Search NASA⌕ Search

SEARCH · Search NASA

Results for “observation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Chromospheric variations in main-sequence stars

The fluxes in passbands 0.1 nm wide and centered on the Ca II H and K emission cores have been monitored in 111 stars of spectral type F2-M2 on or near the main sequence in a continuation of an observing program started by O. C. Wilson. Most of the measurements began in 1966, with observations scheduled monthly until 1980, when observations were schedueld sevral times per week. The records, with a long-term precision of about 1.5%, display fluctuations that can be idntified with variations on timescales similar to the 11 yr cycle of solar activity as well as axial rotation, and the growth and decay of emitting regions. We present the records of chromospheric emission and general conclusions about variations in surface magnetic activity on timescales greater than 1 yr but less than a few decades. The results for stars of spectral type G0-K5 V indicate a pattern of change in rotation and chromospheric activity on an evolutionary timescale, in which (1) young stars exhibit high average levels of activity, rapid rotation rates, no Maunder minimum phase and rarely display a smooth, cyclic variation; (2) stars of intermediate age (approximately 1-2 Gyr for 1 solar mass) have moderate levels of activity and rotation rates, and occasional smooth cycles; and (3) stars as old as the Sun and older have slower rotation rates, lower activity levels and smooth cycles with occasional Maunder minimum-phases.

Baliunas, S. L.↗

SIRTF Science Operations System Design

SIRTF Science Operations System Design William B. Green Manager, SIRTF Science Center California Institute of Technology M/S 310-6 1200 E. California Blvd., Pasadena CA 91125 (626) 395 8572 Fax (626) 568 0673 bgreen@ipac.caltech.edu. The Space Infrared Telescope Facility (SIRTF) will be launched in December 2001, and perform an extended series of science observations at wavelengths ranging from 20 to 160 microns for five years or more. The California Institute of Technology has been selected as the home for the SIRTF Science Center (SSC). The SSC will be responsible for evaluating and selecting observation proposals, providing technical support to the science community, performing mission planning and science observation scheduling activities, instrument calibration during operations and instrument health monitoring, production of archival quality data products, and management of science research grants. The science payload consists of three instruments delivered by instrument Principal Investigators located at University of Arizona, Cornell, and Harvard Smithsonian Astrophysical Observatory. The SSC is responsible for design, development, and operation of the Science Operations System (SOS) which will support the functions assigned to the SSC by NASA. The SIRTF spacecraft, mission profile, and science instrument design have undergone almost ten years of refinement. SIRTF development and operations activities are highly cost constrained. The cost constraints have impacted the design of the SOS in several ways. The Science Operations System has been designed to incorporate a set of efficient, easy to use tools which will make it possible for scientists to propose observation sequences in a rapid and automated manner. The use of highly automated tools for requesting observations will simplify the long range observatory scheduling process, and the short term scheduling of science observations. Pipeline data processing will be highly automated and data-driven, utilizing a variety of tools developed at JPL, the instrument development teams, and Space Telescope Science Institute to automate processing. An incremental ground data system development approach has been adopted, featuring periodic deliveries that are validated with the flight hardware throughout the various phases of system level development and testing. This approach minimizes development time and decreases operations risk. This paper will describe the top level architecture of the SOS and the basic design concepts. A summary of the incremental development approach will be presented. Examples of the unique science user tools now under final development prior to the first proposal call scheduled for mid-2000 will be shown.

Green, William↗

First Results from the ISO-IRAS Faint Galaxy Survey

We present the first result from the ISO-IRAS Faint Galaxy Survey (IIFGS), a program designed to obtain ISO observations of the most distant and luminous galaxies in the IRAS Faint Source Survey by filling short gaps in the ISO observing schedule with pairs of 12um ISOCAM AND 90um ISOPHOT observation.

Galaxy Survey luminous galaxies↗

X-ray observations of rapidly rotating O stars

HEAO-2 results suggest that high vsini O stars appear to be significantly fainter x-ray sources. We proposed to observe additional high vsini O stars to test this hypothesis. Unfortunately, the PSPC was shot down during our scheduled observation time, and the observation was not re-scheduled. The contract work was modified to carry out other related x-ray tasks.

