Health Assessment and Performance Monitoring of Large Machine Diagnostics
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Using DTW for HPC / LDMS data clustering
The purpose of this document is to summarize environmental monitoring data collected at the Remote-Handled Low-Level Waste (RHLLW) Disposal Facility during the first four years of facility operations (FY 2019 through FY 2022). This summary provides a “baseline” condition for the facility, which can be used to distinguish contaminant releases from the RHLLW Disposal Facility from pre existing contamination as well as potential future releases from other sources (i.e., upgradient aquifer sources), as specified in the facility monitoring plan. Sufficient data has been collected over the first four years of operation of the RHLLW Disposal Facility to establish baseline conditions for future compliance monitoring of aquifer wells and performance monitoring of vadose zone lysimeters. Except for seven elevated tritium measurements from lysimeter HFEF-South believed to have been impacted by waste disposals, all data was deemed appropriate for establishing baseline concentrations. Monitoring of the aquifer detected indicator analytes gross alpha and gross beta and target analytes tritium and C-14. There were a few C-14 detections prior to an increase in the required detection level (RDL) after the first round of sampling. I-129 and Tc-99 were not detected above RDLs in aquifer samples. Lysimeter samples detected indicator analytes gross alpha and gross beta and target analyte tritium. Target analytes C-14, I-129, and Tc-99 were not detected above RDLs in lysimeter samples. Except for tritium, baseline concentrations of indicator and target analytes measured during the first four years of RHLLW facility operations are expected to represent conditions through the expected 20 year operating period of the facility. Elevated tritium in the aquifer, a result of past discharges of tritium at upgradient facilities, showed a decline over the first four years of operations, and levels are expected to continue to decline with time as a result of dilution and decay. Current tritium levels in lysimeter samples may be elevated due to tritium in the water applied during construction and infiltration testing of the facility. As a result, tritium concentrations in lysimeters may decline with time as a result of dilution and decay. Statistical measures (i.e., mean, standard deviation, and 99% upper confidence level [UCL]) were calculated for all detected analytes using the four years of concentration data. These measures will be used to evaluate future monitoring results and to demonstrate the facility is performing, or not performing, as established in the facility performance assessment (PA). Future monitoring results will also be combined with the baseline data in this report to further establish temporal trends and natural variability in the measurements. Based on the data collected during the baseline period, it is recommended the gross alpha action level for performance monitoring increase from 10 to 20 pCi/L due to several baseline measurements exceeding the preliminary action level of 10. An action level of 20 pCi/L is slightly greater than the 99% UCL, is protective of the aquifer, and would reduce unnecessary sampling. It is also recommended that tritium be added to the lysimeter analyte list for post-baseline period monitoring. Tritium, while not a dose concern, is a good tracer that can provide valuable information on water flow in and around the RHLLW Disposal Facility. Recommendations for a tritium action level are provided if considered necessary.
