Search NASA⌕ Search

SEARCH · Search NASA

Results for “power grid simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Sparse Linear Solvers for Large-scale Electromagnetic Transient Simulations

Linear solvers form the basis for electromagnetic transient (EMT) simulations. There is a need to speed up EMT simulations as larger regions are analyzed using EMT simulations. For the same, the performance of linear solvers plays an important role. Exploiting the sparsity of the matrices generated in EMT simulations could assist with speed-up. Scalability is also crucial as power grids expand, demanding solutions capable of accommodating the increasing system size. Recent studies from the North American Electric Reliability Corporation (NERC) increasingly emphasize that EMT simulation models of the power grid will grow larger with the inclusion of power electronics components. Parallelisms in sparsity patterns exploit modern central processing units (CPUs), multi-core CPUs, and graphics processing units (GPUs) architectures in sparse solver designs. Therefore, this paper explores publicly available existing linear solvers and investigates their efficiency in large-scale power grid simulations. A large-scale power grid is developed by increasing the size of the IEEE 39 bus test system to up to 39000 bus systems.

Hsu, Kuan-Chieh↗

Potential of Data Center Controls in Grid Services

The rapid proliferation of large data centers brings both challenges and opportunities for grid reliability. The data center resources and their potential flexibility have the potential to contribute resources to grid operations. Through capabilities like energy shifting and resource coordination, data centers can help reduce their net demand on the transmission network, as well as provide additional grid services to support reliable operation on the grid. While transient and long-term grid planning and operations are the scenarios that draw most attention, the quasi-steady state timeseries (QSTS) operation of data centers and grid bring interesting scenarios that can help evaluate the data center controls to aid grid services. This work is focused on modeling data centers for QSTS applications – incorporating the AI data center load profiles and building on the PNNL digital twin model for the thermal management loads to enable simulation studies to reveal the impact of data center controls on grid performance. This includes the integration of a QSTS battery and natural gas generator model to incorporate local resource impacts to the system. The simulation study is performed with a modified IEEE 24-Bus transmission system. Scenarios are focused on evaluating the data center load impacts on the transmission system and leveraging both data center and local generation controls to mitigate those impacts and provide additional grid services. The data center controls revealed the ability to contribute to two main kinds of grid services: preventing congestion on a weak grid by coordinating the data center resources with the collocated BESS and onsite generation; and the ability to help the grid operations during stressed times of operation like during a contingency. Leveraging these and other capabilities has the potential to help data centers become grid responsive assets, aiding in both their integration into the power system and grid reliability.

power grid simulation↗

Coupled TD Simulation project (Final Report)

This project implements coupled simulation of electric power grid transmission and distribution (T&D) by instantiating the co-simulation platform HELICS using a commercial distribution planning software CYMDIST1 by Eaton Inc., a power management company, and by leveraging the open-source transmission grid simulator GridDyn and LLNL’s High Performance Computing (HPC). The project is funded by DOE’s Technology Commercialization Funding (TCF) and supported by DOE Office of Technology Transitions (OTT).

14 SOLAR ENERGY↗

Geographically Distributed Co-Simulation for the Interplay of Integrated Energy Systems and Power Grid

The increased penetration of renewable generation induces unbalanced demand-supply on a power grid, while integrated energy systems (IES) can provide high part-load efficiency and high flexibility to support grid resilience. To study the transients and improve dynamic operability, it’s important to investigate the interplay between IES and power grid concurrently using real-time co-simulation approaches. In this presentation, we showed the previous co-simulation test between NETL and INL and discussed how this co-simulation can be beneficial for both IES and power grid research. In addition, we gave an overview about the SuperLab2.0 project, which was a federated national platform to address future power grid challenges. (Virtual presentation to the MILLENNIUM CLEAN and SUSTAINABLE POWER workshop 2025).