Waldron, Wayne L.↗

SOFIA'S Challenge: Scheduling Airborne Astronomy Observations

The Stratospheric Observatory for Infrared Astronomy (SOFIA) is NASA's next generation airborne astronomical observatory, and will commence operations in 2005. The facility consists of a 747-SP modified to accommodate a 2.5 meter telescope. SOFIA is expected to fly an average of 140 science flights per year over its 20 year lifetime. Depending on the nature of the instrument used during flight, 5-15 observations per flight are expected. The SOFIA telescope is mounted aft of the wings on the port side of the aircraft and is articulated through a range of 20deg to 60deg of elevation. The telescope has minimal lateral flexibility; thus, the aircraft must turn constantly to maintain the telescope's focus on an object during observations. A significant problem in future SOFIA operations is that of scheduling flights in support of observations. Investigators are expected to propose small numbers of observations, and many observations must be grouped together to make up single flights. Flight planning for the previous generation airborne observatory, the Kuiper Airborne Observatory (KAO), was done by hand; planners had to choose takeoff time, observations to perform, and decide on setup-actions (called "dead-legs") to position the aircraft prior to observing. This task frequently required between 6-8 hours to plan one flight The scope of the flight planning problem for supporting GI observations with the anticipated flight rate for SOFIA makes the manual approach for flight planning daunting. In response, we have designed an Automated Flight Planner (AFP) that accepts as input a set of requested observations, designated flight days, weather predictions and fuel limitations, and searches automatically for high-quality flight plans that satisfy all relevant aircraft and astronomer specified constraints. The AFP can generate one candidate flight plan in 5-10 minutes, of computation time, a feat beyond the capabilities of human flight planners. The rate at which the AFP can generate flights enables humans to assess and analyze complex tradeoffs between fuel consumption, estimated science quality and the percentage of scheduled observations. Due to the changing nature of SOFIA scheduling problems, this functionality will play a crucial role in optimizing science and minimizing costs during operations. In the full paper, we will summarize the technical challenges that have been met in order to build this system. These include: design of the search algorithm, design of appropriate heuristics and approximations, and reduction in the size of the search space. We will also describe technical challenges that are currently being addressed, including the extension of the existing approach to handle new solution criteria. Finally, we will describe a variety of cultural challenges that the astronomical community must address in order to successfully use SOFIA, and describe how the AFT can be used to address some of these challenges. Specifically, many of the intended science users are accustomed to using ground-based or space-based observatories; we will identify some differences that arise due to the nature of airborne observatories, and how the AFT can be extended to provide useful services to ease these cultural differences.

Frank, Jeremy↗

SMM Observations of Saturn

During the past year I have participated in a series of team telecons to I plan our observation of Saturn with SMM. The observation, scheduled for this month (September), was canceled and a new observation is being planned for 2002.

Schnopper, Herbert↗

Research at Palomar Observatory in planetary astronomy

A wide range of observational studies are carried out to improve our understanding of the bodies of the outer solar system. Using the 200-inch Hale telescope, near-infrared observations are made of Uranus, Neptune, and the Pluto-Charon system. High time resolution occultation observations of the Uranus Ring system are used to study in detail the dynamics of this system. Occultation studies of Neptune are probing this intriguing ring-arc system. Occulation observations of the Pluto-Charon system probe the surface properties of these distant bodies. In addition, the plate material of the PSSII servey is being used to search for new comets and asteroids. Researchers observed one Neptune stellar occultation in July 1987 and completed the analysis of a series of seven separate Neptune occultation observations in conjunction with Nicholson et al., of Cornell. The analysis has shown that minimum of three ring arcs, at radii ranging from 54,000 km - 67,000 km are required to account for the high quality ring events. Current theoretical models can account for these data. Of two observations scheduled of Pluto-Charon mutual occulations scheduled for the 200-inch, the Charon eclipse event was successfully observed (the other was clouded out).

Soifer, B. T.↗

Planning and Scheduling for Fleets of Earth Observing Satellites

We address the problem of scheduling observations for a collection of earth observing satellites. This scheduling task is a difficult optimization problem, potentially involving many satellites, hundreds of requests, constraints on when and how to service each request, and resources such as instruments, recording devices, transmitters, and ground stations. High-fidelity models are required to ensure the validity of schedules; at the same time, the size and complexity of the problem makes it unlikely that systematic optimization search methods will be able to solve them in a reasonable time. This paper presents a constraint-based approach to solving the Earth Observing Satellites (EOS) scheduling problem, and proposes a stochastic heuristic search method for solving it.

