Search NASA⌕ Search

SEARCH · Search NASA

Results for “programmatic evaluation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

BRAINSTACK – A Platform for Artificial Intelligence & Machine Learning Collaborative Experiments on a Nano-Satellite

As the space economy continues to expand through increasingly easy access to advanced and inexpensive technology, space missions themselves have become more ambitious with exploration targets growing ever distant while simultaneously requiring larger guidance and communication budgets. These conflicting desires of distance and control drive the need for advanced on-board intelligent decision making to reduce communication and control limitations by automating as many mission functions as possible in-situ. While the amount of research on such Artificial Intelligence and Machine Learning (AI/ML) software modules has grown exponentially, the capacity to experimentally validate such software modules in space in a rapid and inexpensive format has not. To this end, the Nano Orbital Workshop (NOW) group at NASA Ames Research Center has been at the forefront of performing initial flight evaluation tests of ‘commercially’ available bleeding-edge computational platforms via what is programmatically referred to as the BrainStack on the TechEdSat (TES-n) flight series. This on-orbit computational platform provides an evaluation laboratory where advanced software experiments are pre-loaded into memory prior to launch, then executed as payloads during mission operations with results reported back and program tweaks or new training sets uploaded as needed. Processors selected as part of the BrainStack are of ideal size, packaging, and power consumption for easy integration into a cube satellite structure. These experiments have included the evaluation of small, high-performance GPUs and, more recently, neuromorphic processors, in LEO operations. Neuromorphic processors are of particular interest due to their superior power efficiency over GPUs in intelligent automation applications. The first TES-n flight test of an Intel first-generation Loihi neuromorphic processor launched on TES-13, January 13, 2022, and continues to operate in orbit despite no significant modifications to harden the processor against the space environment. The Intel Loihi Gen-1 on TES-13 is characterized by a 14nm 128-core Spiking Neural Network (SNN) able to support on-chip training. The processor is packaged in the Kapoho Bay USB module, providing a relatively straight-forward interface to the bus avionics system. The Kapoho Bay was in turn managed by an Intel Pentium single-board computer to handle scheduling of the software application payloads and communications with the satellite’s primary computer. The recently released Intel Loihi Gen-2, able to support integer-valued spike payloads and produced using 7nm process, will form part of the continually evolving BrainStack in the upcoming three TES-n/NOW flights. The Kapoho Point unit will incorporate eight Loihi-2 processors, enabling neural networks of up to one million neurons and one billion synapsis. Additionally, it is planned to measure the radiation environment these processors experience to understand any degradation or computational artifacts caused by long term space radiation exposure on these novel architectures. This evolving flexible and collaborative environment involving various research teams across NASA and other organizations is intended to be a convenient orbital test platform from which many anticipated future space automation applications may be initially tested.

Artificial Intelligence↗

Study to evaluate the effect of EVA on payload systems. Volume 1: Executive summary

Programmatic benefits to payloads are examined which can result from the routine use of extravehicular activity (EVA) during space missions. Design and operations costs were compared for 13 representative baseline payloads to the costs of those payloads adapted for EVA operations. The EVA-oriented concepts developed in the study were derived from these baseline concepts and maintained mission and program objectives as well as basic configurations. This permitted isolation of cost saving factors associated specifically with incorporation of EVA in a variety of payload designs and operations. The study results were extrapolated to a total of 74 payload programs. Using appropriate complexity and learning factors, net EVA savings were extrapolated to over $551M for NASA and U.S. civil payloads for routine operations. Adding DOD and ESRO payloads increases the net estimated savings of $776M. Planned maintenance by EVA indicated an estimated $168M savings due to elimination of automated service equipment. Contingency problems of payloads were also analyzed to establish expected failure rates for shuttle payloads. The failure information resulted in an estimated potential for EVA savings of $1.9 B.

Patrick, J. W.↗

Modular space station phase B extension period executive summary

A narrative summary is presented of technical, programmatic, and planning information developed during the space station definition study extension period. The modular space station is emphasized, but tasks pertaining to shuttle sorties missions and information management advanced development are included. A series of program options considering technical, schedule, and programmatic alternatives to the baseline program are defined and evaluated.

