Search NASA⌕ Search

SEARCH · Search NASA

Results for “offshore monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Coastal Acoustic Buoy for Offshore Wind: Project Synthesis

The population of North Atlantic right whales is critically endangered and their habitat overlaps with offshore windfarm leases. It is therefore imperative that effective mitigation strategies be used to avoid impacts on right whales during the construction of offshore windfarms. The Department of Energy issued FOA Number DE-FOA-0001924 to encourage the development of technology that could monitor large exclusion zones for right whales in order to mitigate potential impact of construction noise on right whales. This report summarizes the past two years of the development and evaluation of the Coastal Acoustic Buoy for Offshore Wind (CABOW) project which aimed to develop technology to monitor large exclusion zones for North Atlantic right whales. Over the course of the project SMRU Consulting have implemented a rigorous design process including comparison of different approaches (e.g., single sensor vs multiple sensors), as well as consideration of placement and timing of acoustic monitoring. We have evaluated critical components of the CABOW system including, reliability, detection range, and bearing accuracy in areas adjacent to offshore windfarm leases in Maryland by conducting 3,536 playbacks of simulated right whale upcalls. The maximum call detection range was 7.5 km when noise was 99 dB re 1µPa rms (50-225 Hz), but this reduced to < 1 km when ambient noise levels were high. Our detection probability in the field was measured as a function of range as well as the source-to-noise level ratio allowing us to build a model to predict the probability of detection under various scenarios (sample size: 3,536 calls x 5 buoys = 17,680). The median bearing error was -0.25° but this is likely an underestimate of error due to experimental design. Using the published recall and precision of the two detectors we implemented in the CABOW system, we estimate that at a recall of 80%, our precision was > 80%, within the range of what we were aiming for in this project. To estimate our exclusion zone false negative and false positive rates, we built a simulation model using the empirical data from our field trial. We modelled three to nine CABOW units placed on the 10 km exclusion zone and estimated our false negative rate to be 1% or less (which was our project goal) and our false positive rate to be between seven and nine percent, slightly above our goal of 5%. However, we also modelled an equivalent PAM system that does not have bearing capabilities and found the false positive rates for that system to be six to eight times higher than the CABOW rate. This higher false positive rate of PAM systems with low spatial information could have significant cost repercussions for offshore wind developers by adding work shutdowns or delays without providing additional protection for right whales. The model we built allows us to explore the placement of PAM systems under various scenarios and will thus help facilitate planning of PAM mitigation systems to meet NOAA Incidental Harassment Authorizations for specific windfarms. We achieved an average system uptime of 98.3%, just below our goal of 99%. The issues that caused these short losses of data have been identified and fixed. Right whale detections and audio clips were typically transferred via radio from the buoys to the base station in two to four seconds. We therefore believe we have developed a highly robust real-time PAM system. Based on the above, we feel we have achieved the stated funding goal of developing a cost-effective and robust real-time PAM system that enables the monitoring of large exclusion zones for right whales during the constructions of offshore windfarms. This should lead to decreased costs and risks for the offshore wind sector while providing robust mitigation for right whales. It is important to state that PAM mitigation will need to be implemented with other mitigation strategies (e.g., visual observers) to provide a complete mitigation strategy to ensure that any effects on right whales from offshore windfarm construction is minimized.

17 WIND ENERGY↗

A Physics-Based Digital Twin for Wave Elevation and Seabed Moment Estimation of Offshore Monopiles: Preprint

In this work, we present a proof of concept of a physics-based digital twin for a monopile structure (with overhead inertia) subjected to wave loading. The digital twin is formulated using reduced-order models derived from first principles and combined with a Kalman filter for state estimation. The proposed framework estimates the monopile top motion, the wave elevation, and the section forces and moments along the pile using primarily acceleration measurements at the monopile top. Key innovations include the use of a hydrodynamic shape function to represent distributed wave loading in a compact and computationally efficient manner, and the introduction of a shaping filter to augment the state-space with wave kinematics. Synthetic measurement data are generated using OpenFAST and used as a reference to assess the performance of the digital twin. Results demonstrate that the wave elevation can be accurately reconstructed without direct sea-state measurements as long as the wave regime is inertia-dominated. Under the ideal tested conditions, the total hydrodynamic force and sea-bed bending moment are estimated with relative errors on the order of 1% and correlation coefficients exceeding 96%. Future work will evaluate the estimator's performance under operational uncertainties and more complex loading conditions.

