Search NASA⌕ Search

SEARCH · Search NASA

Results for “ramp forecasting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Reserve and energy scarcity pricing in United States power markets: A comparative review of principles and practices

Here, errors in forecasting load and renewable-based generation in restructured power systems mean that independent system operators (ISOs) must procure sufficient operating reserves to keep the real-time operation of the system reliable and secure. But when procured reserves turn out to be insufficient in real-time due to the lack of resource capacity or ramp capability, operators often set higher prices for reserves and energy to encourage more supply, and to motivate consumers to decrease usage or shift it to other times. This procedure, which is called scarcity or shortage pricing, is a core feature of U.S. electricity markets. It is receiving increased attention from market designers and stakeholders because scarcity will become more important for spot price formation in the future with the increased penetration of zero-marginal cost renewables, and the shrinking role of fuel costs in setting prices. Scarcity pricing is implemented in various ways by different ISOs. These differences have practical implications for the level of prices and incentives for investment, operations, and demand modification. In this paper, general approaches and specific calculation procedures for reserve and energy scarcity pricing practices and calculations across the seven ISO-based U.S. power markets are reviewed and compared. A consistent terminology is used to facilitate the comparison. Current scarcity pricing practices are grouped into three approaches: (1) imposing an adder after the spot market is run; (2) including stepwise demand curves within market clearing procedures for non-contingency reserve products (e.g., the novel flexiramp product), which tends to yield longer right tails for energy scarcity premium curves; and (3) having stepwise demand curves for traditional contingency reserve products only, which results in shorter right tails in energy scarcity curves. A generic numerical example is presented to highlight the large practical differences among the reserve scarcity pricing approaches and specific implementations. To further investigate factors that contribute the most to demand curves differences among ISOs, a sensitivity analysis is performed. This analysis shows that the largest source of differences among the curves is the scarcity prices assumed in the case of severe scarcity, while the number of steps used and whether flexiramp is considered also yields important differences in scarcity prices. As renewable penetration increases, it will become increasingly crucial to employ administrative demand curves so that spot prices more effectively motivate supply and demand adjustments exactly when and where they are needed. This study shows that the different assumptions yield very different scarcity premiums for reserves and energy, and are likely to provide divergent incentives for resources to respond to shortages. It is concluded that to promote market efficiency, a reserve shortage demand curve should have at least three features: inclusion of the marginal value of reserve products at each shortage level, consideration of the magnitude and probability of supply contingencies, and avoidance of abrupt price discontinuities that can cause excessively volatile market outcomes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Surface Movement Incidents Reported to the NASA Aviation Safety Reporting System

Increasing numbers of aircraft are operating on the surface of airports throughout the world. Airport operations are forecast to grow by more that 50%, by the year 2005. Airport surface movement traffic would therefore be expected to become increasingly congested. Safety of these surface operations will become a focus as airport capacity planning efforts proceed toward the future. Several past events highlight the prevailing risks experienced while moving aircraft during ground operations on runways, taxiways, and other areas at terminal, gates, and ramps. The 1994 St. Louis accident between a taxiing Cessna crossing an active runway and colliding with a landing MD-80 emphasizes the importance of a fail-safe system for airport operations. The following study explores reports of incidents occurring on an airport surface that did not escalate to an accident event. The Aviation Safety Reporting System has collected data on surface movement incidents since 1976. This study sampled the reporting data from June, 1993 through June, 1994. The coding of the data was accomplished in several categories. The categories include location of airport, phase of ground operation, weather /lighting conditions, ground conflicts, flight crew characteristics, human factor considerations, and airport environment. These comparisons and distributions of variables contributing to surface movement incidents can be invaluable to future airport planning, accident prevention efforts, and system-wide improvements.