Tischler, A. A.↗

In-Space Transportation for NASA's Evolvable Mars Campaign

As the nation embarks on a new and bold journey to Mars, significant work is being done to determine what that mission and those architectural elements will look like. The Evolvable Mars Campaign, or EMC, is being evaluated as a potential approach to getting humans to Mars. Built on the premise of leveraging current technology investments and maximizing element commonality to reduce cost and development schedule, the EMC transportation architecture is focused on developing the elements required to move crew and equipment to Mars as efficiently and effectively as possible both from a performance and a programmatic standpoint. Over the last 18 months the team has been evaluating potential options for those transportation elements. One of the key aspects of the EMC is leveraging investments being made today in missions like the Asteroid Redirect Mission (ARM) mission using derived versions of the Solar Electric Propulsion (SEP) propulsion systems and coupling them with other chemical propulsion elements that maximize commonality across the architecture between both transportation and Mars operations elements. This paper outlines the broad trade space being evaluated including the different technologies being assessed for transportation elements and how those elements are assembled into an architecture. Impacts to potential operational scenarios at Mars are also investigated. Trades are being made on the size and power level of the SEP vehicle for delivering cargo as well as the size of the chemical propulsion systems and various mission aspects including Inspace assembly and sequencing. Maximizing payload delivery to Mars with the SEP vehicle will better support the operational scenarios at Mars by enabling the delivery of landers and habitation elements that are appropriately sized for the mission. The purpose of this investigation is not to find the solution but rather a suite of solutions with potential application to the challenge of sending cargo and crew to Mars. The goal is that, by building an architecture intelligently with all aspects considered, the sustainable Mars program wisely invests limited resources enabling a long-term human Mars exploration program.

Percy, Thomas K.↗

Space Hardware Test Effectiveness

A reassessment of the Assurance Processes regarding spacecraft is underway at JPL. Missions are more difficult, funding is constrained, and development guidelines are different. It is necessary to separate the nice-to-do tasks from the required tasks. We need to determine what we are doing, how well we are doing it, and what we should be doing. Tools to be used are reports of flight anomolies, reports of preflight test anomolies, evaluations of flight performance, and studies of the management of risk during development and performance stages and within programmatic realms.

product assurance risk management funding costs an↗

The TPS Advanced Development Project for CEV

The CEV TPS Advanced Development Project (ADP) is a NASA in-house activity for providing two heatshield preliminary designs (a Lunar direct return as well as a LEO only return) for the CEV, including the TPS, the carrier structure, the interfaces and the attachments. The project s primary objective is the development of a single heatshield preliminary design that meets both Lunar direct return and LEO return requirements. The effort to develop the Lunar direct return capable heatshield is considered a high risk item for the NASA CEV development effort due to the low TRL (approx. 4) of the candidate TPS materials. By initiating the TPS ADP early in the development cycle, the intent is to use materials analysis and testing in combination with manufacturing demonstrations to reduce the programmatic risk of using advanced TPS technologies in the critical path for CEV. Due to the technical and schedule risks associated a Lunar return heatshield, the ADP will pursue a parallel path design approach, whereby a back-up TPS/heatshield design that only meets LEO return requirements is also developed. The TPS materials and carrier structure design concept selections will be based on testing, analysis, design and evaluation of scalability and manufacturing performed under the ADP. At the TPS PDR, the preferred programmatic strategy is to transfer the continued (detailed) design, development, testing and evaluation (DDT&E) of both the Lunar direct and LEO return designs to a government/prime contractor coordinated sub-system design team. The CEV prime contractor would have responsibility for the continued heatshield sub-system development. Continued government participation would include analysis, testing and evaluation as well as decision authority at TPS Final System Decision (FSD) (choosing between the primary and back-up heatshields) occurring between TPS PDR and TPS Critical Design Review (CDR). After TPS FSD the prime CEV contractor will complete the detailed design, certification testing, procurement, and integration of the CEV TPS.