Co-simulation↗

Analyzing at-scale distribution grid response to extreme temperatures

Threats against power grids continue to increase, as extreme weather conditions and natural disasters (extreme events) become more frequent. Hence, there is a need for the simulation and modeling of power grids to reflect realistic conditions during extreme events conditions, especially distribution systems. Herein, this paper presents a modeling and simulation platform for electric distribution grids which can estimate overall power demand during extreme weather conditions. The presented platform's efficacy is shown by demonstrating estimation of electrical demand for 1) Electricity Reliability Council of Texas (ERCOT) during winter storm Uri in 2021, and 2) alternative hypothetical scenarios of integrating Distributed Energy Resources (DERs), weatherization, and load electrification. In comparing to the actual demand served by ERCOT during the winter storm Uri of 2021, the proposed platform estimates approximately 34 GW of peak capacity deficit. These numbers are consistent with state-of-the-art prediction results published in the literature. For the case of the future electrification of heating loads, peak capacity of 78 GW (124% increase) is estimated, which would be reduced to 47 GW (38% increase) with the adoption of efficient heating appliances and improved thermal insulation. Integrating distributed solar PV and storage into the grid causes improvement in the local energy utilization and hence reduces the potential unmet energy by 31% and 40%, respectively.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CyDER: A Cyber Physical Co-simulation Platform for Distributed Energy Resources in Smartgrids

The CyDER project aimed at developing an open-source, modular and scalable co-simulation platform for power grids with large shares of Distributed Energy Resources (DERs). The project partners are the Lawrence Berkeley National Lab (LBNL), Lawrence Livermore National Lab (LLNL), PG&E, SolarCity, and ChargePoint. The prime recipient is LBNL; SolarCity and ChargePoint were partners for the project’s first two years. Increased DER integration introduces a number of challenges in power grid operation including a more dynamic interaction between the transmission grid and distribution grids, and increased modeling complexity. Although specialized software exists to precisely model different components of the power system, it is far from trivial to integrate all various models and perform a holistic simulation. Instead of replicating all models in a common simulation program, a commonly accepted approach to tackle this model diversity is to couple third-party simulators and models through a co-simulation platform that coordinates information exchange among the various components. Following this line of research, this project’s objective was to develop a co-simulation platform based on a widely accepted industrial standard called Functional Mockup Interface (FMI). Within this process, the project developed models compliant with the FMI standard, called Functional Mockup Units (FMUs), and used them to perform various operational and planning power system analyses. Relying and building upon an industrial standard is the main differentiation of this project compared with previous or parallel efforts in the co-simulation area. Particular emphasis was put on delivering software utilities to facilitate setting up and running co-simulations by end-users. Furthermore, a strong aspect of this project is demonstrating that co-simulation techniques can be used to perform Hardware-in-the-Loop (HIL) simulations that couple software components (e.g., simulated models) with hardware components (e.g., real devices such PV systems and batteries). The long-term goal of CyDER project is to help establish FMI as a powerful standard for co-simulation and promote adoption by electric utilities and other interested stakeholders. The main accomplishments of the project include the development of several FMUs including distribution and transmission grid models, PV inverters with Volt/Var/Watt controllers, batteries, and predictive optimal controllers. Additionally, a unique software package was developed, called SimulatorToFMU, which is capable of exporting any Python-driven simulator or Python script as an FMU. This is an important contribution towards establishing FMI as one of the main co-simulation standards, because more and more third-party programs for sub-system modeling and simulation are delivered with Python APIs. The CyDER platform was used to perform PV hosting capacity analyses in real utility feeders with and without smart inverter controls, battery storage, and EV charging. Smart inverter controls include conventional Volt/Var/Watt controls for reactive power support and active power curtailment, but also predictive controls that optimize the charging and discharging profile of the battery connected on the DC side in order to minimize the customer’s economic benefit. Finally, an important result of this project is delivering an experimental setup that consists of residential-scale PV inverters with battery storage, a real-time grid simulator with an ideal voltage source as grid emulator, and micro Phasor Measurement Units (PMUs). All these components and additional software modules are coupled to one another using the FMI standard and can be co-simulated with the CyDER platform.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fidelity Analysis of Complex Large-Scale Simulation Models of PEs (MARS) in Future Power Grids

