Search NASA⌕ Search

SEARCH · Search NASA

Results for “ocean wave energy conversion”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Model, Design, and Control for Power Conversion in Wave Energy Converter System

Wave energy, if all been harvested along the U.S. coastline, can power around 65% of the energy consumption in U.S.. Comparing to other renewable energy sources like solar or wind, ocean wave can provide up to 90% of steady uptime. With the high energy density (2-3 kW/m 2 ), it can produce more energy with the same amount of installation area comparing to the energy density of wind turbine (0.6 kW/m 2 ) and solar panel(0.2 kW/m 2 ). The predictability of wave provides advantages like planning installation, power dispatching, and maintenance activities. Although with all these advantages, wave energy converter system is still in the research stage due to its high system cost per electricity production. One of the challenges that need to be solved is the irregularity from the wave motion that leads to high instantaneous peak power into the wave energy converter, which usually reaches up to 10 - 20 times of the average power. The high peak power will not only bring high mechanical/electrical stress but also result in an overrating design of the components in the system. Another obstacle that prevents the wave energy system from moving forward is the high testing cost from the validations in wave-energy-test sites or tank-test sites. A high-fidelity multi-disciplinary system model, including hydrodynamics, mechanical dynamics, electromagnetics, and power electronics, is needed to predict the behavior of the system and reduce the cost of design validation.

16 TIDAL AND WAVE POWER↗

2020 State of the Science Report, Chapter 1: Marine Renewable Energy and Ocean Energy System

Research, development, and deployment of marine renewable energy (MRE) conversion technologies that harvest all forms of ocean renewable resources are being advanced around the world. The potential benefits derived from capturing the abundant energy of tides, waves, ocean currents, as well as thermal and salinity gradients, continue to drive the development of the emerging MRE industry. Stakeholder understanding of the potential benefits of MRE as a renewable energy source is informed by increased science-based understanding of the potential effects of MRE installations worldwide. The international Ocean Energy Systems (OES)-Environmental collaboration continues to promote global technology cooperation and information exchange to accelerate environmentally acceptable development of viable ocean energy systems. https://tethys.pnnl.gov/publications/state-of-the-science-2020-chapter-1-MRE-OES

13 HYDRO ENERGY↗

Recent Developments at the U.S. Navy Wave Energy Test Site.

The U.S. Navy’s Wave Energy Test Site (WETS) in Hawaii has hosted two wave energy conversion (WEC) devices since its June 2015 commissioning – the Fred. Olsen BOLT Lifesaver and the Northwest Energy Innovations (NWEI) Azura – each for two deployments. Several additional devices will be tested in the coming years, beginning with the Ocean Energy device in summer 2019. The Hawaii Natural Energy Institute (HNEI) provides research and logistics support to WETS. We will provide an overview of three major activities that we have recently undertaken in this capacity. First, we will discuss results from a project in which modifications were made to the hull and float of the Azura, aimed at improving power performance for a second WETS deployment. Second, HNEI undertook a redeployment of Lifesaver beginning in October 2018, with the dual intent of achieving improvements in reliability and power performance, while also conducting an important demonstration of the use of wave power for non-grid applications. HNEI partnered with the University of Washington to integrate their Adaptable Monitoring Package (AMP) into the hull of BOLT Lifesaver. Included for this deployment was a subsea inductive charging capability from WiBotic, Inc.. These systems are powered entirely by electricity generated by the Lifesaver itself. Finally, HNEI has undertaken design improvements for the deeper berth moorings at WETS, with principal engineering guidance from DNV GL. This has included extensive numerical analysis of strength and fatigue aimed at establishing moorings that can persist for as long as possible. The resulting design will be discussed.

Wave energy conversion devices, Alternative market↗

The Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC)

The Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC) is a 6-ft wave energy device that turns seawater into drinking water. It is designed for rapid deployment in disaster response scenarios where fresh water is limited. Featuring both hydraulic and electric power takeoff systems, HERO WEC has undergone two ocean deployments at Jennette's Pier on the Outer Banks of North Carolina in addition to extensive in-lab testing. The research provides practical insights into the real-world challenges of wave energy conversion beyond modeling and dry-lab environments. Attendees will develop an understanding of the practical considerations for deploying wave energy devices and the lessons learned from real-world HERO WEC deployments.