Frank, Jeremy↗

Coordinating space telescope operations in an integrated planning and scheduling architecture

The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.

Muscettola, Nicola↗

Applying Squeaky-Wheel Optimization Schedule Airborne Astronomy Observations

We apply the Squeaky Wheel Optimization (SWO) algorithm to the problem of scheduling astronomy observations for the Stratospheric Observatory for Infrared Astronomy, an airborne observatory. The problem contains complex constraints relating the feasibility of an astronomical observation to the position and time at which the observation begins, telescope elevation limits, special use airspace, and available fuel. Solving the problem requires making discrete choices (e.g. selection and sequencing of observations) and continuous ones (e.g. takeoff time and setting up observations by repositioning the aircraft). The problem also includes optimization criteria such as maximizing observing time while simultaneously minimizing total flight time. Previous approaches to the problem fail to scale when accounting for all constraints. We describe how to customize SWO to solve this problem, and show that it finds better flight plans, often with less computation time, than previous approaches.

Frank, Jeremy↗

Balancing antagonistic time and resource utilization constraints in over-subscribed scheduling problems

In this paper, we report work aimed at applying concepts of constraint-based problem structuring and multi-perspective scheduling to an over-subscribed scheduling problem. Previous research has demonstrated the utility of these concepts as a means for effectively balancing conflicting objectives in constraint-relaxable scheduling problems, and our goal here is to provide evidence of their similar potential in the context of HST observation scheduling. To this end, we define and experimentally assess the performance of two time-bounded heuristic scheduling strategies in balancing the tradeoff between resource setup time minimization and satisfaction of absolute time constraints. The first strategy considered is motivated by dispatch-based manufacturing scheduling research, and employs a problem decomposition that concentrates local search on minimizing resource idle time due to setup activities. The second is motivated by research in opportunistic scheduling and advocates a problem decomposition that focuses attention on the goal activities that have the tightest temporal constraints. Analysis of experimental results gives evidence of differential superiority on the part of each strategy in different problem solving circumstances. A composite strategy based on recognition of characteristics of the current problem solving state is then defined and tested to illustrate the potential benefits of constraint-based problem structuring and multi-perspective scheduling in over-subscribe scheduling problems.

Smith, Stephen F.↗

Constraint-based integration of planning and scheduling for space-based observatory management

Progress toward the development of effective, practical solutions to space-based observatory scheduling problems within the HSTS scheduling framework is reported. HSTS was developed and originally applied in the context of the Hubble Space Telescope (HST) short-term observation scheduling problem. The work was motivated by the limitations of the current solution and, more generally, by the insufficiency of classical planning and scheduling approaches in this problem context. HSTS has subsequently been used to develop improved heuristic solution techniques in related scheduling domains and is currently being applied to develop a scheduling tool for the upcoming Submillimeter Wave Astronomy Satellite (SWAS) mission. The salient architectural characteristics of HSTS and their relationship to previous scheduling and AI planning research are summarized. Then, some key problem decomposition techniques underlying the integrated planning and scheduling approach to the HST problem are described; research results indicate that these techniques provide leverage in solving space-based observatory scheduling problems. Finally, more recently developed constraint-posting scheduling procedures and the current SWAS application focus are summarized.

Muscettola, Nicola↗

Hard X-Ray Emission of X-Ray Bursters

The primary goal of this proposal was to increase our understanding of the accretion dynamics and emission mechanisms in neutron-star low-mass x-ray binaries via accurate measurements of their broad-band x-ray spectrum with particular emphasis on the hard x-ray emission. We obtained an extensive set of Rossi X-Ray Timing Explorer (RXTE) observations of a bright hard x-ray outburst from the source 4U1728-34 including data obtained under this proposal and previously scheduled observations for another observer. We have constructed x-ray light curves in several energy bands, including hard energy bands, from these data. We also completed spectral analysis of several observations which show strong hard x-ray emission. We are currently performing timing analysis to search for possible correlations between the spectral and timing evolution of 4U1728-34. Due to the one-year delay in obtaining the observations made for the other observer (which are the ones containing the peak of the hard X-ray emission), the analysis for this project is not yet complete. Because 4U1728-34 shows interesting high-frequency timing behavior, we plan to complete the analysis as part of our on-going investigation of high-frequency timing of X-ray binaries.

