Search NASA⌕ Search

SEARCH · Search NASA

Results for “power simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Examination of Semi-Analytical Solution Methods in the Coarse Operator of Parareal Algorithm for Power System Simulation

With continuing advances in high-performance parallel computing platforms, parallel algorithms have become powerful tools for development of faster than real-time power system dynamic simulations. In particular, it has been demonstrated in recent years that parallel-in-time (Parareal) algorithms have the potential to achieve such an ambitious goal. Here, the selection of a fast and reasonably accurate coarse operator of the Parareal algorithm is crucial for its effective utilization and performance. This paper examines semi-analytical solution (SAS) methods as the coarse operators of the Parareal algorithm and explores performance of the SAS methods to the standard numerical time integration methods. Two promising time-power series-based SAS methods were considered; Adomian decomposition method and Homotopy analysis method with a windowing approach for improving the convergence. Numerical performance case studies on 10-generator 39-bus system and 327-generator 2383-bus system were performed for these coarse operators over different disturbances, evaluating the number of Parareal iterations, computational time, and stability of convergence. All the coarse operators tested with different scenarios have converged to the same corresponding true solution (if they are convergent) and the SAS methods provide comparable computational speed, while having more stable convergence to the true solution in many cases.

97 MATHEMATICS AND COMPUTING↗

Study of microgrid resilience through co-simulation of power system dynamics and communication systems

The interdependence of power and communication systems in smart grid technologies is acknowledged, but difficult to quantify. Communication systems can be essential to maintaining stability in microgrids that are islanded due to extreme events. Though many power system studies assume the presence of communication networks, detailed modeling of power and communication systems for dynamic studies of microgrids is rare. The work presented in this paper develops a framework for power and communication system co-simulation to study the impact of communications system on microgrid stability. An operational use case is examined where a battery energy storage system operates to offset the loss of generation in an islanded microgrid. The framework is evaluated for different communication technologies, network structures, and communication media.

Thekkumparambath Mana, Priya↗

Advancements in Development and Testing of Thermal Power Dispatch Simulators

Flexible plant operations and generation (FPOG) offer nuclear power plants (NPPs) the chance to leverage alternative, non-electric revenue streams while ensuring their continued role as reliable, clean, and constant sources of baseload electrical power. The excess thermal energy generated from NPPs during periods of low electricity demand can be channeled as raw materials to numerous industrial processes via a thermal power dispatch (TPD) system. Hydrogen production via high-temperature steam electrolysis (HTSE) is an optimal use case based on technical and economic feasibility. Researchers at Idaho National Laboratory (INL) have conducted previous works that developed and implemented TPD system models within the GSE Solutions Generic Pressurized Water Reactor (GPWR) simulator to support human-in-the-loop (HITL) scenario-based evaluations. The first part of this report documents modifications made to the GPWR TPD model and HMI from the previous iteration in line with a new Sargent and Lundy (S&L) TPD design with an automatic control system. The was done in collaboration with Westinghouse using their three-loop pressurizer water reactor (W3LPWR) simulator which contains an industrial grade automatic control system for the TPD. This was installed in the Human Systems Simulation Laboratory (HSSL) at INL. The second part of the report documents findings from an all-hands-on-deck integration and verification workshop that was conducted in the HSSL over several days. The research team comprised INL human factors and TPD experts, a nuclear engineer from GSE Solutions who implemented the revised TPD model for GPWR, the human-machine interface (HMI) prototyping and human factors team from the University of Idaho, and personnel with operations experience with pressurized water reactors. The workshop provided time and expertise to conduct the final activities to bring the operations, HMI, and simulator into a functional state. The goals of the integration and verification workshop were: 1. to install the revised GPWR TPD model into the HSSL 2. verify the TPD HMI prototype was functional 3. integrate the HTSE Simulink model to GPWR. 3. Issues were identified for resolution, but overall the workshop accomplished its goal to integrated and verify the majority of the intended functional. Future work will resolve the identified issues and use the integrated simulation to support an evaluation and demonstration in the next fiscal year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Accuracy Enhancement of Nuclear Power Plant Simulators Utilizing High Accuracy Simulation Predictions

