Search NASA⌕ Search

SEARCH · Search NASA

Results for “payload challenges”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Heliophysics Environmental & Radiation Measurement Experiment Suite (HERMES): A Small External Payload for the Lunar Gateway with Big Challenges

Currently scheduled for liftoff in 2024, Gateway will be an outpost orbiting the moon for astronauts headed to and from the lunar surface and serve as a staging point for deep space exploration. In January of 2020 NASA headquarters contacted Goddard Space Flight Center to request that they develop a Heliophysics instrumentation package for Gateway. This package would later become known as HERMES-Heliophysics Environmental & Radiation Measurement Experiment Suite. HERMES consists of a Miniaturized Electron pRoton Telescope (MERIT), an Electron Electrostatic Analyzer (EEA), Solar Probe Analyzers (SPAN)-A-ions, and Noise Eliminating Magnetometer Instrument in a Small Integrated System (NEMISIS), which consists of one fluxgate and two Magneto-Inductive Magnetometers. From the beginning the HERMES mission faced a number of Challenges. It was constrained to fit in a small, half meter, cube and it was required to weigh no more than 25kg. A new boom design for the magnetometer would be required and for safety reasons it must be able to retract autonomously with power removed. To complicate matters the location of the SORI-Small ORU- (Orbital Replacement Unit) Robotics Interface, the primary interface for the HERMES platform to the Gateway elements, was undetermined. Also, the mechanical, thermal and electrical interfaces are not fully defined. The Canadian Space Agency is still in process of designing the version of the SORI that will be flown on the Power and Propulsion Element (PPE) and Habitation and Logistics Outpost (HALO) elements, each of which are being developed by different contractors. At the time of initiating the HERMES project, neither of the Gateway module providers were under contract. Additionally, we would later learn the ISS heritage SORI modules were not originally designed for launching on the Gateway elements with a payload directly attached but rather were intended to be brought up on a separate carrier outfitted with launch locks and specialized launch structures from which the robotic arm on Gateway would then be used to detach the payload and install it on the SORI adapters while on orbit. Launching the integrated Payload/SORI on the PPE and HALO elements complicates the stiffness requirements and coupled loads analysis. Adding to this are serious constraints on Field-Of-View (FOV) for solar viewing and severe radiation exposure considerations brought on by slowly raising the orbit through the Van Allen Belts. Just to make things a little more challenging the budget for the entire project was intended to be a low-cost tailored Class-D mission approach. Plus, the effects of Corona VIrus Disease 2019 (COVID-19) were not factored in from the beginning. This paper will discuss what’s being done to overcome these challenges and put HERMES on track for a 2024 Launch Readiness Date (LRD).

Irving Joseph Burt↗

Payload integration and operations

Integration and operation of Spacelab payloads presents major challenges to engineering disciplines in areas of ground operations and flight mission operations. The integration of ground operations encompasses activities performed by the instrument developers and principal investigators and by the centralized payload integration site and launch site. The payload will be operated on orbit by a payload crew trained in payload experimentation and by a payload operations control center where investigator science groups and operations personnel are prepared to provide support. The payload mission planning, control center, data processing facility and operations are developed and verified prior to realtime flight operations. The mission management approach to minimize program costs and impacts to payloads and the Space Transportation System/Spacelab accommodations is presented.

Hall, R. R.↗

The GAMCIT gamma ray burst detector

The GAMCIT payload is a Get-Away-Special payload designed to search for high-energy gamma-ray bursts and any associated optical transients. This paper presents details on the design of the GAMCIT payload, in the areas of battery selection, power processing, electronics design, gamma-ray detection systems, and the optical imaging of the transients. The paper discusses the progress of the construction, testing, and specific design details of the payload. In addition, this paper discusses the unique challenges involved in bringing this payload to completion, as the project has been designed, constructed, and managed entirely by undergraduate students. Our experience will certainly be valuable to other student groups interested in taking on a challenging project such as a Get-Away-Special payload.

