Search NASA⌕ Search

SEARCH · Search NASA

Results for “planning and operation tools”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

GRAF-Plan for Vietnam

Evaluates the reserve requirements for power system balancing areas based on variability and uncertainty of load as well as wind and solar generation scenarios. The tool uses minute‐by‐minute site‐specific generation and load information, as well as information from generation and load forecasting algorithms used in the balancing areas. The Balancing‐Plan Tool can be used directly by utility planners and operators to aid in the integration of intermittent renewable resources. The tool provides reserve requirements of various kinds, such as day‐ahead, load following and regulation, as well as estimates the capacity of the generation fleet to provide the require reserves.

Campbell, Allison↗

Clean Grid Vision: A U.S. Perspective - Chapter 2. Distribution Issues and Tools

The continued growth in distributed energy resources is fundamentally changing the way the distribution system is operated and planned. Additionally, an increasing number of grid issues are being regularly experienced by distribution engineers within an increasing number of utilities. Fortunately, these fundamental changes and increasingly regular issues are being addressed via continual improvements in existing distribution system modeling tools—for both tools used by industry and researchers—and via novel modeling methods, which are combining transmission and distribution system modeling to investigate new, often complex, system interactions at the transmission/distribution power system interface. As DERs continue to increase more and more utilities, regulators, and developers are finding usable solutions in the deployment of smart inverters with ever more capable functionalities. This increase in functionality is welcome but comes at the cost of more complex analysis when determining what specific settings should be used for an individual interconnection. With more time, experience, and likely the further development of advanced analysis tools, even higher levels of DER integration will result in a reliable, resilient, low-cost, and safely operating grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Representing the Future Role of Hydropower and Pumped Storage Hydropower (PSH) in Electricity Planning Tools

Existing tools for long-term electric sector planning struggle to represent hydropower's nuanced site-specific technical and operating characteristics, which depend on technical specifications as well as water management practices and regulations. As a result, long-term planning models and tools insufficiently characterize hydropower value and incentives, and they cannot fully represent the role hydropower can play in a future electricity system that could include a high penetration of variable wind and solar generation, battery storage, and other low-carbon technologies. This presentation demonstrates the culmination of a multi-year effort to enhance hydropower representations in electricity planning models at the National Renewable Energy Laboratory (NREL), as part of the U.S. Department of Energy (USDOE) HydroWIRES Initiative. New modeling techniques are demonstrated using the NREL Regional Energy Deployment System (ReEDS), an open-access electric sector capacity expansion model used extensively in a wide range of technology deployment and integration analysis, including the 2016 USDOE Hydropower Vision. ReEDS uses a least-cost optimization approach to understand investment and operation of electricity generation, storage, and transmission technologies under future scenarios of electricity technology innovation, demand, policy, and other sectoral drivers. ReEDS was modified to better represent value and opportunities for both pumped storage hydropower (PSH) and hydropower systems without pumping. We incorporated a new national closed-loop PSH resource and cost assessment to explore new PSH deployment opportunities and added plant-level data to better represent the existing PSH fleet. New upgrade pathways enable opportunities for enhanced hydropower flexibility by adding pumps, upgrading dispatchability, increasing capacity, or increasing energy availability. The model was also modified to better represent the value of long-duration energy storage beyond diurnal time scales, allowing both hydropower and PSH to better balance energy supply and demand variations in high-renewable systems. These new features are demonstrated under reference and high-renewable futures and a range of sensitivity scenarios to understand which hydropower and PSH deployment and upgrade opportunities are the most attractive. These scenarios indicate potential for new closed-loop PSH deployment and for hydropower flexibility improvements to have important impacts on long-term electricity system emissions and economic outcomes. Increasing flexibility of the existing hydropower fleet can reduce the need to invest in new flexible grid technologies and help achieve decarbonization goals. Systems with sufficient energy storage could also be valuable for balancing seasonal differences in renewable energy availability, particularly from solar energy. The methods developed for ReEDS and subsequent scenario results reveal important considerations for future hydropower and grid system planning, and all data and code is freely available in a public code repository for use throughout the hydropower industry.