17 WIND ENERGY↗

Sensitivity Analysis of Modal Parameters of a Jacket Offshore Wind Turbine to Operational Conditions

Accurate estimation of offshore wind turbine (OWT) modal parameters has a prominent effect on the design loads, lifetime prediction, and dynamic response of the system. Modal parameters can vary during the operation of OWTs. This paper studies the variation and sensitivity analysis of an OWT’s modal parameters with respect to operational and environmental conditions. Three finite element models of a jacket-supported OWT at the Block Island Wind Farm are created within the OpenSees, SAP2000, and OpenFAST platforms and validated using experimental measurements. The OpenFAST model is used to simulate the modal parameters of the turbine under various wind speed, rotor speed, power, yaw angle, mean sea level, blade pitch angle, and soil spring values. The model-predicted modal parameters of the first fore–aft (FA) and side–side (SS) modes are compared to those identified from experimental measurements. Results from the simulations show that the first FA natural frequency and damping ratio mostly depend on the rotor speed and wind speed, respectively, while yaw angle and mean sea level do not have a visible effect. It is observed that there is about 8% stiffening in the first FA frequency and an aerodynamic damping of 7.5% during the operation of the OWT.

17 WIND ENERGY↗

Development of Event-Based Data Acquisition for Acoustic Emission Monitoring of the Structural Integrity of Wind Turbine Blades [Slides]

DOE Alignment: Reduce the cost of floating offshore wind energy in deep waters to $45/MWh by 2035 from today’s estimated $150/MWh20 by: Developing operations and maintenance strategies and increasing wind turbine reliability to reduce periods of non-operation and reduce labor at sea through remote system health monitoring, inspection, and maintenance capabilities incorporating artificial intelligence and predictive maintenance.

17 WIND ENERGY↗

Field Validation of MVA Technology for Offshore CCS: Novel Ultra-High-Resolution 3D Marine Seismic Technology (P-Cable) (Final Report)

The objectives of the proposed study were to deploy and validate a specific monitoring technology, high-resolution 3D marine seismic (HR3D), appropriate for large-demonstration and commercial-scale offshore CCS sites. The project accomplished successful acquisition two HR3D seismic surveys. The first HR3D dataset was over the offshore injection site of the Tomakomai, Japan integrated pilot CCS project, which at the time of survey acquisition was actively injecting CO 2 . The first survey also represented a successful international collaboration between the DOE NETL program and Japan’s national CCS program and was the first successful acquisition and use of HR3D over an active CO 2 injection site (Meckel, Feng et al. 2019). The Tomakomai HR3D survey successfully tested a novel 4-streamer HR3D system array in which, for the first time, no cross-cable (aka “P-Cable”) was utilized and only four GeoEel streamers were used instead of the standard 12-streamer configuration. Consequently, this was not, strictly speaking, a deployment of the “P-Cable” system of (Planke and Berndt 2004) but rather a modified version, thereof, and it is the first known demonstration of the modified system configuration. One very positive outcome from the Japanese collaboration earlier in the project was the ability to learn from the Japanese how they used tail buoys with GPS to determine the position of the seismic source and receivers in time and space. Based on that experience, GCCC designed and built six GPS receivers that could be used to position the streamer receivers and the seismic source via tail buoys. A fundamental advance that was made on the original design, was the ability to directly power the tail buoy GPS units and transfer data through the streamers (i.e., vs. the batteries used at Tomakomai). The bulkiness of the GPS batteries caused drag and episodic surging of the buoys, which affected data quality by lifting up the tail end of the streamers so the receivers were not at the same depth. The units were tested onshore for accuracy and functionality, and the design was subsequently and successfully tested in marine acquisition mode during the SLP survey acquisition. The marine acquisition test and survey satisfied Subtasks 2.2.2, Novel Positioning Technology Selection and Subtask 2.2.3, Novel Positioning Technology Deployment. Results of the novel positioning technology selection (Subtask 2.2.2) were considered successful and will be incorporated in future HR3D seismic acquisition projects to reduce costs, improve deployment safety at sea, and integrate both seismic and data recording via a single data transfer through the streamers to the recording system. The project also established a permitting process through NETL NEPA compliance, which included an Environmental Assessment in a marine setting and is required for conducting these types of surveys using Federal funding. The permitting process charted a “boilerplate,” which can allow future surveys related to other funded projects to move forward more expeditiously. Future improvements that could be considered are more robust seals on the GPS module and stronger materials (especially joints) on tail buoy fabrication. These would increase fixed costs, but would be advisable and probably more economic long-term if multiple HR3D surveys are planned. Project Accomplishments include: • Pre-survey Sensitivity Study • Marine geochemistry methods and data analysis • Successful HR3D seismic dataset acquired @ Tomakomai active CO 2 injection marine site • Developed advanced seismic processing techniques • No NRMS anomalies detected in overburden; Demonstration of containment • Repeatability study • Second survey collected @ San Luis Pass, TX • 4D application using positioning techniques developed in the project for monitoring were successful