Mccall, Benjamin J.↗

Commercially Hosted Government Payloads: Lessons from Recent Programs

In a commercially hosted operational mode, a scientific instrument or operational device is attached to a spacecraft but operates independently from the spacecraft s primary mission. Despite the expected benefits of this arrangement, there are few examples of hosted payload programs actually being executed by government organizations. The lack of hosted payload programs is largely driven by programmatic challenges, both real and perceived, rather than by technical challenges. Partly for these reasons, NASA has not sponsored a hosted payload program, in spite of the benefits and visible community interest in doing so. In the interest of increasing the use of hosted payloads across the space community, this paper seeks to alleviate concerns about hosted payloads by identifying these programmatic challenges and presenting ways in which they can be avoided or mitigated. Despite the challenges, several recent hosted payload programs have been successfully completed or are currently in progress. This paper presents an assessment of these programs, with a focus on acquisition, costs, schedules, risks, and other programmatic aspects. The hosted payloads included in this study are the Federal Aviation Administration's Wide Area Augmentation System (WAAS) payloads, United States Coast Guard's Automatic Identification System (AIS) demonstration payload, Department of Defense's IP Router In Space (IRIS) demonstration payload, the United States Air Force's Commercially Hosted Infrared Payload (CHIRP), and the Australian Defence Force's Ultra High Frequency (UHF) payload. General descriptions of each of these programs are presented along with issues that have been encountered and lessons learned from those experiences. A set of recommended approaches for future hosted payload programs is presented, with a focus on addressing risks or potential problem areas through smart and flexible contracting up front. This set of lessons and recommendations is broadly applicable to future hosted payload programs, whether they are technology demonstrations, communications systems, or operational sensors. Additionally, we present a basic cost model for commercial access to space for hosted payloads as a function of payload mass

Andraschko, Mark A.↗

Construction of the GAMCIT gamma-ray burst detector (G-056)

The GAMCIT (Gamma-ray Astrophysics Mission, California Institute of Technology) payload is a Get-Away-Special payload designed to search for high-energy gamma-ray bursts and any associated optical transients. This paper presents details on the development and construction of the GAMCIT payload. In addition, this paper will reflect upon the unique challenges involved in bringing the payload close to completion, as the project has been designed, constructed, and managed entirely by undergraduate members of the Caltech SEDS (Students for the Exploration and Development of Space). Our experience will definitely be valuable to other student groups interested in undertaking a challenge such as a Get-Away-Special payload.

Coward, Michael H.↗

Noise considerations for tiltrotor

A projection is made of the technology-development requirements faced by aircraft designers contemplating the evolution of V-22-type tilt-rotor aircraft technology into a civilian tilt-rotor commuter aircraft of the requisite scale and payload. These research challenges are noted to often involve the reduction of noise level to values tolerated by passengers within the cabin and communities in the vicinity of airports, especially during hover and in the course of transition from vertical to horizontal flight (and vice-versa). Noise-generation and noise-radiation characteristics research has been undertaken using the XV-15 tilt-rotor proof-of-concept aircraft.

Huston, Robert J.↗

Selection of wires and circuit protective devices for STS Orbiter vehicle payload electrical circuits

Electrical designers of Orbiter payloads face the challenge of determining proper circuit protection/wire size parameters to satisfy Orbiter engineering and safety requirements. This document is the result of a program undertaken to review test data from all available aerospace sources and perform additional testing to eliminate extrapolation errors. The resulting compilation of data was used to develop guidelines for the selection of wire sizes and circuit protection ratings. The purpose is to provide guidance to the engineering to ensure a design which meets Orbiter standards and which should be applicable to any aerospace design.

