At least 55 records · Page 3

Optimal Economic Dispatch and Load-Following Strategies for Nuclear Integrated Energy Systems

The need for distributed and adaptable energy resources that can handle the growing unpredictability in both supply and demand is rising as the power system continues to modernize. In order to satisfy those needs and maintain grid resilience, nuclear power plants can dynamically control their output, despite typically being used as baseload generators. By incorporating energy storage and renewable energy sources, nuclear integrated energy systems are designed to satisfy the electrical and thermal demands of different end-user applications while ensuring flexible power operation. These systems generate revenue by participating in both wholesale and ancillary services electricity markets, as well as commodity markets for various byproducts generated from coupled industrial processes. This study addresses the economic dispatch efficiency of a tightly coupled nuclear integrated energy system comprising a gigawatt-scale light water reactor, commercialized in the U.S., a high-temperature steam electrolysis unit, a district heating network, and specified electrical loads. To demonstrate the nuclear power plant’s flexibility within the day-ahead unit commitment and economic dispatch framework, while maintaining equilibrium even during periods of refueling outages, this paper develops a mixed-integer linear programming framework that models the subsystems and components of its nuclear steam supply system. A systematic comparative analysis of flexible versus baseload nuclear power plant operation under varying levels of renewable energy integration indicates that flexible operation enhances system profitability by more than 18% while also increasing energy storage utilization, improving reactor responsiveness to load fluctuations, and allowing for greater participation across numerous electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced Flexible Transformers

Advanced grid solutions are comprised of advanced transmission technologies and grid enhancing technologies. In this webinar, experts will provide participants with insights into eight advanced grid solutions. The advanced transmission technologies that will be discussed include point-to-point high voltage direct current and advanced conductoring and the grid enhancing technologies that experts will explore include topology optimization, advanced power flow control, dynamic line rating, energy storage, virtual power plants, and advanced flexible transformers

flexible power transformer, power flow controller,↗

A Multidisciplinary Approach to Integrated Energy Systems: Advanced Nuclear Plants with Thermal Storage for Dynamic and Flexible Operation in Diverse Markets

Energy supply, distribution, and demand are continuously evolving in accordance with the integration of new power generation sources. In the United States, there is a progressive shift toward incorporating fluctuating energy sources such as wind and solar into the energy mix, alongside the distributed generation. Simultaneously, we are seeing a revolution in consumer technologies such as electric vehicles, energy devices for both residential and commercial use, and industrial processes—all contributing to a fundamental change in energy consumption dynamics. These scenarios have led to huge demand for enhanced flexibility from nuclear power plants (NPPs), requiring them to operate with unprecedented adaptability. Furthermore, advanced NPPs (A-NPPs) could potentially apply to scenarios in which power generation flexibility is prioritized over its current and conventional baseload generation capacity for traditional demand patterns. The present work covers several configurations for coupling nuclear energy production with thermal energy storage (TES). Previous work evaluated systems entailing a simple nuclear-TES configuration that used steam as a heat source for the TES of three different advanced reactors (ARs), but its heat diversion ratio (HDR) for charging was limited. The present work proposes a new configuration that features full decoupling of the nuclear reactor and the power cycle, using reactor coolant (i.e., gas) as a heat source for the TES and offering a theoretically unlimited HDR. This configuration is, however, more complex, as both high- and low-temperature TES (HT-TES and LT-TES) systems are required in order to cover the extended temperature range. Although this configuration imposes certain limitations on the discharge system configuration, it also presents the opportunity to design a more efficient system. For this case in particular, a steam reheat cycle is advantageous. Conventional TES systems take advantage of nominal efficiency when discharging, whereas the reheat cycle in the fully decoupled TES system affords a significant efficiency increase over conventional cases. Material selection, component/equipment sizing, and costing analyses were performed, followed by economic dispatch and size optimization. Dynamic models were developed for the decoupled system in order to generate insights into aspects of off design operation (e.g., drops in cycle efficiency), and these models enable exploration of potential mitigation strategies for addressing such drops. The models also highlight the need to design fail-safes that ensure continuous operational stability and minimize the impact of power ramping on the reactor parameters.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Development of Critical Components for the Modular Staged Pressurized Oxy-Combustion Power Plant