More recently, reactor core simulators for core designs associated with commercial nuclear power plants that utilize what is believed to be higher fidelity models have been developed. Features such as neutronics models that utilize transport equation solvers with fine spatial meshes and many energy-groups, thermal-hydraulic models that utilize sub-channel solvers with fine spatial mesh and capable of treating a wide range of fluid conditions, and fuel-coolant chemistry interaction models capable of treating CRUD deposition are to be found in these higher fidelity core simulators. These reactor core simulators require access to higher performance computers, characterized by many processors, cores and large memory. So associated with utilization of these simulators is access to high performance computers and ability to accommodate in one’s workflow longer execution times. By contrast, currently used core simulators by the nuclear industry can execute on engineering workstations and have execution times of seconds to minutes. The desirability for having short execution times is not only desired for support of time critical tasks but supports the mental process of decision making by engineers. The goal of the work reported upon here has the objective of retaining the fidelity of higher fidelity models while retaining the ability to utilize engineering workstations. Beyond the core simulator goal, additional goals of this work include incorporating the just described core simulator capability into a Nuclear Steam Supply System (NSSS) simulator, and to incorporate the resulting capability into an environment supportive of design and operational decision making associated with nuclear power stations. The model selected for the core neutronics model is the NESTLE code, for the core thermal-hydraulic model is the CTF code utilizing coarse mesh, and for the NSSS model is the RELAP5-3D code. WSC’s proprietary 3KEYMASTERTM platform is being used to provide software coupling, user interface, visualization, and reporting. The NESTLE core neutronics simulator was first integrated with the CTF core thermal-hydraulic simulator using CTF developed communication commands which are also used for CTF to communicate with RELAP5-3D under WSC’s proprietary 3KEYMASTERTM platform. To assure NESTLE prediction consistency with higher fidelity core neutronic simulators, buffer codes have been created to automatically generate from output files written by the VERA core simulator the NESTLE nodal neutronic parameter’ library, geometry, and pin-power reconstruction input files, thereby avoiding a number of challenges associated with utilizing lattice physics codes and providing consistency with VERA predictions. To treat absorber rod effects a multi-set library is utilized, where a set refers to a specific absorber rod fully inserted pattern. A coarse spatial mesh CTF model was developed with features added that support using CTF as envisioned in the engineering quality simulator. A hybrid meshing approach was implemented to allow for automated construction of models with mixed levels of refinement. Specifically, a core model could resolve some assemblies at a nodal level (4 subchannels per assembly) and others at a pin-resolution (one subchannel per coolant subchannel in the assembly). The intention is that this will allow for better resolution of limiting conditions such as DNBR and PCT, which are based on local rod and subchannel conditions. Further development was done of features that enhance the capabilities for the envisioned engineering quality simulator that has been developed, but now for RELAP-3D. The RELAP5-3D code development includes ability to model more than 999 components and the addition of the cross-channels turbulence mixing model and the void drift model that are implemented in CTF, aiming to achieve closer prediction agreement of the two codes for transient simulations, specifically, more accurate matches of the overall mass, momentum, and energy exchanges of both the liquid and gas phases between the neighboring core assemblies. Graphics were also developed for the Instructor Station for this project under WSC’s proprietary 3KEYMASTERTM platform to facilitate design and operational decision making.

42 ENGINEERING↗

Investigation of upper-surface-blowing nacelle integration at cruise speeds utilizing powered engine simulators

Various overwing nacelle designs were investigated on a representative four engine short haul aircraft configuration during a combined analytical and experimental program. Design conditions were M sub o = 0.7 and C sub L = 0.4. All nacelles had D shaped nozzle exits and included a streamline contoured design, a low boattail angle reference configuration, and a high boattail angle powered lift design. Testing was done with the design four engine airplane configuration as well as with only inboard nacelles installed. Turbopowered engine simulators were used to provide realistic representation of nacelle flows. Performance trends are compared for the various nacelle designs. In addition, comparisons are presented between analytical and experimental pressure distributions and between flow through and powered simulator results.

Meleason, E. T.↗

Investigation of upper-surface-blowing nacelle integration at cruise speeds utilizing powered engine simulators

Various overwing nacelle designs were investigated on a representative four-engine short-haul aircraft configuration during a combined analytical and experimental program. Design conditions were a Mach number of 0.7 and a lift coefficient of 0.4. All nacelles had D-shaped nozzle exits and included a streamline-contoured design, a low boattail angle reference configuration, and a high boattail angle powered lift design. Testing was done with the design four-engine airplane configuration as well as with only inboard nacelles installed. Turbopowered engine simulators were used to provide realistic representation of nacelle flows. Performance trends are compared for the various nacelle designs. In addition, comparisons are presented between analytical and experimental pressure distributions and between flow-through and powered simulator results.

Meleason, E. T.↗

A sonic satellite power system microwave power transmission simulation

A simulator is described which generates and transmits a beam of audible sound energy mathematically similar to the SPS power beam. The simulator provides a laboratory means for analysis of ground based closed loop SPS phase control and of ionospheric effects on the SPS microwave power beam.