Gaston, Darilyn M.↗

Design, Development and Pre-Flight Testing of the Communications, Navigation, and Networking Reconfigurable Testbed (Connect) to Investigate Software Defined Radio Architecture on the International Space Station

The Communication Navigation and Networking Reconfigurable Testbed (CoNNeCT) is a NASA-sponsored mission, which will investigate the usage of Software Defined Radios (SDRs) as a multi-function communication system for space missions. A softwaredefined radio system is a communication system in which typical components of the system (e.g., modulators) are incorporated into software. The software-defined capability allows flexibility and experimentation in different modulation, coding and other parameters to understand their effects on performance. This flexibility builds inherent redundancy and flexibility into the system for improved operational efficiency, real-time changes to space missions and enhanced reliability/redundancy. The CoNNeCT Project is a collaboration between industrial radio providers and NASA. The industrial radio providers are providing the SDRs and NASA is designing, building and testing the entire flight system. The flight system will be integrated on the Express Logistics Carrier (ELC) on the International Space Station (ISS) after launch on the H-IIB Transfer Vehicle in 2012. This paper provides an overview of the technology research objectives, payload description, design challenges and pre-flight testing results.

Over, Ann P.↗

Thermospheric Heating and Cooling Times During Geomagnetic Storms, Including Extreme Events

We present the first quantitative calculations of thermospheric heating and cooling times for geomagnetic storms of different intensity, including extreme events. We utilize the neutral mass density database of the CHAllenging Mini‐satellite Payload and Gravity Recovery And Climate Experiment missions to produce thermospheric global system response to geomagnetic storms caused by coronal mass ejections via superposed epoch analysis during May 2001 to December 2015. Storm events are grouped in five different categories based on the minimum value of the SYM‐H index. We calculate the time from storm onset for the thermosphere to reach maximum intensification (heating time) and the time from onset for the thermosphere to recover (cooling time). We find that heating and cooling times decrease as storm intensity increases and the effect is more pronounced for the cooling times. For extreme storms, the thermospheric heating time is 9.5 hr, while the cooling time is 22 hr.

Zesta, Eftyhia↗

Challenges and Solutions for Precision Solar Pointing on the ISS for the TSIS Instrument

The International Space Station offers an attractive platform for external payloads in many regards, but its large, complex structure is challenging for payloads that require precise, unobstructed pointing. As an instrument that measures solar irradiance on a continual basis, the TSIS payload was designed to robustly account for these ISS challenges and is now performing its mission on the ISS with great success.This paper first describes how TSIS was able to measure the ISS background jitter using High-rate Fine Sun Sensor data that was taken during passive solar transits through its field of view. The measurements showed that ISS jitter at the TSIS location on ELC-3 Site 5 is relatively benign with less than 4 arcseconds 1 at frequencies less than 0.5 Hz. This value is lower than previous estimates but agrees well with recent measurements from other external payloads, including OPALS and SAGE III. Because TSIS was designed to be robust to base motion jitter, it has achieved less than 4 arcseconds 1 of pointing error, which provides an extremely precise pointing platform for the solar irradiance measurements. The other challenging ISS characteristic is its large, complex structure that obscures solar viewing at sunrise and sunset from the zenith-facing location of TSIS. Although TSIS was able to predict solar viewing durations during the design phase with relatively high accuracy, the exact timing and causes of obscuration were difficult to predict and understand after TSIS began operating on the ISS. To aid in the understanding of blockage by ISS structure, detailed obscuration maps were created using HFSS measurements that clearly show the exact gimbal angles where blockage occurs and the specific structural features of the ISS that cause the blockage. These maps have helped TSIS to maximize its solar tracking durations each orbit, which has supported the mission in meeting its science objectives.