capacity expansion↗

Computational Math Problems for a Clean Energy Future

Cutting edge computational mathematics are ubiquitous in renewable energy research. Problems in resilient and reliable electric grid operations, infrastructure planning, wind farm yaw control, and more demand sophisticated and scalable computational tools that enable the transition of renewable energy technologies from proof of concept to deployment into our energy system. The mission of the Computational Science Center at NREL is to lead the lab's efforts to solve energy challenges using high-performance computing (HPC), computational science, applied mathematics, scientific data management, visualization, and informatics. In this poster, we provide a short overview of three areas of computational mathematics research at NREL: wind power scenario generation for stochastic grid operations and infrastructure planning, improved rational function approximations for electromagnetic transients codes, and wind farm yaw control using a combination of the Alternating Direction Method of Multipliers (ADMM) and reinforcement learning (RL). Increasing penetrations of renewable energy into power grids motivate the investigation of new approaches to characterizing uncertainty for five-minute economic dispatch problems. Similarly, as the penetration of distributed energy resources on power grids increases, it becomes important to revisit our methods of modelling transient phenomena, i.e. electromagnetic transients programs. Finally, the combination of ADMM and RL for wind farm yaw control presented here can potentially increase the efficiency of the deployed distributed controllers by orders of magnitude.

ADMM↗

Cosimulating Integrated Energy Systems With Heterogeneous Digital Twins: Matching a Connected World

Energy system integration promises in-creased resiliency and the unlocking of synergies, while also contributing to our goal of decarbonization. It is enabled by both old and new technologies, glued together with data and digital services. Hydrolyzers, heat pumps, distributed renewable generation, smart buildings, and the digital grid edge are all currently the subject of integration with the power system and the energy sector at large. To plan and operate such a multidisciplinary and multisectoral system properly, insight, tools, and expertise are all needed. Further, this is exactly where the state of the art fails to deliver: tools for integrated energy systems (IESs) are still in their infancy, and many times, even academia treats these sectors separately, producing experts in each of them but not across.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗

Summary of a Workshop on Integrating Energy Equity into Power System Planning and Operation

On November 29 and 30, 2023, the Energy Systems Integration Group convened a one-and-a-half-day workshop in Arlington, Virginia, to improve knowledge and practices for integrating energy equity considerations into power system planning and operation. Workshop participants were invited to discuss approaches for integrating energy equity aspects into models and tools and to explore possible pathways for enhanced technical practices. Participants included utility planning and modeling practitioners, social science and energy justice academics, representatives from energy and environmental justice nongovernmental organizations, non-profits, consumer advocates, and representatives from the U.S. Department of Energy, national labs, and other government agencies. This report summarizes the discussion points and outcomes of the workshop, which prioritized the technical aspects of incorporating the challenges and solutions identified by electricity-futures stakeholders and communities. These technical activities include the fundamental grid structure and hardware, detailed modeling approaches that benchmark energy system performance and justify future investments, and engineering designs and limitations for potential solutions to meet energy equity goals in communities.

energy equity↗

Markov Decision Processes for Intelligent, Risk-Informed Asset-Management Decision-Making

Advanced nuclear reactors are a promising option for aiding the world in achieving its net-zero carbon emission goals, however, there are significant challenges to attaining and maintaining economic competitiveness with other sources of electricity. To improve the economic competitiveness of advanced reactor designs, a project was initiated to explore the use of Markov Decision Processes (MDPs) to guide asset-management decision-making during advanced reactor operation. MDPs are a powerful tool for optimizing decision-making in complex environments and their application to advanced reactors can aid in planning maintenance and repair activities to minimize downtime and maximize generation. The described approach expands on previous work regarding the use of MDPs for operational decision-making through the direct incorporation of real-time plant information. The integral MDP analysis includes information from online component diagnostic tools and the plant’s real-time generation risk assessment (GRA) and probabilistic risk assessment (PRA), which evaluate plant risk from both an economic and safety perspective. The result is an asset-management optimization framework that is based on real-time data regarding plant component status and the current best-estimate of plant risk. The paper presents an overview of the theoretical framework to incorporate the different information pathways into an integral MDP analysis, along with example analyses.

