Search NASASearch

SEARCH · Search NASA

Results for “procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Automated Procurement System (APS) revised project management plan (DS-03)

The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

Murphy, Diane R.

NASA Aerospace Flight Battery Program: Recommendations for Technical Requirements for Inclusion in Aerospace Battery Procurements

This NASA Aerospace Flight Battery Systems Working Group was chartered within the NASA Engineering and Safety Center (NESC). The Battery Working Group was tasked to complete tasks and to propose proactive work to address battery related, agency-wide issues on an annual basis. In its first year of operation, this proactive program addressed various aspects of the validation and verification of aerospace battery systems for NASA missions. Studies were performed, issues were discussed and in many cases, test programs were executed to generate recommendations and guidelines to reduce risk associated with various aspects of implementing battery technology in the aerospace industry. This document contains Part 2 - Volume I: Recommendations for Technical Requirements for Inclusion in Aerospace Battery Procurements of the program's operations.

Jung, David S.

NASA Fastener Procurement, Receiving Inspection, and Storage Practices for NASA Mission Hardware

This document establishes minimum requirements for supply chain risk management, procurement, receiving inspection, testing, traceability management, and storage practices for fasteners used in NASA mission hardware. This document does not contain fastener requirements pertaining to design or design analysis; design and design analysis requirements are contained in NASA-STD-5020, Requirements for Threaded Fastening Systems in Spaceflight Hardware.

Safety and Mission Assurance

Large seals fabricated from small segments reduce procurement lead time

Large diameter seals are fabricated from narrow strip stock welded in segments to form a complete ring. This technique could be used to reduce the cost of critical, large diameter seals in the heating and ventilating industry, petrochemical industry, and marine fabrication industry.

Daniels, C. M.

Procurement specification color graphic camera system

The performance and design requirements for a Color Graphic Camera System are presented. The system is a functional part of the Earth Observation Department Laboratory System (EODLS) and will be interfaced with Image Analysis Stations. It will convert the output of a raster scan computer color terminal into permanent, high resolution photographic prints and transparencies. Images usually displayed will be remotely sensed LANDSAT imager scenes.

Prow, G. E.

Project FIRES - Firefighters Integrated Response Equipment System. Volume 3: Protective Ensemble Design and Procurement Specification, Phase 1B

Each of the subsystems comprising the protective ensemble for firefighters is described. These include: (1) the garment system which includes turnout gear, helmets, faceshields, coats, pants, gloves, and boots; (2) the self-contained breathing system; (3) the lighting system; and (4) the communication system. The design selection rationale is discussed and the drawings used to fabricate the prototype ensemble are provided. The specifications presented were developed using the requirements and test method of the protective ensemble standard. Approximate retail prices are listed.

Abeles, F. J.

Remote sensing procurement package: Remote Sensing Industry Directory

A directory of over 140 firms and organizations which contains detailed information in the types of products, services and equipment which they offer is presented. Also included for each firm or organization are addresses, phone numbers, contact person(s), and experience in the remote sensing field.

Source record

Product assurance technology for procuring reliable, radiation-hard, custom LSI/VLSI electronics

Advanced measurement methods using microelectronic test chips are described. These chips are intended to be used in acquiring the data needed to qualify Application Specific Integrated Circuits (ASIC's) for space use. Efforts were focused on developing the technology for obtaining custom IC's from CMOS/bulk silicon foundries. A series of test chips were developed: a parametric test strip, a fault chip, a set of reliability chips, and the CRRES (Combined Release and Radiation Effects Satellite) chip, a test circuit for monitoring space radiation effects. The technical accomplishments of the effort include: (1) development of a fault chip that contains a set of test structures used to evaluate the density of various process-induced defects; (2) development of new test structures and testing techniques for measuring gate-oxide capacitance, gate-overlap capacitance, and propagation delay; (3) development of a set of reliability chips that are used to evaluate failure mechanisms in CMOS/bulk: interconnect and contact electromigration and time-dependent dielectric breakdown; (4) development of MOSFET parameter extraction procedures for evaluating subthreshold characteristics; (5) evaluation of test chips and test strips on the second CRRES wafer run; (6) two dedicated fabrication runs for the CRRES chip flight parts; and (7) publication of two papers: one on the split-cross bridge resistor and another on asymmetrical SRAM (static random access memory) cells for single-event upset analysis.

Buehler, M. G.