background jitter↗

Simulation of shell pellet injection strategies for ITER-scale tokamaks

Dispersive shell pellet (DSP) injection is considered as an alternative to shattered pellet injection as a disruption mitigation system for ITER, and strategies for penetration of a shell pellet into ITER are modeled with the 3D MHD code NIMROD. Because the high plasma temperatures lead to rapid ablation of the shell, delivery of the dispersive payload to the core of ITER will be very challenging. Two strategies to increase payload delivery depth are modeled: first, multiple staggered pellets are simulated in DIII-D, to assess the ability for one DSP to "piggy-back" on another to reach deeper into the core; second, DSP injection after pre-dilution-cooling with deuterium is simulated in ITER, in order to reduce the plasma temperature before shell pellet arrival. The DIII-D simulations show that a second, slower pellet can penetrate much deeper once the release of the first payload strongly cools the mid-radius region. When the pellets are staggered, deeper penetration of the second pellet leads to higher radiation fraction and larger runaway electron loss fraction, consistent with single pellet results. However, simultaneously released pellets at mid-radius that do not trigger a large n=1 mode produce an even higher radiation fraction. The ITER simulations show that an inside-out TQ can be produced with a payload release just inside of the q=2 surface, which is achieved at a speed of 800 m/s after pre-dilution cooling. Although stochastization of the core leads to a complete thermal quench, the edge flux surfaces are surprisingly robust in the ITER simulations, regardless of payload release location. As a result, runaway electron losses would not be expected.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Europa Spacecraft Configuration Optimization for the Solar Powered Vehicle

A mission to Europa has been on the minds of NASA and JPL for many years. After the Galileo mission to Jupiter in the 1990s there have been various proposals for missions to the Jovian moon. The most recent proposal, previously named the Europa Clipper, has gone through numerous iterations of spacecraft configurations on its road to becoming an official NASA project in June of 2015. Most of these configurations included options for either multi mission radioisotope thermoelectric generators (MMRTGs) or solar power. In 2014, the decision was made to focus on solar arrays as the source for spacecraft power. The decision to move forward with a baseline design that utilized only solar arrays as its power system meant that some configuration choices had to be re- evaluated. Initially, a configuration was adapted to keep as much of the previous spacecraft design the same while replacing MMRTGs with solar panels. This proved to be difficult as the arrays presented a slew of new challenges that the nuclear vehicle was not optimized for. The solar arrays needed to be large due to Jupiter's substantial distance from the Sun. This meant that many of the instrument and radiator FOVs would now be obstructed, or would receive reflected light and heat from the large panel s. Also, the mass of the panels meant that mounting near the bottom of the spacecraft would be sub-optimal as the wings would cause major disturbance to the vehicle as they oscillated in their deployed state. Another major, and possibly the largest, concern was the fact that as the high gain antenna pointed to Earth for communication, the Ice Penetrating Radar (IPR) would cast a large shadow on the cell -side of the array. This resulted in an estimated 10% power loss to the vehicle. On top of all this, NASA announced the selection of the instruments that would fly on the Europa mission and replace the notional instrument suite that had been used to develop and submit the project proposal. The selected instruments, while not varying widely from the notional suite, did come with a new set of challenges including a size increase over the notional package, thus requiring more room for accommodation. They also introduced new features not previously addressed by the notional package, such as a two-axis gimbal on one of the imagers. Additionally, two new instruments, an ultraviolet plume -hunting spectrograph, and an atmospheric dust analyzer we added to the payload and presented new challenges not previously covered in the proposal. Finally, additional payloads were under consideration, such as a 250kg ejectable payload that would be released at Jupiter and would accomplish flybys of some of the other Jovian moons. All of this resulted in a drastically different "family" of configurations that were capable of addressing these issues, and staying flexible to the numerous potential changes that could come. This paper discusses the details of the various configurations considered to address these items, and the configuration concepts that were selected as the baseline for moving forward with the proposal.

