Determining Hazard Severity via Probabilistic Risk Assessment in the Commercial Trucking Industry to Inform Design and Qualification.
Abstract not provided.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Explore the source record for details and available documents.
Slides for an invited seminar for a safety/risk class at MIT.
Powerpoint slides for meeting with KAERI, organized by YungJoon Choi
Explore the source record for details and available documents.
Poster for ECRA poster session.
The U.S. Department of Defense (DoD) Strategic Capabilities Office (SCO) has tasked PNNL to address the regulatory challenges associated with confirming the safe transport of Transportable Nuclear Power Plants (TNPPs) containing irradiated nuclear fuel. A previous report—Proposed Risk-Informed Regulatory Framework for Approval of Microreactor Transportation Packages (PNNL-31867)—determined that the expected radioactive inventory in the irradiated fuel of a TNPP would likely require shipment in an NRC-approved Type B package (or spent nuclear fuel cask) but that a TNPP “package” is unlikely to meet the entire suite of NRC requirements set forth in Part 71 of Title 10 of the Code of Federal Regulations (CFR) for a Type B package. It was therefore concluded that shipment of this initial TNPP transportation package, as well as possibly others, under existing regulations would likely require NRC approval using the 10 CFR 71.12 (“Specific exemptions”) process that relies on risk-informed decision making supported by quantitative risk assessment (i.e., Probabilistic Risk Assessment).
Pacific Northwest National Laboratory (PNNL) is addressing the challenges associated with safe transport of microreactors including the development and evaluation of regulatory options. PNNL developed a risk-informed regulatory framework for the licensing of the transportation of microreactors in which irradiated nuclear fuel is part microreactor transportation package. The framework lays out a viable regulatory pathway, including decision points for regulatory options and the supporting technical evaluations for those options in phases from near to long term. A microreactor and its contents will likely not be able to meet all the federal regulatory requirements as a Type B or fissile material transportation package under 10 CFR Part 71 (“Packaging and Transportation of Radioactive Material”). However, the regulatory framework developed by PNNL lays out a viable risk-informed licensing options that are safe and feasible. Risk assessment such as probabilistic risk assessment (PRA) can be used to show comparable safety to that provided by a Type B or fissile material package for surface transport. The framework includes guidance on applicable regulations and discusses historical precedence in using risk information for transportation licensing. The framework includes guidance for performing a microreactor transportation PRA, use and development of risk evaluation criteria, and factors such of defense-in-depth and safety margin concepts. Key advantages of using the approach are (1) increasing the likelihood of successfully obtaining regulatory transportation package approval, (2) informing the design on the relative risk significance of microreactor containment and shielding, and (3) informing the need for transportation compensatory measures. This paper focuses on two primary elements of the framework which are development of a transportation PRA for microreactor packages and development of the risk acceptance guidelines to assess the results of the PRA for regulatory decision-making.
Advanced nuclear reactors are a promising option for aiding the world in achieving its net-zero carbon emission goals, however, there are significant challenges to attaining and maintaining economic competitiveness with other sources of electricity. To improve the economic competitiveness of advanced reactor designs, a project was initiated to explore the use of Markov Decision Processes (MDPs) to guide asset-management decision-making during advanced reactor operation. MDPs are a powerful tool for optimizing decision-making in complex environments and their application to advanced reactors can aid in planning maintenance and repair activities to minimize downtime and maximize generation. The described approach expands on previous work regarding the use of MDPs for operational decision-making through the direct incorporation of real-time plant information. The integral MDP analysis includes information from online component diagnostic tools and the plant’s real-time generation risk assessment (GRA) and probabilistic risk assessment (PRA), which evaluate plant risk from both an economic and safety perspective. The result is an asset-management optimization framework that is based on real-time data regarding plant component status and the current best-estimate of plant risk. The paper presents an overview of the theoretical framework to incorporate the different information pathways into an integral MDP analysis, along with example analyses.