3D seismic GPS positioning↗

Potential of U.S. Marine and Offshore Wind Energy to Power Marine Carbon Dioxide Removal

The goal of this project was to provide a preliminary feasibility assessment of powering different marine carbon dioxide removal (mCDR), carbon capture (mCC), and carbon sequestration (mCS) strategies with marine energy. The investigation focused on methods with clear power requirements at sea beyond monitoring such as artificial upwelling, deep ocean storage, electrochemical (eChem) mCDR and mCC, offshore microalgae cultivation, and seaweed farming and sinking. The project found that eChem mCDR powered by marine energy and offshore wind energy available in the United States could meet global CDR scales needed by 2040 and 2050 to limit warming to 1.5 degrees C by 2100 and marine energy alone could greatly contribute to reaching scales needed by 2040. Note that this preliminary estimate assumes that it is possible to harvest all the marine and offshore wind resources available in the United States with existing technology options. Though the biological methods were limited in scale they still hold promise in developing carbon negative fuels and products which can reduce emissions in the short term.

afforestation↗

A Heterogeneous System for Eagle Detection, Deterrent, and Wildlife Collision Detection for Wind Turbines (Final Technical Report)

This report summarizes the design, implementation, and test of an integrated system for automated detection and deterrence of eagles, with included wind turbine blade strike detection and imaging functionality. A machine learning approach was used in conjunction with a 360° camera system for automated detection and classification of golden eagles. This was developed using footage obtained from trained golden eagles and other raptors, in collaboration with wildlife biologists and professional bird handlers. Oregon State University developed a visual deterrent system, which uses inflatable anthropomorphic sculptures with random, kinetic motion to deter eagles, and conducted limited field testing on live eagles; the deterrent can be triggered by the visual detection of eagles using the vision system. Finally, a multi-sensor module was developed that is mounted at the turbine blade root. This module measures vibration and other motions to detect blade strikes, and an integrated on-blade camera captures an image of any impacting objects. Long-term, this blade strike detection system is intended to support an automatic monitoring and certification system for the eagle detection and deterent system. Independent field testing of each system component is described. Testing of the integrated system on an operational wind turbine was conducted across three separate field tests. This includes multi-day fields tests on a General Electric 1.5MW wind turbine at the National Renewable Energy Laboratory (NREL) National Wind Technology Center (NWTC) in Boulder, CO in October 2018 and July 2019; installation procedures, test procedures, and a summary of collected data are presented. A third multi-day on-turbine field test is also presented, which was performed using a General Electric 1.5MW wind turbine at the North American Wind Research and Training Center (NAWRTC) at Mesalands Community College, Tucumcari, NM in April 2019. Across these field tests, the vision system was demonstrated using unmanned aerial vehicles (UAV), and the eagle classification algorithm was not tested; the visual deterrent system was demonstrated, including automatic, remote deployment following surrogate visual detections; and, multi-sensor on-blade data was recorded across multiple wind turbine operational conditions and through more than 100 surrogate blade strikes using soft projectiles, including the successful demonstration of automatic image capture of striking objects. This data set was also used for offline development and validation of enhanced collision detection algorithms. As summarized in this report, the development and field validation of an integrated detection, deterrent, and blade collision detection system represents a critical proof of concept for future technology development of related detection and deterrent technologies, where both deterrent as well as collision detection recording devices are needed for future siting, monitoring, and operation of wind turbine installations, both onshore and offshore.

