Search NASA⌕ Search

SEARCH · Search NASA

Results for “reactor siting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

First demonstration of 30 eVee ionization energy resolution with RICOCHET germanium cryogenic bolometers

The future RICOCHET experiment aims to search for new physics in the electroweak sector by measuring the Coherent Elastic Neutrino-Nucleus Scattering process from reactor antineutrinos with high precision down to the sub-100 eV nuclear recoil energy range. While the RICOCHET collaboration is currently building the experimental setup at the reactor site, it is also finalizing the cryogenic detector arrays that will be integrated into the cryostat at the Institut Laue Langevin in early 2024. In this paper, we report on recent progress from the Ge cryogenic detector technology, called the CryoCube. More specifically, we present the first demonstration of a 30 eVee (electron equivalent) baseline ionization resolution (RMS) achieved with an early design of the detector assembly and its dedicated High Electron Mobility Transistor (HEMT) based front-end electronics with a total input capacitance of about 40 pF. This represents an order of magnitude improvement over the best ionization resolutions obtained on similar phonon-and-ionization germanium cryogenic detectors from the EDELWEISS and SuperCDMS dark matter experiments, and a factor of three improvement compared to the first fully-cryogenic HEMT-based preamplifier coupled to a CDMS-II germanium detector with a total input capacitance of 250 pF. Additionally, we discuss the implications of these results in the context of the future RICOCHET experiment and its expected background mitigation performance.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Overview of System Integration Analysis Activities for Integrated Waste Management

Spent nuclear fuel (SNF) generated by the current fleet of commercial nuclear reactors is being stored at reactor sites in spent fuel pools (SFPs) and in dry independent spent fuel storage installations (ISFSIs). The U.S. Department of Energy Office of Nuclear Energy (DOE-NE) Integrated Waste Management (IWM) program is examining a suite of IWM system options and conducting supporting analyses to enable future informed choices. The IWM program is currently organized into the following four major areas: (1) IWM facilities and equipment concepts and development, (2) transportation capability analysis and support, (3) information technology solutions and support, and (4) system integration analysis and support. This paper focuses on the activities ongoing in the IWM system integration analysis and support area. Two main research activities in this area are: data and tools development, validation, and maintenance; and special studies, analyses, and assessments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Update on Parallel Process Execution in the Next Generation System Analysis Model

As of the end of 2021, 88,880 metric tons of heavy metal (MTHM) (44,741 MTHM in dry storage; 44,139 MTHM in wet storage) of spent nuclear fuel (SNF) were stored at various reactor sites across the United States [1]. The Office of Storage and Transportation in the Department of Energy is planning for the transportation, storage, and eventual disposal of SNF and high-level radioactive waste (HLW). To aid in this effort and inform decision-makers about the backend of the spent fuel cycle, systems analysis tools capable of analyzing the various options with respect to SNF and HLW management are being used as well as continuously improved to meet the evolving needs of the program. System analysts typically use these tools to vary underlying assumptions (shipping rates, allocation priority, available facilities, start dates, etc.) and study the implications of these changes on site clearance schedules, campaign costs, transportation infrastructure acquisition, etc.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Update on Parallel Process Execution in the Next Generation System Analysis Model (NGSAM)

As of the end of 2022, it is estimated that over 90,000 metric tons of heavy metal (MTHM) of spent nuclear fuel (SNF) were stored at various commercial nuclear power reactor sites (both operating and shutdown) across the United States [1]. The Office of Storage and Transportation within the U.S. Department of Energy’s Office of Nuclear Energy is planning for the transportation, storage, and eventual disposal of SNF and high-level radioactive waste (HLW). To aid in this effort and inform decision-makers about the backend of the spent fuel cycle, systems analysis tools capable of analyzing the various options with respect to SNF and HLW management are being used as well as continuously improved to meet the evolving needs of the program. System analysts typically use these tools to vary underlying assumptions (shipping rates, available facilities, start dates, interim storage capacity, etc.) and study the associated system implications such as timing for clearing sites of SNF, various cost elements, transportation infrastructure acquisition needs, etc.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Methods and system for siting advanced nuclear reactors and evaluating energy policy concerns