Connell, Linda J.↗

Atmospheric condition identification in multivariate data through a metric for total variation

Identification of atmospheric conditions within a multivariable atmospheric data set is a necessary step in the validation of emerging and existing high-fidelity models used to simulate wind plant flows and operation.Atmospheric conditions relevant for wind energy research include stationary conditions, given the need for well-converged statistics for model validation, as well as conditions observed less frequently, such as extreme atmospheric events, which are used in wind turbine and wind plant design.Aggregation of observations without regard to covariance between time series discounts the dynamical nature of the atmosphere and is not sufficiently representative of atmospheric conditions.Identification and characterization of continuous time periods with atmospheric conditions that have a high value for analysis or simulation set the stage for more advanced model validation and the development of real-time control and operational strategies.The current work explores a single metric for variation in a multivariate data sample that quantifies variability within each channel as well as covariance between channels.The total variation is used to identify conditions of interest that conform to desired objective functions, such as stationary conditions, ramps or waves of wind speed, and changes in wind direction.Total variation is somewhat sensitive to the presence of outliers in the input data, and the method is best complemented by quality-control procedures to ensure reliable results.The direct detection and classification of events or conditions of interest within atmospheric data sets is vital to developing our understanding of wind plant response and to the formulation of forecasting and control models.

17 WIND ENERGY↗

Forecasting of high voltage insulation performance: Testing of recommended potting materials and of capacitors

Nondestructive high voltage test techniques (mostly electrical methods) are studied to prevent total or catastrophic breakdown of insulation systems under applied high voltage in space. Emphasis is on the phenomenon of partial breakdown or partial discharge (P.D.) as a symptom of insulation quality, notably partial discharge testing under D.C. applied voltage. Many of the electronic parts and high voltage instruments in space experience D.C. applied stress in service, and application of A.C. voltage to any portion thereof would be prohibited. Suggestions include: investigation of the ramp test method for D.C. partial discharge measurements; testing of actual flight-type insulation specimen; perfect plotting resin samples with controlled defects for test; several types of plotting resins and recommendations of the better ones from the electrical characteristics; thermal and elastic properties are also considered; testing of commercial capaciters; and approximate acceptance/rejection/rerating criteria for sample test elements for space use, based on D.C. partial discharge.

Bever, R. S.↗

Machine learning surrogate of physics-based building-stock simulator for end-use load forecasting

Building energy models are used to simulate heat and mass transfer and estimate end-use load in buildings. With the proliferation of solar photovoltaics on residential and commercial buildings, increasingly, buildings are expected to provide grid services, for which accurate and computationally efficient building energy simulations and end-use load prediction are imperative. Existing building energy simulation tools, however, have significant computational overhead that make them less practical in real-time deployment for optimization, design, uncertainty quantification and control in building energy management systems. Here this article presents a data-driven machine learning model based on light gradient boosting method (LightGBM) as a surrogate for a physics-based simulator for residential buildings to predict end-use load. The machine learning based surrogate model accounts for time-series related variables, seasonality and trend component of end-use load, and history of end-use load. The accuracy of the surrogate model is assessed on the prediction of the load profiles of 100 different houses in Cook County, Illinois, USA. The LightGBM surrogate model is shown to reduce the root-mean-squared error by 53% relative to a reference decision tree (DT) based model reported previously in the literature. Moreover, the model predicts the load spikes and high-ramp rate events throughout the year which are often the Achilles heel of other models in the literature. The machine learning based surrogate model is demonstrated to be computationally efficient, with a ten-fold reduction in the computational time compared to a physics-based building energy simulation, and suitable for uncertainty analysis and real-time control of building characteristics in response to uncertainty.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Estimating the impacts of natural gas power generation growth on solar electricity development: PJM's evolving resource mix and ramping capability