Accident tolerant fuels (ATFs) are new nuclear fuels developed in response to the accident at the Fukushima power station in March 2011. The goal of ATFs is to withstand accident scenarios through better performance compared to currently employed fuels (e.g., small-scale hydrogen generation). This paper targets a method for evaluating and comparing ATF performance from a probabilistic risk assessment (PRA) perspective by employing a newly developed combination of event trees and dynamic PRA methods. Compared to classical PRA methods based on event trees and fault trees, dynamic PRA can evaluate with higher resolution the safety impacts of physics dynamics and the timing/sequencing of events on the accident progression without the need to introduce overly conservative modeling assumptions and success criteria. In this paper, we analyze the impact on the accident progression of three different cladding configurations for two initiating events [a large break loss-of-coolant accident (LB-LOCA) and a station blackout (SBO)] by employing dynamic PRA methods. The goal is to compare the safety performance of ATFs (FeCrAl and Cr-coated cladding) and the currently employed Zr-based clad fuel. We employ two different strategies. The first focuses on the identification of success criteria discrepancies between the accident sequences generated by the classical PRA model and the set of simulation runs generated by dynamic PRA using ATF. The second one, on the other hand, directly uses dynamic PRA to evaluate the impact of timing of events (e.g., recovery actions) on accident progression. In conclusion, by applying these methods to the LB-LOCA and SBO initiating events, we show how dynamic PRA methods can provide analysts with detailed and quantitative information on the safety impact of ATFs.
Advancements in nuclear system designs with automated control features provide many benefits, but can lead to complex coupled systems and dynamic failure scenarios. This is especially true for microreactor designs where components are not expected to be replaced during the reactor’s lifetime. Hence, the life of the system, in addition to the safety, needs to be evaluated. Modeling these sequences of time-dependent events requires addressing cyclical processes and changing failure rates in ways that represent the actual system dynamics in contrast to a single sampling for a component’s time to failure. This research presents two distinct analytical methods for several failure distributions that evaluate a final time to failure used for different scenarios where the time to failure must be sampled multiple times. The first method is used when evaluating a component whose failure rate increases due to an outside event after the initial sampling but before the initially sampled time to failure. The second method is used when evaluating multiple identical components or a component that has been replaced with a new identical version before the second sampling. The two methods were implemented in a few representative case studies developed in the dynamic probabilistic risk assessment tool Event Modeling Risk Assessment using Linked Diagrams. Overall, this paper provides guidelines on how these approaches give a more realistic and accurate dynamic probabilistic risk assessment of complex systems.
Here, it is found from actual data that due to generation dispatch and uncertain renewable generations and loads with complicated correlations, inferring the probabilistic distributions for uncertain inputs is challenging. Many probabilistic power flow approaches have been developed in the literature but their validations using realistic systems and data are lacking. This paper proposes a data-driven probabilistic analysis approach for system risk assessment of the miniWECC system using actual data. The sparse Gaussian process (SGP) is advocated to quantify the impacts of uncertain inputs on voltage security. SGP does not need the probability distribution function of uncertain inputs, can handle correlations and is highly computationally efficient. Results on the miniWECC system using realistic data show that SGP outperforms existing approaches and is able to quantify the voltage violation risks.
For many decades, PSA (Probabilistic Safety Assessment) or PRA (Probabilistic Risk Assessment) techniques have been used to enhance the operational safety of nuclear power plants (NPPs) based on the consideration of potential hazards that could result in an unexpected consequence. As human error is one of the potential hazards, diverse human reliability analysis (HRA) methods have been proposed to provide a systematic way to estimate the likelihood of human errors (i.e., human error probability, HEP) in specific task contexts. Accordingly, it is evident that the quality of HRA results strongly depends on the credibility of HEP estimations. This implies that, in terms of enhancing this credibility, the collection of raw information (HRA data) that is helpful for understating when and why human errors occur is a crucial issue. In order to address this issue, in this study, the feasibility of a framework to integrate HRA data obtained from different sources is investigated based on the complexity of proceduralized tasks.
This plan proposes a strategy for licensing a transportable nuclear power plant, containing its unirradiated and irradiated fuel, as a transportation package for maritime transport using a probabilistic risk assessment framework in order to meet the regulatory requirements of 10 CFR Part 71. It is anticipated that initially, the deterministic transportation package licensing approach will be challenging due to the functional requirements of the transportable nuclear power plant. As such, a partial exemption request from the U.S. Nuclear Regulatory Commission coupled with applied compensatory measures are anticipated in support of providing equivalent safety to the public, worker, and environment. A plan is outlined as to how this would be demonstrated and a pathway is primarily outlined using the accompanying low accident rates which in turn support very low probabilities of release for a maritime application. Wherever possible, the proposed plan is supported by actual accident (casualty) data. Additional supporting information regarding a highway transportation probabilistic risk assessment in support of the Project Pele demonstration reactor that is currently under development is also referenced and discussed.