Grabaskas, David↗

Transportation and Systems Analysis Collaborations in Support of a Federal Consolidated Interim Storage Facility

The U.S. Department of Energy’s Integrated Waste Management (IWM) program under the Office of Nuclear Energy is planning for the future transportation, storage, and eventual disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant sites across the United States. To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the IWM program has been sponsoring the development and application of system analysis tools capable of analyzing various options for managing SNF and HLW. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, start and stop dates of facilities, etc. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation toolkit that is used for a system-level simulation and analysis focused on SNF management in the United States. An analyst using NGSAM has the ability to define several factors like the number of storage facilities, capacity at each facility, transportation schedules, shipment rates, and other conditions. NGSAM’s primary purpose is to provide a system analyst with capabilities to model the IWMS and gain insights into SNF and HLW management alternatives including the impact of system choices, associated cost estimates, and development of integrated yet flexible approaches. IWM is also developing the Stakeholder Tool for Assessing Radioactive Transportation (START). START is a web-based geospatial tool developed to provide visualization and initial evaluation of transportation options associated with future SNF and HLW shipment planning and operations. This includes characterizing safety, economic, and environmental conditions on and in proximity to shipment origins as well as along prospective transportation routes. Information from the START tool can be presented/shared as maps, graphics, geospatial files, and tabular form to enable easy data representation and export functionality. The system analysis, NGSAM, and START teams had been working closely for several years before formalizing this collaboration. START provides the SNF routing information for use in NGSAM. System analysts use the NGSAM tool to generate results (schedule, costs, infrastructure acquisitions, shipment rates, etc.). Subject-matter experts and system analysts work together to inform how NGSAM should model the waste management system. Specifically, this paper discusses the collaborations between the system analysis, NGSAM, and START teams and their accomplishments over the past year. Some examples of these efforts include calibrating and adding data to the START output files to meet NGSAM needs, gaining a better understanding of START data used in NGSAM, as well as how updates in START data could result in an improved NGSAM analysis. Detailed examples of various tasks that have been performed by the team will be discussed in the full paper. Continued efforts in this direction are expected in the coming years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Stochastic economic dispatch of wind power under uncertainty using clustering-based extreme scenarios

Operation of power systems with high penetrations of renewable energy sources requires tools for robust decision making under uncertainty. Stochastic economic dispatch and stochastic unit commitment are effective techniques for planning and operation under uncertainty, whose effectiveness depends on the cardinality and quality of the scenario set. Here, this article proposes a machine learning method using -means clustering for capturing relevant physical information from a large population of analog scenarios. Extreme scenario samples drawn from the clusters are used in a two-stage stochastic economic dispatch computation. The effectiveness of the proposed approach is assessed on a synthetic 200-bus system with a geographic footprint over Illinois, USA for four months from each season of WIND Toolkit data. The combination of -means clustering with importance sampling is shown to reduce the total operational cost by over 43% compared to sampling from populations based on heuristic clustering-based methods. Additionally, the variability in the mean cost is about 56% lower than the variability using Monte Carlo sampling. Moreover, the operational cost with the presented approach is shown to be close to the cost calculated based on a hindsight exact wind profile, signifying a highly accurate quantification of wind uncertainty by the presented -means clustering based sampling method.

17 WIND ENERGY↗

Expedition UT-GOM2-2 Methods

Methods used during the University of Texas (UT) Deepwater Hydrate Coring Expedition (UT-GOM2-2) include work done onboard the Helix Q4000 in the offshore Gulf of America (Gulf of Mexico), herein “the Gulf”, “dockside” in Salt Lake City, Utah, and some shore-based work in individual laboratories. The goal of this report is two-fold: to provide enough detail on the methods so they can be repeated by others; and to provide a reference document for the team to enhance cross-disciplinary understanding and knowledge. Methods include drilling operations, depth references and depth modification, downhole tool deployment, coring tool performance assessment, core processing, lithostratigraphy, biostratigraphy, as well as physical properties, including core logging and imaging, rock magnetism, dissolved methane concentration, hydrate saturation, microbiology, and geochemistry. An extensive amount of operational work and planning was required before mobilization of the expedition to permit, build mobile labs, and test downhole tools for deepwater drilling.

