Search NASA⌕ Search

SEARCH · Search NASA

Results for “project design and planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Methodology for Good Machine Learning with Multi‐Omics Data

In 2020, Novartis Pharmaceuticals Corporation and the U.S. Food and Drug Administration (FDA) started a 4‐year scientific collaboration to approach complex new data modalities and advanced analytics. The scientific question was to find novel radio‐genomics‐based prognostic and predictive factors for HR+/HER− metastatic breast cancer under a Research Collaboration Agreement. This collaboration has been providing valuable insights to help successfully implement future scientific projects, particularly using artificial intelligence and machine learning. This tutorial aims to provide tangible guidelines for a multi‐omics project that includes multidisciplinary expert teams, spanning across different institutions. We cover key ideas, such as “maintaining effective communication” and “following good data science practices,” followed by the four steps of exploratory projects, namely (1) plan, (2) design, (3) develop, and (4) disseminate. We break each step into smaller concepts with strategies for implementation and provide illustrations from our collaboration to further give the readers actionable guidance.

Pharmacology & Pharmacy↗

A practical method for modeling temporally-averaged ocean wave frequency-directional spectra for characterizing wave energy climates

Wave energy resource characterization investigations have been hindered because frequency-directional wave spectra are not broadly available for many coastal regions due to the insufficient spatial coverage of buoy observation networks and spectral wave model hindcast outputs. We address this problem by developing and validating a practical method for approximating temporally-averaged frequency-directional wave spectra averaged over periods of months or years from bulk wave parameters, which are available at a much greater coverage and resolution than frequency-directional wave spectra. While the temporally averaged frequency-directional wave spectrum over these periods cannot be used for analyzing a single sea state, it aggregates multiple sea states, identifies dominant wave energy systems representing wave climate, and resolves their spectral characteristics. Therefore, modelling temporally averaged frequency-directional wave spectra is of great value for planning and designing wave energy projects, e.g., resource characterization, site assessment, and conceptual design of wave energy converters. Temporally-averaged frequency-directional wave spectra and related important wave energy parameters approximated using this method are found to be more accurate than commonly used parametric wave spectrum models. This method can be applied to a wide range of wave climates given its universality and high accuracy. Also, the availability of bulk wave parameters from multi-decade high-resolution wave model hindcasts is increasing.

16 TIDAL AND WAVE POWER↗

Unexpected dividends from level 16 automated substructuring

The automated multistage substructuring capability now available in NASTRAN level 16 is shown to provide a number of unexpected tools for use in both project planning and the structural design cycle. The payoffs in terms of improved design, more reliable results, and confidence are extra benefits added to the savings in cost and schedule that can be realized. To realize these advantages, some old stereotypical assumptions of what substructuring entails are must be challenged.

Field, E. I.↗

New mission requirements methodologies for services provided by the Office of Space Communications

The Office of Space Communications, NASA Headquarters, has recently revised its methodology for receiving, accepting and responding to customer requests for use of that office's tracking and communications capabilities. This revision is the result of a process which has become over-burdened by the size of the currently active and proposed missions set, requirements reviews that focus on single missions rather than on mission sets, and negotiations most often not completed early enough to effect needed additions to capacity or capability prior to launch. The requirements-coverage methodology described is more responsive to project/program needs and provides integrated input into the NASA budget process early enough to effect change, and describes the mechanisms and tools in place to insure a value-added process which will benefit both NASA and its customers. Key features of the requirements methodology include the establishment of a mechanism for early identification of and systems trades with new customers, and delegates the review and approval of requirements documents to NASA centers in lieu of Headquarters, thus empowering the system design teams to establish and negotiate the detailed requirements with the user. A Mission Requirements Request (MRR) is introduced to facilitate early customer interaction. The expected result is that the time to achieve an approved set of implementation requirements which meet the customer's needs can be greatly reduced. Finally, by increasing the discipline in requirements management, through the use of base lining procedures, a tighter coupling between customer requirements and the budget is provided. A twice-yearly projection of customer requirements accommodation, designated as the Capacity Projection Plan (CPP), provides customer feedback allowing the entire mission set to be serviced.