In the past few decades, the increasing complexity of modern engineering systems has been driven by the integration of a large number of components whose operations may involve many disciplines (e.g., thermal hydraulics, plant operations, cybersecurity). Most computational tools used by industry and regulators for system safety and reliability assessments are still based on the traditional fault tree (FT) and event tree (ET) approach, which may not be able to capture complex interactions among system constituents. The use of simulation tools has widely increased in the past few decades to improve the fidelity of the reliability and safety analyses. However, the direct use of simulation tools as part of dynamic probabilistic risk assessment (DPRA) methods is not getting traction since (1) modeling the whole system under consideration with DPRA methods may be computationally expensive and unnecessary, and (2) the manual integration of DPRA models into existing state-of-practice probabilistic risk assessment models (i.e., based on FTs and ETs) can be time consuming and prone to errors. Here, in this paper we propose a procedure to overcome this limitation by presenting several algorithms designed to automatically construct subsystem ETs and FTs from DPRA methods for integration into an existing ET/FT system model.
Safety analysis simulations have been carried out using the SAS4A/SASSYS-1 safety analysis code system to update the baseline set of results for the Versatile Test Reactor conceptual design. Results from a previous revision of this work provided input for the Conceptual Safety Design Report summarizing the overall safety basis for the VTR. This work will also support future analyses that will be required for Chapter 13, “Accident Analysis,” of a preliminary safety analysis report. A number of transients have been evaluated based on categories of postulated accident sequences suggested for consideration in NUREG-1537. Ultimately, the full spectrum of event initiators and subsequent accident sequences will be defined through a probabilistic risk assessment of the plant design following the implementation of the Licensing Modernization Project guidelines as described in the VTR Safety Design Strategy. Since that process is ongoing, the present analysis addresses several transients that are expected to be bounding accident scenarios that represent the three key ways to perturb a reactor: through changes to the core inlet temperature, mass flow rate, or reactivity. These correspond to a loss of heat sink (LOHS), loss of flow (LOF) or station blackout (SBO), and transient overpower (TOP), respectively. Both Protected and Unprotected versions of these transients have been evaluated, along with additional transients that include transient overpower with one stuck rod, pump coast-down failures, seismic events, and overcooling events. At the current stage of design, transient simulation results for the Versatile Test Reactor indicate that large safety margins exist for many event initiators. However, several “enabling” assumptions have been made, in terms of both design features and design limits, in order to perform the analyses; and these assumptions will need to be revised as the design matures. In addition, a larger spectrum of events needs to be evaluated as part of the on-going probabilistic risk assessment process.
Most current efforts have modified and applied existing human reliability analysis (HRA) methods to treat human actions related to beyond-design-basis external events in which diverse and flexible coping strategies (FLEX) equipment would be deployed. However, many questions remain regarding the suitability of legacy HRA methods to address FLEX human actions, sparking the need for a new method of reasonably evaluating them. In this context, Idaho National Laboratory (INL) researched a relatively new approach to treating FLEX human actions via Event Modeling Risk Assessment Using Linked Diagrams (EMRALD) software. EMRALD was developed to support the increasing need for dynamic probabilistic risk assessment (PRA) models that can respond to evolving plant conditions during simulations. A couple benefits were identified when analyzing FLEX human actions through this software. In general, it is especially useful for evaluating a strategy’s feasibility, including FLEX human actions that require a relatively long time to perform. In this paper, we suggest how FLEX human actions can be modeled using the EMRALD software. Two different HRA modeling approaches using EMRALD are introduced: (1) procedure-based modeling and (2) PRA/HRA-based modeling. The former approach was introduced in the authors’ previous paper, whereas this paper mainly discusses how the latter approach works for an extended loss of AC power (ELAP) scenario with relevant procedures and PRA models. A hybrid method combining the two modeling approaches is introduced at the paper’s conclusion.
Geologic carbon storage (GCS) is a promising technology for mitigating CO 2 emissions. The overall success of GCS depends on safe operations that are informed by risk assessment and have proper mitigation plans in place. Performing quantitative probabilistic risk assessment for a GCS site using traditional reservoir simulators can be challenging due to the high computational costs. To overcome this challenge, the US Department of Energy’s National Risk Assessment Partnership (NRAP) project has developed an integrated assessment modeling approach that utilizes computationally efficient reduced-order models (ROM) for simulating various parts of a GCS storage site to quantify uncertainty. Here, in this study, we develop a reduced-order model for fault leakage risk assessment. We use a deep learning approach to build the reduced-order model. We perform a sensitivity analysis and find that the deep learning model yields high accuracy with a much smaller computational cost than full-physics simulation. We also evaluate the performance of the model in scenarios where simulations are not possible to run, providing analysis not previously performed in fault-leakage ROM analyses. Based on a sensitivity analysis of the model, we suggest a simplified conceptual model for fault leakage and site monitoring.