Reuther, James↗

An On-line Technology Information System (OTIS) for Advanced Life Support

OTIS is an on-line communication platform designed for smooth flow of technology information between advanced life support (ALS) technology developers, researchers, system analysts, and managers. With pathways for efficient transfer of information, several improvements in the ALS Program will result. With OTIS, it will be possible to provide programmatic information for technology developers and researchers, technical information for analysts, and managerial decision support. OTIS is a platform that enables the effective research, development, and delivery of complex systems for life support. An electronic data collection form has been developed for the solid waste element, drafted by the Solid Waste Working Group. Forms for other elements (air revitalization, water recovery, food processing, biomass production and thermal control) will also be developed, based on lessons learned from the development of the solid waste form. All forms will be developed by consultation with other working groups, comprised of experts in the area of interest. Forms will be converted to an on-line data collection interface that technology developers will use to transfer information into OTIS. Funded technology developers will log in to OTIS annually to complete the element- specific forms for their technology. The type and amount of information requested expands as the technology readiness level (TRL) increases. The completed forms will feed into a regularly updated and maintained database that will store technology information and allow for database searching. To ensure confidentiality of proprietary information, security permissions will be customized for each user. Principal investigators of a project will be able to designate certain data as proprietary and only technical monitors of a task, ALS Management, and the principal investigator will have the ability to view this information. The typical OTIS user will be able to read all non-proprietary information about all projects.Interaction with the database will occur over encrypted connections, and data will be stored on the server in an encrypted form. Implementation of OTIS will initiate a community-accessible repository of technology development information. With OTIS, ALS element leads and managers will be able to carry out informed technology selection for programmatic decisions. OTIS will also allow analysts to make accurate evaluations of technology options. Additionally, the range and specificity of information solicited will help educate technology developers of program needs. With augmentation, OTIS reporting is capable of replacing the current fiscal year-end reporting process. Overall, the system will enable more informed R&TD decisions and more rapid attainment of ALS Program goals.

Levri, Julie A.↗

Conceptual design and evaluation of selected Space Station concepts, volume 1

Space Station configuration concepts are defined to meet the NASA Headquarters Concept Development Group (CDG) requirements. Engineering and programmatic data are produced on these concepts suitable for NASA and industry dissemination. A data base is developed for input to the CDG's evaluation of generic Space Station configurations and for use in the critique of the CDG's generic configuration evaluation process.

Source record↗

Space Station Systems Analysis Study. Volume 1: Executive summary, part 1 and 2

The elements of space station programs required to support an operational base theme, a space laboratory theme, and advanced missions relatable to public needs/national interests are defined. Missions satisfying the foregoing requirements are identified, program scenarios/options are established. System options are evaluated for a selected number of program options. Subsystem analysis and programmatic comparisons are performed for selected primary concepts.

Source record↗

Special environmental control and life support equipment test analyses and hardware

This final report summarizes NAS8-38250 contract events, 'Special Environmental Control and Life Support Systems Test Analysis and Hardware'. This report is technical and includes programmatic development. Key to the success of this contract was the evaluation of Environmental Control and Life Support Systems (ECLSS) test results via sophisticated laboratory analysis capabilities. The history of the contract, including all subcontracts, is followed by the support and development of each Task.

Callahan, David M.↗

Phase 1 Space Fission Propulsion System Design Considerations

Fission technology can enable rapid, affordable access to any point in the solar system. If fission propulsion systems are to be developed to their full potential; however, near-term customers must be identified and initial fission systems successfully developed, launched, and operated. Studies conducted in fiscal year 2001 (IISTP, 2001) show that fission electric propulsion (FEP) systems operating at 80 kWe or above could enhance or enable numerous robotic outer solar system missions of interest. At these power levels it is possible to develop safe, affordable systems that meet mission performance requirements. In selecting the system design to pursue, seven evaluation criteria were identified: safety, reliability, testability, specific mass, cost, schedule, and programmatic risk. A top-level comparison of three potential concepts was performed: an SP-100 based pumped liquid lithium system, a direct gas cooled system, and a heatpipe cooled system. For power levels up to at least 500 kWt (enabling electric power levels of 125-175 kWe, given 25-35% power conversion efficiency) the heatpipe system has advantages related to several criteria and is competitive with respect to all. Hardware-based research and development has further increased confidence in the heatpipe approach. Successful development and utilization of a "Phase 1" fission electric propulsion system will enable advanced Phase 2 and Phase 3 systems capable of providing rapid, affordable access to any point in the solar system.

Houts, Mike↗

Evaluation of TAO Observation System on ENSO Predictions from the GMAO S2S Forecast System

Since the early 1990’s, the Tropical Atmosphere Ocean (TAO) mooring array has been instrumental for observing Kelvin and Rossby wave propagation which is key for El Nino/Southern Oscillation (ENSO) prediction. However, recent funding and programmatical issues have highlighted the need to rigorously assess the impact of the TAO observing system on ENSO predictions. Therefore, we evaluate the TAO using data assimilation observation denial experiments (also known as Observing System Evaluation or OSE experiments). This presentation will evaluate the TAO observing impact on both reanalyses and prediction of the big 2015 El Nino. We have completed reanalyses for July 2014-Dec 2015 for both the CONTROL experiment (that assimilates all available data) and the NOTAO experiment (that is identical to the CONTROL but withholds all TAO observations) using the best available NASA GEOS-S2S V3 seasonal prediction system. Validation of these reanalyses shows that TAO assimilation generally improves comparisons of temperature and salinity versus gridded in situ observations. Temperature is universally improved above the thermocline near the equator, but the biggest improvement is found in the eastern Pacific, just below the thermocline, where the variation of the thermocline defines ENSO events. In addition, a surprising result is that even with relatively few observations, salinity is improved throughout the equatorial region except near 120oW near the surface. ENSO forecasts were performed that were initialized from these CONTROL and NOTAO reanalyses. For the 9-month forecasts which were initialized in January, July, and October 2015, the NINO3.4 SST shows that the CONTROL forecasts are warmer and closer to observations than the NOTAO forecasts. We will show that upwelling and shoaling of the mixed layer amplifies the ENSO signal due to TAO assimilation. Prior to (after) April 2015, this upwelling is caused by relatively stronger Rossby (Kelvin) waves in the CONTROL than in the NOTAO experiments.