Holmes, Dwight P.↗

Long Reach Robotic Arm

The Accelerator Division at Fermilab began a robotics program, known as the AD Robotics Initiative. A multi-axis robotic arm was proposed to be included in the program. This summer internship, our team began the planning and design for this project, called the Long Reach Robotic Arm. The problem is that critical systems around the magnets require analysis when water leaks cause them to fail. However, the tightly compacted parts and the quadrupole magnet, weighing approximately 1,000 pounds, cause access viewing problems. The process of having to dismantle and remove the magnet is time-consuming; it is not an efficient solution. The goal for the Long Reach Robotic Arm was to extend and reach behind the component of the Main Injector while "snaking" around and avoiding obstructions. At the start of the project, my teammate, Amanda Hoeksema, and I coded a program in the C language that will determine the number of links and their respective lengths for the robot arm. After, we began the 3D CAD model of the robot arm, base, and counterweight system. The design of the Long Reach Robotic Arm provided a learning experience in learning how to code in the C programming language, using SDL libraries and understanding mechanical engineering.

43 PARTICLE ACCELERATORS↗

Employing Earned Value Management in Government Research and Design - Lessons Learned from the Trenches

To effectively manage a project, the project manager must have a plan, understand the current conditions, and be able to take action to correct the course when challenges arise. Research and design projects face technical, schedule, and budget challenges that make it difficult to utilize project management tools developed for projects based on previously demonstrated technologies. Projects developing new technologies by their inherent nature are trying something new and thus have little to no data to support estimates for schedule and cost, let alone the technical outcome. Projects with a vision for the outcome but little confidence in the exact tasks to accomplish in order to achieve the vision incur cost and schedule penalties when conceptual solutions require unexpected iterations or even a reinvention of the plan. This presentation will share the project management methodology and tools developed through trial and error for a NASA research and design project combining industry, academia, and NASA inhouse work in which Earned Value Management principles were employed but adapted for the reality of the government financial system and the reality of challenging technology development. The priorities of the presented methodology are flexibility, accountability, and simplicity to give the manager tools to help deliver to the customer while not using up valuable time and resources on extensive planning and analysis. This presentation will share the methodology, tools, and work through failed and successful examples from the three years of process evolution.

Simon, Tom↗

Comparing Methods for Dynamic Airspace Configuration

This paper compares airspace design solutions for dynamically reconfiguring airspace in response to nominal daily traffic volume fluctuation. Airspace designs from seven algorithmic methods and a representation of current day operations in Kansas City Center were simulated with two times today's demand traffic. A three-configuration scenario was used to represent current day operations. Algorithms used projected unimpeded flight tracks to design initial 24-hour plans to switch between three configurations at predetermined reconfiguration times. At each reconfiguration time, algorithms used updated projected flight tracks to update the subsequent planned configurations. Compared to the baseline, most airspace design methods reduced delay and increased reconfiguration complexity, with similar traffic pattern complexity results. Design updates enabled several methods to as much as half the delay from their original designs. Freeform design methods reduced delay and increased reconfiguration complexity the most.

Zelinski, Shannon↗

Comparing Methods for Dynamic Airspace Configuration

This paper compares airspace design solutions for dynamically reconfiguring airspace in response to nominal daily traffic volume fluctuation. Airspace designs from seven algorithmic methods and a representation of current day operations in Kansas City Center were simulated with two times today's demand traffic. A three-configuration scenario was used to represent current day operations. Algorithms used projected unimpeded flight tracks to design initial 24-hour plans to switch between three configurations at predetermined reconfiguration times. At each reconfiguration time, algorithms used updated projected flight tracks to update the subsequent planned configurations. Compared to the baseline, most airspace design methods reduced delay and increased reconfiguration complexity, with similar traffic pattern complexity results. Design updates enabled several methods to as much as half the delay from their original designs. Freeform design methods reduced delay and increased reconfiguration complexity the most.