DOE's Coal FIRST (Flexible, Innovative, Resilient, Small, Transformative) Initiative was implemented to encourage the development of the coal plant of the future, which will be capable of flexible operation to meet the needs of the grid; using innovative and cutting-edge components that improve efficiency and reduce emissions; providing resilient power to Americans; being small compared to today's conventional utility-scale coal power plants; and transforming how coal power plant technologies are designed and manufactured. The modular Staged, Pressurized Oxy-Combustion (SPOC) process envisioned by and under development at Washington University in St. Louis (WUSTL) has the potential to achieve these goals. The process offers: 1) a modular plant design for improved operational flexibility; 2) fuel-staging combined with pressurized oxy-combustion, which leads to smaller plant size, higher plant efficiency, and lower cost for pollutant and greenhouse gases removal compared with traditional carbon-capture equipped coal power plants; and 3) small modular boilers and pollutant removal units that can be fabricated in shop and assembled on site, further reducing plant capital costs. Under DOE's support (DE-FE0031925), WUSTL is advancing the development of the critical components for the SPOC power plant, including the integrated combustion system and the direct contact cooler (DCC) from TRL 4 to TRL-5, which would allow them to be subsequently incorporated into a pilot plant. These units are the only two components that are not commercially available for a SPOC plant, and hence, their development is a key step toward the commercialization of SPOC. This work presents the objectives, task descriptions, and current progress of the project. So far, the fabrication of a new combustor design and the convective heat transfer boiler has been completed, and the integration of the combustor, boiler, and DCC is underway. Recent results obtained with the newly designed combustor show a stable coal/methane flame while dry-feeding PRB coal under oxy-combustion conditions.

Magalhaes, Duarte↗

Cost and Performance Requirements for Flexible Advanced Nuclear Plants in Future U.S. Power Markets

Advanced reactor developers are at various stages of commercializing new products and must design for future market environments that will exist when their plants are available. It is therefore critical to have a clear understanding about what plants will need to cost to be attractive investments, and what performance characteristics will create the most value for plant owners. This study is among the first to model the substantial contribution that flexible advanced reactors can make towards reliable, responsive, affordable, and clean future energy systems by supplying clean dispatchable generating capacity. Advanced reactor technologies could make a major contribution to lowering the overall system cost while reducing emissions and improving the performance of future energy systems. Depending on specific market conditions, it may also be beneficial to co-locate thermal energy storage systems (ESS).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cost & Performance Requirements for Flexible Advanced Nuclear Plants in Future U.S. Power Markets

This report summarizes a modeling effort to estimate the highest allowable CapEx for advanced nuclear plants in future power market environments to still achieve a market rate of return for their owners. This is not a policy report making recommendations to policymakers about how to regulate power markets. Rather, the study’s assumptions and scenarios reflect likely market conditions across a large percentage of US electricity markets. Its goal is to define target cost and performance parameters determined by future market conditions in order to guide design choices and tradeoffs in the early stage of the reactor and power plant development process. Although this was not a deployment modeling exercise to determine the market size for a given technology at selected price points, it does suggest that advanced reactors delivered under the allowable CapEx thresholds identified in this report could cost competitively serve a significant fraction of load in the modeled power markets.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Report

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of subcritical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Program Review

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of sub-critical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Optimal design and integration of decentralized electrochemical energy storage with renewables and fossil plants

Increasing renewable energy requires improving the electricity grid flexibility. Existing measures include power plant cycling and grid-level energy storage, but they incur high operational and investment costs. Using a systems modeling and optimization framework, we study the integration of electrochemical energy storage with individual power plants at various renewable penetration levels. Furthermore, our techno-economic analysis includes both Li-ion and NaS batteries to encompass different technology maturity levels. A California case-study indicates localized integration to be cost-effective for greater grid flexibility. Li-ion batteries can mitigate the residual demand fluctuations of small to medium-sized plants, while NaS batteries would be best-suited for larger storage with higher renewable penetration. Overall, the battery-enabled renewable integration could reduce the unmet grid demand by 75%, the renewable curtailment by 58%, and the CO 2 emission intensity by 16% while including the life cycle emissions of the battery and the renewable farm. Our scenario-based analysis also indicates that rather than replacing all fossil power plants, it is more economical to combine batteries and renewables with individual fossil plants to achieve a clean energy grid.

