Search NASA⌕ Search

SEARCH · Search NASA

Results for “power inverters”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

A High-Power Density Segmented Traction Drive Inverter

High power density is one of the requirements for traction drive inverters for meeting increasing demand for higher power and performance electrical vehicles (EV). This paper presents design and preliminary experimental results for a 100 kW high-power density inverter for EV traction drive applications. The inverter design was based on the segmented inverter topology that can significantly reduce the inverter DC filter capacitor and employs low-profile planar double-sided cooled SiC MOSFET-based power modules, compact mini-channel heat sinks with fin-profile optimized using genetic-algorithms, and high-ripple current capacitors. The design produced a compact inverter package with a total volume less than 1 litter, exceeding the power density goal of 100 kW/L. Experimental results are included to demonstrate the cooling and electrical performance.

Su, Gui-Jia↗

Structural Impact of Grid-Forming Inverters on Power System Coherency

This paper addresses the following fundamental research question: how does the integration of grid-forming inverters (GFMs) replacing conventional synchronous generators (SGs) impact the slow coherent eigen-structure and the low frequency oscillatory behavior of future power systems? Due to time-scale separated dynamics, generator states inside a coherent area synchronize over a fast time-scale due to stronger coupling, while the areas themselves synchronize over a slower time scale. Our mathematical analysis shows that due to the large-scale integration of GFMs, the weighted Laplacian structure of the frequency dynamics is preserved, however, the entries of the Laplacian may be significantly modified based on the location and penetration levels of the GFMs. This can impact and potentially significantly alter the coherency structure of the system. We have validated our findings with numerical results using the IEEE 68-bus test system.

Mukherjee, Sayak [BATTELLE (PACIFIC NW LAB)]↗

Optimal Power System Black start using Inverter-Based Generation

Power system black start readiness is part of the system planning. Utility planners perform periodic studies to assess if their power system is capable of total restoration following a black out. Hydro and diesel generators are the most commonly used black start capable resources by power utilities. However, with increasing penetration of solar generation, inverter-based resources can be considered to provide black start capability. Since the solar inverters can be located at multiple locations throughout the power system, and in view of their unique characteristics, an optimal real-time capable plan is helpful for system operators for faster black start. Black start optimization is a multi stage mixed-integer non-linear optimization which is extremely hard to solve. In this paper, we propose an optimal black start methodology that is easier to solve and scalable in real-time. We demonstrate the proposed methodology on two test systems and illustrate how inverter-based resources can contribute and improve power system restoration.

power system restoration, blackstart, Inverter-bas↗

Modeling of a Networked Community Microgrid with High Solar Penetration Considering Control Dynamics of Inverter-Based Resources

Microgrids help facilitate the integration of renewable energy in distribution-level grids and increase the resilience of the electric grid to extreme weather, especially in rural areas. Compared to traditional microgrids, a networked microgrid leverages multiple grid-forming sources to form a potential meshed grid and is more flexible in operation. This paper demonstrates the simulation modeling of an actual networked microgrid located in Adjuntas, Puerto Rico. The model contains representations of power inverters that connect the battery energy storage systems and photovoltaic generation systems to the networked microgrid and is capable of simulating fast grid transients as well as long-term operation of the networked microgrid. The modeling technique for power inverters allows the time-efficient simulation of the microgrid with a minimal penalty on model accuracy.

Li, Dingrui↗

A Large-Scale Hardware Experiment Demonstration of Operating High Inverter-Based Resource Power Systems With Grid-Forming Inverters

This paper presents experimental hardware results from a microgrid system as the penetration level of grid-forming (GFM) inverters increases. The experiment aims to showcase the advantages of GFM inverters in enhancing system stability and to investigate the operational challenges in systems relying entirely on inverter-based resources (IBRs). Five test scenarios are devised to progressively increase GFM inverter penetration levels: 0% (S1), 19% (S2), 37% (S3), 68% (S4), and 100% (S5). To ensure consistency, identical loading conditions and dynamic events are applied across all scenarios. The conducted tests include load step changes, output variation of grid-following (GFL) inverters during islanded mode, transition operations (such as synchronization to the grid and islanding), and rateof- change-of-frequency (ROCOF) and voltage jump tests during grid-connected mode. Key findings from the tests are summarized as follows: (1) Scenario S1 proved most challenging for load steps, and GFL variations because of insufficient GFM capacity, leaving the diesel generator unable to handle transient ridethrough; (2) Scenario S5 was the most difficult for transition operations, because the lack of a diesel generator to maintain stiff bus voltage resulted in unexpected reactive power flows during synchronization, causing the point of common coupling (PCC) breaker to trip; (3) Scenarios S4 and S5 were particularly challenging for ROCOF tests because of minimal system inertia, leading to large transients that triggered breaker trips; and (4) Scenario S4 exhibited the strongest voltage recovery capability because of the presence of the diesel generator and a higher number of GFM inverters, both of which possess the highest capacity for reactive power injection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reliable, High Power Density Inverters for Heavy Equipment Applications