This project focused on developing advanced methods for thermal performance monitoring of a coal-fueled power plant. The specific goal was to develop and demonstrate a new thermal performance monitoring approach using a hybrid model that integrates a physics-based heat balance model with a machine learning-based pattern recognition model. The hybrid model enables increased accuracy and scope of the thermal analysis and an improved ability to monitor and detect changes in plant operation. This new approach takes full advantage of the individual model capabilities and creates an important new set of capabilities not previously possible using the two types of models separately. Using the heat balance model, a rich set of derived parameters (virtual sensors) are calculated from the measured plant operating data at each time point. The combined measured and derived data values are used by machine learning algorithms to create pattern recognition models over the range of normal unit operation. To create the monitoring models, historical data from normal operation of the plant is first processed by the heat balance model to compute the derived parameter data. The result is a greatly expanded set of normal operating data that can be used as input to create the pattern recognition model. Once the models are calibrated for normal operation, the hybrid model is suitable for use in continuous online monitoring. During online monitoring, new plant operating data is processed first by the heat balance model and then by the pattern recognition model. Results from the pattern recognition model quantify the deviation of each measured or derived parameter from its expected value in normal operation. The hybrid models can detect abnormal changes in plant operating data with very high accuracy and sensitivity. When abnormal behavior is detected, alerts are generated automatically for evaluation by the plant monitoring staff. The new hybrid solution product was developed and verified in the performance of the project. The hybrid solution was tested first in a simulation environment that mimicked the plant data systems and infrastructure used by U.S. power generating plants and utilities. The hybrid solution was then deployed for real-time, online monitoring of an operating coal-fueled power plant at a field test site. Field testing demonstrated that all hybrid solution development objectives were accomplished. The project work was based on combining the capabilities of two existing software products to create the new hybrid solution product. One of these was the existing MapEx® heat balance product and the other was the existing SureSense® advanced pattern recognition product. Each of these separate products was assessed to be at a Technology Readiness Level (TRL) of 9 at the start of the effort. The hybrid solution product was assessed to be at a TRL of 2 at the start of the project based on early feasibility work by the project team. At completion of the field testing performed in the project, the hybrid solution product was assessed to be at a TRL of 7. The project team expects that the hybrid solution product will be deployed commercially and will achieve a TRL of 9 within one year after completion of the project.
This monitoring plan for Idaho National Laboratory’s Remote-Handled Low Level Waste Disposal Facility was developed to meet the requirements for monitoring low-level waste disposal facilities according to the U.S. Department of Energy (DOE) Order 435.1, “Radioactive Waste Management,” and the guidance provided in the associated technical standard “Disposal Authorization Statement and Tank Closure Documentation” (DOE-STD-5002-2017). The purpose of this monitoring plan is to document a monitoring strategy that includes (1) compliance monitoring activities to demonstrate compliance with regulatory standards/limits and (2) performance monitoring to build confidence the facility is performing as demonstrated in the facility performance assessment (PA) (DOE-ID 2018a), composite analysis (CA) (DOE ID 2012), and CA addendum (DOE-ID 2018b). The de minimus impact to the aquifer predicted by the PA suggests that aquifer compliance monitoring should be augmented with performance monitoring of the drainage course materials and sedimentary interbeds in the vadose zone beneath the facility to provide a more effective means of identifying performance deviations. The monitoring approach delineated in this document was informed by the systems evaluation of natural and engineered facility features presented in the PA, an assessment of aquifer baseline conditions (INL 2017d), the dose analysis conducted in support of the PA and CA, and monitoring data collected during the first four years of facility operations (baseline monitoring phase) (INL 2023b). This plan provides monitoring locations, sampling frequencies, and sampling methods; recommendations for data evaluation; and a description of the monitoring plan implementation. Collected data will be used to demonstrate facility compliance and to identify conditions that are not consistent with the key assumptions made by the PA and CA.
Concentrating Solar Power (CSP) generation is an attractive option for low-emission power generation; however, the high costs of thermal storage associated with concentrating solar create a large barrier for their use and adaptation into modern life. Lowering their operation costs, while maintaining high thermal storage and transfer performance is essential. Solid particle-based heat exchange systems can reduce CSP cost but are often less efficient. Efforts to increase their performance have led to use of binary size particle mixes. Presented is an optical-based thermal analysis technique used to measure near-wall thermal conductivity of particle beds essential in determining their heat exchanger efficiency. Modulated Photothermal Radiometry is used to make dynamic temperature measurements, allowing for the extraction of the most relevant thermal properties like thermal conductivity, specific heat, and effusivity. The system uses a modulated laser source causing a damped periodic heat flux, resulting in a frequency and thermal property dependent surface temperature, of which is measured using radiometry. Lock-In techniques are used to extrapolate the amplitude of the signal. Plotting the amplitude against the root angular frequency allows for effusivity measurement by ratio to a known sample. Using specific heat measurements from literature and density measurements, the thermal conductivity of the particle mixes can be calculated. The simplicity of MPTR to probe through the depth of the bed is ideal for use in CSP for dynamic thermal performance monitoring.