With the proliferation of power electronic (PE)-based resources in the electric grid, there have been numerous different kinds of simulation models developed and studied to understand their dynamic behavior. Study of PE-based resources using each simulation model has its own distinct advantages and disadvantages. Therefore it is very important to carefully select the appropriate model for the evaluation of the PE-based resources. In this paper, one such effort is made to analyze the different types of models in the case of a multi-port autonomous reconfigurable solar power plant (MARS). The MARS integrates a hybrid photovoltaic (PV)-energy storage system (ESS) plant to high-voltage direct current (HVdc) system and transmission alternating current (ac) grid. The dynamic models are evaluated under different test cases varying the short-circuit ratio (SCR) and control algorithms. Recommendations are provided on the equipment study needs based on the analysis completed.

Marthi, Phani Ratna Vanamali↗

Control Design and EMT Simulation Toward the Restoration of Faulted Wind-Dominant Grids

Present power engineers have been challenged to employ electromagnetic transient (EMT) simulations to study the restoration of wind-dominant grids. This paper addresses this hurdle by developing strategies to: (i) reliably control the dc-link voltage of grid-forming wind turbines with dc-coupled batteries, (ii) tune controllers to stably interconnect wind power plants into a grid under recovery, and (iii) autonomously make restoration decisions if transmission faults occur during restoration. These contributions are assessed via EMT simulations of wind-dominant versions of the WSCC 9-bus grid and a 22-bus power system. Furthermore, this paper is significant to address recommendations by the North American Electric Reliability Corporation.

17 WIND ENERGY↗

Architecture for Quantum-in-the Loop Real-Time Simulations for Designing Resilient Smart Grids

With the power grid growing more complex every day with the inclusion of new sensors and regulatory approvals that enable end-users and small local developers to participate in the grid, it is becoming challenging for conventional smart grid simulation, emulation, and testing technologies to keep up. In this work, we propose that quantum-encoded real-time simulations can be helpful under the new paradigm and operational circumstances to solve optimization problems for power grids. By leveraging the principles of quantum mechanics, the proposed quantum-in-loop (QIL) framework will enable better and faster optimization solutions based on real-world, real-time data streams, facilitating the real-time planning and operations of electrical grids that rely on millions of distributed sensors and controllers. Furthermore, QIL will allow researchers and engineers to assist utilities in designing, developing, and de-risking algorithms to optimize power grid operation and resilience by considering inputs from millions of grid-connected devices. QIL framework is being developed to have a self-limiting triage mechanism, which will help engineers and practitioners identify fundamental physical limits on quantum processors, revealing what quantum algorithms can and cannot do in utility-specific use cases and must continue to count on classical high-performance computing infrastructure.

digital real-time simulation↗

Study of eVTOL Charging Impact on Airport Electrical Grids

Growth in commercial air traffic has increased the aviation industry's contribution to global emissions. Aircraft electrification can reduce greenhouse gas emissions along with being efficient and reliable. Advanced air mobility introduces the idea of an advanced and more efficient air transportation system. Electric and hybrid aircraft designs, such as electric vertical takeoff and landing (eVTOL), are being considered for a number of applications, such as urban air mobility, cargo delivery, and medical emergencies. Although the electrification of aircraft provides environmental benefits, their charging needs will place significant demand on the electrical grid. This work presents a grid impact study and infrastructure upgrade requirements analysis of eVTOL charging on a realistic distribution grid through power flow simulation analysis. The case study results show that the eVTOL charging can lead to power quality issues, such as undervoltage and equipment capacity overloading. Grid infrastructure, such as lines and transformers, would need to be upgraded, and voltage management strategies would need to be deployed to accommodate eVTOL charging at an existing airport.

advanced air mobility (AAM)↗

Outdoor Test Bed Performance of a Power Line Sensor Using a Real-Time Event Simulator