25 ENERGY STORAGE↗

Economic Evaluation of a Coupled Nuclear Power Plant and Hydrogen Production Facility: A Case Study

This study optimized the design sizes and operation of a power-to-hydrogen-to-power integrated energy system to allow a baseload power plant to operate flexibly in the energy market. In collaboration with a utility industry partner, the system, consisting of an electrolyzer, compressors, storage tank, and fuel cell, was optimized under conditions specific to the proposed project at the site of a nuclear power plant. The Design Integration and Synthesis Platform to Advance Tightly Coupled Hybrid Energy Systems (DISPATCHES) maximized net present value by optimizing sizing of components and dispatch decisions. Revenues included sale of electricity, capacity payments typical of the New York Independent System Operator, and the section 45V hydrogen production tax credit of the Inflation Reduction Act of 2022 (the tax credit was assumed to be available to legacy plants in the absence of clear guidance at present). Under default assumptions which excluded many capital expenditures, the base case optimized solution had a net present value of $\$$1.4 million over a 30 year lifetime, with a 0.365 MW fuel cell operating nearly continuously and 85% of revenues supplied by the hydrogen production tax credit (which was counted as a revenue regardless of profit, thus assuming credit monetization or offset of taxes within the larger firm was possible in all years). Beyond the base case, a sensitivity study elucidated drivers of the economics as capacity payment rate and hydrogen production tax credit rate vary. Additional sensitivity studies also extended results to variation of other, previously fixed parameters, including the fuel cell capital cost, and to imposition of further constraints. Optimization was also repeated for the default assumptions but recognizing tax credits upon use of hydrogen rather than upon its production, producing no change in the optimal solution. Most notably, capacity payments above $\$$15/kW-month drove optimal fuel cells multiple times larger than those with the default estimated capacity payment of $\$$2.5/kW-month (approaching 11 vs. 0.365 MW), and these larger fuel cells operated rarely (capacity factors of ~0.03). Furthermore, when the hydrogen production tax credit was provided for only 10 years, under the specific assumptions of this study (e.g., neither site preparation costs nor electrolyzer capital cost counted), the optimal solution avoided economic loss by ceasing system operation after the 10th year. Viewed broadly, this study demonstrated the capabilities of DISPATCHES, which can be user-adapted to serve other industrial case studies.

08 HYDROGEN↗

Low-Cost Sulfur Thermal Storage for Increased Flexibility and Improved Economics of Fossil-Fueled Electricity Generating Units (Final Report)

The US electric grid relies on conventional fossil fuel power plants for reliable and secure power, but these plants suffer from physical and financial strain due to the influx of inexpensive and variable solar and wind electricity. Conventional power plants need to generate electricity flexibly and on-demand to accommodate these renewable resources on the grid. Integrating a low-cost thermal energy storage (TES) gives fossil assets the ability to regulate their output efficiently and optimize the plant operation to maximize revenue in the wholesale electricity market. Element 16’s TES concept uses sulfur, a byproduct of the oil & gas industry, as the storage media that is 10 times cheaper than molten salt used in commercial two-tank TES technology. In this project, the team completed a detailed feasibility and technoeconomic study establishing the impact, cost and performance of molten sulfur TES system integrated with fossil assets.

20 FOSSIL-FUELED POWER PLANTS↗

Hybrid Analytics Solution for Power Plant Operations

Expert Microsystems, Inc., MapEx Software Inc. and XMPLR Energy LLC have teamed to submit a proposal to the US Department of Energy’s Office of Fossil Energy to improve the efficiency, reliability and flexibility of existing coal-based power plants. The project, titled Hybrid Analytics Solution to Improve Coal Power Plant Operations (the “Hybrid Analytics” project), will develop, demonstrate and commercialize a novel approach that integrates two proven real-time monitoring techniques. The Hybrid Analytics approach integrates into a single, integrated solution: a) an established, advanced data-driven analytics solution that includes artificial intelligence, advanced pattern recognition and machine-learning techniques and b) a well-proven, first principle thermal heat balance model solution. The future role of coal plants will depend on the ability to cycle and follow loads to meet marginal power demands, accommodate renewables and support the grid. Essential to success in this new role is a plant’s ability to maintain high reliability, efficiency and flexibility. However, these changing operational demands put significant stresses on power plant components that directly impact the ability to deliver these requirements. In the past, plants have independently monitored performance using physics-based solutions (heat rate, boiler losses, etc.) and reliability using data-driven analytics (advanced pattern recognition). The Hybrid Analytics solution integrates both approaches to enhance fault detection, provide automated diagnostics and estimates of remaining time to act, and provide critical, enhanced and accurate real-time information to coal plant operators. As a result, coal plants can improve efficiency, reliability, and flexibility and can cost-effectively maintain their key role in the power delivery system.