Abstract Expansion of distributed solar photovoltaic (PV) and natural gas‐fired generation capacity in the United States has put a renewed spotlight on methods and tools for power system planning and grid modernization. This article investigates the impact of increasing natural gas‐fired electricity generation assets on installed distributed solar PV systems in the Pennsylvania–New Jersey–Maryland (PJM) Interconnection in the United States over the period 2008–2018. We developed an empirical dynamic panel data model using the system‐generalized method of moments (system‐GMM) estimation approach. The model accounts for the impact of past and current technical, market and policy changes over time, forecasting errors, and business cycles by controlling for PJM jurisdictions‐level effects and year fixed effects. Using an instrumental variable to control for endogeneity, we concluded that natural gas does not crowd out renewables like solar PV in the PJM capacity market; however, we also found considerable heterogeneity. Such heterogeneity was displayed in the relationship between solar PV systems and electricity prices. More interestingly, we found no evidence suggesting any relationship between distributed solar PV development and nuclear, coal, hydro, or electricity consumption. In addition, considering policy effects of state renewable portfolio standards, net energy metering, differences in the PJM market structure, and other demand and cost‐related factors proved important in assessing their impacts on solar PV generation capacity, including energy storage as a non‐wire alternative policy technique. This article is categorized under: Photovoltaics > Economics and Policy Fossil Fuels > Climate and Environment Energy Systems Economics > Economics and Policy

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

MPC4CLR (Model-Predictive-Control-for-Critical-Load-Restoration-in-Power-Distribution-Systems) [SWR-22-24]

Model predictive control (MPC) is a system or process control technique for making decisions under uncertainty via rolling look-ahead optimizations at each control step where only the current step decisions are applied, and the rest are discarded. In this work, we developed an MPC for a critical load restoration (CLR) in power distribution systems to recover system service (electricity delivery) following an extreme event-triggered substation outage. The method considers the problem of controlling distributed energy resources (DERs) of the distribution system with the objective of achieving maximum load pick up while satisfying distribution network flow and voltage constraints. A linearized optimal power flow (OPF) model is employed to represent the physics of the network. The problem formulation is augmented with a ramping (up) reserve product for the DERs to ensure improved and upward monotonic load restoration as time evolves. Simulation analysis and performance tests are performed using a modified IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage battery. The software is developed using various software packages in Julia and Python. The MPC model is implemented using the JuMP optimization language in Julia while the data analytics including renewable generation and load demand forecasts, running the MPC simulation and visualizations is performed in Python.

Eseye, Abinet Tesfaye↗

Empirical Assessment of the Appliance-Level Load Shape and Demand Response Potential in India

Over the next 15 years, electricity demand from the key residential and commercial appliances is projected to be nearly 300 GW or ~65% of India’s total peak demand. The objective of this study is to characterize appliance level demand and temporal variation, and identify the overall DR potential in India. We use Bangalore Electricity Supply Company territory (peak load of 3,505 MW in 2016) as a case study, using actual one-minute resolution load data for 2,979 distribution feeders and a detailed load survey. Our results show that agricultural pumping and space cooling (residential, commercial, and industrial) are the main contributors to the peak demand – with shares of 23-27% and 14-23%, respectively. Both sectors have about 1,000 MW of DR potential – agricultural pumps offering load shifting service while space cooling offering shimmy service that is capable of dynamically adjusting to react to short-run ramps and grid disturbances. Residential electric water heaters contribute nearly 18% of the winter morning peak demand and can also offer about 500 MW in shimmy service. Overall, we find that shifting and shimmy services offer 1,199 MW and 1,511 MW total DR potential, respectively.

demand response↗

An Integrated 0-1 Hour First-Flash Lightning Nowcasting, Lightning Amount and Lightning Jump Warning Capability