16 TIDAL AND WAVE POWER↗

Advanced Laboratory and Field Arrays (ALFA)/Lab Collaboration Project (LCP) for Marine Energy (Final Scientific/Technical Report)

The objective of the Advanced Laboratory and Field Arrays (ALFA) project was to reduce the Levelized Cost of Energy (LCOE) of Marine and Hydrokinetic (MHK) energy by leveraging research, development, and testing capabilities at Oregon State University, University of Washington, and the University of Alaska, Fairbanks. ALFA is a project within the Pacific Marine Energy Center (PMEC; formerly NNMREC), a multi-institution entity with a diverse funding base that focuses on research and development for marine renewables. The ALFA project aimed to accelerate the development of next-generation arrays of wave energy conversion (WEC) and tidal energy conversion (TEC) devices through a suite of field-focused R&D activities spanning a broad range of strategic opportunity areas identified in the Funding Opportunity Announcement: • Device and/or array operation and maintenance (O&M) logistics development; • High-fidelity resource characterization and/or modeling technique development and validation; • Array-specific component technology development (e.g. moorings and foundations, transmission, and other offshore grid components); • Array performance testing and evaluation; and • Novel cost-effective environmental monitoring techniques and instrumentation testing and evaluation. The objective of the Lab Collaboration Project (LCP) was to accelerate the development of next-generation marine energy conversion systems. The LCP aimed to achieve these project objectives in collaboration with the national laboratories by: • Developing concept generation and assessment tools; • Improving access to existing testing resources; • Validating collision risk models between fish and turbines; and • Advancing analysis and simulation capabilities for wave-WEC interactions and PTO analysis in nonlinear ocean waves. The ALFA portion of the project was comprised of six overarching technical tasks: • Task 1: Debris Modeling, Detection and Mitigation; • Task 2: Autonomous Monitoring & Intervention; • Task 3: Resource Characterization for Extreme Conditions; • Task 4: Robust Models for Design of Offshore Anchoring and Mooring Systems; • Task 5: Performance Enhancement for Marine Energy Converter (MEC) Arrays; and • Task 6: Evaluating Sampling Techniques for MHK Biological Monitoring. The LCP was divided into four overarching technical tasks: • Task 7: Project Management and Reporting • Task 8: Novel Design and Assessment Methodologies for Wave Energy Converter Design (Wave- SPARC) • Task 9: Testing Access for Commercial Marine Renewable Energy Technology Developers • Task 10: Quantifying Collision Risk for Fish and Turbines • Task 11: Nonlinear Ocean Waves and PTO Control Strategy Each ALFA/LCP task listed above functioned as a separate and discreet project. A final Technical Report was written for each individual task and these reports were uploaded to OSTI, after receiving DOE approval. The following document is a compilation of each of these final, approved reports arranged as individual chapters.

13 HYDRO ENERGY↗

Control-inspired design and power optimization of an active mechanical motion rectifier based power takeoff for wave energy converters

Ocean waves have high energy density and are persistent and predictable. Yet, converting wave energy to a useable form remains challenging. A significant hurdle is the oscillatory nature of waves resulting in the alternating loads, which necessitate the use of rectification at some stage of the energy conversion. This research effort presents a novel design of active mechanical motion rectifier (AMMR) for the power takeoff (PTO), which provides enhanced controllability and better power performance when compared to passive mechanical motion rectifiers (MMR). Inspired by transistors used in synchronous electrical rectifiers, the proposed design uses controllable electromagnetic clutches in the mechanical transmission to allow active engagement-disengagement control; thus, rectifying the oscillatory motion into a unidirectional rotation for high energy conversion efficiency and allowing the generator in unidirectional rotation to control the bidirectional wave capture structure for maximizing the power output. A semi-analytical computational approach is developed to efficiently evaluate the optimal power achieved using the proposed AMMR-based PTO and active control. It is found that the AMMR-based PTO design yields a higher optimal power than the previous passive MMR design across the wave spectrum. The influences of generator inertia and reactive power are discussed. Furthermore, the effects of control parameters on the power output and the optimal trajectories are analyzed. Wave tank tests with the AMMR prototype demonstrated the effectiveness of AMMR based PTO design and validated the numerical analysis.