Horner, Matthew D.↗

Amine Swingbed Payload Project Management

The International Space Station (ISS) has been designed as a laboratory for demonstrating technologies in a microgravity environment, benefitting exploration programs by reducing the overall risk of implementing such technologies in new spacecraft. At the beginning of fiscal year 2010, the ISS program manager requested that the amine-based, pressure-swing carbon dioxide and humidity absorption technology (designed by Hamilton Sundstrand, baselined for the ORION Multi-Purpose Crew Vehicle, and tested at the Johnson Space Center in relevant environments, including with humans, since 2005) be developed into a payload for ISS Utilization. In addition to evaluating the amine technology in a flight environment before the first launch of the ORION vehicle, the ISS program wanted to determine the capability of the amine technology to remove carbon dioxide from the ISS cabin environment at the metabolic rate of the full 6-person crew. Because the amine technology vents the absorbed carbon dioxide and water vapor to space vacuum (open loop), additional hardware needed to be developed to minimize the amount of air and water resources lost overboard. Additionally, the payload system would be launched on two separate Space Shuttle flights, with the heart of the payload the swingbed unit itself launching a full year before the remainder of the payload. This paper discusses the project management and challenges of developing the amine swingbed payload in order to accomplish the technology objectives of both the open-loop ORION application as well as the closed-loop ISS application.

Hayley, Elizabeth↗

Amine Swingbed Payload Project Management

The International Space Station (ISS) has been designed as a laboratory for demonstrating technologies in a microgravity environment, benefitting exploration programs by reducing the overall risk of implementing such technologies in new spacecraft. At the beginning of fiscal year 2010, the ISS program manager requested that the amine-based, pressure-swing carbon dioxide and humidity absorption technology (designed by Hamilton Sundstrand, baselined for the Orion Multi-Purpose Crew Vehicle, and tested at the Johnson Space Center in relevant environments, including with humans, since 2005) be developed into a payload for ISS Utilization. In addition to evaluating the amine technology in a flight environment before the first launch of the Orion vehicle, the ISS program wanted to determine the capability of the amine technology to remove carbon dioxide from the ISS cabin environment at the metabolic rate of the full 6 ]person crew. Because the amine technology vents the absorbed carbon dioxide and water vapor to space vacuum (open loop), additional hardware needed to be developed to minimize the amount of air and water resources lost overboard. Additionally, the payload system would be launched on two separate Space Shuttle flights, with the heart of the payload-the swingbed unit itself-launching a full year before the remainder of the payload. This paper discusses the project management and challenges of developing the amine swingbed payload in order to accomplish the technology objectives of both the open -loop Orion application as well as the closed-loop ISS application.

Walsch, Mary↗

Tug payload interfaces

Some conclusions reached during the IUS/Tug payload requirements compatibility study are presented. This study is concerned with all prospective Tug-payload interfaces, including detailed analysis of low-earth orbit, geosynchronous, and interplanetary missions. Tug payload requirements are discussed and summarized as to operational requirements, structural/mechanical interface, avionics interfaces, fluids interface, and environment. The shuttle impacts created by Tug/payload interfaces are examined and presented in tabular form. Major conclusions are that all payloads in the mission model can be suitably and inexpensively accommodated by the Tug and the Shuttle if standardized integration equipment is employed, that multiple payloads pose no significant integration challenge, and that a relatively small inventory of integration equipment is required to support all prospective payloads.

Runge, F.↗

Future MAUS payload and the TWIN-MAUS configuration

The German MAUS project (materials science autonomous experiments in weightlessness) was initiated in 1979 for optimum utilization of NASA's Get Away Special (GAS) program. The standard MAUS system was developed to meet GAS requirements and can accommodate a wide variety of GAS-type experiments. The system offers a range of services to experimenters within the framework of standardized interfaces. Four MAUS payloads being prepared for future space shuttle flight opportunities are described. The experiments include critical Marangoni convection, oscillatory Marangoni convection, pool boiling, and gas bubbles in glass melts. Scientific objectives as well as equipment hardware are presented together with recent improvements to the MAUS standard system, e.g., a new experiment control and data management unit and a semiconductor memory. A promising means of increasing resources in the field of GAS experiments is the interconnection of GAS containers. This important feature has been studied to meet the challenge of future advanced payloads. In the TWIN-MAUS configuration, electrical power and data will be transferred between two containers mounted adjacent to each other.

