Search NASA⌕ Search

SEARCH · Search NASA

Results for “provenance tracking”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Three-Dimensional High-Resolution Optical/X-Ray Stereoscopic Tracking Velocimetry

Measurement of three-dimensional (3-D) three-component velocity fields is of great importance in a variety of research and industrial applications for understanding materials processing, fluid physics, and strain/displacement measurements. The 3-D experiments in these fields most likely inhibit the use of conventional techniques, which are based only on planar and optically-transparent-field observation. Here, we briefly review the current status of 3-D diagnostics for motion/velocity detection, for both optical and x-ray systems. As an initial step for providing 3-D capabilities, we have developed stereoscopic tracking velocimetry (STV) to measure 3-D flow/deformation through optical observation. The STV is advantageous in system simplicity, for continually observing 3-D phenomena in near real-time. In an effort to enhance the data processing through automation and to avoid the confusion in tracking numerous markers or particles, artificial neural networks are employed to incorporate human intelligence. Our initial optical investigations have proven the STV to be a very viable candidate for reliably measuring 3-D flow motions. With previous activities focused on improving the processing efficiency, overall accuracy, and automation based on the optical system, the current efforts is directed to the concurrent expansion to the x-ray system for broader experimental applications.

Cha, Soyoung S.↗

A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki

The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.

Delaney, Michael M.↗

STRAP V - Higher accuracy, lower drift attitude control system

The STRAP V system was developed to provide higher accuracy and lower limit cycle fine pointing (+ or - 7 arcseconds) in all three axes at targets which cannot be tracked by startrackers or solar trackers. The system provides an increase in pointing performance over that obtainable with the STRAP IV (1) Attitude Control System (ACS). The STRAP IV concept of third axis updates is utilized to reduce pointing errors, using the flight-proven STRAP III (2) system as a first stage. Flight aspect photographs and telemetry records show that the STRAP V objectives have been met. The STRAP IV major error contributors have been significantly reduced and the tracking flexibility has been increased with only minor error contributions. Attention is given to the basic STRAP III control modes, major STRAP IV system error sources, tuned restrained inertial gyros (TRIGs), the programmable sequence timer, the STRAP V control box, third axis update, system gyro alignments, and STRAP V operational capabilities.

Budney, T. J.↗

Practical Orbit Determination for Aerobraking with Accumulated Accelerometer Data

Navigation during aerobraking missions has historically relied solely on radiometric Doppler data. Accelerometer data, available on all modern spacecraft, has the potential to supplement Doppler data, increasing operational tempos, filling tracking data gaps, and improving the accuracy of orbit determination solutions. However, integration of Doppler and accelerometer data into the batch filter solutions used for operational navigation has proven to be practically challenging, due to the narrow region of adequate linear approximation for acceleration incurred by drag. This work proposes to use the accumulated velocity changes derived from these values as a more compatible data type. Demonstrations of results focus on NASA’s Maven and ESA’s TGO mission, and how this technique can be used to improve operations for the upcoming Maven aerobraking phase with reduced tracking data and lighter staffing requirements.

Young, Brian↗

RF front end interface and AGC modification

Preliminary results indicate that the new front end automatic gain control (AGC) combination perform satisfactorily. Side by side bench tests with Trimble 10A and Texas Instruments 9900 LORAN-C receivers have proven that the proper time differences are being obtained. Further optimization of the AGC circuit will occur as software to track all of the stations in a LORAN-C chain is developed. The AGC circuit was designed to sample up to six separate LORAN-C stations. Along with expanded station tracking software, a more sophisticated search routine is also under development. A printed circuit board for the AGC is planned and will be enclosed with the RF front end in a sealed enclosure to reduce interference from the other digital circuits of the microcomputer.