Zelinski, Shannon↗

The Project for Intercomparison of Land-surface Parameterization Schemes

The Project for Intercomparison of Land-surface Parameterization Schemes (PILPS) is described and the first stage science plan outlined. PILPS is a project designed to improve the parameterization of the continental surface, especially the hydrological, energy, momentum, and carbon exchanges with the atmosphere. The PILPS Science Plan incorporates enhanced documentation, comparison, and validation of continental surface parameterization schemes by community participation. Potential participants include code developers, code users, and those who can provide datasets for validation and who have expertise of value in this exercise. PILPS is an important activity because existing intercomparisons, although piecemeal, demonstrate that there are significant differences in the formulation of individual processes in the available land surface schemes. These differences are comparable to other recognized differences among current global climate models such as cloud and convection parameterizations. It is also clear that too few sensitivity studies have been undertaken with the result that there is not yet enough information to indicate which simplifications or omissions are important for the near-surface continental climate, hydrology, and biogeochemistry. PILPS emphasizes sensitivity studies with and intercomparisons of existing land surface codes and the development of areally extensive datasets for their testing and validation.

Henderson-Sellers, A.↗

GIF-VHTR Materials (Graphite) Project Plan: Progress since September 2021

¦1: Data, Design Methodology and Construction 1.1: Graphite Selection and Acquisition Strategy (Original tasks completed) 1.2: Graphite Properties (Virgin Materials) 1.3: Graphite Fracture Behaviour(Original tasks completed) 1.4: Graphite Oxidation Behaviour(Original tasks completed) 1.5: Graphite Component Testing 1.6: Graphite Irradiation Effects 1.7: Graphite Irradiation Induced Creep 1.8: Graphite Codes and Standards Development (ASME & ASTM) 1.9: Graphite BehaviourModels Development 1.10: Links to Existing Graphite Irradiation BehaviourDatabases 1.11: Materials Database ¦2: Operation and Inspection 2.1: Methodologies for determining requirements for inspection of graphite cores 2.2: Methodologies for ISI of graphite cores ¦3: Decommissioning and Disposal (New task added 2021) 3.1: Technical data for decommissioning and disposal issues

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

United States Space Station technical and programmatic interfaces

This paper describes the design of the U.S. Space Station and explains the control factors used for internal and external interfaces among the various government and contractor participants. It discusses the documentation of the U.S. Space Station Program including the Program Approval Document (PAD), the Program Plans (PPs), the Program Requirements Document (PRD), the Program Definition and Requirements Document (PDRD), the Level III project plans, and the Level III project design requirements documents. It discusses the relationship of Space Station documentation to the international Memoranda of Understanding (MOUs) and the Joint PP, PRD, and PDRD, the interrelationship of the Architectural Control Documents (ACDs), the Baseline Control Document (BCD), and the Interface Requirement Documents (IRDs) and Interface Control Documents (ICDs). Also included are the controlling functions of the various NASA and contractor participants and the international partners.

Carlisle, Richard F.↗

Spacelab development and its operational verification

This paper gives a brief status report on the current Spacelab program and describes how the results of ground and flight tests will be combined to provide the operational verification of the system. For the on-going project, data on design, testing and fabrication plans are presented. In particular, recent changes to meet the constraints of a 'build-to-cost' project are described. In the operational verification of Spacelab, ground and flight tests which ESA and NASA will perform are addressed. The installation of test instrumentation and the performance of integrated tests will be accomplished in the US. Experiments for the first flight will be integrated into Spacelab racks and pallets and simulated mission tests performed. On-orbit, system thermal surveys are planned and stress data will be obtained during launch and re-entry.

Bignier, M.↗

FEED Study of CarbonCapture Inc DAC and CarbonCure Utilization Technologies Using United States Steel’s Gary Works Plant Waste Heat (Final Report)

