Search NASA⌕ Search

SEARCH · Search NASA

Results for “program metrics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Metrics for the NASA Airspace Systems Program

This document defines an initial set of metrics for use by the NASA Airspace Systems Program (ASP). ASP consists of the NextGen-Airspace Project and the NextGen-Airportal Project. The work in each project is organized along multiple, discipline-level Research Focus Areas (RFAs). Each RFA is developing future concept elements in support of the Next Generation Air Transportation System (NextGen), as defined by the Joint Planning and Development Office (JPDO). In addition, a single, system-level RFA is responsible for integrating concept elements across RFAs in both projects and for assessing system-wide benefits. The primary purpose of this document is to define a common set of metrics for measuring National Airspace System (NAS) performance before and after the introduction of ASP-developed concepts for NextGen as the system handles increasing traffic. The metrics are directly traceable to NextGen goals and objectives as defined by the JPDO and hence will be used to measure the progress of ASP research toward reaching those goals. The scope of this document is focused on defining a common set of metrics for measuring NAS capacity, efficiency, robustness, and safety at the system-level and at the RFA-level. Use of common metrics will focus ASP research toward achieving system-level performance goals and objectives and enable the discipline-level RFAs to evaluate the impact of their concepts at the system level.

Smith, Jeremy C.↗

Performance Metrics for Monitoring Parallel Program Executions

Existing tools for debugging performance of parallel programs either provide graphical representations of program execution or profiles of program executions. However, for performance debugging tools to be useful, such information has to be augmented with information that highlights the cause of poor program performance. Identifying the cause of poor performance necessitates the need for not only determining the significance of various performance problems on the execution time of the program, but also needs to consider the effect of interprocessor communications of individual source level data structures. In this paper, we present a suite of normalized indices which provide a convenient mechanism for focusing on a region of code with poor performance and highlights the cause of the problem in terms of processors, procedures and data structure interactions. All the indices are generated from trace files augmented with data structure information.. Further, we show with the help of examples from the NAS benchmark suite that the indices help in detecting potential cause of poor performance, based on augmented execution traces obtained by monitoring the program.

Sarukkai, Sekkar R.↗

PCMDI Metrics Package

The Program for Climate Model Diagnosis & Intercomparison (PCMDI) Metrics Package (PMP) is used to provide "quick-look" objective comparisons of Earth System Models (ESMs) with one another and available observations. The PMP provides a diverse suite of analysis utilities each of which produce summary statistics that gauge the consistency between climate model simulations and available observations. The primary application of the PMP is to evaluate simulations from the Coupled Model Intercomparison Project (CMIP). It can also be used to provide objective performance summaries during the model development process as well as selected research purposes.

Ullrich, PaulA [Lawrence Livermore National Labora↗

Second Line of Defense Spares Program

During Fiscal Year 2012, a team from the Pacific Northwest National Laboratory (PNNL) conducted an assessment and analysis of the Second Line of Defense (SLD) Sustainability spare parts program. Spare parts management touches many aspects of the SLD Sustainability Program including contracting and integration of Local Maintenance Providers (LMP), equipment vendors, analyses and metrics on program performance, system state of health, and maintenance practices. Standardized spares management will provide better data for decisions during site transition phase and will facilitate transition to host country sustainability ownership. The effort was coordinated with related SLD Sustainability Program initiatives, including a configuration items baselining initiative, a metrics initiative, and a maintenance initiative. The spares study has also led to pilot programs for sourcing alternatives that include regional intermediate inventories and partnering agreements that leverage existing supply chains. Many partners from the SLD Sustainability program contributed to and were consulted in the course of the study. This document provides a description of the findings, recommendations, and implemented solutions that have resulted from the study.

Henderson, Dale L.↗

Earned Value-Added

Earned value management [EVM] ...either you swear by it, or swear at it. Either way, there s no getting around the fact that EVM can be one of the most efficient and insightful methods of synthesizing cost, schedule, and technical status information into a single set of program health metrics. Is there a way of implementing EVM that allows a program to reap its early warning benefits while avoiding the pitfalls that make it infamous to its detractors? That s the question recently faced by the International Space Station [ISS] program.

Jansen, Michael↗

Comp Plan: A computer program to generate dose and radiobiological metrics from dose-volume histogram files

Treatment planning studies often require the calculation of a large number of dose and radiobiological metrics. To streamline these calculations, a computer program called Comp Plan was developed using MATLAB. Comp Plan calculates common metrics, including equivalent uniform dose, tumor control probability, and normal tissue complication probability from dose-volume histogram data. The dose and radiobiological metrics can be calculated for the original data or for an adjusted fraction size using the linear quadratic model. A homogeneous boost dose can be added to a given structure if desired. The final output is written to an Excel file in a format convenient for further statistical analysis. Comp Plan was verified by independent calculations. A lung treatment planning study comparing 45 plans for 7 structures using up to 6 metrics for each structure was successfully analyzed within approximately 5 minutes with Comp Plan. The code is freely available from the authors on request.