Lightning one of the most dangerous weather-related phenomena, especially as many jobs and activities occur outdoors, presenting risk from a lightning strike. Cloud-to-ground (CG) lightning represents a considerable safety threat to people at airfields, marinas, and outdoor facilities-from airfield personnel, to people attending outdoor stadium events, on beaches and golf courses, to mariners, as well as emergency personnel. Holle et al. (2005) show that 90% of lightning deaths occurred outdoors, while 10% occurred indoors despite the perception of safety when inside buildings. Curran et al. (2000) found that nearly half of fatalities due to weather were related to convective weather in the 1992-1994 timeframe, with lightning causing a large component of the fatalities, in addition to tornadoes and flash flooding. Related to the aviation industry, CG lightning represents a considerable hazard to baggage-handlers, aircraft refuelers, food caterers, and emergency personnel, who all become exposed to the risk of being struck within short time periods while convective storm clouds develop. Airport safety protocols require that ramp operations be modified or discontinued when lightning is in the vicinity (typically 16 km), which becomes very costly and disruptive to flight operations. Therefore, much focus has been paid to nowcasting the first-time initiation and extent of lightning, both of CG and of any lightning (e.g, in-cloud, cloud-to-cloud). For this project three lightning nowcasting methodologies will be combined: (1) a GOESbased 0-1 hour lightning initiation (LI) product (Harris et al. 2010; Iskenderian et al. 2012), (2) a High Resolution Rapid Refresh (HRRR) lightning probability and forecasted lightning flash density product, such that a quantitative amount of lightning (QL) can be assigned to a location of expected LI, and (3) an algorithm that relates Pseudo-GLM data (Stano et al. 2012, 2014) to the so-called "lightning jump" (LJ) methodology (Shultz et al. 2011) to monitor lightning trends and to anticipate/forecast severe weather (hail > or =2.5 cm, winds > or =25 m/s, tornadoes). The result will be a time-continuous algorithm that uses GOES satellite, radar fields, and HRRR model fields to nowcast first-flash LI and QL, and subsequently monitors lightning trends on a perstorm basis within the LJ algorithm for possible severe weather occurrence out to > or =3 hours. The LI-QL-LJ product will also help prepare the operational forecast community for Geostationary Lightning Mapper (GLM) data expected in late 2015, as these data are monitored for ongoing convective storms. The LI-QL-LJ product will first predict where new lightning is highly probable using GOES imagery of developing cumulus clouds, followed by n analysis of NWS (dual-polarization) radar indicators (reflectivity at the -10 C altitude) of lightning occurrence, to increase confidence that LI is immanent. Once lightning is observed, time-continuous lightning mapping array and Pseudo-GLM observations will be analyzed to assess trends and the severe weather threat as identified by trends in lightning (i.e. LJs). Additionally, 5- and 15-min GOES imagery will then be evaluated on a per-storm basis for overshooting and other cloud-top features known to be associated with severe storms. For the processing framework, the GOES-R 0-1 hour convective initiation algorithm's output will be developed within the Warning Decision Support System - Integrated Information (WDSS-II) tracking tool, and merged with radar and lightning (LMA/Psuedo-GLM) datasets for active storms. The initial focus of system development will be over North Alabama for select lightning-active days in summer 2014, yet will be formed in an expandable manner. The lightning alert tool will also be developed in concert with National Weather Service (NWS) forecasters to meet their needs for real-time, accurate first-flash LI and timing, as well as anticipated lightning trends, amounts, continuation and cessation, so to provide key situational awareness and decision support information. The NASA Short-term Prediction Research and Transition (SPoRT) Center will provide important logistical and collaborative support and training, involving interactions with the NWS and broader user community.

Mecikalski, John↗

Absorbing the Sun: Operational Practices and Balancing Reserves in Florida's Municipal Utilities

The Florida Reliability Coordinating Council (FRCC) power system is comprised of multiple balancing authorities ranging in size from Gainesville Regional Utilities (GRU) with a 2019 summer net firm demand of 429 MW to Florida Power & Light with a 2019 summer net firm demand of 22,510 MW; and including cooperative, municipal, and investor-owned utilities. As all of these balancing authorities are and have plants to continue installing significant quantities of utility-scale solar photovoltaics, one relevant question is how much operating reserves they will need to hold as solar penetrations increase. While there are estimates of how regulating and flexibility reserve requirements change with solar penetration, the literature almost exclusively focuses on large balancing authorities with sub-hourly dispatch. In this work we analyze how reserve needs change not only with solar photovoltaic penetration, but also balancing authority size and operational practices. We find that, measured as a fraction of load, smaller balancing authorities with less frequent load and solar forecasts and less frequent dispatch need more reserves. Such utilities' reserve needs also increase more with increasing solar deployment as compared to larger or more frequently dispatched balancing authorities. These impacts are most acute for GRU. We find that moving from day-ahead to hour-ahead load and solar forecasting and system dispatch could enable GRU to incorporate 32% solar generation with median reserves at 20% instead of 60% of load; and that median reserve needs could drop further to about 10% of load if Florida's municipal utilities formed a reserve sharing group and moved to sub-hourly dispatch.

