Search NASA⌕ Search

SEARCH · Search NASA

Results for “operations maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

How To Determine and Verify Operations and Maintenance Savings in Energy Savings Performance Contracts

Operations and maintenance (O&M) savings frequently occur in energy savings performance contracts (ESPCs). During FY 2022, 37% of reported annual cost savings for projects awarded under the U.S. Department of Energy (DOE) ESPC indefinite delivery indefinite quantity (IDIQ) contracts and in the performance period were due to O&M or other energy- and/or water-related cost savings, with the balance (63%) from utility cost savings (i.e., energy or water cost savings). Sometimes the energy- and water-related cost savings are acknowledged and included in payments within ESPCs; other times, for various reasons, they are not. As presented in this guide, FEMP recommends including energy- and water-related cost savings that are O&M (including related repair and replacement) savings in the financial aspects of an ESPC, to the extent such savings can be documented. Inclusion of these savings will help augment project scopes and/or lower interest costs (by shortening financing terms). However, there is a burden of proof as to what constitutes acceptability in O&M savings that needs to be carefully considered and documented in individual projects. Beyond promoting a key tenet used in U.S. federal performance contracting—that savings must be from actual budgets and therefore based on the level of O&M that is actually occurring, not what should have been performed—FEMP also recommends good practice in establishing and documenting O&M baselines, formulating the rationale for baseline adjustments during the performance period, and conducting ongoing verification activities. This document concludes with five examples of how O&M savings may be handled, in situations ranging from the partial displacement of O&M contracts to consolidation and “virtualization” of servers in data centers. A key theme that permeates this guide is the importance of thoroughly documenting all conditions and assumptions used in the development of and accounting for O&M costs and savings throughout the ESPC life cycle, from baseline-setting to measurement and verification (M&V) of the savings during each year of the performance period. Doing so not only prevents internal claims of non-performance (especially in the case of staff turnover during the contract term), but also simplifies ordering agency and energy service company (ESCO) response in the event of scrutiny from oversight organizations, such as government audits. While this guide focuses on federal ESPCs, it may also be applicable when O&M savings are included in utility energy service contracts (UESCs) and non-federal ESPCs.

Voss, Phil↗

Operation and maintenance cost data for residential photovoltaic modules/panels

Costs associated with the operation and maintenance of residential photovoltaic modules and arrays are studied. Six basic topics related to operation and maintenance to photovoltaic arrays are investigated: maintenance; cleaning; panel replacement; gasket repair/replacement; wiring repair/replacement; and termination repair/replacement. The effects of the mounting types (rack mount, stand off mount, direct mount and integral mount) and the installation/replacement type (sequential, partial interruption and independent) are identified and described. Methods of reducing maintenance costs are suggested.

Oster, J. R., Jr.↗

Co-optimization of nuclear reactor flexible power operation and maintenance scheduling

As flexible power operation of nuclear power plants becomes more attractive due to the reduction in fossil-fueled dispatchable generation on energy grids, finding optimal power production strategies that balance revenue generation with operational concerns becomes more complex. This article presents a general framework to aid operators in designing economically optimal long term dispatch strategies for nuclear power plants. The principal novelty is the linking of estimated system remaining useable life (RUL) to strategic operational decisions. It is shown that, depending on the relationship between the fixed costs from maintenance and the associated lost revenue from an outage, it can be economically optimal in the long term to delay a maintenance outage and not perform this alongside refueling. For a given relationship between power ramping and degradation, optimal strategies were found that discouraged load following in some situations while minimizing unnecessary maintenance. It is shown that heavy load following can cause maintenance and refueling outages to diverge due to their inverse relationships with respect to load following, potentially leading to a significant loss in capacity factor. As a result, this general framework can be applied to specific reactor dispatch allowing operators to adapt operational strategies as future grid conditions change.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Maintenance and operations cost model for DSN subsystems

A procedure is described which partitions the recurring costs of the Deep Space Network (DSN) over the individual DSN subsystems. The procedure results in a table showing the maintenance, operations, sustaining engineering and supportive costs for each subsystems.

Burt, R. W.↗

Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

Source record↗

Build-to-Replace Strategy to Reduce Operations and Maintenance Costs for Advanced Reactors

This paper targets the reduction of fixed operations and maintenance (O&M) costs for advanced reactor (AR) designs. This goal will be severely constrained if the underlying assumptions of O&M approaches and practices are not questioned and reexamined, especially today when changes can be implemented effectively and efficiently. Achieving a reduction in AR O&M costs requires a completely new way of thinking -a paradigm shift- not through incremental, technology-focused approaches alone. Here, we address this challenge by evaluating the impact of moving to a shorter design life for major structures, systems, and components and shorter, more predictable refurbishment cycles as modeled by the commercial airline industry: the build-to-replace approach. This paper provides a brief overview of this different mindset to O&M applied to ARs and it provided a set of analytical tools based on multi-objective optimization to identify the benefits of such an approach. In conclusion, we provide a direct example analysis of a build-to-replace scenario by identifying and evaluating scenarios for reduced system and component lifetimes and associated replacement and refurbishment schedules to evaluate impacts on O&M costs and other lifecycle elements, such as structure, system, and component reliability.