61 RADIATION PROTECTION AND DOSIMETRY↗

Strategic Energy Management Program Persistence and Cost Effectiveness An Analysis of the SEM Program Landscape

This study examines the relationship between strategic energy management (SEM) programs and their persistence and cost effectiveness, with analysis based on interview data from 24 SEM program administrators, SEM program evaluations, and other reports. The 80 interview questions focused on the topics of program design, energy savings, energy savings persistence, cost effectiveness, and customer SEM persistence. The generosity of interview respondents provided a wealth of data, resulting in a report of sufficient length to warrant inclusion of this brief guide of the report structure. The major sections are listed below with brief descriptions. Individual sections of this report are mainly stand-alone and do not require reading of other sections. As a result, there is some duplication between sections, but with differing levels of detail. Executive Summary: Presents three key conclusions of this work with a short description of potential actions to advance the understanding of each key finding. Brief Observations: Lists a large number of bulleted observations resulting from this research, arranged by the five major topic areas included in the interviews. Analysis details are provided in the Analysis of Interview Results section. Foundations for this Research: Provides an overview of SEM, SEM frameworks, SEM programs, the topics of persistence and cost effectiveness, and the focus of this research. Methodology: Details the approach and strategy of this research, providing background information relevant to the formulation of interview questions and the identification of which SEM programs to interview. Observations from Compiled Evaluations and Other Reports: Reports observations from the collection and analysis of program evaluations, annual reports, utility planning documents, and SEM-related white papers. This section, presented in bullet form, highlights challenges in data collection and ultimately a comparison of program practices as they pertain to persistence and cost effectiveness. Analysis of Interview Results: Presents detailed analysis of responses from SEM program administrators, arranged by the five major categories examined: program design, energy savings, energy savings persistence, cost effectiveness, and customer SEM persistence. Interview questions are generally grouped together into subsections when it makes sense to examine them together. SEM Programs Challenge Traditional Cost-Effectiveness Metrics: Details an analysis based on five key factors showing that applying traditional cost-effectiveness metrics to SEM programs is not straightforward. This invites the opportunity to consider whether traditional cost-effectiveness metrics are applicable to SEM programs, either individually or at large. Resolution of Research Hypotheses: Tabulates a set of hypotheses that were developed to address the fundamental nature of the research at hand. Analysis of responses to multiple questions informs an understanding of each hypothesis and can be used to better understand the SEM program environment at large.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Peak Demand Impacts From Electricity Efficiency Programs

Quantification of the costs and benefits of electricity efficiency programs have focused largely on the economic value of annual energy reductions. State public utility commissions PUCs and utilities are increasingly interested in assessing peak demand impacts of these programs. The U.S. Energy Information Administration defines peak demand as "The maximum load during a specified period of time." In practice, utilities and grid operators use a wide range of definitions for peak demand. With increasing need for a more flexible and resilient electricity system, and changing costs for generation, utilities and other efficiency program administrators must take into account all characteristics of efficiency programs — including peak demand reduction — to ensure a reliable system at the most affordable cost. In this study, Berkeley Lab explored a new metric, the program administrator (PA) cost of saving peak demand (PA CSPD). We collected data on costs, energy savings and peak demand savings for electricity efficiency programs for 36 investor-owned utilities and other PAs in nine states (Arizona, Arkansas, California, Colorado, Illinois, Massachusetts, Maryland, New York and Texas) for 2014 to 2017. While some utilities report demand reductions for their electricity efficiency programs, there has been little sustained effort in the United States to gather peak demand reduction data or benchmark the cost of achieving peak demand impacts. As a first of its kind analysis, we developed a framework for analyzing peak demand savings across utilities and states and begin to quantify the cost of saving peak demand.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

WE-D-BRA-01: FEATURED PRESENTATION and BEST IN PHYSICS (THERAPY): Predicting Potentially Problematic VMAT Treatment Plans Before Patient Specific QA Measurements