Yost, S. R.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress is on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance (ULA) in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the OSA and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center (MSFC) in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 t to LEO, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the EUS, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the proving ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations program is transforming Kennedy Space Center into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the Exploration Upper Stage, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the Proving Ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

JPL airborne instruments activities

Two instruments intended for flight aboard aircraft for research in advanced remote sensing of the earth are under development: the airborne imaging spectrometer (AIS) and the airborne visible-infrared imaging spectrometer (AVIRIS). The AIS utilizes a 32 x 32 element HgCdTe CCD array to gather 10nm spectral data, initially in the 1.2 to 2.4 micron range, with 32 pixels of cross-track spatial data. The instrument acquires 128 channels of spectral data by using a grating spectrometer whose grating is stepped through four positions during a fraction of an IFOV time on the ground. With an IFOV of 2 mrad, the GIFOV at the design altitude of 3 km is 6m. The instrument has several on-board processing capabilities including ax+b corrections for detector calibration, cross-track and down-track pixel summing, spectral band summing, and variable integration time to allow flight at various altitudes and velocities. The AVIRIS uses a proven scanning mechanism to acquire the spatial data in a whisk broom mode. The spectral coverage is from 0.35 to 2.5 microns at bandwidths ranging from 10 to 20 nm.

Vane, G.↗

External Tank GH2 Vent Arm

Because the venting of free hydrogen gas to the atmosphere presents an extremely hazardous situation, it was necessary to devise a means for safe, controlled venting of the shuttle external tank gaseous hydrogen during and after liquid hydrogen tank loading. Several design concepts that were considered initially were discarded as unfeasible because of vehicle weight restrictions, high cost, and because the proposed structure was itself deemed a hazard due to the vehicle's nonvertical launch trajectory. These design concepts are discussed. A design employing a support structure/access arm attached to the fixed service structure was finally selected. The various design problems resolved included vent arm disconnect/drop interference, minimizing refurbishment due to launch damage, disconnect reliability, vehicle movement tracking, minimizing vent line pressure drop, and the presence of other vehicle services at the same centralized supply area. Six launches have proven the system to be reliable, efficient, and of nearly zero refurbishment cost.

Reichle, G. E.↗

Hi-5: A Potential High-Contrast Thermal Near-Infrared Imager for the VLTI

Hi-5 is a high-contrast (or high dynamic range) infrared imager project for the VLTI. Its main goal is to characterize young extra-solar planetary systems and exozodiacal dust around southern main-sequence stars. In this paper, we present an update of the project and key technology pathways to improve the contrast achieved by the VLTI. In particular, we discuss the possibility to use integrated optics, proven in the near-infrared, in the thermal near-infrared (L and M bands, 3-5 μm) and advanced fringe tracking strategies. We also address the strong exoplanet science case (young exoplanets, planet formation, and exozodiacal disks) offered by this wavelength regime as well as other possible science cases such as stellar physics (fundamental parameters and multiplicity) and extragalactic astrophysics (active galactic nuclei and fundamental constants). Synergies and scientific preparation for other potential future instruments such as the Planet Formation Imager are also briefly discussed.

exozodiacal dust↗

Monitoring River Basin Development and Variation in Water Resources in Transboundary Imjin River in North and South Korea Using Remote Sensing

This paper presents methods of monitoring river basin development and water variability for the transboundary river in North and South Korea. River basin development, such as dams and water infrastructure in transboundary rivers, can be a potential factor of tensions between upstream and downstream countries since dams constructed upstream can adversely affect downstream riparians. However, because most of the information related to North Korea has been limited to the public, the information about dams constructed and their locations were inaccurate in many previous studies. In addition, water resources in transboundary rivers can be exploited as a political tool. Specifically, due to the unexpected water release from the Hwanggang Dam, upstream of the transboundary Imjin River in North and South Korea, six South Koreans died on 6 September 2009. The Imjin River can be used as a political tool by North Korea, and seven events were reported as water conflicts in the Imjin River from 2001 to 2016. In this paper, firstly, we have updated the information about the dams constructed over the Imjin River in North Korea using multi-temporal images with a high spatial resolution (15-30 cm) obtained from Google Earth. Secondly, we analyzed inter- and intra-water variability over the Hwanggang Reservoir using open-source images obtained from the Global Surface Water Explorer. We found a considerable change in water surface variability before and after 2008, which might result from the construction of the Hwanggang Dam. Thirdly, in order to further investigate intra-annual water variability, we present a method monitoring water storage changes of the Hwanggang Reservoir using the area-elevation curve (AEC), which was derived from multi-sensor Synthetic Aperture Radar (SAR) images (Sentinel-1A and -1B) and the Shuttle Radar Topography Mission (SRTM) Digital Elevation Model (DEM). Since many previous studies for estimating water storage change have depended on satellite altimetry dataset and optical images for deriving AEC, the method adopted in this study is the only application for such inaccessible areas since no altimetry ground track exists for the Hwanggang Reservoir and because clouds can block the study area for wet seasons. Moreover, this study has newly proven that unexpected water release can occur in dry seasons because the water storage in the Hwanggang Reservoir can be high enough to conduct a release that can be used as a geopolitical tool. Using our method, potential risks can be mitigated, not in response to a water release, but based on pre-event water storage changes in the Hwanggang Reservoir.