17 WIND ENERGY↗

Mapping of Benthic Habitats at Marine Renewable Energy Sites Using Multibeam Echosounder and Sediment Profile Imaging Technologies

Objectives/Scope: The goal of this work was to develop a consistent and semi-automated seafloor survey method for generating high-resolution, benthic habitat maps for environmental assessments and monitoring of marine renewable energy sites. Sediment profile and plan view imaging (SPI/PV) technology was combined with multibeam bathymetry and acoustic backscatter methods to demonstrate a rapid, cost-effective benthic mapping protocol. A key technical innovation of this project was the development of an image processing platform that automatically measures key features from the images. Methods: Multibeam echosounder (MBES) acoustic and SPI/PV surveys were conducted at three coastal areas off the U.S. west coast, including the PacWave South energy test site off of Newport, Oregon. Point data on physical and biological sediment conditions obtained from the SPI/PV imagery were used to efficiently ground-truth the high-resolution MBES bathymetry and backscatter mosaics. The SPI camera is an optical corer that obtains an undisturbed 21 by 15 cm, high-resolution, cross-sectional image of the sediment–water interface and upper sediment column. The plan view camera attached to the SPI camera frame captures a downward looking view of the seabed immediately before the SPI image is obtained. As part of this project, we developed a computer vision image processing platform (iSPI) that uses deep convolutional neural networks and other approaches to automatically identify and measure key features in the images, such as grain size and surface relief. Results: Detailed benthic habitat maps were generated using this mapping approach for three different marine settings. The sites mapped included a silt-dominated embayment; a sloping, nearshore, transitional very fine to coarse sand bottom; and a medium, sand-dominated continental shelf marine energy test site. In each case, acoustic and imaging surveys were completed in less than week, and detailed benthic habitat maps were generated within 60 days. The results were placed within the Coastal and Marine Ecological Classification Standard (CMECS) habitat mapping framework, and various combinations of the bathymetry, backscatter, and SPI and PV data were used to generate CMECS component maps. Novel Information: This project developed and demonstrated a repeatable and cost-effective approach for efficiently mapping benthic habitat conditions over broad areas of the seafloor by combining state-of-the-art acoustic and imaging techniques. The primary survey tools used in this project have been used previously in both the offshore renewable (wind) and oil and gas sectors to map and monitor benthic environments. This project’s innovations include 1) the focused use of high-resolution SPI/PV imagery to ground-truth acoustic mosaics, and 2) the development of a computer automated image analysis processing tool that both streamlines and standardizes the generation of data from the imagery and makes the data extraction process more cost-effective and repeatable.

13 HYDRO ENERGY↗

A digital twin solution for floating offshore wind turbines validated using a full-scale prototype