14 SOLAR ENERGY↗

Exploring Multidimensional Spatial-Temporal Hydropower Operational Flexibilities by Modeling and Optimizing Water-Constrained Cascading Hydroelectric Systems

Because of unique characteristics such as clean and cost-competitive electricity as well as fast-ramping and storage abilities, the power industry continues to evolve its operation strategies for cascading hydroelectric (CHE) systems for providing enhanced values to the grid, especially under the deeper renewable resource integration. However, existing operation practices of CHEs predate the integration of renewables, which could prohibit the effective utilization of their inherent flexibilities in delivering maximum financial benefits and providing valuable grid services to the power system and electricity market operations. Indeed, modeling and optimizing these resource-limited while flexible CHE assets with uncertainties and imperfect information across multiple spatial-temporal dimensions present significant challenges. To facilitate CHE facility operators in effectively coordinating water usage and hydropower plant operations across multiple timescales, this project aims to fill the existing gaps by developing a suite of accurate water inflow (WI) forecast models as well as enhanced CHE modeling and optimization approaches with proper consideration of their unique characteristics, which would help explore their multidimensional spatial-temporal operational flexibility potentials. The developed approaches could better align reservoir operation strategies with variability and uncertainty of future water availability. They can also promote more effective utilization of multidimensional spatial-temporal hydropower operational flexibility potentials by designing long-term evacuation plans of reservoirs and short-term operation of CHEs, along with their coordination with other types of renewables. The project leverages various resources to facilitate the research and development activities, including actual characteristics data of CHE systems and a library of current and future cases of Portland General Electric (PGE). These realistic data enable the project team to study how to maximize the value of CHEs under current and future portfolios and evaluate opportunities to improve operation practices.

13 HYDRO ENERGY↗

Forced unsteady deceleration of a turbulent boundary layer from a temporal perspective

The behavior of a turbulent boundary layer which has been subjected to a local ramp-like deceleration in the external velocity field, which leads to forced separation, has been studied experimentally. The data of this study are re-interpreted in light of more recent findings concerning the temporal nature of boundary layer turbulence in the presence of forced unsteady shear. In particular, the robustness of the near-wall turbulent motions to organized deformation is recognized. Their resilence during unsteady shearing action promotes continued efficient turbulent mixing and rapid redistribution of turbulent kinetic energy during forced transients. In aerodynamic problems, the rapid nature of the adjustment of the turbulence field to a new temporal boundary condition necessitates equally rapid remedial measures to be taken if means of control/prevention of forced unsteady separation are to be deployed to maximum effect. This requirement suggests exploration of the use of simple, real-time statistical forecasting techniques, based upon time-series analysis of easily-measurable features of the flow, to help assure timely deployment of mechanisms of boundary-layer control. This paper focuses upon the nature of turbulence in boundary layers undergoing forced deceleration which would lead to separation. A preliminary form of a forecasting model is presented and evaluated. Using observations of the previous two large eddies passing a detector, it forecasts the behavior of the future large eddy rather well.

Brereton, G. J.↗

Rolling Optimization of Transmission Network Recovery and Load Restoration Considering Hybrid Wind-Storage System and Cold Load Pickup

A common solution to deal with the stochasticity introduced by fast-ramping wind power integration is to equip wind farms (WFs) with energy storage systems (ESSs) to formulate hybrid WF-ESSs. In addition to leveling off wind power fluctuations during normal operations, a hybrid WF-ESS can be a flexible power source to accumulate the power system restoration. In this paper, we propose a rolling optimization model for transmission network recovery and load restoration considering the contributions of WF-ESSs. The proposed model is formulated as a mixed integer linear programming problem that simultaneously optimizes the amount and location of restorable load blocks as well as the restoration lines. The cold load pickup features of interrupted loads considering the outage duration are modeled in detail. A chance-constrained method is employed to deal with the uncertainty of wind power, and a rolling horizon-based framework is adopted to reduce the influence of forecast error. Case studies are conducted on both New England 39-bus system and part of a provincial power system in China. The results show that the load restoration process can be significantly accelerated by employing the proposed method and contributions of hybrid WF-ESSs to power system restoration are validated.