Kim, Donghwan↗

Hydra Rendezvous and Docking Sensor

The U.S. technology to support a CEV AR&D activity is mature and was developed by NASA and supporting industry during an extensive research and development program conducted during the 1990's and early 2000 time frame at the Marshall Space Flight Center. Development and demonstration of a rendezvous/docking sensor was identified early in the AR&D Program as the critical enabling technology that allows automated proxin~ity operations and docking. A first generation rendezvous/docking sensor, the Video Guidance Sensor (VGS) was developed and successfully flown on STS 87 and again on STS 95, proving the concept of a video-based sensor. Advances in both video and signal processing technologies and the lessons learned from the two successful flight experiments provided a baseline for the development of a new generation of video based rendezvous/docking sensor. The Advanced Video Guidance Sensor (AVGS) has greatly increased performance and additional capability for longer-range operation. A Demonstration Automatic Rendezvous Technology (DART) flight experiment was flown in April 2005 using AVGS as the primary proximity operations sensor. Because of the absence of a docking mechanism on the target satellite, this mission did not demonstrate the ability of the sensor to co~ltrold ocking. Mission results indicate that the rendezvous sensor operated successfully in "spot mode" (2 km acquisition of the target, bearing data only) but was never commanded to "acquire and track" the docking target. Parts obsolescence issues prevent the construction of current design AVGS units to support the NASA Exploration initiative. This flight proven AR&D technology is being modularized and upgraded with additional capabilities through the Hydra project at the Marshall Space Flight Center. Hydra brings a unique engineering approach and sensor architecture to the table, to solve the continuing issues of parts obsolescence and multiple sensor integration. This paper presents an approach to sensor hardware trades, to address the needs of future vehicles that may rendezvous and dock with the International Space Station (ISS). It will also discuss approaches for upgrading AVGS to address parts obsolescence, and concepts for modularizing the sensor to provide configuration flexibility for multiple vehicle applications. Options for complementary sensors to be integrated into the multi-head Hydra system will also be presented. Complementary sensor options include ULTOR, a digital image correlator system that could provide relative six-degree-of-freedom information independently from AVGS, and time-of-flight sensors, which determine the range between vehicles by timing pulses that travel from the sensor to the target and back. Common targets and integrated targets, suitable for use with the multi-sensor options in Hydra, will also be addressed.

Roe, Fred↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton Block 1 configuration, and will then evolve to an ultimate capability of 130 metric tons. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS - Exploration Mission-1 (EM-1), an uncrewed mission to orbit the moon and return, and progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance (ULA) in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations program is transforming Kennedy Space Center into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton (t) Block 1 configuration, and will then evolve to an ultimate capability of 130 t. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS -- Exploration Mission-1 (EM-1), an un-crewed mission to orbit the moon and return. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Design of a Low-Cost, Submersible, Digital Holographic Microscope for in Situ Microbial Imaging

The methodologies for studying marine microbiology typically consist of utilizing instrumentation within a laboratory. This typically requires extracting a sample from its place of origin prior to examination, which may be days after collection. Oftentimes, the solution is to bring the lab to the ocean, which may be costly and provide further limitations for a sterile and stable laboratory environment. Here we present a low-cost, submersible, digital holographic microscope (DHM) designed to image marine microorganisms (such as bacteria and plankton) in their natural underwater environment. Our instrument eliminates the need to transport samples and allows for instantaneous data collection of microbes in-situ. The DHM achieves sub-micron spatial resolution and is paired with artificial intelligence for the detection and tracking of specimens to reduce the overall collected data. This instrument also aims to reduce the cost of manufacturing and field expenses relative to marine microbiological research. “Off the shelf” components were selected in the design process of this instrument which allows us to achieve precise results without sacrificing data quality. The DHM itself costs under one thousand dollars and features a low-cost high-resolution camera, the Arducam MT9J001. Included in the design were five main subsystems: optical, mechanical, electrical, power, and machine learning. Our on board computer and artificial intelligence consist of a Raspberry Pi 4 (8 Gb) and Google Coral USB Tensorflow accelerator. Instrument testing has successfully proven our abilities of data acquisition for at least two hours in depths of at least forty meters below sea level. Additionally, our artificial intelligence system is currently capable of tracking up to ten areas of interest in a fraction of a second with over ninety percent confidence via the neural net driven by the tensor cores on the Google Coral. Furthermore, we have demonstrated the versatility of our instrument by mounting it on an ocean-going ROV, the BlueRov2 by BlueRobotics. Our tests on the BlueRov2 exemplified the cost-effective nature of a submersible and reusable instrument that can be implemented in moderate environments and on most vessels.