Real-time, in-situ, high spatial resolution (sub-cm) imaging of the near-borehole environment would revolutionize wellbore diagnostics and integrity assessment by direct observation of defects. It is becoming increasingly apparent, that better understanding of the near-wellbore environment is required to meet the safety and operational needs in challenging environments such as those present in subsurface energy extraction (geothermal) and storage (CO2 sequestration) applications. Therefore, it is important to have a more robust ability to image the near-borehole and reliably detect defects. It was proposed to further develop and improve our advanced 3D imaging system to evaluate casing defects (e.g. corrosion) and cement quality in either open- or cased-borehole with the ultimate goal to develop a commercially deployable technology. The system consists of a unique acoustic source (LANL) and advanced inversion techniques for image processing (LANL, ORNL). This system will provide comprehensive borehole integrity monitoring with improved resolution over existing techniques. As an application of this imaging system, we will characterize the effectiveness of next-generation wellbore completion technology (NETL, SNL), and will demonstrate that, unlike current technology, the proposed approach can successfully characterize foamed cements.
This report contains the groundwater and surface water monitoring data obtained during calendar year (CY) 2019 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12. The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system, shown as Plant North. The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Background information in Section 2 of this report outlines the hydrogeologic framework for groundwater and surface water quality monitoring at Y-12 and includes an overview of the groundwater contamination in each hydrogeologic regime. Section 3 provides details regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP, including sampling locations and frequency, sample collection and handling, field measurements and laboratory analytes, quality assurance (QA)/quality control (QC) sampling, data management, and data quality assessment (DQA). However, the equivalent QA/QC or DQA information for the groundwater and surface water data associated with the monitoring programs implemented by UCOR are not included in this report and instead are deferred to referenced programmatic plans and reports issued by OREM and UCOR. Section 4 of this report presents a summary evaluation of the CY 2019 monitoring data with regard to the respective objectives of surveillance monitoring and exit pathway/perimeter monitoring. The evaluation is based primarily on the analytical results for the following principal groundwater contaminants at Y-12: nitrate, uranium, gross alpha activity, gross beta activity, and volatile organic compounds (VOCs). Section 5 summarizes the most significant findings with respect to the principal contaminants along with recommendations for any proposed changes to the ongoing groundwater and surface water quality monitoring performed under the Y-12 GWPP. Technical reports and plans cited in the narrative sections of the report are listed in Section 6. Narrative sections of this report reference several appendices. Figures (maps and diagrams) and data tables (excluding data summary tables incorporated in the narrative sections) are in Appendix A and Appendix B, respectively. Appendix C contains construction details for each well sampled during CY 2019 by either the Y-12 GWPP or UCOR, along with schematic diagrams for wells equipped with Westbay™ multiport sampling equipment or Barcad® pump systems. Appendix D supports the background summary discussion in Section 2 and provides more detailed information about the hydrogeologic framework for groundwater and surface water monitoring at Y-12, including the primary sources of groundwater contamination in each hydrogeologic regime. Results for all field measurements and laboratory analyses obtained by the Y-12 GWPP and UCOR are presented in Appendix E, which also includes the sample numbers for the QA/QC samples associated with groundwater and surface water monitoring performed by the Y-12 GWPP.
Real-time highly resolved spatial-temporal vehicle energy consumption is a key missing dimension in transportation data. Most roadway link-level vehicle energy consumption data are estimated using average annual daily traffic measures derived from the Highway Performance Monitoring System; however, this method does not reflect day-to-day energy consumption fluctuations. As transportation planners and operators are becoming more environmentally attentive, they need accurate real-time link-level vehicle energy consumption data to assess energy and emissions; to incentivize energy-efficient routing; and to estimate energy impact caused by congestion, major events, and severe weather. This paper presents a computational workflow to automate the estimation of time-resolved vehicle energy consumption for each link in a road network of interest using vehicle probe speed and count data in conjunction with machine learning methods in real time. The real-time pipeline can deliver energy estimates within a couple seconds on query to its interface. The proposed method was evaluated on the transportation network of the metropolitan area of Chattanooga, Tennessee. The volume estimation results were validated with ground truth traffic volume data collected in the field. To demonstrate the effectiveness of the proposed method, the energy consumption pipeline was applied to real-world data to quantify road transportation-related energy reduction because of mitigation policies to slow the spread of COVID-19 and to measure energy loss resulting from congestion.