The University of Illinois at Urbana-Champaign (UIUC) led this project to produce a front-end engineering design (FEED) study of an advanced Direct Air Capture and Utilization System (DACUS) system that can remove a minimum of 5,000 tonnes/yr net of carbon dioxide from air (based on cradle-to-gate LCA) and utilizing the CO 2 to produce low carbon intensity ready mix concrete. The designed system, if built, would be larger than any currently existing Direct Air Capture (DAC) collector in the U.S. Such carbon capture technologies are critical to meeting the goals of the DOE’s program to accelerate climate-critical technology. In addition to the power sector, industrial facilities for the manufacture of steel and cement/concrete are among the major sources of anthropogenic CO 2 . DAC is a promising new technology for reducing CO 2 , a potent greenhouse gas, in the atmosphere but is expensive, in part due to the energy required to adsorb and desorb captured CO 2 during cycles. By integrating CarbonCapture Inc. (CCI) DAC modules at United States Steel's Gary Works (USS) and utilizing the site's waste heat, energy, and location this project evaluates the feasibility of utilizing the captured CO 2 and the logistics of transportation. CarbonCapture Inc. has developed an innovative DAC system using novel adsorbents to cost-effectively capture CO 2 . The captured, liquified gas will be trucked to ready-mix concrete plants within the region, the closest of which is approximately 3.5 miles away, where CarbonCure will inject it into concrete during the mixing process at the facilities. The carbon dioxide reacts with concrete, mineralizing into calcium carbonate (CaCO 3 ), permanently locking the greenhouse gas into the matrix of the building material. This FEED study demonstrated a full CO 2 value chain for DACUS from industrial facilities. It also provided a means for Visage Energy Corp. (Visage) to assess the impact of this holistic approach on job creation, regional economic impact, and environmental justice. The project team also included Sargent & Lundy (S&L) to provide the constructability review and costing of the integration of the DAC with the steel plant. Ecotek Engineering USA, LLC designed the outside battery limit (OSBL) infrastructure to connect the DAC and the plant. Activities performed during the project included: (1) Project Management Plan; (2) Technology Maturation Plan (TMP); (3) Initial Workforce Readiness Plan; (4) Workforce Readiness Plan; (5) Front-End Engineering Design (FEED) Study; (6) Project Design Basis; (7) Hazards and Operability (HAZOP) Study; (8) Constructability Review; (9) Project Cost Assessment; (10) Logistics Analysis of CO 2 Transportation to the Utilization Site; (11) Business Case Analysis; (12) Life Cycle Analysis (LCA); (13) Environmental Health and Safety (EH&S) Analysis; (14) Environmental Justice Analysis; and (15) Economic Revitalization and Job Creation Outcomes Analysis. This report provides a summary of the outcomes and results of the project, which was performed between Oct. 1, 2022, through Sept. 30, 2024.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A document describing shuttle considerations for the design of large space structures

A Shuttle user guide document to aid designers and analysis associated with large space structures projects is described. The format and contents are a compromise designed to satisfy the needs of several levels of users. Special features include checklists and references to source documents as a convenience to very knowledgeable readers. In addition, general, introductory and explanatory text, and art work are included for the reader less familiar with shuttle systems. Also, there are a subject index, glossary, list of acronyms, and many cross references. Throughout the document, there are suggested implications or references to the importance of the included orbiter interfaces material as it pertains to designing and planning large space structures projects. The content of the document is outlined. Shuttle payload accommodations and constraints, connections for orbiter construction fixtures, packaging, and construction space eometry are addressed.

Roebuck, J. A., Jr.↗

NASA LCLUC Program: An Integrated Forest Monitoring System for Central Africa

Central Africa has the second largest unfragmented block of tropical rain forest in the world; it is also one of the largest carbon and biodiversity reservoirs. With nearly one-third of the forest currently allocated for logging, the region is poised to undergo extensive land-use change. Through the mapping of the forests, our Integrated Forest Monitoring System for Central Africa (INFORMS) project aims to monitor habitat alteration, support biodiversity conservation, and promote better land-use planning and forest management. Designed as an interdisciplinary project, its goal is to integrate data acquired from satellites with field observations from forest inventories, wildlife surveys, and socio-economic studies to map and monitor forest resources. This project also emphasizes on collaboration and coordination with international, regional, national, and local partners-including non-profit, governmental, and commercial sectors. This project has been focused on developing remote sensing products for the needs of forest conservation and management, insuring that research findings are incorporated in forest management plans at the national level. The societal impact of INFORMS can be also appreciated through the development of a regional remote sensing network in central Africa. With a regional office in Kinshasa, (www.OSFAC.org), the contribution to the development of forest management plans for 1.5 million hectares of forests in northern Republic of Congo (www.tt-timber.com), and the monitoring of park encroachments in the Albertine region (Uganda and DRC) (www.albertinerift.org).