Abstract. In this work, we implement, verify, and validate a physics-based digital twin solution applied to a floating offshore wind turbine. The digital twin is validated using measurement data from the full-scale TetraSpar prototype. We focus on the estimation of the aerodynamic loads, wind speed, and section loads along the tower, with the aim of estimating the fatigue lifetime of the tower. Our digital twin solution integrates (1) a Kalman filter to estimate the structural states based on a linear model of the structure and measurements from the turbine, (2) an aerodynamic estimator, and (3) a physics-based virtual sensing procedure to obtain the loads along the tower. The digital twin relies on a set of measurements that are expected to be available on any existing wind turbine (power, pitch, rotor speed, and tower acceleration) and motion sensors that are likely to be standard measurements for a floating platform (inclinometers and GPS sensors). We explore two different pathways to obtain physics-based models: a suite of dedicated Python tools implemented as part of this work and the OpenFAST linearization feature. In our final version of the digital twin, we use components from both approaches. We perform different numerical experiments to verify the individual models of the digital twin. In this simulation realm, we obtain estimated damage equivalent loads of the tower fore–aft bending moment with an accuracy of approximately 5 % to 10 %. When comparing the digital twin estimations with the measurements from the TetraSpar prototype, the errors increased to 10 %–15 % on average. Overall, the accuracy of the results is promising and demonstrates the possibility of using digital twin solutions to estimate fatigue loads on floating offshore wind turbines. A natural continuation of this work would be to implement the monitoring and diagnostics aspect of the digital twin to inform operation and maintenance decisions. The digital twin solution is provided with examples as part of an open-source repository.

17 WIND ENERGY↗

Low-Flow Marine Hydrokinetic Turbine for Small Autonomous Unmanned Mobile Recharge Stations

A prototype low-flow marine current turbine for deployment from a small unmanned mobile floating platform has been developed for autonomously seeking and harnessing tidal/coastal currents. The support platform is an unmanned surface vehicle (USV), in the form of a catamaran with two electric outboard motors and with capabilities for autonomous navigation. The USV utilized is a WAM-V 16 vehicle that has been developed separately with support from the Office of Naval Research (ONR) [1]. The marine current turbine is based on a freestream waterwheel (FSWW), also known as an undershot waterwheel (FSWW), mounted on the stern of the USV. The concept of operation involves the USV autonomously navigating to a designated marine current resource. Upon arrival, the USV anchors itself, aligns with the current, and deploys the FSWW turbine using a custom cable-lift mechanism. The turbine harnesses the local current, and an onboard power-take-off (PTO) device converts the mechanical energy into electricity, which is stored in an onboard battery bank. When energy harvesting is completed, the turbine and the anchor are retrieved and the USV navigates to a selected location. These unmanned at-sea platforms can provide power to other unmanned maritime systems. Specifically, in this project, the power generated onboard can be used to charge aerial drones via a custom flight deck that has been developed for the USV. The recharging capabilities offered by a fleet of such strategically placed recharging stations can significantly benefit aerial drones operating in the maritime domain by eliminating the need to travel back and forth to land or ship based charging stations. The project has resulted in the development of subcomponents, including the FSWW turbine, a novel PTO, an automated anchoring system for the USV, an automated turbine deployment system, and a flight deck with capabilities onboard the USV for landing, direct-contact charging and takeoff of aerial drones. The design and development of these subsystems have culminated in the overall prototype marine hydrokinetic platform (MHK Platform, Fig. 1). Comprehensive lab and field testing have been conducted to validate the functionality and performance of the platform and its components. The project demonstrates the potential for autonomous, unmanned systems to harness renewable energy from marine currents, and provide sustainable power solutions for maritime applications such as coastal surveillance and environmental monitoring; shoreline mapping; search and rescue; oceanographic research; inspection and maintenance of offshore energy installations like wind turbines and oil rigs; oil spill response; maritime disaster response; and aerial surveys, as well as facilitation of data transfer drones and shore stations.

16 TIDAL AND WAVE POWER↗

International assessment of priority environmental issues for land-based and offshore wind energy development

