Search NASA⌕ Search

SEARCH · Search NASA

Results for “proactive scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

38 records · Page 3

Accelerated Materials Deployment in Advanced Nuclear Power Plants

The purpose of this report is to begin the development of a maximally efficient process for licensing and deploying new materials in Advanced Non-Light-Water Reactors (ANLWRs). Some new materials that are to be used in some new plants are seen as possibly introducing risks, because our understanding of those new materials’ behavior in the conditions generated by some novel plant designs is less complete than our understanding of the behavior of materials with long use histories in existing designs. In these cases, an approved code/standard or a code case to support the use of these materials in the novel design’s safety case may not exist for the regulator to utilize as part of the licensing determination. This circumstance creates the potential for an extremely long licensing process for new designs using new materials. The present strategy is to show how to manage these risks proactively, in such a way as to permit licensing decisions to be made in a timely manner, based on this risk management process. The present report outlines the gaps in the current codes to support deployment and use of novel materials and begins the development of the necessary risk management framework that is focused on the subject materials issues; it is based on risk-informed in-service surveillance practices, carried out in such a way as to compensate for current limitations in our state of knowledge. This development will enable licensing and deployment of the subject materials, conditional on the proactive surveillance process to be established. While this report is occasioned by limitations in our knowledge of certain materials issues that may arise in advanced designs, in-service surveillance is always done in order to compensate for a lack of knowledge: if we knew that components were not already failed and not trending toward failure, we would not perform surveillance, even in current-generation plants (except that prescriptive requirements would force us to do so). What is different about the surveillance program discussed here is that the issues are newer and the relevant experience base is less complete, so the surveillance presently contemplated may need to measure new things and/or measure them more often than has been traditional for surveillance coupons. The present report is devoted to the risk management framework and applies American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Division [1] to establish the structure of a protocol for carrying out the necessary surveillance. These documents are generic: they do not tell us how often to surveille, or what to surveille, or what to measure, but rather how to determine those things, given certain technical inputs. The Regulatory Development R&D Program [2] is currently developing the companion supporting technical basis for the materials surveillance technology that, when completed and validated, can be used by owner/operator and NRC to implement a materials degradation management program for ANLWRs. This report also outlines salient points of discussion, positive potential outcomes, and potential concerns from industry and the USNRC. These aspects of the report intend to inform future work to develop a proposed technical process for adoption by the industry and endorsement by the USNRC to allow developers to propose a risk informed and conservative approach for the use of materials where operating experience/data and codes and standards may not exist for use of a novel material in an operating reactor environment. Additionally, such a technology could be leveraged to potentially reduce part of the upfront materials data requirements from ongoing long-term materials testing so that early action on license application could be undertaken by NRC, in parallel with the continuation of long-term data collection. This could accelerate the schedule for a first-of-a-kind ANLWR deployment or a nth-of-a-kind new materials insertion for established ANLWR designs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Institutional impediments to using alternative water sources in thermoelectric power plants.

This report was funded by the U.S. Department of Energy's (DOE's) National Energy Technology Laboratory (NETL) Existing Plants Research Program, which has an energy-water research effort that focuses on water use at power plants. This study complements the Existing Plants Research Program's overall research effort by evaluating water issues that could impact power plants. Obtaining adequate water supplies for cooling and other operations at a reasonable cost is a key factor in siting new and maintaining existing thermoelectric power plant operations. One way to reduce freshwater consumption is to use alternative water sources such as reclaimed (or recycled) water, mine pool water, and other nontraditional sources. The use of these alternative sources can pose institutional challenges that can cause schedule delays, increase costs, or even require plants to abandon their plans to use alternative sources. This report identifies and describes a variety of institutional challenges experienced by power plant owners and operators across the country, and for many of these challenges it identifies potential mitigating approaches. The information comes from publically available sources and from conversations with power plant owners/operators familiar with using alternative sources. Institutional challenges identified in this investigation include, but are not limited to, the following: (1) Institutional actions and decisions that are beyond the control of the power plant. Such actions can include changes in local administrative policies that can affect the use of reclaimed water, inaccurate growth projections regarding the amount of water that will be available when needed, and agency workloads and other priorities that can cause delays in the permitting and approval processes. (2) Developing, cultivating, and maintaining institutional relationships with the purveyor(s) of the alternative water source, typically a municipal wastewater treatment plant (WWTP), and with the local political organizations that can influence decisions regarding the use of the alternative source. Often a plan to use reclaimed water will work only if local politics and power plant goals converge. Even then, lengthy negotiations are often needed for the plans to come to fruition. (3) Regulatory requirements for planning and developing associated infrastructure such as pipelines, storage facilities, and back-up supplies that can require numerous approvals, permits, and public participation, all of which can create delays and increased costs. (4) Permitting requirements that may be difficult to meet, such as load-based discharge limits for wastewater or air emissions limitations for particulate matter (which will be in the mist of cooling towers that use reclaimed water high in dissolved solids). (5) Finding discharge options for cooling tower blowdown of reclaimed water that are acceptable to permitting authorities. Constituents in this wastewater can limit options for discharge. For example, discharge to rivers requires National Pollutant Discharge Elimination System (NPDES) permits whose limits may be difficult to meet, and underground injection can be limited because many potential injection sites have already been claimed for disposal of produced waters from oil and gas wells or waters associated with gas shale extraction. (6) Potential liabilities associated with using alternative sources. A power plant can be liable for damages associated with leaks from reclaimed water conveyance systems or storage areas, or with mine water that has been contaminated by unscrupulous drillers that is subsequently discharged by the power plant. (7) Community concerns that include, but are not limited to, increased saltwater drift on farmers fields; the possibility that the reclaimed water will contaminate local drinking water aquifers; determining the 'best' use of WWTP effluent; and potential health concerns associated with emissions from the cooling towers that use recycled water. (8) Interveners that raise public concerns about the potential for emissions of emerging pollutants of concern to cause health or environmental problems. Mitigating solutions range from proactive communications with the local communities (which can be implemented by the power plants) to technical solutions, such as developing means to reduce the concentrations of total dissolved solids (TDS) and other contaminants in cooling water to maintain plant efficiency and while meeting discharge limits. These kinds of solutions may be appropriate for DOE research and development (R&D) funding.

03 NATURAL GAS↗