exploration capabilities since the Apollo Program has recommended the renewal of a heavy lift launch capability for the United States. NASA is aggressively pursuing that capability. This paper will discuss several aspects of that effort and the potential uses for that heavy lift capability. The need for heavy lift was cited most recent in the findings of the Review of U.S. Human Space Flight Plans Committee. Combined with considerations of launch availability and on-orbit operations, the Committee finds that exploration will benefit from the availability of a heavy-lift vehicle, the report said. In addition, heavy lift would enable the launching of large scientific observatories and more capable deep-space missions. It may also provide benefit in national security applications. The most recent focus of NASA s heavy lift effort is the Ares V cargo launch vehicle, which is part of the Constellation Program architecture for human exploration beyond low Earth orbit (LEO). The most recent point-of-departure configuration of the Ares V was approved during the Lunar Capabilities concept Review (LCCR) in 2008. The Ares V first stage propulsion system consists of a core stage powered by six commercial liquid hydrogen/liquid oxygen (LH2/LOX) RS-68 engines, flanked by two 5.5-segment solid rocket boosters (SRBs) based on the 5-segment Ares I first stage. The boosters use the same Polybutadiene Acrylonitrile (PBAN) propellant as the Space Shuttle. Atop the core stage is the Earth departure stage (EDS), powered by a single J-2X upper stage engine based on the Ares I upper stage engine. The 33-foot-diameter payload shroud can enclose a lunar lander, scientific instruments, or other payloads. Since LCCR, NASA has continued to refine the design through several successive internal design cycles. In addition, NASA has worked to quantify the broad national consensus for heavy lift in ways that, to the extent possible, meet the needs of the user community.

Creech, Steve↗

Satellite Conjunction Assessment, Risk Analysis and Collision Avoidance Best Practices: The History, Evolution and Opportunities

Since Explorer 1 was launched on January 31, 1958, the United States (U.S.) has reaped the benefits of space exploration. New markets and new technologies have spurred the economy and changed lives in many ways across the national security, civil, and commercial sectors. Space technologies and space-based capabilities now provide global communications, navigation and timing, weather forecasting, and more. Space exploration also presents challenges that impact not only the U.S. but also its allies and other partners. A significant increase in the volume and diversity of activity in space means that it is becoming increasingly congested. Emerging commercial ventures such as satellite servicing, in-space manufacturing, and tourism as well as new technologies enabling small satellites and large constellations of satellites present serious challenges for safely and responsibly using space in a stable, sustainable manner. To meet these challenges, the U.S. seeks to improve global awareness of activity in space by publicly sharing flight safety-related information and by coordinating its own on-orbit activity in a safer, more responsible manner. It seeks to bolster stability and reduce current and future operational on-orbit risks so that space is sustained for future generations. To this end, new and better Space Situational Awareness (SSA) capabilities are needed to keep pace with the increased congestion, and the U.S. seeks to create a dynamic environment that encourages and rewards commercial providers who improve these capabilities. The National Aeronautics and Space Administration (NASA) Spacecraft Conjunction Assessment and Collision Avoidance Best Practices Handbook reflects how NASA currently operates, which has evolved over time. Consideration is given to important topics such as spacecraft and constellation design; spacecraft “trackability;” pre-launch preparation and early launch activities; on-orbit collision avoidance; and automated trajectory guidance and maneuvering. This talk aims to present examples of responsible practices for spacecraft Owners/Operators (O/O) to consider for lowering collision risks and operating safely in space (from LEO and beyond) in a stable and sustainable manner. As technology and innovation continues to improve upon existing capabilities, what kind of new challenges are presented in the SSA community? Can space exploration and commercial ventures thrive while keeping paramount the safety and protection of the space environment? What are the challenges and opportunities that need to be addressed and considered for space situational awareness in Cis-Lunar Space? It may prove useful for entities offering, or intending to offer, SSA or Conjunction Assessment (CA) services to consider such examples of responsible practices to protect the space environment for future use by all.

Collision Avoidance↗

Private financing and operation of a space station: Investment requirements, risk, government support and other primary business management considerations

Private investment in a manned space station is considered as an alternative to complete government sponsorship of such a program. The implications of manned space operations are discussed from a business perspective. The most significant problems and risks which would be faced by a private company involved in a space station enterprise are outlined and possible government roles in helping to overcome these difficulties suggested. Economic factors such as inflation and the rate of interest are of primary concern, but less obvious conditions such as antitrust and appropriate regulatory laws, government appropriations for space activities, and national security are also considered.

Simon, M.↗

Solar thermal technologies benefits assessment: Objectives, methodologies and results for 1981

The economic and social benefits of developing cost competitive solar thermal technologies (STT) were assessed. The analysis was restricted to STT in electric applications for 16 high insolation/high energy price states. Three fuel price scenarios and three 1990 STT system costs were considered, reflecting uncertainty over fuel prices and STT cost projections. After considering the numerous benefits of introducing STT into the energy market, three primary benefits were identified and evaluated: (1) direct energy cost savings were estimated to range from zero to $50 billion; (2) oil imports may be reduced by up to 9 percent, improving national security; and (3) significant environmental benefits can be realized in air basins where electric power plant emissions create substantial air pollution problems. STT research and development was found to be unacceptably risky for private industry in the absence of federal support. The normal risks associated with investments in research and development are accentuated because the OPEC cartel can artificially manipulate oil prices and undercut the growth of alternative energy sources.

Gates, W. R.↗

Conservation of strategic metals

A long-range program in support of the aerospace industry aimed at reducing the use of strategic materials in gas turbine engines is discussed. The program, which is called COSAM (Conservation of Strategic Aerospace Materials), has three general objectives. The first objective is to contribute basic scientific understanding to the turbine engine technology bank so that our national security is not jeopardized if our strategic material supply lines are disrupted. The second objective is to help reduce the dependence of United States military and civilian gas turbine engines on worldwide supply and price fluctuations in regard to strategic materials. The third objective is, through research, to contribute to the United States position of preeminence in the world gas turbine engine markets by minimizing the acquisition costs and optimizing the performance of gas turbine engines. Three major research thrusts are planned: strategic element substitution; advanced processing concepts; and alternate material identification. Results from research and any required supporting technology will give industry the materials technology options it needs to make tradeoffs in material properties for critical components against the cost and availability impacts related to their strategic metal content.

Joseph R. Stephens↗

Space station needs, attributes, and architectural options study. Volume 1: Missions and requirements

Science and applications, NOAA environmental observation, commercial resource observations, commercial space processing, commercial communications, national security, technology development, and GEO servicing are addressed. Approach to time phasing of mission requirements, system sizing summary, time-phased user mission payload support, space station facility requirements, and integrated time-phased system requirements are also addressed.

Source record↗