Non-technical summary A substantial increase in wind energy deployment worldwide is required to help achieve international targets for decreasing global carbon emissions and limiting the impacts of climate change. In response to global concerns regarding the environmental effects of wind energy, the International Energy Agency Wind Technical Collaborative Program initiated Task 34 – Working Together to Resolve Environmental Effects of Wind Energy or WREN. As part of WREN, this study performed an international assessment with the global wind energy and environmental community to determine priority environmental issues over the next 5‒10 years and help support collaborative interactions among researchers, developers, regulators, and stakeholders. Technical summary A systematic assessment was performed using feedback from the international community to identify priority environmental issues for land-based and offshore wind energy development. Given the global nature of wind energy development, feedback was of interest from all countries where such development is underway or planned to help meet United Nations Intergovernmental Panel on Climate Change targets. The assessment prioritized environmental issues over the next 5–10 years associated with wind energy development and received a total of 294 responses from 28 countries. For land-based wind, the highest-ranked issues included turbine collision risk for volant species (birds and bats), cumulative effects on species and ecosystems, and indirect effects such as avoidance and displacement. For offshore wind, the highest-ranked issues included cumulative effects, turbine collision risk, underwater noise (e.g. marine mammals and fish), and displacement. Emerging considerations for these priorities include potential application to future technologies (e.g. larger turbines and floating turbines), new stressors and species in frontier regions, and cumulative effects for multiple projects at a regional scale. For both land-based and offshore wind, effectiveness of minimization measures (e.g. detection and deterrence technologies) and costs for monitoring, minimization, and mitigation were identified as overarching challenges. Social media summary Turbine collisions and cumulative effects among the international environmental priorities for wind energy development.

17 WIND ENERGY↗

Integrating in situ environmental covariates in an American lobster catch model to improve impact assessment

The installation and operation of floating offshore wind power is an integral component of societal transition to renewable energy generation where fixed bottom offshore wind is not possible. However, it will cause unique ecosystem changes. To disentangle the effects of offshore wind installations from the concurrent effects of climate change and the fishing practices on commercially significant resources, we must develop detailed characterizations of the resources before development occurs. In the Gulf of Maine, American lobster is the most commercially and culturally important fishery. At the time of writing, this is the largest fishery by value in North America. Our understanding of baseline localized parameters (such as catch per trap at the spatial scale of individual turbines) should be informed by relationships to environmental, biological, and survey-specific functional drivers of catch. A more mechanistic understanding of catch will allow for strategic adjustments to Post- Deployment fishery responses and ultimately, the development of research- and commercial-scale floating offshore wind development. Here, we used survey data from the New England Aqua Ventus Pre-Construction Commercial Trapping Survey to develop Generalized Additive Models describing seasonal catch per trap for legal and sublegal lobsters. We found fall catch to be nearly twice that of spring. Bottom temperature dynamics could be used to predict catch, and the Fall survey was associated with a warmer temperature regime. By using analytical tools that incorporate environmental heterogeneity, we developed monitoring methods from preconstruction baseline data that will be applicable over the post-construction operating period of an offshore wind farm.

BACI↗

A surrogate-model-based approach for estimating the first and second-order moments of offshore wind power

Power curve, the functional relationship that governs the process of converting a set of weather variables experienced by a wind turbine into electric power, is widely used in the wind industry to estimate power output for planning and operational purposes. Existing methods for power curve estimation have three main limitations: (i) they mostly rely on wind speed as the sole input, thus ignoring the secondary, yet possibly significant effects of other environmental factors, (ii) they largely overlook the complex marine environment in which offshore turbines operate, potentially compromising their value in offshore wind energy applications, and (ii) they solely focus on the first-order properties of wind power, with little (or null) information about the variation around the mean behavior, which is important for ensuring reliable grid integration, asset health monitoring, and energy storage, among others. In light of that, this study investigates the impact of several wind-and wave-related factors on offshore wind power variability, with the ultimate goal of accurately predicting its first two moments. Further, our approach couples OpenFAST—a multi-physics wind turbine simulator—with Gaussian Process (GP) regression to reveal the underlying relationships governing offshore weather-to-power conversion. We first find that a multi-input power curve which captures the combined impact of wind speed, direction, and air density, can provide double-digit improvements, in terms of prediction accuracy, relative to univariate methods which rely on wind speed as the sole explanatory variable (e.g. the standard method of bins). Wave-related variables are found not important for predicting the average power output, but interestingly, appear to be extremely relevant in describing the fluctuation of the offshore power around its mean. Tested on real-world data collected at the New York/New Jersey bight, our proposed multi-input models demonstrate a high explanatory power in predicting the first two moments of offshore wind generation, testifying their potential value to the offshore wind industry.