Performance Analytics for Computational Experiments (PACE) is an end-to-end performance monitoring infrastructure to summarize performance data collected from Department of Energy’s (DOE) climate model experiments to derive insights and present them through a web portal. PACE automatically captures provenance/timing data from simulations run on DOE supercomputers.
Explore the source record for details and available documents.
This report describes the scaled experimental system and approach used to examine dead-end filtration performance of representative 200W waste feeds. The scaled system, which was originally designed and assembled to test Tank Side Cesium Removal (TSCR) system performance with higher-than-expected solid loadings in 2021 (Schonewill et al. 2021), was repurposed to conduct the current experiments at ~1/145 of full scale (based on throughput). Six experimental runs were conducted with five different 200W waste feed simulants: three using a DEF module scaled for TSCR and three using a DEF module scaled for the 200W process modules (based on the current design for the Advanced Modular Pretreatment System). Each experiment was run continuously for multiple days with an operating approach prototypic of the full-scale system. Staff performing the experimental runs monitored performance, obtained data from calibrated process instruments, and collected samples for observation and analysis. The measured data are presented with a focus on assessing DEF performance – specifically, the filters’ differential pressure response to the five waste simulants, frequency and efficacy of backwashing, and baseline recovery between experimental runs; data related to ion exchange column performance are also discussed in cases where the opportunity arose. The experimental campaign demonstrated that the DEFs satisfied their primary function of protecting the ion exchange column from solid intrusion for all the representative simulants used. The filters readily handled solids loadings of =500 ppm (and even greater), especially the modules scaled to the 200W process modules. Adjustments to the processing flow rate and reductions in feed temperature were observed to affect the rate of differential pressure increase on the filters, but neither adversely affected the ability of the DEFs to perform their primary function. Backflushing reliably recovered filter performance in all runs, although it did not prevent irreversible fouling for one simulant. The run that exhibited irreversible fouling established that both the quantity and the nature of the solids being filtered need to be considered when projecting filter performance.
The design of pebble bed reactors (PBRs) and their method of operation align more closely with statistical approaches used in manufacturing and process control than traditional safeguards statistical approaches. The reason is PBRs will employ a nondestructive assay (NDA) measurement (burnup measurement system [BUMS]) that is part of the fuel handling system supporting discharge decisions in addition to the reactor code which monitor performance. The integration of these two approaches provides the opportunity to monitor reactor performance statistically for both operations and safeguards in ways not achievable using other reactor designs. For light water reactors (LWRs), knowledge about reactor code performance in predicting irradiated special nuclear material (SNM) content historically was only achieved from special measurement campaigns or from fuel reprocessing. Conversely, through statistical comparison of the BUMS with the reactor code-predicted values, PBRs can achieve this in real time. The resulting SNM distribution is an indicator of reactor performance because factors such as transit time and path of the pebble fuel through the reactor determine the plutonium production and uranium depletion. By analyzing the predicted and measured values, opportunities exist to adjust operating parameters, fuel design, and other characteristics to optimize performance and fuel utilization. From a safeguards perspective, this approach also provides the information necessary to validate declared values and evaluate whether the reactor is being operated as expected. This paper outlines statistical approaches for PBRs that can be used to support both operations and safeguards.
This annotated Request for Proposal (RFP) template includes an Energy Management and Information System (EMIS) technology specification, an ongoing services specification, RFP evaluation criteria, and more. It is designed to guide building professionals through the specification, procurement, and selection of an EMIS or related building performance monitoring and diagnostic technology.
Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)