Search NASA⌕ Search

SEARCH · Search NASA

Results for “project procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

W.A. Parish Post-Combustion CO 2 Capture and Sequestration Demonstration Project (Final Technical Report)

The Petra Nova Project (Project) is a commercial scale post-combustion carbon capture project developed by a joint venture between NRG Energy, Inc. (NRG) and JX Nippon Oil Exploration (EOR) Limited (JX). The Project is designed to separate and capture carbon dioxide (CO2) from an existing coal-fired unit’s flue gas slipstream at NRG’s W.A. Parish Electric Generating Station (WAP) located southwest of Houston, Texas. The captured CO2 is dried, compressed, and transported via an 81-mile pipeline to the West Ranch oilfield (West Ranch) in Jackson County, Texas, where it is injected to boost oil production. The Project, which is partially funded by a grant (Grant) from the United States (U.S.) Department of Energy (DOE) under the Clean Coal Power Initiative (CCPI) Round 3, uses the Kansai Mitsubishi Carbon Dioxide Recovery advanced amine-based CO 2 absorption technology (KM-CDR Process®), which was jointly developed by Mitsubishi Heavy Industries, Ltd. (MHI) and the Kansai Electric Power Co. Inc., to treat and capture at least ninety percent (90%) of the CO 2 from a 240-megawatt equivalent (MWe) flue gas slipstream off of Unit 8 at WAP. When operating at full capacity, the Project captures approximately 5,200 short tons of CO 2 per day, which would otherwise be emitted into the atmosphere, representing the largest commercial scale deployment of post-combustion CO2 capture technology at a coal power plant to date. Under the Grant, the Project was managed in 3 phases: (1) Phase 1: Project Definition / Front End Engineering Design (FEED) (2) Phase 2: Detailed Engineering, Procurement & Construction (3) Phase 3: Demonstration and Monitoring. On December 29, 2016, commercial operation of the Project was achieved, ending Phase 2 and starting Phase 3, a 3-year demonstration period running from January 1, 2017 through December 31, 2019. The key objectives of Phase 3 were to (a) demonstrate the specific advanced technologies constructed during Phase 2 and (b) monitor the injected CO 2 at West Ranch to demonstrate technologies and protocols for monitoring, verification, and accounting (MVA). As of the end of Phase 3, Petra Nova captured 3,904,978 short tons of CO 2 (3,542,537 metric tons) that was transported to West Ranch. To support the DOE obligation to monitor, verify, and account for the sequestered CO 2 at West Ranch, Petra Nova contracted with the Bureau of Economic Geology (in the Jackson School of Geosciences at The University of Texas at Austin) to (a) design a monitoring program, (b) draft an MVA Plan for DOE review and approval, and (c) working with Petra Nova and the operator of West Ranch to manage and report on the MVA activity. This report discussed the technical aspects of the project during each of the 3 phases of the project as identified above.

01 COAL, LIGNITE, AND PEAT↗

LCLS-II Helium Refrigeration System : A comprehensive overview of the project

SLAC National Accelerator Laboratory has upgraded to LCLS-II, featuring a 4 GeV superconducting accelerator composed of 37 cryomodules and two large helium refrigeration systems with a total cooling capacity of 8 kW at 2.0 K. The cryogenic system at SLAC is the successful outcome of a nine-year partnership between SLAC, Fermilab, and Jefferson Lab. This paper highlights the joint efforts between Jefferson Lab and SLAC in the development and implementation of the LCLS-II Cryogenic Plants. It details the project organization, schedule, budget, staffing profile and procurement strategy.

42 ENGINEERING↗

Progress on the Proton Power Upgrade at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory will double the proton power capability from 1.4 to 2.8 MW. This will be accomplished through an energy increase from 1.0 to 1.3 GeV and a beam current increase from 26 to 38 mA. The energy increase will be accomplished through the addition of 7 cryomodules to the linear accelerator (Linac). The beam current increase will be supported by upgrading several radio-frequency systems in the normal-conducting section of the Linac. Upgrades to the accumulator ring injection and extraction regions will accommodate the increase in beam energy. A new 2-MW-capable target and supporting systems will be developed and installed. Conventional facility upgrades include build-out of the existing klystron gallery and construction of a tunnel stub to facilitate future beam transport to the second target station. The project received approval to proceed with construction in October 2020. Procurements are in progress, and some installation activities have already occurred. Most of the installation will take place during three outages in 2022-2023. The project early finish is planned for 2025.