03 NATURAL GAS↗

Incorporating energy justice and equity objectives in power system models

Ensuring an equitable energy transition requires models and tools that can account for equity and energy justice goals. Power system models (PSMs) are widely used throughout industry, government, and academia to simulate or optimize the operations and planning of current and future electricity systems under different scenarios, parameter assumptions and policy frameworks. These models are important tools that allow users to understand how the power system may evolve under different future conditions, but importantly, they are also used to inform policy implementation and investment decisions across all aspects of the power system. However, existing models seldom include energy justice considerations and therefore energy justice priorities are not reflected in the policies and other decision-making processes that are informed by these models. The purpose of this review is to provide a framework that energy modelers can draw upon to integrate energy justice and equity goals into PSMs. To this end, 99 papers that examine the intersection of energy justice and power system models are summarized and ten core aspects of the power system that can impact energy justice outcomes, and therefore require new modeling approaches, are identified. This review then establishes key current practices, challenges, and opportunities associated with capturing energy justice considerations in power system models across these ten aspects. This review concludes by proposing four key research directions that should be pursued to improve the representation of energy justice and equity in power system modeling. Finally, this review also addresses challenges raised by United Nations Sustainable Development Goal 7, which aims to ensure affordable energy access to everyone and Sustainable Development Goal 13, which aims to take urgent action to address climate change.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Transportation and System Analysis Collaborations in Support of a Federal Consolidated Interim Storage Facility

The U.S. Department of Energy’s Integrated Waste Management (IWM) program under the Office of Nuclear Energy is planning for the future transportation, storage, and eventual disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant and waste custodian sites across the United States. To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the IWM program has been sponsoring the development and application of system analysis tools capable of analyzing various options for managing SNF and HLW. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, start and stop dates of facilities, etc. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation toolkit that is used for a system-level simulation and analysis focused on SNF management in the United States. NGSAM’s primary purpose is to provide a system analyst with capabilities to model the IWMS and gain insights into SNF and HLW management alternatives including the impact of system choices, associated cost estimates, and development of integrated yet flexible approaches. An analyst using NGSAM can define several factors like the number of storage facilities, capacity at each facility, transportation schedules, shipment rates, and other conditions. IWM is also developing the Stakeholder Tool for Assessing Radioactive Transportation (START). START is a web-based geospatial tool developed to provide the visualization and initial evaluation of transportation options associated with future SNF and HLW shipment planning and operations. This includes characterizing safety, economic, and environmental conditions at and in proximity to shipment origins as well as along prospective transportation routes. Information from the START tool can be presented/shared as maps, graphics, geospatial files, and tabular form to enable easy data representation and export functionality. The system analysis, NGSAM, and START teams have been working closely for several years before formalizing this collaboration. START provides the SNF transportation routing information for use in NGSAM. System analysts use the NGSAM tool to generate results (schedule, costs, infrastructure acquisitions, shipment rates, etc.). Subject-matter experts and system analysts work together to inform how NGSAM should model the waste management system. Specifically, this paper discusses the collaborations between the system analysis, NGSAM, and START teams and their accomplishments over the past year. Some examples of these efforts include calibrating and adding data to the START output files to meet NGSAM needs, gaining a better understanding of START data used in NGSAM as well as how updates in START data could result in an improved NGSAM analysis. Detailed examples of various tasks that have been performed by the team will be discussed in the full paper. Continued efforts in this direction are expected in the coming years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Decay Dose Shielding Analysis with Hybrid Unstructured Mesh/Constructive Solid Geometry Monte Carlo Calculation and ADVANTG Acceleration

The Oak Ridge National Laboratory (ORNL) Second Target Station (STS) neutron production facility is an accelerator driven pulsed neutron source that is currently being actively developed at ORNL. The neutrons are produced by proton-induced spallation reactions. A proton beam of 700 kW power is delivered to a spallation target in short, less than 1 µs long pulses, with 15 Hz repetition rate. The spallation target of ORNL STS is a rotating water-cooled tungsten target with tantalum cladding housed in a stainless-steel shroud. It is divided into 21 segments. These segments become highly activated due to spallation reactions or nuclei transmutation by the emitted neutrons. The radioactive nuclides continue to decay after ceasing operation. The decay dose rates generated from the target segments once they are removed from their operational location within the core vessel must be accurately quantified to determine the shielding configurations of remote handling tools and transport casks and to aid in planning maintenance events. To determine the shielding configurations needed for an activated target segment after ceasing operation, both the hybrid unstructured mesh (UM)/constructive solid geometry (CSG) approach that was previously utilized for STS analyses [1] and the ADVANTG code [2] were used. Even though the ADVANTG code does not include UM capability, the utilization of its advanced variance reduction technique was crucial to accelerate the extremely difficult final photon transport calculation in this analysis. This paper also describes the procedures taken to mitigate the convergence issues that occur when ADVANTG uses a source definition that does not match the source of the final Monte Carlo (MC) calculation. These convergence issues often occur because of inconsistencies between source and transport biasing parameters.