With this final report, the combined team of the University of Arkansas (UA), University of Illinois, Urbana-Champaign (UIUC), Wolfspeed, Caterpillar, and Ampaire have successfully met all of their project objectives. Noteworthy for the heavy equipment portion of the project with Caterpillar is that the team made its project milestones two years into the project by designing a power dense motor drive for a permanent magnet synchronous machine. Upon finding out that Caterpillar had pivoted to switched-reluctance machines (SRMs), the team subsequently redesigned and implemented the SRM drive with a coolant temperature of 105°C! The other major task that the UA, UIUC, and Wolfspeed teams took on was the design of a PMSM drive for a hybrid aircraft that was flown on Feb. 20, 2023 by Ampaire after extensive testing and evaluation. While there were also technical objectives in thermal management, integrated gate drivers, reliability studies, and high temperature capacitors with integrated bussing, each of these have been fully reported on in quarterly reports. In brief, advances in thermal management and high temperature capacitors were utilized in order to achieve a 105°C motor drive. The integrated gate driver work resulted in a higher density drive with no loss of efficiency. Most of the last year, during a no-cost extension, was spent waiting for the Ampaire motor drive to be tested (outside of our project). Many months passed with the device just sitting in California while the company dealt with battery-related issues. This delayed the integration and testing activities until Fall 2022. Once those began, then the process took about 4-5 months to complete culminating in the test flight in Feb. 2023. By providing technical advances and integration into final platforms, the barrier to economic impact has been lowered. This project benefits the public by overcoming key technical barriers to electrified and hybrid electric heavy equipment and aircraft. This, in turn, leads to lower greenhouse gas emissions and a cleaner environment. This final report summarizes the integrated gate driver work and the Ampaire hybrid electric aircraft integration and test flight efforts. All other information has been previously reported in quarterly reports. A summary of the motor drives created during this project is provided along with a listing of publications.

42 ENGINEERING↗

Grid-Connected Self-Synchronous Cascaded H-Bridge Inverters with Autonomous Power Sharing: Preprint

Cascaded inverters are widely applied in applications where elevated ac voltages are required while using semiconductor devices with lower voltage ratings. Here, we focus on structures that require localized power transfer between low-voltage sources/loads dispersed across inverter dc links and the inverter ac-sides are series-connected across a three-phase medium-voltage ac grid. To date, decentralized controllers that allow for bi-directional power transfer in such systems are limited. To fill this gap, we propose a virtual oscillator controller which modulates the power processed by each inverter in a purely decentralized manner.

autonomous power sharing↗

Motor starting a Brayton cycle power conversion system using a static inverter

The power conversion module of a 2- to 15-kWe Brayton engine was motor started using a three-phase, 400-hertz static inverter as the power source. Motor-static tests were conducted for initial gas loop pressures of 10, 14, and 17 N/sq cm (15, 20, and 25 psia) over a range of initial turbine inlet temperatures from 366 to 550 K (200 to 530 F). The data are presented to show the effects of temperature and pressure on the motor-start characteristics of the rotating unit. Electrical characteristics during motoring are also discussed.

Curreri, J. S.↗

Deep reinforcement learning assisted co-optimization of Volt-VAR grid service in distribution networks