Ott, J. H.↗

Using Qualified On-Site Nuclear Power Plant Simulators in Human Factors Validations of Control Room Upgrades

Existing commercial nuclear power plants (NPPs) are valuable assets in the infrastructure portfolio of the United States (U.S.) because they safely and reliably generate about 1/5th of all the electricity used. The instrumentation and control (I&C) systems in commercial NPPs are the ‘eyes and ears' of the operator, allowing operators to maintain situation awareness, thereby allowing the plant to operate safely and efficiently for all phases of operation. Because the I&C systems in NPPs are still mostly based on analog technologies, which are reliable but not especially cost-effective, upgrading the existing I&C in com-mercial NPPs to new digital I&C is very important. Furthermore, simulators and simulation are critical human factors engineering tools for this I&C modernization work. NPP control room simulators are essential test beds to simulate normal, abnormal, and emergency operations that allow human factors researchers to safely and realistically evaluate early design phase prototypes of the upgraded digital I&C, and validate final as-built digital I&C systems that have been modernized deployed in NPPs. This paper describes research performed using qualified on-site NPP simulators to perform human factors validations of digital I&C control room upgrades.

99 GENERAL AND MISCELLANEOUS↗

Dynamic Human-in-the-Loop Simulated Nuclear Power Plant Thermal Dispatch System Demonstration and Evaluation Study

An Idaho National Laboratory research team performed a human-in-the-loop study with two formerly licensed retired operators to evaluate thermal power dispatch operations supported by the modified GSE Systems GPWR plant simulator. Virtual representations of the analog control panels were presented on touch-screen bays configured to mimic the control room layout in the newly renovated Human Systems Simulation Laboratory. The operators performed 15 scenarios covering normal evolutions to transition the plant from full turbine operation to joint turbine and thermal power dispatch operations in addition to transient response scenarios induced with simulated faults to evaluate the impact of thermal power dispatch system on operator and plant responses. A prototype human-system interface (HSI) was developed and displayed in tandem with the virtual analog panels to support the operators executing the procedurally drive evolutions and transient responses. An interdisciplinary team of operations experts, nuclear engineers, and human factors experts observed the operators performing the scenarios to evaluate the operations. Only a preliminary analysis of the results has been performed. The full analysis will be shared in a milestone report scheduled for release at the end of September; however, some high-level conclusions were readily available. Two high level findings for the system design were captured in the study. The manual control supported by the HSI to transition from standard operations to thermal power dispatch operation imposed a considerable amount of workload on the operators due to tedious manual valve manipulations and system monitoring required to verify their intended effect. An additional operator would be required in the control room to support the daily evolution. Automatic control for the transition was deemed a requirement for plant adoption without imposing additional staffing costs. The second finding was the necessity for an automatic thermal power dispatch system trip isolation function linked to a turbine and reactor trip signal. The operators completed scenarios with automatic isolation functionality and manually required actuation of the thermal power dispatch system. The operator response was sufficiently slower in the manual trip condition, such that operators were unable to manually actuate key post trip safety functions an indicate a degraded control capability that should be avoided. With an automatic trip signal little to no impact of the thermal power dispatch system was identified on the primary plant response and therefore the system could be readily and safely adopted. Together these two findings represent the need to support the adoption of thermal power dispatch capability into existing operations by leveraging automation to augment any additional operator tasking required to control and monitor an additional system beyond existing operations.

99 GENERAL AND MISCELLANEOUS↗

Hubble Space Telescope electrical power system simulation breadboard

The components and operation of the Hubble Space Telescope (HST) electrical power system (EPS) breadboard are described. The HST EPS breadboard consists of: (1) the power distribution breadboard, (2) the batteries, (3) the solar array simulators, (4) the load banks, (5) the charge current control hardware, and (6) a control computer; the functions of each of these elements are discussed. The HST EPS has been used to simulate changes in charge level, charge control schemes, and beta angle, failed cells, batteries, solar panel assemblies (SPAs), beginning of life SPAs, and end of life SPAs, and temperature differences. The test data reveal that the HST EPS is capable of operating over a wide range of conditions.

Bush, John R., Jr.↗

Power Grid Simulation Testbed for Transactive Energy Management Systems

To effectively engage demand-side and distributed energy resources (DERs) for dynamically maintaining the electric power balance, the challenges of controlling and coordinating building equipment and DERs on a large scale must be overcome. Although several control techniques have been proposed in the literature, a significant obstacle to applying these techniques in practice is having access to an effective testing platform. Performing tests at scale using real equipment is impractical, so simulation offers the only viable route to developmental testing at scales of practical interest. Existing power-grid testbeds are unable to model individual residential end-use devices for developing detailed control formulations for responsive loads and DERs. Furthermore, they cannot simulate the control and communications at subminute timescales. To address these issues, this paper presents a novel power-grid simulation testbed for transactive energy management systems. Detailed models of primary home appliances (e.g., heating and cooling systems, water heaters, photovoltaic panels, energy storage systems) are provided to simulate realistic load behaviors in response to environmental parameters and control commands. The proposed testbed incorporates software as it will be deployed, and enables deployable software to interact with various building equipment models for end-to-end performance evaluation at scale.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A sonic satellite power system microwave power transmission simulator

A simulator which generates and transmits a beam of audible sound energy mathematically similar to the SPS power beam is described. The simulator provides a laboratory means for analysis of ground based closed loop SPS phase control and of ionospheric effects on the SPS microwave power beam.