Barbier, Charlotte↗

Microgrid Procurement Checklist Training: Part 1

Learn how to navigate the Microgrid Procurement Checklist, a key resource for federal agencies developing microgrid projects. This first session will provide a step-by-step walkthrough of the checklist, helping participants understand its structure, key tasks, and how to apply it in project planning.

25 ENERGY STORAGE↗

Hydrogen Production, Grid Integration, and Scaling for the Future

The Hydrogen Production, Grid Integration, and Scaling for the Future project will inform clean hydrogen production deployment across the planning, procurement, and operation stages of hydrogen production on the grid. Hydrogen production from renewables is a clean source of fuel which is near zero for greenhouse gas emissions and criteria pollutants. The results from this project will inform entities looking to build clean energy projects that produce good paying jobs in manufacturing, installation, maintenance and operation of these facilities. This project provides system characterization examples, multiple configurations, optimizations, and suggested metering and custody transfer points through multiple scenarios and hardware testing of NREL's state-of-the-art 1.25 MW polymer electrolyte membrane (PEM) electrolyzer system to characterize system performance in relevant scenarios. This work also creates a digital twin for emulation in the Advanced Research on Integrated Systems (ARIES) virtual environment and performs hardware-in-the-loop (HIL) testing of pilot-scale, decentralized, and centralized hydrogen systems.

centralized hydrogen production↗

Programmatic Equipment Procurement: An Improved System for Coordinating the Procurement of New Programmatic Equipment

A better structured system that outlines the communication required between the Project Manager (PM) and all the Key Stakeholders. This system will help the PM work with the SMEs to define the scope of the equipment to be procured. It will also help the PM confirm that all associated key stakeholders (WCI IT, FPOC, etc.) have been contacted and have reviewed the new equipment being proposed to be procured. This step is crucial in order to confirm that the piece of equipment being procured not only meets the SME requirements but also the security, safety and building requirements on site. This is a step that is currently missed or overlooked and can cause delays in procurement after the piece of equipment has already been decided on. This new system should help mitigate any delays or miscommunication regarding the piece of equipment being procured.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗

Highly Efficient Vacuum Smelting of Aluminum

The goal of this SBIR project was to develop and demonstrate an innovative aluminum smelting technology that will significantly increase the range of aluminum alloys that can be manufactured from recycling of scrap aluminum. This will result in reduction of need for primary aluminum with corresponding 95% energy and CO 2 emission benefits. The proposed melting of pre-sorted aluminum alloys using UHV’s patented high throughput sorter funded by ARPA-E METALS program in an energy efficient vacuum furnace avoids the typical 5% metal loss due to oxidation of molten metal. In addition, pre-sorting scrap into different categories (cast, wrought, extrusion and aerospace) allows lower cost production of high value aluminum alloys without the need for adding alloying elements to primary aluminum. During this SBIR project, pure aluminum and several different commercial alloys were procured and melted in a laboratory furnace in vacuum, CH4 and air environments. The slag and oxidation formation were measured using weight and cross-sectional scanning electron microscope. The results otained were mixed and did not show direct correlation between furnace pressure and oxidation. We believe that the results were tainted due to small furnace size and non-uniformity of oxidation layer. A more thorough investigation is required to prove the advantages of vacuum smelting which could not be performed due to the COVID-19 lockdowns during this project. The theoretical fact remains that in the absence of oxygen in the furnace, there should be no oxide after melting, however the team could not prove it experimentally, and thus decided to dis-continue the project.