Purpose: Several promising IMRT QA tools have been developed in recent years to combat problems found in the lack of sensitivity in planar dose measurements analyzed using consensus gamma analysis criteria. The increased complexity and added information with such devices adds not only increased time, but new challenges in determining endpoints for pass/fail criteria. Using a large cohort of previously measured planar IMRT QA data, it may be possible to correlate potentially problematic plans with calculated plan metrics that can be done a priori, such that these tools can be used only in clinically relevant situations. Methods: 90 previously measured, clinically delivered VMAT plans were exported in DICOM RT format. Using a Matlab program, plan metrics were computed based on a previously developed set of equations (Du et al. 2014). These metrics included MU-weighted beam irregularity, which quantifies an MLC shape’s deviation from that of a circle. Machine delivery parameters such as MU delivered per degree and leaf movement in millimeters per MU were also calculated. Based on a previous analysis of 394 IMRT QA measurements, a “failing” plan was defined as one with less than 85% gamma pass rate when computed at 1% dose difference and 2 mm distance to agreement; 16 of the 90 plans were identified as failing Results: A ROC curve was generated with an AUC of 0.9409. All 16 outliers were detected with a specificity of 85.1% when using a threshold value based on a linear combination of the MU-weighted plan irregularity and the leaf speed in mm/degree (average MU delivered per degree multiplied by average leaf movement in mm per MU). Conclusion: This data supports that potentially problematic VMAT plans can possibly be predicted before measurement by assessing the MU-weighted irregularity of the MLC shapes combined with the averaged leaf speed of the MLC.

60 APPLIED LIFE SCIENCES↗

NASA metric transition plan

NASA science publications have used the metric system of measurement since 1970. Although NASA has maintained a metric use policy since 1979, practical constraints have restricted actual use of metric units. In 1988, an amendment to the Metric Conversion Act of 1975 required the Federal Government to adopt the metric system except where impractical. In response to Public Law 100-418 and Executive Order 12770, NASA revised its metric use policy and developed this Metric Transition Plan. NASA's goal is to use the metric system for program development and functional support activities to the greatest practical extent by the end of 1995. The introduction of the metric system into new flight programs will determine the pace of the metric transition. Transition of institutional capabilities and support functions will be phased to enable use of the metric system in flight program development and operations. Externally oriented elements of this plan will introduce and actively support use of the metric system in education, public information, and small business programs. The plan also establishes a procedure for evaluating and approving waivers and exceptions to the required use of the metric system for new programs. Coordination with other Federal agencies and departments (through the Interagency Council on Metric Policy) and industry (directly and through professional societies and interest groups) will identify sources of external support and minimize duplication of effort.

Source record↗

Description of the Sandia National Laboratories science, technology & engineering metrics process.

There has been a concerted effort since 2007 to establish a dashboard of metrics for the Science, Technology, and Engineering (ST&E) work at Sandia National Laboratories. These metrics are to provide a self assessment mechanism for the ST&E Strategic Management Unit (SMU) to complement external expert review and advice and various internal self assessment processes. The data and analysis will help ST&E Managers plan, implement, and track strategies and work in order to support the critical success factors of nurturing core science and enabling laboratory missions. The purpose of this SAND report is to provide a guide for those who want to understand the ST&E SMU metrics process. This report provides an overview of why the ST&E SMU wants a dashboard of metrics, some background on metrics for ST&E programs from existing literature and past Sandia metrics efforts, a summary of work completed to date, specifics on the portfolio of metrics that have been chosen and the implementation process that has been followed, and plans for the coming year to improve the ST&E SMU metrics process.

99 GENERAL AND MISCELLANEOUS↗

Analysis-based arguments for abstract data type calculus.

Increasing demands on the complexity of scientific models coupled with increasing demands for their scalability are placing programming models on equal footing with the numerical methods they implement in terms of significance. A recurring theme across several major scientific software development projects involves defining abstract data types (ADTs) that closely mimic mathematical abstractions such as scalar, vector, and tensor fields. In languages that support user-defined operators and/or overloading of intrinsic operators, coupling ADTs with a set of algebraic and/or integro-differential operators results in an ADT calculus. This talk will analyze ADT calculus using three tool sets: object-oriented design metrics, computational complexity theory, and information theory. It will be demonstrated that ADT calculus leads to highly cohesive, loosely coupled abstractions with code-size-invariant data dependencies and minimal information entropy. The talk will also discuss how these results relate to software flexibility and robustness.

99 GENERAL AND MISCELLANEOUS↗

Measuring Fundamental Improvements in Sustainable Urban Mobility: The Mobility-Energy Productivity Metric