01 COAL, LIGNITE, AND PEAT↗

Mitigation of Alkali Induced Aerosols

Barr, in partnership with the University of North Dakota, Microbeam Technologies Inc., Envergex LLC, and MLJ Consulting, worked to develop a transformational technology that controls the formation of alkali aerosols found in coal ash. This technology mitigates ash deposition by injecting sorbents into the boiler and capturing volatile species responsible for boiler fouling, the primary cause for boiler outages. In this session, we’ll explore the science behind this technology and see some real-world results of its implementation.

01 COAL, LIGNITE, AND PEAT↗

Update on Mitigation of Aerosol Impacts on Ash Deposition and Emission from Coal Combustion

Barr, in partnership with the University of North Dakota, Microbeam Technologies Inc., Envergex LLC, and MLJ Consulting, worked to develop a transformational technology that controls the formation of alkali aerosols found in coal ash. This technology mitigates ash deposition by injecting sorbents into the boiler and capturing volatile species responsible for boiler fouling, the primary cause for boiler outages. In this session, we’ll explore the science behind this technology and see some real-world results of its implementation.

01 COAL, LIGNITE, AND PEAT↗

An Improved Genetic Algorithm approach to the Unit Commitment/Economic Dispatch problem

The deployment of new technologies, the importance of accurately modeling the dynamics of the generating units and the introduction of new policies are making the solution of the Unit Commitment/Economic Dispatch problem more and more complicated.In the present scenario, traditionally followed scheduling criteria might not lead to the optimal fleet configuration any more. In addition, most of the widely used techniques have limited capabilities at modeling the nonlinear dynamics of committed power plants. When realistic power systems comprising of several tens of generating units are modeled, the resulting optimization problem turns to be computationally intensive for the current computing capabilities. In this paper, an improved version of a GA-based optimization algorithm is presented. A detailed methodology aimed at obtaining a more efficient version of the GA, and a more detailed and accurate description of the flexible operation flexibility of the power plants is described.

genetic algorithm↗

A physics-based parametric regression approach for feedwater pump system diagnosis

Here in this paper, we assessed the performance of a model-based approach for fault diagnosis of a nuclear power plant feedwater pump system. Physics-based models were constructed to monitor the performance of the system components. Plant data were used for the calibration of the models and subsequently in the diagnosis of abnormal events. We considered two real-time events representing scenarios of a pump fault and component performance degradation. The two events were correctly diagnosed, and the results demonstrated the high detection sensitivity of the physics-based models. Various sensor fault scenarios were simulated to show the capability of the approach to detect and uniquely identify sensor faults. Results for a scenario in which the plant operated in flexible power mode also showed that the diagnostic approach is insensitive to changes of operating conditions, which is one of the advantages of the model-based approach using physics-based models over purely data-driven approach.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Update on the United States Advanced Ultra-Supercritical Program with Full Scale Component Fabrication to Develop Utility Scale Power Plants with 760°C Steam Temperature