17 WIND ENERGY↗

Site Identification framework and environmental compliance for floating ocean turbines in US Waters (Abstract)

Like all potential marine energy deployment sites, characterizing the site, understanding the environmental interactions with floating tidal technology, and mapping a pathway towards regulatory acceptance will be needed to site and permit ocean current development within the Florida Current. The proposed work will be based on a modeling analysis, a desk-top review and analysis, focusing on the characteristics of the ocean current technology and environmental monitoring information on the marine animals and habitats that are specific to the appropriate latitude, particularly those that are endemic to the offshore Florida area. The analysis will also describe the state and federal authorizations required for deploying a floating tidal energy technology, with an emphasis on how they differ from those in Washington, Alaska, and Maine. Environmentally compliant sites within Florida Current will be selected based on environmental, logistical, and regulatory criteria. Recommendations on monitoring needs and adaptive management practices will be provided. The need to acquire social acceptance for the Orbital Marine Power technology will also be explored and general recommendations prepared to encourage the best acceptance in the communities of interest.

16 TIDAL AND WAVE POWER↗

Deep neural operators can predict the real-time response of floating offshore structures under irregular waves

The use of neural operators in a digital twin model of an offshore floating structure holds the potential for a significant shift in the prediction of structural responses and health monitoring, offering valuable real-time control insights. In this work, we investigate the effectiveness of three neural operators, namely the deep operator network (DeepONet), the Fourier neural operator (FNO), and the Wavelet neural operator (WNO), to accurately capture the responses of a floating structure under six different sea state codes (3 − 8) based on the wave characteristics described by the World Meteorological Organization (WMO). To further enhance the accuracy of the vanilla architecture of the neural operators, novel extensions, such as wavelet-DeepONet and self-adaptive WNO, are proposed in this paper. The results demonstrate that these high-precision neural operators can deliver structural responses more efficiently, up to two orders of magnitude faster than a dynamic analysis using conventional numerical solvers. Additionally, compared to gated recurrent units (GRUs), a commonly used recurrent neural network for time-series estimation, neural operators are both more accurate and efficient, especially in situations with limited data availability. Taken together, our study shows that FNO outperforms all other operators for approximating the mapping of one input functional space to the output space as well as for responses that have small bandwidth of the frequency spectrum. Conversely, DeepONet, with historical states, proves most accurate in learning the mapping of multiple input functions to the output space and capturing responses within a broad frequency spectrum.

97 MATHEMATICS AND COMPUTING↗

Mission Analysis for Marine Renewable Energy to Provide Power for Marine Carbon Dioxide Removal

The mission of this project was to provide a preliminary feasibility assessment of powering different marine carbon dioxide removal (mCDR), marine carbon capture, and marine carbon sequestration strategies with marine energy. In this report, carbon capture refers to methods that can separate or capture carbon dioxide (CO 2 ) from the air or ocean; carbon sequestration refers to methods that store CO 2 obtained by capture methods out of the atmosphere for long periods of time; and carbon dioxide removal (CDR) refers to methods that do both. The project found that mCDR powered by marine energy and offshore wind energy available in the United States could meet global CDR scales needed by 2040 and 2050 to limit warming to 1.5 degrees C by 2100. Note that this preliminary estimate assumes that it is possible to harvest all the marine and offshore wind resources available in the United States with existing technology options, and it does not account for the power needed for monitoring these methods, as these power needs are not yet well defined and require further research. Additionally, these CDR scales will still require emissions reductions.