Recent technological advancements in mobility are creating many options for connecting citizens with employment, goods, and services, particularly in urban areas where modes such as bike and car shares, electric scooters, ridesourcing, and ridesharing are proliferating at a rapid pace. Analysis and tools for overall transportation planning are dominated by urban regional travel demand models whose roots in highway operations poorly reflect the system dynamics in denser areas where parking costs, convenience, and availability - not to mention sustainability concerns and quality of life - are driving people to an ever-greater spectrum of mobility services. In this paper, we present a new paradigm for evaluating mobility options within an urban area. First developed for the U.S. Department of Energy's Energy Efficient Mobility System research program, this metric is termed the mobility-energy productivity (MEP) metric. At its heart, the MEP metric measures accessibility and appropriately weights it with travel time, cost, and energy of modes that provide access to opportunities in any given location. The proposed metric is versatile in that it can be computed from readily available data sources or derived from outputs of regional travel demand models. End times associated with parking, curb access, cost, and reliability and frequency of service need to be carefully considered to obtain an appropriate and accurate perspective when computing the metric. Ultimately, the MEP metric can be used to reflect the impacts of new mobility technologies (transportation network companies, electric scooters), business models (car shares and bike shares), and land-use practices (such as transit-oriented development) on sustainable urban mobility. This paper lays out the need, requirements, and framework for this new metric, and offers it, in collaboration with the American Society for Civil Engineers (ASCE), as a foundational metric for smart city assessment.

30 DIRECT ENERGY CONVERSION↗

Measuring Fundamental Improvements in Sustainable Urban Mobility: The Mobility-Energy Productivity Metric: Preprint

Recent technological advancements in mobility are creating many options for connecting citizens with employment, goods, and services, particularly in urban areas where modes such as bike and car shares, electric scooters, ridesourcing, and ridesharing are proliferating at a rapid pace. Analysis and tools for overall transportation planning are dominated by urban regional travel demand models whose roots in highway operations poorly reflect the system dynamics in denser areas where parking costs, convenience, and availability - not to mention sustainability concerns and quality of life - are driving people to an ever-greater spectrum of mobility services. In this paper, we present a new paradigm for evaluating mobility options within an urban area. First developed for the U.S. Department of Energy's Energy Efficient Mobility System research program, this metric is termed the Mobility-Energy Productivity (MEP) metric. At its heart, the MEP metric measures accessibility and appropriately weights it with travel time, cost, and energy of modes that provide access to opportunities in any given location. The proposed metric is versatile in that it can be computed from readily available data sources or derived from outputs of regional travel demand models. End times associated with parking, curb access, cost, and reliability and frequency of service need to be carefully considered to obtain an appropriate and accurate perspective when computing the metric. Ultimately, the MEP metric can be used to reflect the impacts of new mobility technologies (transportation network companies, electric scooters), business models (car shares and bike shares), and land-use practices (such as transit-oriented development) on sustainable urban mobility. This paper lays out the need, requirements, and framework for this new metric, and offers it, in collaboration with the American Society for Civil Engineers (ASCE), as a foundational metric for Smart City assessment.

30 DIRECT ENERGY CONVERSION↗

Diagnosing the Causes and Severity of One-sided Message Contention

Two trends suggest network contention for one-sided messages is poised to become a performance problem that concerns application developers: an increased interest in one-sided programming models and a rising ratio of hardware threads to network injection bandwidth. Unfortunately, it is difficult to reason about network contention and one-sided messages because one-sided tasks can either decrease or increase contention. We present effective and portable techniques for diagnosing the causes and severity of one-sided message contention. To detect that a message is affected by contention, we maintain statistics representing instantaneous (non-local) network resource demand. Using lightweight measurement and modeling, we identify the portion of a message's latency that is due to contention and whether contention occurs at the initiator or target. We attribute these metrics to program statements in their full static and dynamic context. We characterize contention for an important computational chemistry benchmark on InfiniBand, Cray Aries, and IBM Blue Gene/Q interconnects. We pinpoint the sources of contention, estimate their severity, and show that when message delivery time deviates from an ideal model, there are other messages contending for the same network links. With a small change to the benchmark, we reduce contention up to 50% and improve total runtime as much as 20%.

Network Contention, Performance Analysis, Dynamic ↗

Building a Metric

Launch Services Program is a Kennedy Space Center based program whose job it is to undertake all the necessary roles required to successfully launch Expendable Launch Vehicles. This project was designed to help Launch Services Program accurately report how successful they have been at launching missions on time or +/- 2 days from the scheduled launch date and also if they weren't successful, why. This information will be displayed in the form of a metric, which answers these questions in a clear and accurate way.

Spencer, Shakira↗

Appendix B – Building Technologies

The GPRA FY04 published documentation for Building Technologies and the Weatherization and Intergovernmental Program can be found at this link: http://www.pnl.gov/main/publications/external/technical_reports/PNNL-14231.pdf The Federal Energy Management Program (FEMP) metrics are estimated via a top-down approach, which are driven by forecasts of future energy consumption and prices. Federal metrics for regular buildings are aggregated from metrics developed for the Department of Defense (DOD), Department of Energy (DOE), General Services Administration (GSA), United States Postal Service (USPS), Veterans Affairs (VA), and all other agencies grouped together. Federal metrics for buildings housing energy intensive operations are estimated separately, but as a single group for the entire federal government. Metrics are not developed for exempt buildings, by definition.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