chance-constrained optimization↗

Case study of a bore wind-ramp event from lidar measurements and HRRR simulations over ARM Southern Great Plains

The rapid change of wind speed and direction on 21 August 2017 is studied using Doppler lidar measurements at five sites of the Atmospheric Radiation Measurement (ARM) Southern Great Plains (SGP) facility in north-central Oklahoma. The Doppler lidar data were investigated along with meteorological variables such as temperature, humidity, and turbulence available from the large suite of instrumentation deployed at the SGP Central Facility (C1) during the Land-Atmosphere Feedback Experiment in August 2017. Lidar measurements at five sites, separated by 55-70 km, allowed us to document the development and evolution of the wind flow over the SGP area, examine synoptic conditions to understand the mechanism that leads to the ramp event, and estimate the ability of the High-Resolution Rapid Refresh model to reproduce this event. The flow feature in question is an atmospheric bore, a small-scale phenomenon that is challenging to represent in models, that was generated by a thunderstorm outflow northwest of the ARM SGP area. The small-scale nature of bores, its impact on power generation, and the modeling challenges associated with representing bores are discussed in this paper. In conclusion, the results also provide information about model errors between sites of different surface and vegetation types.

54 ENVIRONMENTAL SCIENCES↗

Assessment of Model Hub Height Wind Speed Performance Using DOE Lidar Buoy Data

As the offshore wind industry continues to gain momentum both in the U.S. and globally, reanalysis products remain essential tools for the lifecycle of a wind farm. From project siting and production estimates to determining construction and maintenance windows, reanalysis products play an important role. These regional and global long-term models also serve as inputs to higher resolution models. With such wide-ranging impacts on the offshore wind industry, the need for validation of reanalysis products is strong, particularly at typical turbine hub heights. Pacific Northwest National Laboratory (PNNL) operates two AXYS WindSentinelTM buoys for the U.S. Department of Energy (DOE) in order to collect meteorological and oceanographic data, including hub height wind speed, in areas of interest for offshore wind development. This work uses DOE buoy observations off the coasts of New Jersey and Virginia to evaluate the performance of Modern Era Retrospective Analysis for Research and Applications-2 (MERRA-2), the North American Regional Reanalysis (NARR), the European Center for Medium-Range Weather Forecasts (ECMWF) Reanalysis 5th generation (ERA5), and the National Oceanic and Atmospheric Administration (NOAA) assimilation system Rapid Refresh (RAP). Biases and degrees of correspondence are determined for each reanalysis product in order to provide insights on the performance and uncertainty for long-term wind resource characterization. With the baseline metrics determined, this work proceeds with an investigation into the sources of large deviations between the modeled and observed hub height wind speeds during the East Coast lidar buoy deployments. Consistent sources of reanalysis model error include stably stratified flow conditions, high wind shear, flow parallel to the coastline, and tropical and winter storms. For the near shore New Jersey location, offshore winds (i.e. blowing from land to water) tend to be associated with model overestimation of observed hub height wind speed, while winds parallel to the coastline are correlated with model underestimation of wind speed. Similarly, near the Virginia buoy, during southerly winds (parallel to the coastline) models underestimate the observed wind speed due to coastal upwelling. Reanalysis model wind speeds underestimate the hub height winds with increasing stable atmospheric stratification. Reanalysis model biases are seen when the observed wind speeds approach or exceed typical turbine cut-out speeds (around 20 m s-1). Large model errors during winter and tropical storm events, high wind speed events, and ramp events are often the result of wind speed timing and magnitude offsets. Overall, ERA5 provides the most successful representation of observed offshore hub height wind speeds at the U.S. East Coast buoy locations and is therefore best suited as an input boundary condition for model case studies. ERA5 performs well for a variety of atmospheric phenomena, including storms and sea breezes, however RAP, the next most successful reanalysis model, performs best in capturing the frequency of ramp events.