16 TIDAL AND WAVE POWER↗

Hydrodynamics and Load Shedding Behavior of a Variable-Geometry Oscillating Surge Wave Energy Converter (OSWEC)

In order to improve their long-term viability, wave energy converters (WECs) need to be able to shed loads when a threshold wave condition is exceeded. As shown by Tom et al. (2016) [1], provision of adjustable flaps within the body of an oscillating surge wave energy converter (OSWEC) allows wave energy to pass through the device. A control system may then be able to open and close the flaps when waves approaching the device exceed preset thresholds. The variable-geometry OSWEC (VG-OSWEC) concept studied in this paper is a bottom-hinged, rectangular wave paddle with five flaps of elliptical cross-section embedded into the face of the paddle. System ID tests were conducted on this VG-OSWEC device at a 1:14 scale in a wave basin. Free decay tests showed that the damping was distinctly nonlinear when the flaps were fully open, and the natural frequency increased by 40% when compared with the flaps in a fully closed configuration. Tests with regular wave conditions were used to develop the response amplitude operator for the rotational motion about the hinge. These response amplitude operator results when compared with numerical simulations run using WEC-Sim/WAMIT and ANSYS AQWA, show strong agreement with the flap open and closed conditions. The regular-wave condition measurements also show that the wave excitation moment about the hinge was reduced by up to 60% when the flaps were fully open. The experiments serve to demonstrate the potential of the variable geometry design to shed loads and survive harsh ocean environments.

load shedding↗

Advancing the HERO WEC Through Integrated Modeling, Testing, and Field Deployments: Preprint

The Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC) was developed by the National Laboratory of the Rockies as a modular platform for advancing wave-powered desalination technologies. Designed to operate in either a hydraulic or electric configuration, the system enables direct comparison of mechanical-to-water and electrical-to-water conversion pathways using a single hardware architecture. Deployments at the Jennette's Pier test site in 2022 and 2024 demonstrated freshwater production between 60 and 300 gallons per day, including successful operation in wave heights as low as 0.25 m. A structured evaluation approach combining numerical modeling of hydrodynamic and PTO response, controlled laboratory testing, and in-ocean field deployments has been used to characterize and refine system performance. Insights from these efforts are now informing the second-generation HERO WEC (V2), which incorporates improved drivetrain components, refined geometry, enhanced control systems, and design updates aimed at increasing robustness and long-duration survivability. The HERO WEC platform continues to serve as an open-access research asset supporting broader marine energy and desalination development.

16 TIDAL AND WAVE POWER↗

Advancing the HERO WEC Through Integrated Modeling, Testing, and Field Deployments

The Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC) was developed by the National Laboratory of the Rockies as a modular platform for advancing wave-powered desalination technologies. Designed to operate in either a hydraulic or electric configuration, the system enables direct comparison of mechanical-to-water and electrical-to-water conversion pathways using a single hardware architecture. Deployments in 2022 and 2024 at the Jennette's Pier test site in North Carolina demonstrated freshwater production between 60 and 300 gallons per day, including successful operation in wave heights as low as 0.25 m. A structured evaluation approach combining numerical modeling of hydrodynamic and power take-off response, controlled laboratory testing, and in-ocean field deployments has been used to characterize and refine system performance. Specifically, insights from these efforts are now informing the second-generation HERO WEC (V2) to increase robustness and overall survivability. Changes from the original prototype include improved drivetrain components, refined geometry, enhanced control systems, and design. The HERO WEC platform continues to serve as an open-access research asset supporting broader marine energy and desalination development.

16 TIDAL AND WAVE POWER↗

The Feasibility of Incorporating Engineering within SWAC and OTEC That Would Enhance Open-Ocean Aquaculture

The U.S. Department of Energy transmits to Congress the following Report to Congress on the Feasibility of Incorporating Engineering within Sea Water Air Conditioning (SWAC) and Ocean Thermal Energy Conversation (OTEC) that would Enhance Open-Ocean Aquaculture, as requested in the 2022 House Committee on Appropriations Report 117-98, an update to the previously requested Report on Ocean Thermal Energy Conversion (OTEC) and Sea Water Air Conditioning (SWAC) systems in noncontiguous states and U.S. territories, as requested in the 2021 House Committee on Appropriations Report 116-449, and more recently requested again in the 2023 House Committee on Appropriations Report 117-394.