36 MATERIALS SCIENCE↗

IACMI Project 4.10: Blade Finishing Automation (Final Report)

IACMI Project 4.10, the Innovative Wind Turbine Blade Finishing with Advanced Automated Technology project, performed research addressing the challenges and opportunities associated with automating wind turbine blade finishing operations, including blade trimming and grinding. These activities, developed and conducted in close cooperation with wind industry partners, included: • The development of new automation technology and systems; • The integration of automation technology and components; • The improvements of sensor technology and their deployment in automation systems • The elimination of extensive manual programing for the automation of wind blade finishing; • The rethinking of the approach to specific work tasks for automation systems; • The demonstration at scale of innovative wind turbine blade finishing automations systems. The IACMI Wind TA team worked with GE Renewable Energy and LM Wind Power to establish the metrics of the automated blade finishing system developed in the project. In addition, the project team helped to integrate the advanced automated systems into wind turbine blade production facilities. This project was divided into two phases. Phase I provided project management, preliminary techno-economic model development, early US wind turbine industry outreach, and early research into robotic solutions for automated wind blade finishing. This second phase continued with project management, as well as final techno-economic model development, advanced research into robotic solutions for automated wind blade finishing, as well as specifications and procurement of a robotic system for automated wind blade finishing. The 4.10 project leveraged the capabilities and facilities established through the Institute for Advanced Composites Manufacturing Innovation (IACMI), the Colorado Office of Economic Development and International Trade (OEDIT) and the National Renewable Energy Laboratory (NREL). The IACMI Wind Technology Area (TA) designed and prepared for deployment a robotic automated wind turbine blade finishing system at the NREL/IACMI Composites Manufacturing Education and Technology (CoMET) facility. The results of this project led to follow-on funding to build upon and expand research in automated wind turbine blade finishing.

17 WIND ENERGY↗

ESPC ESA Training Series: Site-Specific/Stand-Alone Contract Vehicle

This webinar provides instructions and resources for financing distributed energy projects (e.g., on–site renewable energy, storage, and combined heat and power) using an energy savings performance contract (ESPC) energy sales agreement (ESA) through the site–specific/stand–alone contract vehicle. The site–specific/stand–alone contract vehicle is a procurement process using a request for proposal (RFP). Topics covered during the webinar include forming a strong project team, validating the feasibility of the distributed energy project at a site, acquisition planning, RFP development, procurement, proposal evaluation and contract award, and the construction and performance period. This webinar also provides an overview of the resources available in the ESPC ESA Toolkit, such as checklists and templates.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Customizable Technical Specifications for Lithium-Ion Battery Storage Projects

Learn how to navigate the FEMP Lithium-ion Battery Storage Technical Specifications, a key resource for federal agencies developing onsite energy storage projects. This webinar, led by technical experts, will provide a step-by-step walkthrough of the specifications, supplemented with a real-world case study. Gain practical insights to support successful battery storage project development and implementation.

25 ENERGY STORAGE↗

MARVEL Lessons Learned – 2026 Edition Fabrication, Fuel Procurement, Quality Assurance, and Safety Basis

The Microreactor Applications Research Validation and Evaluation (MARVEL) project is intended to be among the first U.S. advanced reactor demonstrations in four decades. By virtue of being sponsored directly by the U.S. Department of Energy (DOE), the reactor is expected to benefit the broader nuclear community by exercising design processes, safety reviews, and supply chains. This project is committed to publicly documenting key lessons learned along the way toward demonstration. Building on a 2025 report that focused on lessons learned from guard vessel fabrication and Primary Coolant Apparatus Test (PCAT) testing (Abou-Jaoude et al. 2025), this 2026 edition captures findings spanning structural fabrication, quality assurance (QA), reactivity control system (RCS) assembly, fuel fabrication and shipment, safety basis development, balance-of-plant design, and overall reactor design.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Wind Supply Chain Security: Hardware Enumeration and Analysis