Following the successful completion of a 15-year effort to develop and test materials that would allow coal-fired power plants to be operated at advanced ultra-supercritical (A-USC) steam conditions, a United States-based consortium is presently engaged in Phase 2 of a project which includes an advanced manufacturing effort to complete US-based supply chain development for full commercial scale (800-850 MWe) A-USC components made of nickel-based alloys, components operating at up to 760°C. The project, funded under U.S. Department of Energy Award No. DE-FE0025064, falls under the US DOE overall goal to Develop cost-effective, reliable technologies to improve the efficiency of new and existing coal-fired power plants. A-USC steam cycles have the potential to improve cycle efficiency, reduce fuel costs, and reduce greenhouse gas emissions. Current development and demonstration efforts are focused on enabling the construction of A-USC plants, operating with steam temperatures as high as 1400°F (760°C) and steam pressures up to 5000 psi (35 MPa), which can potentially increase cycle efficiencies to 47% HHV (higher heating value), or approximately 50% LHV (lower heating value), and reduce CO 2 emissions by roughly 25%, compared to today’s U.S. fleet. A-USC technology provides a lower-cost method to reduce CO 2 emissions, compared to CO 2 capture technologies, while retaining a viable coal option for owners of coal generation assets. Among the specific goals of Phase 2 of the ComTest Project are to: validate that components made from advanced nickel-based alloys can operate and perform under A-USC conditions accelerate the development of a U.S.-based supply chain for the full complement of A-USC components close the remaining gaps and reduce the risks for manufacturing components from advanced materials for commercial demonstration fabricate full-scale versions of selected key components made of nickel-based alloys validate a qualified U.S. supply chain, to provide greater cost certainty for components obtain American Society of Mechanical Engineers (ASME) code approval for new materials, components and processes Additional benefit: Manufacturing technology will be applicable to other advanced fossil energy high temperature cycles, and can support increased flexibility of existing power plants The ComTest project is managed by Energy Industries of Ohio, and technically directed by the Electric Power Research Institute, Inc., with General Electric designing the A-USC components. As stated earlier, the current phase of the effort is primarily funded by the U.S. Department of Energy, through the National Energy Technology Laboratory. This presentation outlines the motivation for the project, explains the project’s structure and schedule, and provides some of the technical details on the design of the ComTest components.

01 COAL, LIGNITE, AND PEAT↗

Update on the United States Advanced Ultra-Supercritical Program with Full Scale Component Fabrication to Develop Utility Scale Power Plants with 760°C Steam Temperature

Following the successful completion of a 15-year effort to develop and test materials that would allow coal-fired power plants to be operated at advanced ultra-supercritical (A-USC) steam conditions, a United States-based consortium is presently engaged in Phase 2 of a project which includes an advanced manufacturing effort to complete US-based supply chain development for full commercial scale (800-850 MWe) A-USC components made of nickel-based alloys, components operating at up to 760°C. The project, funded under U.S. Department of Energy Award No. DE-FE0025064, falls under the US DOE overall goal to Develop cost-effective, reliable technologies to improve the efficiency of new and existing coal-fired power plants. A-USC steam cycles have the potential to improve cycle efficiency, reduce fuel costs, and reduce greenhouse gas emissions. Current development and demonstration efforts are focused on enabling the construction of A-USC plants, operating with steam temperatures as high as 1400°F (760°C) and steam pressures up to 5000 psi (35 MPa), which can potentially increase cycle efficiencies to 47% HHV (higher heating value), or approximately 50% LHV (lower heating value), and reduce CO 2 emissions by roughly 25%, compared to today’s U.S. fleet. A-USC technology provides a lower-cost method to reduce CO 2 emissions, compared to CO 2 capture technologies, while retaining a viable coal option for owners of coal generation assets. Among the specific goals of Phase 2 of the ComTest Project are to: validate that components made from advanced nickel-based alloys can operate and perform under A-USC conditions accelerate the development of a U.S.-based supply chain for the full complement of A-USC components close the remaining gaps and reduce the risks for manufacturing components from advanced materials for commercial demonstration fabricate full-scale versions of selected key components made of nickel-based alloys validate a qualified U.S. supply chain, to provide greater cost certainty for components obtain American Society of Mechanical Engineers (ASME) code approval for new materials, components and processes Additional benefit: Manufacturing technology will be applicable to other advanced fossil energy high temperature cycles, and can support increased flexibility of existing power plants The ComTest project is managed by Energy Industries of Ohio, and technically directed by the Electric Power Research Institute, Inc., with General Electric designing the A-USC components. As stated earlier, the current phase of the effort is primarily funded by the U.S. Department of Energy, through the National Energy Technology Laboratory. This presentation outlines the motivation for the project, explains the project’s structure and schedule, and provides some of the technical details on the design of the ComTest components.

01 COAL, LIGNITE, AND PEAT↗