With the increasing penetration of distributed energy resources in distribution networks, Volt-VAR control and optimization (VVC/VVO) have become very important to ensure an acceptable quality of service to all customers. System operators can rely on slow-responding utility devices, including capacitor banks and on-load tap changing transformers, along with fast-responding battery and photovoltaic (PV) inverters for the VVC/VVO implementation. Because of variations in response time of these two classes of devices, and different control actions (discrete versus continuous), coordinated and optimal scheduling and operation have become of utmost importance. Here, this paper develops a look-ahead deep reinforcement learning (DRL)-based multi-objective VVO technique to improve the voltage profile of active distribution networks, decrease network and inverter power loss, and save the operational cost of the grid. It proposes a deep deterministic policy gradient (DDPG)-based approach to schedule the optimal reactive and/or active power set-points of fast-responding inverters, and a deep Q-network (DQN)-based DRL agent to schedule the discrete decisions variables of slow-responding assets. The reactive power output of PV and battery smart inverters are scheduled at 30-minute intervals and the capacitors’ commitment status is scheduled with several hour intervals. The proposed framework is validated on the modified IEEE 34-bus and 123-bus test cases with embedded PV and PV-plus-storage. To validate the efficacy of the proposed VVO, it is compared with several scenarios, including the base case without VVO, localized droop control of DERs, DDPG-only, and twin delayed DDPG (TD3) agent-based DRL techniques. The results justify the superior performance of the proposed method to improve the voltage profile, reduce network power loss, and minimize the look-ahead grid operational cost while minimizing the undesirable power losses in inverters as a result of power factor adjustments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Forming Control Tuning for a Hybrid Inverter-Based Resource Power Plant

A hybrid inverter-based resource (IBR) power plant consists of grid-following (GFL) and grid-forming inverter-based resources (GFM-IBR) connected in parallel. Here, this research focuses on how to design and tune GFM's control parameters to ensure stable operation of the hybrid power plant for weak and strong grid conditions. We consider two design cases: one where the GFL-IBR does not provide frequency support, and one where it does. It is found that the GFM's power-frequency synchronizing system can lose stability when the power-frequency droop constant is large and/or the grid is strong. Additionally, if the GFL has its frequency support enabled, oscillation stability worsens. To explain the mechanism of the interactions, we construct a feedback system for the synchronizing loop, which consists of the GFM's power-frequency droop control that generates the GFM's synchronizing angle, the GFL's phase-locked loop that measures the voltage phase angle, the GFL's frequency-power control that generates its power order, and the rest of the system. The feedback system is effective in illustrating the potential stability risks. Successful design ensures that the hybrid power plant can operate smoothly and ride through grid disturbances.

feedback systems↗

Module failure isolation circuit for paralleled inverters

A module failure isolation circuit is described which senses and averages the collector current of each paralled inverter power transistor and compares the collector current of each power transistor the average collector current of all power transistors to determine when the sensed collector current of a power transistor in any one inverter falls below a predetermined ratio of the average collector current. The module associated with any transistor that fails to maintain a current level above the predetermined radio of the average collector current is then shut off. A separate circuit detects when there is no load, or a light load, to inhibit operation of the isolation circuit during no load or light load conditions.

Nagano, S.↗

AC motor controller with 180 degree conductive switches

An ac motor controller is operated by a modified time-switching scheme where the switches of the inverter are on for electrical-phase-and-rotation intervals of 180.degree. as opposed to the conventional 120.degree.. The motor is provided with three-phase drive windings, a power inverter for power supplied from a dc power source consisting of six switches, and a motor controller which controls the current controlled switches in voltage-fed mode. During full power, each switch is gated continuously for three successive intervals of 60.degree. and modulated for only one of said intervals. Thus, during each 60.degree. interval, the two switches with like signs are on continuously and the switch with the opposite sign is modulated.

Oximberg, Carol A.↗

Integral inverter/battery charger for use in electric vehicles

The design and test results of a thyristor based inverter/charger are discussed. A battery charger is included integral to the inverter by using a subset of the inverter power circuit components. The resulting charger provides electrical isolation between the vehicle propulsion battery and ac line and is capable of charging a 25 kWh propulsion battery in 8 hours from a 220 volt ac line. The integral charger employs the inverter commutation components at a resonant ac/dc isolated converter rated at 3.6 kW. Charger efficiency and power factor at an output power of 3.6 kW are 86% and 95% respectively. The inverter, when operated with a matching polyphase ac induction motor and nominal 132 volt propulsion battery, can provide a peak shaft power of 34 kW (45 ph) during motoring operation and 45 kW (60 hp) during regeneration. Thyristors are employed for the inverter power switching devices and are arranged in an input-commutated topology. This configuration requires only two thyristors to commutate the six main inverter thyristors. Inverter efficiency during motoring operation at motor shaft speeds above 450 rad/sec (4300 rpm) is 92-94% for output power levels above 11 KW (15 hp). The combined ac inverter/charger package weighs 47 kg (103 lbs).

Thimmesch, D.↗