Staniek, S.↗

Mars Science Laboratory: Entry, Descent, and Landing System Performance

In 2010, the Mars Science Laboratory (MSL) mission will pioneer the next generation of robotic Entry, Descent, and Landing (EDL) systems, by delivering the largest and most capable rover to date to the surface of Mars. To do so, MSL will fly a guided lifting entry at a lift-to-drag ratio in excess of that ever flown at Mars, deploy the largest parachute ever at Mars, and perform a novel Sky Crane maneuver. Through improved altitude capability, increased latitude coverage, and more accurate payload delivery, MSL is allowing the science community to consider the exploration of previously inaccessible regions of the planet. The MSL EDL system is a new EDL architecture based on Viking heritage technologies and designed to meet the challenges of landing increasing massive payloads on Mars. In accordance with level-1 requirements, the MSL EDL system is being designed to land an 850 kg rover to altitudes as high as 1 km above the Mars Orbiter Laser Altimeter defined areoid within 10 km of the desired landing site. Accordingly, MSL will enter the largest entry mass, fly the largest 70 degree sphere-cone aeroshell, generate the largest hypersonic lift-to-drag ratio, and deploy the largest Disk-Gap-Band supersonic parachute of any previous mission to Mars. Major EDL events include a hypersonic guided entry, supersonic parachute deploy and inflation, subsonic heatshield jettison, terminal descent sensor acquisition, powered descent initiation, sky crane terminal descent, rover touchdown detection, and descent stage flyaway. Key performance metrics, derived from level-1 requirements and tracked by the EDL design team to indicate performance capability and timeline margins, include altitude and range at parachute deploy, time on radar, and propellant use. The MSL EDL system, which will continue to develop over the next three years, will enable a notable extension in the advancement of Mars surface science by delivering more science capability than ever before to the surface of Mars. This paper describes the current MSL EDL system performance as predicted by end-to-end EDL simulations, highlights the sensitivity of this baseline performance to several key environmental assumptions, and discusses some of the challenges faced in delivering such an unprecedented rover payload to the surface of Mars.

Way, David W.↗

Mars Science Laboratory: Entry, Descent, and Landing System Performance

In 2010, the Mars Science Laboratory (MSL) mission will pioneer the next generation of robotic Entry, Descent, and Landing (EDL) systems, by delivering the largest and most capable rover to date to the surface of Mars. To do so, MSL will fly a guided lifting entry at a lift-to-drag ratio in excess of that ever flown at Mars, deploy the largest parachute ever at Mars, and perform a novel Sky Crane maneuver. Through improved altitude capability, increased latitude coverage, and more accurate payload delivery, MSL is allowing the science community to consider the exploration of previously inaccessible regions of the planet. The MSL EDL system is a new EDL architecture based on Viking heritage technologies and designed to meet the challenges of landing increasing massive payloads on Mars. In accordance with level-1 requirements, the MSL EDL system is being designed to land an 850 kg rover to altitudes as high as 1 km above the Mars Orbiter Laser Altimeter defined areoid within 10 km of the desired landing site. Accordingly, MSL will enter the largest entry mass, fly the largest 70 degree sphere-cone aeroshell, generate the largest hypersonic lift-to-drag ratio, and deploy the largest Disk-Gap-Band supersonic parachute of any previous mission to Mars. Major EDL events include a hypersonic guided entry, supersonic parachute deploy and inflation, subsonic heatshield jettison, terminal descent sensor acquisition, powered descent initiation, sky crane terminal descent, rover touchdown detection, and descent stage flyaway. Key performance metrics, derived from level-1 requirements and tracked by the EDL design team to indicate performance capability and timeline margins, include altitude and range at parachute deploy, time on radar, and propellant use. The MSL EDL system, which will continue to develop over the next three years, will enable a notable extension in the advancement of Mars surface science by delivering more science capability than ever before to the surface of Mars. This paper describes the current MSL EDL system performance as predicted by end-to-end EDL simulations, highlights the sensitivity of this baseline performance to several key environmental assumptions, and discusses some of the challenges faced in delivering such an unprecedented rover payload to the surface of Mars.

Way, David W.↗