Wallace, James Kent↗

The preliminary design of an orbiting observatory - The Space Telescope

The systems and subsystems of the Space Telescope proposed for an orbiting observatory to be launched by the Space Shuttle in the 1980s are described. The structural design is simple and based on existing technologies for high reliability. Provisions are made for on-orbit servicing and maintenance. All deployable appendages are designed for manual override to insure retrieval and return of the Space Telescope to earth for major refurbishing, which should occur at intervals of not less than six years. Low performance risk, passive techniques are used in the thermal control subsystem to provide a cold-biased design with thermostatically controlled heaters to adjust temperature. The electrical power system utilizes NASA Standard Hardware - 50 ampere hour nickel-cadmium battery cells, a standard power regulator unit, and a flight-proven flexible rollup solar array with high-efficiency (12.5 per cent) silicon solar cells. The communication subsystem is designed for compatibility with the Tracking and Data Relay Satellite System. The pointing control system will have a maximum line of sight variation of 0.007 arc seconds. The telescope optics are a Ritchey-Chretien version of the Cassegrain configuration.

Timmons, K. P.↗

The InSAR Scientific Computing Environment

We have developed a flexible and extensible Interferometric SAR (InSAR) Scientific Computing Environment (ISCE) for geodetic image processing. ISCE was designed from the ground up as a geophysics community tool for generating stacks of interferograms that lend themselves to various forms of time-series analysis, with attention paid to accuracy, extensibility, and modularity. The framework is python-based, with code elements rigorously componentized by separating input/output operations from the processing engines. This allows greater flexibility and extensibility in the data models, and creates algorithmic code that is less susceptible to unnecessary modification when new data types and sensors are available. In addition, the components support provenance and checkpointing to facilitate reprocessing and algorithm exploration. The algorithms, based on legacy processing codes, have been adapted to assume a common reference track approach for all images acquired from nearby orbits, simplifying and systematizing the geometry for time-series analysis. The framework is designed to easily allow user contributions, and is distributed for free use by researchers. ISCE can process data from the ALOS, ERS, EnviSAT, Cosmo-SkyMed, RadarSAT-1, RadarSAT-2, and TerraSAR-X platforms, starting from Level-0 or Level 1 as provided from the data source, and going as far as Level 3 geocoded deformation products. With its flexible design, it can be extended with raw/meta data parsers to enable it to work with radar data from other platforms

geodetic imaging↗

Climate Model Diagnostic Analyzer

The comprehensive and innovative evaluation of climate models with newly available global observations is critically needed for the improvement of climate model current-state representation and future-state predictability. A climate model diagnostic evaluation process requires physics-based multi-variable analyses that typically involve large-volume and heterogeneous datasets, making them both computation- and data-intensive. With an exploratory nature of climate data analyses and an explosive growth of datasets and service tools, scientists are struggling to keep track of their datasets, tools, and execution/study history, let alone sharing them with others. In response, we have developed a cloud-enabled, provenance-supported, web-service system called Climate Model Diagnostic Analyzer (CMDA). CMDA enables the physics-based, multivariable model performance evaluations and diagnoses through the comprehensive and synergistic use of multiple observational data, reanalysis data, and model outputs. At the same time, CMDA provides a crowd-sourcing space where scientists can organize their work efficiently and share their work with others. CMDA is empowered by many current state-of-the-art software packages in web service, provenance, and semantic search.

cloud computing↗