E. Hackert↗

Phase 1 Space Fission Propulsion Energy Source Design

Fission technology can enable rapid, affordable access to any point in the solar system. If fission propulsion systems are to be developed to their full potential; however, near-term customers must be identified and initial fission systems successfully developed, launched, and operated. Studies conducted in fiscal year 2001 (IISTP, 2001) show that fission electric propulsion (FEP) systems with a specific mass at or below 50 kg/kWjet could enhance or enable numerous robotic outer solar system missions of interest. At the required specific mass, it is possible to develop safe, affordable systems that meet mission requirements. To help select the system design to pursue, eight evaluation criteria were identified: system integration, safety, reliability, testability, specific mass, cost, schedule, and programmatic risk. A top-level comparison of four potential concepts was performed: a Testable, Passive, Redundant Reactor (TPRR), a Testable Multi-Cell In-Core Thermionic Reactor (TMCT), a Direct Gas Cooled Reactor (DGCR), and a Pumped Liquid Metal Reactor.(PLMR). Development of any of the four systems appears feasible. However, for power levels up to at least 500 kWt (enabling electric power levels of 125-175 kWe, given 25-35% power conversion efficiency) the TPRR has advantages related to several criteria and is competitive with respect to all. Hardware-based research and development has further increased confidence in the TPRR approach. Successful development and utilization of a "Phase I" fission electric propulsion system will enable advanced Phase 2 and Phase 3 systems capable of providing rapid, affordable access to any point in the solar system.

Houts, Mike↗

Extra-Zodiacal-Cloud Astronomy via Solar Electric Propulsion

Solar electric propulsion (SEP) is often considered as primary propulsion for robotic planetary missions, providing the opportunity to deliver more payload mass to difficult, high-delta-velocity destinations. However, SEP application to astrophysics has not been well studied. This research identifies and assesses a new application of SEP as primary propulsion for low-cost high-performance robotic astrophysics missions. The performance of an optical/infrared space observatory in Earth orbit or at the Sun-Earth L2 point (SEL2) is limited by background emission from the Zodiacal dust cloud that has a disk morphology along the ecliptic plane. By delivering an observatory to a inclined heliocentric orbit, most of this background emission can be avoided, resulting in a very substantial increase in science performance. This advantage enabled by SEP allows a small-aperture telescope to rival the performance of much larger telescopes located at SEL2. In this paper, we describe a novel mission architecture in which SEP technology is used to enable unprecedented telescope sensitivity performance per unit collecting area. This extra-zodiacal mission architecture will enable a new class of high-performance, short-development time, Explorer missions whose sensitivity and survey speed can rival flagship-class SEL2 facilities, thus providing new programmatic flexibility for NASA's astronomy mission portfolio. A mission concept study was conducted to evaluate this application of SEP. Trajectory analyses determined that a 700 kg-class science payload could be delivered in just over 2 years to a 2 AU mission orbit inclined 15 to the ecliptic using a 13 kW-class NASA's Evolutionary Xenon Thruster (NEXT) SEP system. A mission architecture trade resulted in a SEP stage architecture, in which the science spacecraft separates from the stage after delivery to the mission orbit. The SEP stage and science spacecraft concepts were defined in collaborative engineering environment studies. The SEP stage architecture approach offers benefits beyond a single astrophysics mission. A variety of low-cost astrophysics missions could employ a standard SEP stage to achieve substantial science benefit. This paper describes the results of this study in detail, including trajectory analysis, spacecraft concept definition, description of telescope/instrument benefits, and application of the resulting SEP stage to other missions. In addition, the benefits of cooperative development and use of the SEP stage, in conjunction with a SEP flight demonstration mission currently in definition at NASA, are considered.