Ott, J. H.↗

Simulation and power quality analysis of a Loose-Coupled bipolar DC microgrid in an office building

With distributed generation and battery storage technologies thriving in microgrids, the use of direct current (DC) microgrids in the building sector offers multiple advantages in energy efficiency and power quality compared with alternating current (AC) systems. This study developed a new concept of a loose-coupled bipolar DC building power system. In this work, the concept was used to design a real-world office building in Shenzhen, China. A power system model was developed to study the stability and control of the DC power system and to verify DC power quality. The design and modeling of the DC power control system is discussed in detail. The study developed a few common fault scenarios in DC building microgrids that were simulated in the MATLAB-Simulink environment to validate the design of a loose-coupled bipolar DC system. The results indicate that the proposed loose-coupled bipolar DC system schema, when implemented with proper control algorithms, can achieve good fault-tolerant performance with reliable power quality, even during disruptive system events.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Digital Real-Time Simulation and Power Quality Analysis of a Hydrogen-Generating Nuclear-Renewable Integrated Energy System

This paper investigates the challenges and solutions associated with integrating a hydrogen-generating nuclear-renewable integrated energy system (NR-IES) under a transactive energy framework. The proposed system directs excess nuclear power to hydrogen production during periods of low grid demand while utilizing renewables to maintain grid stability. Using digital real-time simulation (DRTS) in the Typhoon HIL 404 model, the dynamic interactions between nuclear power plants, electrolyzers, and power grids are analyzed to mitigate issues such as harmonic distortion, power quality degradation, and low power factor caused by large non-linear loads. A three-phase power conversion system is modeled using the Typhoon HIL 404 model and includes a generator, a variable load, an electrolyzer, and power filters. Active harmonic filters (AHFs) and hybrid active power filters (HAPFs) are implemented to address harmonic mitigation and reactive power compensation. The results reveal that the HAPF topology effectively balances cost efficiency and performance and significantly reduces active filter current requirements compared to AHF-only systems. During maximum electrolyzer operation at 4 MW, the grid frequency dropped below 59.3 Hz without filtering; however, the implementation of power filters successfully restored the frequency to 59.9 Hz, demonstrating its effectiveness in maintaining grid stability. Future work will focus on integrating a deep reinforcement learning (DRL) framework with real-time simulation and optimizing real-time power dispatch, thus enabling a scalable, efficient NR-IES for sustainable energy markets.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Early-stage Testing of Thermal Power Dispatch Simulator for Subjective Mental Workload and Evolution Time

The excess thermal energy produced by nuclear power plants (NPPs) during low electricity demands can be utilized in industrial processes, such as hydrogen production, through a thermal power dispatch (TPD) system. Initial testing of the first iteration of a single-train TPD design with a manual control mode at the Idaho National Lab (INL) revealed a high operator workload and degraded control capability. The current study evaluated the impact of an enhanced dual-train TPD design on operators’ subjective mental workload and evolution task-time while completing two operating scenarios in manual and automatic control modes. The results showed no statistically significant difference between participants’ mental workload using both control modes. Evolution time in automatic control mode took a shorter time than in manual control, with participants completing all evolutions in less than the 10-min set as the design specification limit. The shorter evolution time is discussed within the context of plant safety and operational efficiency.

Gideon, Olugbenga↗

Regenerative Fuel Cell Test Rig at Glenn Research Center

The regenerative fuel cell development effort at Glenn Research Center (GRC) involves the integration of a dedicated fuel cell and electrolyzer into an energy storage system test rig. The test rig consists of a fuel cell stack, an electrolysis stack, cooling pumps, a water transfer pump, gas recirculation pumps, phase separators, storage tanks for oxygen (O2) and hydrogen (H2), heat exchangers, isolation valves, pressure regulators, interconnecting tubing, nitrogen purge provisions, and instrumentation for control and monitoring purposes. The regenerative fuel cell (RFC) thus formed is a completely closed system which is capable of autonomous cyclic operation. The test rig provides direct current (DC) load and DC power supply to simulate power consumption and solar power input. In addition, chillers are used as the heat sink to dissipate the waste heat from the electrochemical stack operation. Various vents and nitrogen (N2) sources are included in case inert purging is necessary to safe the RFC test rig.

Chang, Bei-Jiann↗