Ibrahim, Ahmad↗

Automation Tool to Create Chronological AC Power Flow Cases for Large Interconnected Systems

Combining planning models with operational details allows the industry to proactively investigate future resource and load scenarios, rather than react to their implementation in real time. In this project, the following tasks are proposed. The methodologies we developed to resolve current challenges in importing and solving the chronological AC power flow is a three-stage process.

Vyakaranam, Bharat↗

Reliability and Resiliency in South Asia's Power Sector - Pathways for Research, Modeling, and Implementation

Reliability and resilience are the core principles of power system planning and operations around the world. Power systems in South Asia are transforming with increasing penetration of clean energy generation resources, emerging technologies, increasing electricity demand and electrification. At the same time, these power systems are facing challenges posed by extreme weather events and climate change. All these factors would add furthermore importance to the reliability and resilience of future power systems in South Asia. This has motivated us to better understand the country specific challenges and chalk out the pathways for research, modelling and implementation in South Asia. Our research, experience in the region and feedback from key stakeholders indicate following as the key areas where more work is needed to improve reliability and resilience of power systems in the region: Renewable energy Data for power system studies, New Tools and Studies, Resilience Planning, Resource Adequacy, Advanced RE Forecasting, Cybersecurity, Load Forecasting, and Coordinated Planning and Operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Autonomous Inspection of Geologic Repositories: Current State of the Art and Future Directions

Geological repositories for nuclear waste, including spent nuclear fuel, present a significant challenge for traditional International Atomic Energy Agency (IAEA) safeguards tools due to their inaccessibility and demanding operational conditions. The IAEA has been working closely with Member State organizations currently involved in repository construction and planning, including Euratom, the Finnish and Swedish regulatory authorities, and relevant facility operators. However, the verification challenge remains unsolved, and there persists an out- standing need for tools and approaches that will help the IAEA verify that no nuclear material is diverted from a repository environment. The challenge is also not static. Activities must encompass verification of the design, prior to and during the construction/operation phase, and post backfill. Throughout these various phases, it is imperative that the IAEA maintains a continuity of knowledge (CoK) of all material including information on material inventory and flow. This paper highlights these challenges and outlines how they might be addressed by using remote or autonomous vehicles. Specifically, we discuss the current state of the art in robotic autonomy for known or partially known environment mapping and patrolling, as well as shared autonomy, where humans collaborate with closed loop autonomation to complete tasks. We explore the feasibility of using rovers for these verification tasks, along with the challenges associated with system implementation. Hardware and software suggestions are provided based on the adoption of similar technologies in other comparable areas and ability to close technical gaps. Lastly, human-robotic interactions are considered based on the challenges of the environment of the repository and effective deployment and continued operation of the robot system.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Autonomous Monitoring of Nuclear Repositories: Current State of the Art and Future Directions

Geological repositories for nuclear waste, including spent nuclear fuel, present a significant challenge for traditional International Atomic Energy Agency (IAEA) safeguards tools due to their inaccessibility and demanding operational conditions. The IAEA has been working closely with Member State organizations currently involved in repository construction and planning, including Euratom, the Finnish and Swedish regulatory authorities, and relevant facility operators. However, the verification challenge remains unsolved, and there persists an out- standing need for tools and approaches that will help the IAEA verify that no nuclear material is diverted from a repository environment. The challenge is also not static. Activities must encompass verification of the design, prior to and during the construction/operation phase, and post backfill. Throughout these various phases, it is imperative that the IAEA maintains a continuity of knowledge (CoK) of all material including information on material inventory and flow. This paper highlights these challenges and outlines how they might be addressed by using remote or autonomous vehicles. Specifically, we discuss the current state of the art in robotic autonomy for known or partially known environment mapping and patrolling, as well as shared autonomy, where humans collaborate with closed-loop autonomation to complete tasks. We explore the feasibility of using rovers for these verification tasks, along with the challenges associated with system implementation. Hardware and software suggestions are provided based on the adoption of similar technologies in other comparable areas and ability to close technical gaps. Lastly, human-robotic interactions are considered based on the challenges of the environment of the repository and effective deployment and continued operation of the robot system.

geologic repository, safeguards, IAEA, Robotics↗