17 WIND ENERGY↗

A Guide for Improved Resource Adequacy Assessments in Evolving Power Systems: Institutional and Technical Dimensions

This paper identifies and evaluates issues in traditional resource adequacy (RA) assessment practices, and how adjusting these practices may affect and depend on existing institutional arrangements for planning and procurement. The paper proposes a technical-institutional roadmap that would allow regulators in vertically-integrated jurisdictions and system planners and operators in restructured jurisdictions to revise RA practices across a range of components. First, we compile a critical review of current RA assessment practices based on (1) interviews with RA practitioners and (2) a review of recent technical literature. We find that (i) RA may need to expand beyond capacity adequacy to ensure energy adequacy – relevant for energy-limited resources such as storage – and potentially some form of ancillary service adequacy (e.g. enough ramping-up and ramping-down capability in the system); (ii) chronological hourly simulations for all hours in the year are the current best practice; (iii) metrics and models used do not reflect economic criteria in system operation and loss of load; and (iv) there is a need to improve representation of weather dependencies and weather data. Second, we review planning and RA reports for several private and public entities that plan generation and/or transmission infrastructure in the continental U.S. to look for existing practices involving resilience assessments. We find no systematic treatment of the costs of extreme weather and other hazards, the benefits of resilience, and resilience metrics in planning analyses and no systematic treatment of resilience metrics, methods, and outcomes for resource adequacy purposes. Third, we create a technical framework for probabilistic RA assessment and use it to study how key choices about how to model power system operations affect the values that are obtained for RA metrics. We find that (i) non-economic dispatch schemes that ignore economic objectives can lead to accurate RA assessments when coordinated with detailed operational strategies; (ii) multi-year data is critical to capture a wide variety of system conditions; (iii) not incorporating transmission limits into RA assessment could lead to substantial underestimation of traditional “expected value” RA metrics; and (iv) new RA metrics that capture event-specific shortfall characteristics should be used as supplements to traditional metrics. Finally, we examine RA assessments and use this information to propose a guide of evolving industry standards for resource adequacy assessments in resource planning and transmission planning. We report minimum, best, and frontier practices for temporal resolution of assessments, metrics and targets, weather data, load forecasting, characterization of variable renewable resources, characterization of transmission and market transactions, RA modeling and integration with planning processes, and capacity accreditation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Regime Characterization of Offshore Wind Resource Using Unsupervised Learning

Predictability of wind resource conditions is critical for offshore wind design and operations. While many studies of extreme wind conditions focus on specific events such as low-level jets or ramps, these rely on threshold definitions that limit generality. Here we present a data-driven framework that combines principal component analysis (PCA), self-organizing maps (SOM), and k-means clustering to classify wind resource conditions as typical and anomalous from climatological data. Anomalies are defined not by fixed thresholds but by flagging samples located far from SOM node centers inside the baseline SOM structure. This reframes extremes as rare ebents and hence, likely difficult to anticipate by numerical weather prediction models. We applied this approach to 23 years (2000–2022) of hourly profiles from the NOW-23 hindcast model at the Humboldt Wind Energy Area. Classification is conducted on a feature space consisting of 10 m wind speed and direction, bulk shear and veer across 30–270 m, and a low-level jet index. Dimensionality reduction is achieved through PC. A 2 × 3 OM lattice trained on the PCA vectors identified six baseline regimes spanning weak to strong flow states. High quantization-error profiles are identified and re-clustered into four anomalous regimes. The baseline regimes exhibited clear seasonal and diurnal cycles. Meanwhile, the anomalous regimes represented <10 % of all hours but showed distinct combinations of speed, shear, and veer, when compared to the baseline regimes. Anomalous regimes are typically short-lived (~few hours), yet their transitions can lead to hub-height wind changes of −18 to +9 m s -1 . For a representative 15 MW turbine, these shifts imply rapid swings in capacity factor from near-full output to negligible generation. Validation with lidar buoy data showed 51% agreement in SOM labels across ~6,000 overlapping hours, with most mismatches confined to adjacent speed classes. HRRR comparisons further revealed that anomalous regimes were disproportionately associated with forecast biases exceeding 5 m s -1 . Together, these results reframe extremes in offshore wind from absolute maxima or minima to weather states that are difficult to anticipate from models.