16 TIDAL AND WAVE POWER↗

Modulation of the Eastern Equatorial Pacific Seasonal Cycle by Tropical Instability Waves

Feedbacks from tropical instability waves (TIWs) on the seasonal cycle of the eastern Pacific Ocean are studied using two eddy-rich ocean simulations, with and without TIWs. By warming the equatorial waters by up to 0.4°C through nonlinear advection in boreal summer and fall, TIWs reduce the amplitude of the seasonal cycle in upper ocean temperatures. In addition, TIWs stabilize the upper part of the Equatorial Undercurrent (EUC) through enhanced barotropic energy conversion, leading to a year-round weakening by -0.15 m s -1 and preventing an unrealistic re-intensification in boreal fall usually found in non-eddy resolving models. A coarser simulation at 1-degree horizontal resolution fails to reproduce the TIW-induced nonlinear warming of equatorial waters, but succeeds in inhibiting the EUC re-intensification. This suggests a threshold effect in TIW strength, associated with the model's ability to simulate eddies, which may be responsible for long-standing biases displayed by global climate models in this region.

58 GEOSCIENCES↗

Revisiting Theoretical Limits for One Degree-of-Freedom Wave Energy Converters

This work revisits the theoretical limits of one degree-of-freedom wave energy converters (WECs). This work considers the floating sphere used in the OES Task 10 WEC modeling and verification effort for analysis. Analytical equations are derived to determine bounds on displacement amplitude, time-averaged power (TAP), and power-take-off (PTO) force. A unique result found shows that the TAP absorbed by a WEC can be defined solely by the inertial properties and radiation hydrodynamic coefficients. In addition, a unique expression for the PTO force was derived that provides lower and upper bounds when resistive control is used to maximize power generation. For complex conjugate control, this same expression only provides a lower bound, as there is theoretically no upper bound. These bounds assist in comparing the performance of the floating sphere if it were to extract energy using surge or heave motion. The analysis shows because of differences in hydrodynamic coefficients for each oscillating mode, there are different frequency ranges that provide better power capture efficiency. The influence of a motion constraint on TAP while utilizing a nonideal power take-off is examined and found to reduce the losses associated with bidirectional energy flow. The expression to calculate TAP with a nonideal PTO is modified by the electrical conversion efficiency and the ratio of the PTO spring and damping coefficients. Furthermore, the PTO spring and damping coefficients were separated in the expression, allowing for limits to be set on the PTO coefficients to ensure net power generation.

16 TIDAL AND WAVE POWER↗

Comparing Numerical Models of the TALOS Wave Energy Converter

In this study, we present the development of a numerical model of the TALOS Wave Energy Converter (WEC) in WEC-Sim and compare it with existing numerical in-house models from Lancaster and results from DNV's Sesam code. The objective of this work is to validate the performance of the TALOS WEC using WEC-Sim and compare the results with those obtained from other numerical models. The TALOS WEC is a promising technology for the generation of clean, renewable energy from ocean waves. The development of a reliable numerical model for the TALOS WEC is crucial for its design and optimization. To achieve this, we have implemented the TALOS WEC in WEC-Sim and compared the results to in-house models from Lancaster and to results from DNV's Sesam code. Our results show good agreement with the results from Lancaster and DNV, demonstrating the accuracy and reliability of the numerical model developed in WEC-Sim. This work advances the field of wave energy conversion by providing a verified numerical model of the TALOS WEC, which can be used for further optimization and design studies.

CFD↗

Investigations into Balancing Peak-to-Average Power Ratio and Mean Power Extraction for a Two-Body Point-Absorber Wave Energy Converter

The power harnessed by wave energy converters (WECs) in oceans is highly variable and, therefore, has a high peak-to-average power (PTAP) ratio. To minimize the cost of a WEC power take off (PTO) system, it is desirable to reduce the PTAP ratio while maximizing the mean power extracted by WECs. The important issue of how PTAP ratio reduction measures (such as adding an inertia element) can affect the mean power extracted in a reference model has not been thoroughly addressed in the literature. To investigate this correlation, this study focuses on the integration of the U.S. Department of Energy’s Reference Model 3, a two-body point absorber, with a slider-crank WEC for linear-to-rotational conversion. In the first phase of this study, a full-scale numerical model was developed that predicts how PTO system parameters, along with an advanced control algorithm, can potentially affect the proposed WEC’s PTAP ratio as well as the mean power extracted. In the second phase, an appropriate scaled-down model was developed, and extracted power results were successfully validated against the full-scale model. Finally, numerical and hardware-in-the-loop (HIL) simulations based on the scaled-down model were designed and conducted to optimize or make trade-offs between the operational performance and PTAP ratio. The initial results with numerical and HIL simulations reveal that gear ratio, crank radius, and generator parameters substantially impact the PTAP ratio and mean power extracted.