This report summarizes the design and application of an outdoor power line sensor testbed (OPLST) with a real-time simulator and power meter to compare a potential transformer (PT) and current transformer (CT) versus an advanced line-post sensor. The OPLST was created to validate advanced medium-voltage (20/34.5 kV) outdoor power line sensors used in electrical distribution systems. Electrical utilities have installed metering and relay-protection transformers like PTs and CTs for several decades. The PTs/CTs are iron core measurement transformers based on the electromagnetic induction principle and provide reliable data in normal grid operation. However, new outdoor power line sensors (OPLS) using other technologies like voltage divider, Rogowski coil and optical principles have become available and may have favorable performance and costs compared to PTs/CTs. Therefore, the importance of testing these technologies with the PT/CT, to compare the measured phase voltage/current at different power grid scenarios is crucial to understand the performance of these new OPLS. For this study a G&W Electric Model CVS-36-O power line sensor was chosen as the OPLS to test with voltage/current signals. An OPAL-RT Technologies Model OP4510 real-time simulator and Schweitzer Engineering Laboratories Model SEL-735 power meter were installed with the 20/34.5 kV OPLST to compare the measured transient events collected from an advanced OPLS and the PT/CT. This system is installed at the Distributed Energy Communications and Control (DECC) lab, Oak Ridge National Laboratory (ORNL). The simulator generated different power grid scenarios (electrical faults, capacitor bank operation, service restoration, etc.), and its analog-output signals were connected to the voltage/current amplifiers that feed the 20/34.5 kV aerial cable loop through the PT/CT devices. Additional PT/CT devices were also wired with the medium voltage aerial cable loop to measure the phase current/voltage signals and server as references. After each test, common format for transient data exchange (COMTRADE) files were collected from the SEL-735 power meter and used to compare the performance of the OPLS with the PT/CT. The behavior of analog signals, harmonic components, total harmonic distortion and crest factors were assessed and found favorable for the G&W sensor as compared to the reference PT/CT.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗

Evaluating power grid model hydropower feasibility with a river operations model

Production cost models (PCMs) simulate dispatch of generators across a large power grid and are used widely by planners to study the reliability of electricity supply. As energy systems transition away from the thermoelectric technologies that have traditionally balanced electricity supply and demand, hydropower and its representation in PCMs is of increasing importance. A limitation of PCMs applied to continental power grids with diverse generation portfolios is that hydropower generation is simulated without full consideration of complex river dynamics, leading to possible misrepresentation of grid flexibility and performance. In addition, data used in PCMs may reflect outdated operating policies. In this paper we propose a hydropower generation feasibility test for PCMs. The approach uses a detailed hydropower model to determine whether the hourly hydropower schedule from a PCM with simplified monthly parameterization can be attained after accounting for realistic river dynamics and operating policies, such as spill requirements and general water movement and balance through a cascade reservoir system. We perform this hydropower generation test for the ‘Big 10’ hydropower system on the Columbia River (part of the Western Interconnect of the United States), revealing 9% overestimation of available hydropower generation in a PCM solution in an average hydrologic year. Our evaluation provides insight on the cost and opportunities for better representing hydropower in PCMs.

54 ENVIRONMENTAL SCIENCES↗

A Semi-Analytical Approach for State-Space Electromagnetic Transient Simulation

Here, this paper proposes a semi-analytical approach for efficient and accurate electromagnetic transient (EMT) simulation of a power grid. The approach first derives a high-order semi-analytical solution (SAS) of the grid’s state-space EMT model using the differential transformation (DT), and then evaluates the solution over enlarged, variable time steps to significantly accelerate the simulations while maintaining its high accuracy on detailed fast EMT dynamics. The approach also addresses switches during large time steps by using a limit violation detection algorithm with a binary search-enhanced quadratic interpolation. Case studies are conducted on EMT models of the IEEE 39-bus system and large-scale systems to demonstrate the merits of the new simulation approach against traditional numerical methods.