Laporte, Nadine↗

TOPEX/POSEIDON joint verification plan

TOPEX/POSEIDON is a satellite mission that will use altimetry to make precise measurements of sea level with the primary goal of studying global ocean circulation. The mission is jointly conducted by the United States' National Aeronautics and Space Administration (NASA) and the French space agency, Centre National d'Etudes Spatiales (CNES). The current plans call for a launch of the satellite in August 1992. The primary mission will last 3 years, and provisions were made to extend the mission for an additional 2 years. The mission was coordinated with a number of international oceanographic and meteorological programs, including the World Ocean Circulation Experiment and the Tropical Ocean and Global Atmosphere Program, both of which are sponsored by the World Climate Research Program. The observations of TOPEX/POSEIDON are timed to provide a global perspective for interpreting the in situ measurements collected by these programs and in turn will be combined with observations of other satellites to achieve a global, four-dimensional description of the circulation of the world's oceans. In the autumn of 1987, an international team of 38 Principal Investigators was selected to participate in the mission. These scientists have been working closely with the TOPEX/POSEIDON Project to refine the mission design and science plans. During the first 6 months after launch, a number of these investigators will join with the project to conduct a wide range of oceanographic and geophysical investigations using the TOPEX/POSEIDON data. The purpose of these investigations is to demonstrate the scientific utility of the mission to the international scientific community.

Source record↗

Future Circular Collider Feasibility Study Report

Volume 3 of the FCC Feasibility Report presents studies related to civil engineering, the development of a project implementation scenario, and environmental and sustainability aspects. The report details the iterative improvements made to the civil engineering concepts since 2018, taking into account subsurface conditions, accelerator and experiment requirements, and territorial considerations. It outlines a technically feasible and economically viable civil engineering configuration that serves as the baseline for detailed subsurface investigations, construction design, cost estimation, and project implementation planning. Additionally, the report highlights ongoing subsurface investigations in key areas to support the development of an improved 3D subsurface model of the region. The report describes the development of the project scenario based on the ‘avoid-reduce-compensate’ iterative optimisation approach. The reference scenario balances optimal physics performance with territorial compatibility, implementation risks, and costs. Environmental field investigations covering almost 600 hectares of terrain—including numerous urban, economic, social, and technical aspects—confirmed the project’s technical feasibility and contributed to the preparation of essential input documents for the formal project authorisation phase. The summary also highlights the initiation of public dialogue as part of the authorisation process. The results of a comprehensive socio-economic impact assessment, which included significant environmental effects, are presented. Even under the most conservative and stringent conditions, a positive benefit-cost ratio for the FCC-ee is obtained. Finally, the report provides a summary of the studies conducted to document the current state of the environment.

Benedikt, M. [European Organization for Nuclear Re↗

Using Information Automation and Human Technology Integration to Implement Integrated Operations for Nuclear

The purpose of the research effort described in this report is to develop and demonstrate an approach to the design and implementation of advanced, automated systems intended to increase operational efficiencies at nuclear power plants. In particular, we describe methods for considering human-technology integration (HTI) issues throughout the various phases of system design, test, and implementation and how these considerations help promote effective design. This research project will develop planning tools and comprehensive guidance on how HTI principles and methods, in combination with information automation technologies, can enable effective data integration and coordination for full nuclear plant modernization. Specifically, this research project will develop an approach to automate the mapping of data from plant systems and processes to application needs, thereby significantly reducing the amount of human workload currently required for the execution of these tasks. In addition to developing an automated solution as a replacement for these tasks, this research will also analyze digitalization’s effectiveness in reducing operational costs of compliance related activities. Compliance activities are estimated to account for as much as 50% of operations and maintenance (i.e., non-fuel and non-capital) costs of plant operation.

97 MATHEMATICS AND COMPUTING↗