This project, undertaken by Idaho National Laboratory (INL) for the Department of Energy (DOE) Wind Energy Technologies Office (WETO), focused on the enumeration and analysis of six key devices important to wind technologies. The devices analyzed included Beckhoff Bus Terminal Controllers (BK1120 and BC9000), a Beckhoff Economy Built-in Panel PC (CP6231), an N-Tron Managed Industrial Ethernet Switch (711FX3), a Bachmann M1 Gateway, and a Bachmann Smart Power Plant Controller. Device selection was driven by availability and budget constraints, with several components sourced from existing wind farms and others procured through a co-agreement with another WETO-funded project. The project's primary objective was to create a hardware bill of materials (HBOM) for each device, identifying and documenting all components to assess potential security and supply chain risks. A detailed analysis revealed over 750 unique components across the six devices, with 80% successfully identified and accompanied by datasheets. Notably, Texas Instruments emerged as the leading supplier, providing over 16% of the components, followed by ON Semiconductor at 11.3%, Analog Devices at 5.3%, and Renesas Electronics Corp at 4.1%. Other notable vendors included Toshiba Corporation, iC-Haus Corporation, Atmel, Vishay, and STMicroelectronics. The enumeration process involved thorough documentation of each component, including its designation, quantity, identifiers, pin package, description, vendor, model, and country of origin. This process provided valuable insights into the complexity and diversity of the electronic systems within these wind devices. It also highlighted the distinct separation of components between vendors, suggesting a trend of vendor-specific component usage. Key findings from the project emphasized the importance of broadening the scope of vendor analysis in future research to gain a comprehensive understanding of component distribution and commonality. The identification of vendor-specific component usage patterns offers new avenues for research and underscores the significance of continued investigation in this field. Overall, this project provides critical insights into the component composition of wind devices, aiding in the development of improved supply chain management and component sourcing strategies. The results contribute valuable knowledge to the wind technology sector, laying the groundwork for enhanced security and resilience in wind energy systems.

17 - WIND ENERGY↗

INFN LASA in-kind contribution to PIP-II

This paper reports the status and recent progress of INFN LASA’s in-kind contribution to the PIP-II project at Fermilab, with updates on key activities and major procurements. Production efforts for the 38 INFN LASA-designed, 5-cell cavities (β=0.61) for the LB650 section of the linac are underway and two pre-series prototypes are being realized as a first step to validate the manufacturing and treatment sequence. Concurrently, preliminary testing on existing prototypes is progressing to gain a deeper understanding of the surface preparation and qualification procedures, including cross-validation at different infrastructures. Series LB650 cavities will be industrially produced and surface-treated to achieve the stringent performance targets, qualified via vertical cold tests at DESY AMTF, and delivered installation-ready for string assembly.

Paparella, Rocco [INFN, Pisa; LASA, Segrate]↗

Potential State Regulatory Pathways to Facilitate Low-Carbon Fuels

States and the federal government are increasingly engaged in the challenges around decarbonizing the electric grid. In particular, regulators, consumers, stakeholders, and utilities recognize the need to carefully consider the role natural gas will play in a decarbonized future. A variety of technology and policy options to reduce greenhouse gas emissions associated with natural gas use are available, including energy efficiency programs, demand reduction tools, strategic electrification, and strategies to reduce emissions from natural gas production, transportation, and consumption. Low-carbon fuels – mainly renewable natural gas (RNG) and clean hydrogen – are being considered an important component of decarbonization goals. RNG and hydrogen may be able to meaningfully reduce emissions from processes independent of geologic natural gas, displacing emissions of methane, a powerful greenhouse gas. Although RNG and hydrogen are not cost-competitive today with geologic natural gas and are smaller in scale and potential than other decarbonization options, they can be explored as potential critical tools to decarbonize sectors that are difficult to electrify or shift off of natural gas entirely, such as air travel, industrial processes, maritime transport, long-distance trucking, space heating on cold days, and railroads (Nadel, 2022). The role of this report is to provide informational context for state utility regulators to understand the impacts of and challenges associated with broader integration of low-carbon fuels, followed by examples of state regulatory actions taken to date to facilitate the development of low-carbon fuels. Setting clear guidance to calculate the environmental benefits of low-carbon fuels and continuing federal and state investments in research and development to reduce costs relative to fossil fuels will be important steps to take to signal the desire to grow the market for these fuels. State public utility commissions may play a key role in setting regulatory frameworks for low-carbon fuels and ensuring that ratepayer funds, if utilized, are done so to further the public interest. This report is intended to summarize decisions that states have made to date on low-carbon fuels. In the spirit of understanding the current market and sharing information, this report provides success stories, and lessons learned across states as regulators implement varying strategies to achieve decarbonization objectives while maintaining their focus on affordability, safety, and reliability of the energy system. The report begins with an introduction of the role of natural gas in the U.S. economy (Section I) and background information on natural gas use, decarbonization, and low-carbon fuels (Section II). Next, the report describes the current market by discussing the scale of current production, emissions intensity, resource potential, and costs of low-carbon fuels compared to geologic natural gas (Section III). Following these sections, the report describes four strategies states have employed to facilitate low-carbon fuels: opening exploratory dockets, approving voluntary tariffs for customers, approving interconnection tariffs for producers, and considering portfolio-wide procurement targets (Section IV). This section lists states that have taken actions in each category, citing utility filings, commission decisions, stakeholder comments, and other relevant sources. Finally, the report concludes with suggested questions regulators may wish to consider regarding low-carbon fuels, in the interest of preparing to make decisions in the future (Section V). These questions include: Are there existing regulatory or technical barriers to voluntary purchases of low-carbon fuels? Can customers work with utilities to procure low-carbon fuels; are producers able to interconnect projects without significant barriers to entry? Should the infrastructure and/or commodity costs of low-carbon fuels be socialized among all ratepayers, or borne solely by the large commercial and industrial (C&I) customers currently driving the market? Should regulated natural gas and/or electric utilities own and operate low-carbon fuel production? How should regulators consider the unique decarbonization potential of low-carbon fuels, particularly for hard-to-abate sectors, in decision-making? Is additional direction or clarity from state policymakers needed? What no-regrets approaches can help facilitate both near-term RNG development and long-term development of hydrogen and other zero-carbon fuels? We collectively wish to express our gratitude to the U.S. Department of Energy, Office of Fossil Energy and Carbon Management, for supporting this report and other technical assistance resources for state regulators on natural gas topics. State regulators operate under a variety of policy environments, and states have vastly different types of energy resources, infrastructure, and customers. While there is no optimal regulatory, policy, or technological solution that will be successful in every state, state regulators can benefit by exchanging lessons learned with their peers across the country. We look forward to continued engagement with our fellow commissioners, commission staff, NARUC, the U.S. Department of Energy, and other stakeholders to develop sound regulation in the public interest.