electromagnetic transient↗

Hydropower Role in a Power Grid with a High Proportion of Variable Renewables

The importance of hydropower increases as the power grid evolves with the higher variable renewable contribution. As conventional thermal power plants are retired, the importance of hydropower contribution increases to balance the variability of solar and wind generation. However, reservoir water resources are constrained by multiple constraints, and variability of water inflow to the reservoirs creates limitations to dam water releases for power grid needs. Coordination of multiple tools, including water resources modeling, ecological modeling, and technical and economic power grid modeling, informs dam water releases. Better representation of ecological constraints and other water use details in the suit of power grid models are required to identify the hydropower flexibility to provide multiple power grid services. Impacts of water planning and hydropower operation changes to a power grid are better understood by production cost model simulations with technical and economic data, including unserved energy, reserve failures, transmission congestion to serve load, and local marginal price increases. Similarly, PCM simulation of current and future projected power grid information, including LMP, and carbon emission rates, informs short-term water release plans and long-term investments for power plant upgrades for technical and ecological needs. Hydropower operations of several case studies are simulated to understand operation patterns, revenue, water release decisions in multiple time scales (month, day, minutes), hydropower contracts scheduling, and water variability impacts.

environmental↗

Flexible AI Models for Grid Resilience

The rapid growth in size and complexity of artificial intelligence (AI) and machine learning (ML) models has led to increased energy demands, posing a threat to the reliability of the existing power grid. This project addresses the challenge of highly intermittent and energy-intensive inference workloads by (1) developing fidelity-adaptive neural networks capable of dynamic response to grid conditions and (2) integrating these networks with power flow simulations to assess their impact on power grid reliability. We will explore both top-down and bottom-up approaches to create hierarchies of submodels that provide a controlled trade-off between power draw and prediction accuracy. The top-down method utilizes NN pruning to reduce a flagship model into progressively smaller, energy-efficient variants. The bottom-up approach employs geometrically principled weight setting strategies to construct depth-efficient models from the ground up. A real-time hardware-in-the-loop (HIL) platform will be developed to simulate a scaled AC power grid, integrating live AI workload power draw and enabling dynamic model switching in response to grid feedback. This work will provide a novel framework for evaluating the impact of flexible AI/ML workloads on grid performance and establish new methodologies for energy-aware computing in data centers. The outcomes will demonstrate that adaptive AI/ML can play a critical role in improving grid stability while advancing NREL's leadership in energy-efficient computing research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Natural Gas Community of the Future (Final Report)

Nicor Gas, a subsidiary of Southern Company Gas and its parent company Southern Company, is developing the concept of the Carbon-neutral, Affordable, Resilient, and Equitable Community ("CARE Community") to address the challenges of accessibility and affordability of grid-interactive efficient buildings in historically disadvantaged communities. The CARE Community is a new construction net-zero energy and carbon neutral residential neighborhood consisting of 50 homes with electricity and natural gas services in South Suburban Chicago, built as low-income affordable housing. The National Renewable Energy Laboratory (NREL) is assisting Southern Company to explore how energy efficiency, renewable technologies, and the reliability and resilience of natural gas can be combined and optimized in an islandable energy system as part of a broader effort to understand the role natural gas plays in future communities integrated with renewable energy and improved energy efficiency. The CARE Community will demonstrate how energy efficiency, distributed energy resources (DERs), and advanced controls can be combined with existing natural gas infrastructure to serve historically disadvantaged communities in a cold climate with low energy cost for affordable housing programs and enhanced resilience to withstand extreme weather. Homes will be a part of an islandable energy system, integrating multiple DER technologies such as solar panels, natural gas fuel cells, reciprocating natural gas engines, and battery storage. The CARE Community will provide a replicable template that affordable housing developers and energy companies can adopt throughout the United States. In this report, we present the design and modeling of the community and potential approaches for integrating DERs. We analyze and discuss annual simulations under normal operating conditions and week-long simulations under electric power grid outage conditions.

03 NATURAL GAS↗