97 - MATHEMATICS AND COMPUTING↗

Operations and Maintenance for Electric Vehicle Charging Infrastructure in Indian Country

This fact sheet provides an overview of operations and maintenance (O&M) costs, responsibilities, and contracts to help ensure EV charging infrastructure remains functional and reliable in Indian Country. O&M planning is important for Tribes to consider at the beginning of EV charging infrastructure projects to help ensure charger uptime and longevity.

33 ADVANCED PROPULSION SYSTEMS↗

Operations and maintenance manual for a scale-model lunar roving vehicle

A one-sixth scale model of the lunar roving vehicle used in the Apollo 15 mission was built and instrumented to conduct model studies of vehicle mobility. The model was free running under radio control and was equipped with a lightweight telemetry transmitter that allowed 16 channels of data to be gathered simultaneously. String payout and fifth-wheel devices were developed to measure vehicle velocity. Other real-time measurements included wheel torque, wheel speed, center-of-gravity accelerations, and steering forces. Calibration, operations, and maintenance procedures were worked out. Details of the development of the instrumentation, its maintenance, and some of the problems encountered, are recorded serve as a preliminary operations and maintenance manual for this specific model. In addition, information regarding soil processing and testing that may be useful to NASA personnel planning mobility research with the model in soil is furnished.

Lessem, A. S.↗

Intelligent systems and advanced user interfaces for design, operation, and maintenance of command management systems

Historically, command management systems (CMS) have been large and expensive spacecraft-specific software systems that were costly to build, operate, and maintain. Current and emerging hardware, software, and user interface technologies may offer an opportunity to facilitate the initial formulation and design of a spacecraft-specific CMS as well as to develop a more generic CMS system. New technologies, in addition to a core CMS common to a range of spacecraft, may facilitate the training and enhance the efficiency of CMS operations. Current mission operations center (MOC) hardware and software include Unix workstations, the C/C++ programming languages, and an X window interface. This configuration provides the power and flexibility to support sophisticated and intelligent user interfaces that exploit state-of-the-art technologies in human-machine interaction, artificial intelligence, and software engineering. One of the goals of this research is to explore the extent to which technologies developed in the research laboratory can be productively applied in a complex system such as spacecraft command management. Initial examination of some of these issues in CMS design and operation suggests that application of technologies such as intelligent planning, case-based reasoning, human-machine systems design and analysis tools (e.g., operator and designer models), and human-computer interaction tools (e.g., graphics, visualization, and animation) may provide significant savings in the design, operation, and maintenance of the CMS for a specific spacecraft as well as continuity for CMS design and development across spacecraft. The first six months of this research saw a broad investigation by Georgia Tech researchers into the function, design, and operation of current and planned command management systems at Goddard Space Flight Center. As the first step, the researchers attempted to understand the current and anticipated horizons of command management systems at Goddard. Preliminary results are given on CMS commonalities and causes of low re-use, and methods are proposed to facilitate increased re-use.

Potter, William J.↗

Intelligent Systems and Advanced User Interfaces for Design, Operation, and Maintenance of Command Management Systems

Historically Command Management Systems (CMS) have been large, expensive, spacecraft-specific software systems that were costly to build, operate, and maintain. Current and emerging hardware, software, and user interface technologies may offer an opportunity to facilitate the initial formulation and design of a spacecraft-specific CMS as well as a to develop a more generic or a set of core components for CMS systems. Current MOC (mission operations center) hardware and software include Unix workstations, the C/C++ and Java programming languages, and X and Java window interfaces representations. This configuration provides the power and flexibility to support sophisticated systems and intelligent user interfaces that exploit state-of-the-art technologies in human-machine systems engineering, decision making, artificial intelligence, and software engineering. One of the goals of this research is to explore the extent to which technologies developed in the research laboratory can be productively applied in a complex system such as spacecraft command management. Initial examination of some of the issues in CMS design and operation suggests that application of technologies such as intelligent planning, case-based reasoning, design and analysis tools from a human-machine systems engineering point of view (e.g., operator and designer models) and human-computer interaction tools, (e.g., graphics, visualization, and animation), may provide significant savings in the design, operation, and maintenance of a spacecraft-specific CMS as well as continuity for CMS design and development across spacecraft with varying needs. The savings in this case is in software reuse at all stages of the software engineering process.

Mitchell, Christine M.↗