03 NATURAL GAS↗

Analysis of Supply Chain Challenges in the U.S. Solar Industry: Focus on Build America, Buy America Act and Inverter Supply Issues

The United States (U.S.) solar industry has been undergoing significant transformation, driven largely by meeting U.S. climate goals while simultaneously maintaining national security. At the forefront of this movement is the Inflation Reduction Act (IRA) and the Build America, Buy America (BABA) Act. The IRA has driven investment in clean energy generation deployments while the BABA Act, enacted under Division G, Title IX of the Infrastructure Investment and Jobs Act (IIJA) establishes domestic content procurement preference for all federal financial assistance obligated for infrastructure projects. While these pieces of legislation aim to reduce reliance on foreign-made solar components and increase domestic production, the sector continues to face notable supply chain challenges. These are particularly pronounced with inverters, a critical component in solar photovoltaic (PV) systems. This report explores the current state of these supply chain challenges, with a specific focus on the impact of the BABA requirements and the associated complexities in inverter manufacturing and supply.

14 SOLAR ENERGY↗

Incorporating energy justice into utility-scale photovoltaic deployment: A policy framework

Utility-scale photovoltaic (PV) installations made up 77 GW (6%) of installed capacity in the United States, as of the end of 2021. This will grow to more than 500 GW by 2050 under a mid-case projection or more than 800 GW if solar costs decline more rapidly. While utility-scale PV is projected to grow rapidly, to date, unlike energy efficiency or distributed PV, utility-scale PV has not been used to provide substantial financial benefits to underserved communities, either through ownership, financing of assets, or direct electricity bill reduction. We assess two mechanisms through which utility-scale PV could benefit underserved communities. We find that while a framework for direct electricity bill reduction can be meaningful to customers, this mechanism falls short of providing restorative justice via wealth creation for minority-owned businesses. In contrast, we find that a framework for procurement of utility-scale PV by public and private entities from PV projects that are financed, owned, and/or developed by minority-owned businesses can provide this restorative justice benefit, and thereby facilitate an equitable energy transition. We conclude with concrete recommendations for new policies and programs to ensure that the benefits of utility-scale PV systems are distributed to underserved communities.

14 SOLAR ENERGY↗