16 TIDAL AND WAVE POWER↗

A meteorological overview of the ORACLES (ObseRvations of Aerosols above CLouds and their intEractionS) campaign over the southeastern Atlantic during 2016–2018: Part 1 – Climatology

In 2016–2018, the ObseRvations of Aerosols above CLouds and their intEractionS (ORACLES) project undertook 3-month-long deployments to the southeastern (SE) Atlantic Ocean using research aircraft to better understand the impact of biomass burning (BB) aerosol transport to the SE Atlantic Ocean on climate. In this (part 1 of the meteorological overview) paper, the climatological features at monthly timescales are investigated. The southern African easterly jet (AEJ-S), defined as the zonal easterlies over 600-700 hPa exceeding 6 m s-1 around 5-15°S, is a characteristic feature of the mid-level circulation over southern Africa that was also during the deployment months of August 2017, September 2016, and October 2018. Climatologically, the AEJ-S develops at lower altitudes (~3 km; 700 hPa) between 5-10° S in August, while it develops at around 4 km (~600 hPa) and further south (5-15 °S) in September and October, largely driven by the strong sensible heating over the African plateau. Notable meteorological anomalous characteristics during the 3 deployment months, compared to climatology (2000-2018), include the following: (1) during August 2017, the AEJ-S was weaker than the climatological mean, with an additional anomalous upper-level jet aloft (~6 km) around 10 °S. August 2017 was also drier over the SE Atlantic at 600-700 hPa than climatology, with a stronger Benguela low-level jet (LLJ) at 925-950 hPa along the Namibian coast of the SE Atlantic. Consistent with this, the southern Atlantic anticyclone was also stronger and closer to the coast than the August climatological mean. (2) During September 2016, the AEJ-S intensity was similar to the climatological mean, although the heat low and vertical motion over the land was slightly stronger compared to the September climatology. The LLJ and the large-scale southern Atlantic anticyclone were stronger than the climatological mean. (3) During October 2018, the AEJ-S was slightly weaker compared to the climatological mean, as was the LLJ and the southern Atlantic anticyclone. October 2018 was wetter over the Benguela coastal region at 600 hPa than the climatological mean. During all the deployment months, the sea surface temperatures (SST) over the SE Atlantic were warmer than the climatological means, but the monthly mean low cloud fraction was only noticeably reduced in August 2017. A weak August 2017 AEJ-S can explain low offshore black carbon (BC) mixing ratios within the European Centre for Medium-Range Weather Forecasts (ECMWF) Copernicus Atmosphere Monitoring Service (CAMS) reanalysis, although the BC peak altitude, at 2-3 km, is below that of the AEJ-S. The upper-level wave disturbance and the associated anomalous circulation also explain the weakening of AEJ-S through the reduction of the strength of the heat low over the land during August 2017.

54 ENVIRONMENTAL SCIENCES↗

Monitoring of Photovoltaic (PV) Performance and Degradation: Integrated Renewable Energy Systems (IRES) - PV Monitoring Task

The Integrated Renewable Energy System (IRES) testbed demonstration at the Pacific Northwest National Laboratory (PNNL) Sequim campus includes development of a suite of capabilities for tracking the performance of photovoltaic (PV) renewable energy components located on a floating platform (floating PV) and on a shoreline building rooftop. The marine environment represents potentially harsh and corrosive conditions for PV modules. Compared to terrestrial PV, potential concerns for offshore PV arising from high humidity and occasional contact with saltwater, marine wildlife, and aquaculture. These environmental factors can reduce electricity generation efficiency and increase the risk of electrical faults, polymer insulation or jacketing degradation and hydrolysis of the PV cell encapsulant materials. Offshore PV modules may also be exposed to lower temperatures and buoyant and vibrating motions with a floating platform. It is not clear how the long-term performance of floating PV will be affected by these factors. To understand expected energy generation through solar cells on a floating platform, monitoring of the performance of PV modules in the marine environment is needed. This report outlines a plan for long-term testing of IRES PV components utilizing resources of the PNNL Material Aging and Detection (MAaD) Science team and the Marine and Coastal Research Laboratory (MCRL). Equipment applicable for onsite testing and real-time monitoring of the PV performance associated with environmental conditions including temperature, solar irradiance, shading and soiling is included. In case of performance loss, equipment for fault detection, failure analysis, material testing, and further troubleshooting are also available. Through establishment of this capabilities, the enabling IRES project sets the stage for future research to advance off-shore and near-shore energy options for businesses and communities.

14 SOLAR ENERGY↗