17 WIND ENERGY↗

Public Reference Data for Megawatt-Scale Hydrogen Electrolysis - Simulated Wave

The U.S. Department of Energy and the National Laboratory of the Rockies (NLR) demonstrate hydrogen electrolysis, hydrogen compression and storage, and variable hydrogen fuel cell power production using megawatt-scale equipment at NLR’s Flatirons Campus as part of the Advanced Research on Integrated Energy Systems (ARIES) initiative. This dataset represents part of that effort and is intended for academic, national laboratory, industrial, and other stakeholders to plan, design, and validate models of megawatt-scale hydrogen technologies and diverse energy infrastructure nationwide. These data provide a baseline for how existing hydrogen electrolysis technologies perform when coupled with various energy technologies. Future datasets will demonstrate how existing hydrogen fuel cell technologies can provide controllable, dispatchable, and variable power output for artificial intelligence (AI) data centers and other variable loads. This dataset entry describes hydrogen production using a single, simulated wave energy conversion device. The electrolyzer is a 1.25-MW proton exchange membrane type MC250 system manufactured by Nel Hydrogen. While the unit supports up to 2.5 MW of electrolysis, NLR only has a single 1.25-MW electrolysis stack. For the wave energy, NLR used a wave energy converter model from PacWave. These devices can be equipped with accumulators and pressure relief values to smooth the power output by storing and releasing hydraulic energy. Using a peak power output of 10 MW, the model created two 25-minute profiles: one with and one without the accumulators and pressure relief valves. To down select the profile data from the native resolution of 20 Hz to 1 Hz, NLR took the mean of every 20 data points. NLR experimented with two simulated wave energy power plants: one that peaks at 10 MW, and one that peaks at 5 MW. These profiles were scaled for the physical 1.25 MW electrolyzer by multiplying the original profiles by one eighth and one quarter, respectively. The first profile matches the capacity rating of eight of the 1.25 MW electrolyzers, while the second matches four electrolyzers. Finally, NLR experimented with two settings for the electrolyzer power supply minimum and maximum current ramp rates (gain and slew): 200 and 400 amperes per second. The simulated profiles were translated from power (kilowatts) to current (amperes) using a curve fit with calibration data and sent to the electrolyzer power supply at 1-Hz frequency. These datasets report relevant hydrogen balance-of-plant and system data, all captured at 1 Hz, including hydrogen mass production measured with an Emerson Coriolis flow meter. Each .zip file represents a single wave electrolysis experiment and is formatted as follows: {technology}-{accumulator?}_{number of 1.25 MW electrolyzers connected}-{electrolyzer ramp rate in amperes/second} For instance, “wavePacWave-Noacc_4-400.zip” represents the 25 minute-long experiment using the PacWave’s wave energy converter model, equipped with no accumulator, connected to four 1.25-MW electrolyzers with their power supplies set to a maximum current ramp rate (gain and slew) of 400 A/s. Each .zip folder contains the following files: A .csv file containing raw data. An .xlsx file explaining all the fields in the raw data. A .png plot showing the time series of hydrogen production in kilograms per hour, electrolysis power consumption, and input wave power. An experiment, labeled “characterization_200.zip”, demonstrates the MC250 electrolyzer steady-state response with 30 minute load steps for a total duration of 5 hours. Finally, a .csv file is provided with all wave profiles combined into one dataset labeled "combined_wave_experiments.csv". NLR also built an AI/machine-learning predictive model based on these datasets. The model ingests the electrolyzer current command in amperes, as well as various pressures and temperatures across the system, and predicts hydrogen output in kilograms per hour. The complete model can be found at https://huggingface.co/NatLabRockies/ptmelt-hydrogen-electrolysis.

08 HYDROGEN↗