Kaaret, P.↗

Optical interferometers for tests of relativistic gravity in space

A space-based astrometric interferometer with a large optical bandwidth is considered. POINTS (Precision Optical INTerferometry in Space) would measure the angular separation of two stars separated by about 90 deg on the sky with a nominal measurement error of 5 microarcseconds (mas). For a pair of mag 10 stars, the observation would require about 10 minutes. It is estimated that the instrument would measure daily the separation of two stars for each of about 60 pairs of stars; a random sequence of such measurements, if suitably redundant, contains the closure information necessary to detect and correct time dependent measurement biases to well below the nominal measurement accuracy. The 90 deg target separation permits absolute parallax measurements in all directions. A redundant observing schedule for 300 stars and 5 quasars would provide extra redundancy to compensate for the quasars' higher magnitude. If a nominal 30-day observation sequence were repeated 4 times per year for 10 years, stellar parameter uncertainties would be obtained of: 0.6 mas, position; 0.4 mas/y, proper motion; and 0.4 mas, parallax. This set of well-observed stars and quasars would form a rigid frame and the stars would serve as reference objects for measurements of all additional targets, as well as being targets of direct scientific interest. The instrument global data analysis since objectives are considered including a relativity test and technology.

Reasenberg, R. D.↗

INTEGRAL reloaded: Spacecraft, instruments and ground system

The European Space Agency’s INTErnational Gamma-Ray Astrophysics Laboratory (ESA/INTEGRAL) was launched aboard a Proton-DM2 rocket on 17 October 2002 at 06:41 CEST, from Baikonur in Kazakhstan. Since then, INTEGRAL has been providing long, uninterrupted observations (up to about 47 h, or 170 ksec, per satellite orbit of 2.7 days) with a large field-of-view (FOV, fully coded: 100 deg), millisecond time resolution, keV energy resolution, polarization measurements, as well as additional wavelength coverage at optical wavelengths. This is realized by two main instruments in the 15 keV to 10 MeV energy range, the spectrometer SPI (spectral resolution 3 keV at 1.8 MeV) and the imager IBIS (angular resolution: 12 arcmin FWHM), complemented by X-ray (JEM-X; 3–35 keV) and optical (OMC; Johnson V-band) monitor instruments. All instruments are co-aligned to simultaneously observe the target region. A particle radiation monitor (IREM) measures charged particle fluxes near the spacecraft. The Anti-coincidence subsystems of the main instruments, built to reduce the background, are also very efficient all-sky γ-ray detectors, which provide virtually omni-directional monitoring above ~75 keV. Besides the long, scheduled observations, INTEGRAL can rapidly (within a couple of hours) re-point and conduct Target of Opportunity (ToO) observations on a large variety of sources. INTEGRAL observations and their scientific results have been building an impressive legacy: The discovery of currently more than 600 new high-energy sources; the first-ever direct detection of (56)Ni and (56)Co radio-active decay lines from a Type Ia supernova; spectroscopy of isotopes from galactic nucleo-synthesis sources; new insights on enigmatic positron annihilation in the Galactic bulge and disk; and pioneering gamma-ray polarization studies. INTEGRAL is also a successful actor in the new multi-messenger astronomy introduced by non-electromagnetic signals from gravitational waves and from neutrinos: INTEGRAL found the first prompt electromagnetic radiation in coincidence with a binary neutron star merger. Up to now more than 1750 scientific papers based on INTEGRAL data have been published in refereed journals. In this paper, we will give a comprehensive update of the satellite status after more than 18 years of operations in a harsh space environment, and an account of the successful Ground Segment.

Erik Kuulkers↗

Obtaining the Greatest Scientific Benefit from Observational Platforms by Consideration of the Relative Benefit of Observations

One of the current trends in spacecraft software design is to increase the autonomy of onboard flight and science software. This is especially true when real-time observations may affect the observation schedule of a mission. For many science missions, such as those conducted by the Swift Burst Alert Telescope, the ability of the spacecraft to autonomously respond in real-time to unpredicted science events is crucial for mission success. We apply utility theory within resource management middleware to optimize the real-time performance of application software and achieve maximum system level benefit. We then explore how this methodology can be extended to manage both software and observational resources onboard a spacecraft to achieve the best possible observations.

Chelberg, David↗