16 TIDAL AND WAVE POWER↗

Application of Ocean Thermal Energy Conversion (OTEC) Systems for Powering Safety Monitoring Systems of Offshore Oil and Gas Operations. OESI 2.0 M-1 T-1-P1.1 – Objective 1 Interim Report: Summary of Offshore Oil and Gas Well Monitoring Systems and Process Power Requirements

This report is part of a comprehensive research initiative aimed at evaluating the technoeconomic feasibility of deploying greenhouse gas (GHG) emissions monitoring systems powered by small-scale renewable energy sources on the U.S. Outer Continental Shelf (OCS). The study has three primary objectives: summarizing available GHG monitoring systems for the OCS, modeling a renewable marine energy source (specifically ocean thermal energy conversion, or OTEC), and modeling the collocation of OTEC power sources with offshore oil and gas activities to offset power demand.

02 PETROLEUM↗

Cyclic bend over sheave performance of a steel tension member belt for wave energy conversion

Rotary power take-offs (PTOs) promise many benefits for commercial wave energy converters (WECs), including longer power strokes/reduced end-stop concerns, deployment advantages, and controllability. However, these winch-type PTOs can impose millions of bending cycles on the belt or rope element every year, which may lead to a failure mode known as Cyclic Bend Over Sheave, or “CBOS”. Synthetic rope, though attractive due to its high strength, low elongation, and durability, suffers from comparatively poor CBOS performance and struggles to reach a million load cycles without failing. Using belts instead of ropes for winching elements should improve CBOS performance due to having a smaller thickness that undergoes bending. Unfortunately, belts have their own host of problems. Maintaining even tension across the width of a belt subject to twist or fleet angles is a challenge, especially for WECs which can move in all 6 degrees of freedom in the ocean. This study sought to quantify the CBOS performance of a belt constructed of steel tension members in a polyurethane matrix containing longitudinal profiles. Belt samples were tested to failure or up to two million bend-unbend cycles and subject to a range of fleet angles. This paper summarizes the utilized testing methodology and the resulting belt performance.

16 TIDAL AND WAVE POWER↗

More Powerful Twistron Carbon Nanotube Yarn Mechanical Energy Harvesters

We report that stretching a coiled carbon nanotube (CNT) yarn can provide large, reversible electrochemical capacitance changes, which convert mechanical energy to electricity. Here, it is shown that the performance of these “twistron” harvesters can be increased by optimizing the alignment of precursor CNT forests, plastically stretching the precursor twisted yarn, applying much higher tensile loads during precoiling twist than for coiling, using electrothermal pulse annealing under tension, and incorporating reduced graphene oxide nanoplates. The peak output power for a 1 and a 30 Hz sinusoidal deformation are 0.73 and 3.19 kW kg -1 , respectively, which are 24- and 13-fold that of previous twistron harvesters at these respective frequencies. This performance at 30 Hz is over 12-fold that of other prior-art mechanical energy harvesters for frequencies between 0.1 and 600 Hz. The maximum energy conversion efficiency is 7.2-fold that for previous twistrons. Twistron anode and cathode yarn arrays are stretched 180° out-of-phase by locating them in the negative and positive compressibility directions of hinged wine-rack frames, thereby doubling the output voltage and reducing the input mechanical energy.

36 MATERIALS SCIENCE↗

Application of Ocean Thermal Energy Conversion (OTEC) Systems for Powering Safety Monitoring Systems of Offshore Oil and Gas Operations, OESI 2.0 M-1 T-1-P1.1 – Objective 3 Report: Collocation of OTEC with Offshore Oil and Gas Activities

This report is a component of a comprehensive research initiative aimed at evaluating the technoeconomic feasibility of deploying Ocean Thermal Energy Conversion (OTEC) systems to power safety monitoring systems for offshore oil and gas operations in the Gulf of America (GOA). The overarching study has three primary objectives: summarizing existing oil and gas equipment monitoring systems, modeling OTEC as a renewable marine energy source, and exploring the collocation of OTEC power sources with offshore oil and gas activities to offset power demand. This report specifically addresses Objective 3, focusing on the integration of OTEC systems with floating oil and gas facilities.

02 PETROLEUM↗