Benson, Scott W.↗

Techniques for Conducting Effective Concept Design and Design-to-Cost Trade Studies

Concept design plays a central role in project success as its product effectively locks the majority of system life cycle cost. Such extraordinary leverage presents a business case for conducting concept design in a credible fashion, particularly for first-of-a-kind systems that advance the state of the art and that have high design uncertainty. A key challenge, however, is to know when credible design convergence has been achieved in such systems. Using a space system example, this paper characterizes the level of convergence needed for concept design in the context of technical and programmatic resource margins available in preliminary design and highlights the importance of design and cost evaluation learning curves in determining credible convergence. It also provides techniques for selecting trade study cases that promote objective concept evaluation, help reveal unknowns, and expedite convergence within the trade space and conveys general practices for conducting effective concept design-to-cost studies.

Design To Cost↗

Techniques for Conducting Effective Concept Design and Design-to-Cost Trade Studies

Concept design plays a central role in project success as its product effectively locks the majority of system life cycle cost. Such extraordinary leverage presents a business case for conducting concept design in a credible fashion, particularly for first-of-a-kind systems that advance the state of the art and that have high design uncertainty. A key challenge, however, is to know when credible design convergence has been achieved in such systems. Using a space system example, this paper characterizes the level of convergence needed for concept design in the context of technical and programmatic resource margins available in preliminary design and highlights the importance of design and cost evaluation learning curves in determining credible convergence. It also provides techniques for selecting trade study cases that promote objective concept evaluation, help reveal unknowns, and expedite convergence within the trade space and conveys general practices for conducting effective concept design-to-cost studies.

Trade Studies↗

Architecture and Functionality of the Advanced Life Support On-Line Project Information System (OPIS)

An ongoing effort is underway at NASA Amcs Research Center (ARC) tu develop an On-line Project Information System (OPIS) for the Advanced Life Support (ALS) Program. The objective of this three-year project is to develop, test, revise and deploy OPIS to enhance the quality of decision-making metrics and attainment of Program goals through improved knowledge sharing. OPIS will centrally locate detailed project information solicited from investigators on an annual basis and make it readily accessible by the ALS Community via a web-accessible interface. The data will be stored in an object-oriented relational database (created in MySQL(Trademark) located on a secure server at NASA ARC. OPE will simultaneously serve several functions, including being an R&TD status information hub that can potentially serve as the primary annual reporting mechanism. Using OPIS, ALS managers and element leads will be able to carry out informed research and technology development investment decisions, and allow analysts to perform accurate systems evaluations. Additionally, the range and specificity of information solicited will serve to educate technology developers of programmatic needs. OPIS will collect comprehensive information from all ALS projects as well as highly detailed information specific to technology development in each ALS area (Waste, Water, Air, Biomass, Food, Thermal, and Control). Because the scope of needed information can vary dramatically between areas, element-specific technology information is being compiled with the aid of multiple specialized working groups. This paper presents the current development status in terms of the architecture and functionality of OPIS. Possible implementation approaches for OPIS are also discussed.

Hogan, John A.↗

Architecture and Functionality of the Advanced Life Support On-Line Project Information System

An ongoing effort is underway at NASA Ames Research Center (ARC) to develop an On-line Project Information System (OPIS) for the Advanced Life Support (ALS) Program. The objective of this three-year project is to develop, test, revise and deploy OPIS to enhance the quality of decision-making metrics and attainment of Program goals through improved knowledge sharing. OPIS will centrally locate detailed project information solicited from investigators on an annual basis and make it readily accessible by the ALS Community via a Web-accessible interface. The data will be stored in an object-oriented relational database (created in MySQL) located on a secure server at NASA ARC. OPE will simultaneously serve several functions, including being an research and technology development (R&TD) status information hub that can potentially serve as the primary annual reporting mechanism for ALS-funded projects. Using OPIS, ALS managers and element leads will be able to carry out informed R&TD investment decisions, and allow analysts to perform accurate systems evaluations. Additionally, the range and specificity of information solicited will serve to educate technology developers of programmatic needs. OPIS will collect comprehensive information from all ALS projects as well as highly detailed information specific to technology development in each ALS area (Waste, Water, Air, Biomass, Food, Thermal, Controls and Systems Analysis). Because the scope of needed information can vary dramatically between areas, element-specific technology information is being compiled with the aid of multiple specialized working groups. This paper presents the current development status in terms of the architecture and functionality of OPIS. Possible implementation approaches for OPIS are also discussed.

Hogan, John A.↗