There is a growing sociopolitical desire to develop cleaner energy sources in the United States and maintain energy security. Regardless of politics, many coal-fired electric plants have already been shut down and many utilities are vowing to retire their current coal-fired assets within the next two decades. Replacement power assets require consideration of appropriate siting. A geographic information system (GIS)-based multicriteria decision analysis approach is useful to assist utility and energy companies, as well as policymakers, to evaluate potential areas for siting new plants in the contiguous United States. A GIS-based framework is simply a database of location information that allows for mapping, querying, modeling, and analyzing data based on location. The spatial output can be structured to be visual, allowing for easier analysis of location data. The need to site additional power assets, including renewable resources and clean power sources, such as nuclear, led to the development of the Oak Ridge Siting Analysis for power Generation Expansion (OR-SAGE) tool discussed in this paper. The tool takes inputs such as population growth, water availability, environmental indicators, and tectonic and geological hazards to provide an in-depth visual analysis for siting options. Energy companies and other stakeholders can use OR-SAGE to procure feedback quickly and effectively on land suitability based on technology specific inputs. Policymakers can use OR-SAGE to analyze the impacts of future energy technology decisions, while balancing competing resource use. Overall, this paper discusses the recent use of OR-SAGE for these purposes and plans for future development.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

National Reactor Innovation Center NRC Early Site Permit Roadmap

The National Reactor Innovation Center (NRIC) at Idaho National Laboratory (INL) in Idaho Falls, Idaho, was authorized under the Nuclear Energy Innovation Capabilities Act (Public Law 115–248) to provide private sector technology developers with resources and infrastructure for testing, demonstration, and performance assessment to accelerate deployment of new advanced reactor technology concepts. NRIC’s mission is to enable clean, affordable, reliable energy by supporting U.S. government investments in nuclear energy research, development, demonstration, and commercialization of new nuclear energy systems. It intends to provide existing facilities and other undeveloped and previously developed sites at INL to advanced reactor vendors for prototype technology testing and deployment. Some of these demonstration projects may be subject to DOE authorization, while other projects may require approval by the U.S. Nuclear Regulatory Commission (NRC) prior to construction and operation. NRIC and INL are considering whether to pursue one or more ESPs to help facilitate new reactor deployment at the INL Site. An ESP would allow early investment in licensing infrastructure in advance of a reactor design being ready to deploy. Through the ESPs, NRIC would help reduce the cost and time required to deploy demonstration reactors at the INL Site. This also will allow INL to bring its nuclear and siting experience to the ESP development process allowing for better and more efficient improvements and utilization of the Site. A preapproved ESP at INL will also remove the uncertainty of NRC siting approvals from the demonstration project proponents, who may not be well positioned to complete the analyses in a timely manner. The purpose of this NRIC ESP roadmap is to provide rigor and understanding needed for INL and DOE decision-makers to make data-informed decisions on pursuing NRC ESPs in support of future advanced reactor demonstrations at INL. The roadmap provides a structured method for addressing potential challenges and identifying options for resolution.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

National Reactor Innovation Center NRC Early Site Permit Roadmap

The National Reactor Innovation Center (NRIC) at Idaho National Laboratory (INL) in Idaho Falls, Idaho, was authorized under the Nuclear Energy Innovation Capabilities Act (Public Law 115–248) to provide private sector technology developers with resources and infrastructure for testing, demonstration, and performance assessment to accelerate deployment of new advanced reactor technology concepts. NRIC’s mission is to enable clean, affordable, reliable energy by supporting U.S. government investments in nuclear energy research, development, demonstration, and commercialization of new nuclear energy systems. It intends to provide existing facilities and other undeveloped and previously developed sites at INL to advanced reactor vendors for prototype technology testing and deployment. Some of these demonstration projects may be subject to DOE authorization, while other projects may require approval by the U.S. Nuclear Regulatory Commission (NRC) prior to construction and operation. NRIC and INL are considering whether to pursue one or more ESPs to help facilitate new reactor deployment at the INL Site. An ESP would allow early investment in licensing infrastructure in advance of a reactor design being ready to deploy. Through the ESPs, NRIC would help reduce the cost and time required to deploy demonstration reactors at the INL Site. This also will allow INL to bring its nuclear and siting experience to the ESP development process allowing for better and more efficient improvements and utilization of the Site. A preapproved ESP at INL will also remove the uncertainty of NRC siting approvals from the demonstration project proponents, who may not be well positioned to complete the analyses in a timely manner. The purpose of this NRIC ESP roadmap is to provide rigor and understanding needed for INL and DOE decision-makers to make data-informed decisions on pursuing NRC ESPs in support of future advanced reactor demonstrations at INL. The roadmap provides a structured method for addressing potential challenges and identifying options for resolution.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Approach and Model Used to Represent a Timeline Analysis for Security Design Enhancements

Next-generation reactors will be able to use risk to inform and performance base the licensing of many aspects of the reactor, facility, and site design, including attributes of physical security. There are several factors related to security, including site topography, reactor design, and physical protection system components, to consider when designing the physical protection system into the overall facility design and plan of operation. With the versatility of advanced reactors, especially micro reactors, methods are needed to simplify and quickly evaluate potential timelines for designing a site configuration. This report describes an approach to generate qualitative and quantitative insights using a risk-informed simulation. The modeling process is described in detail, focusing on three aspects: (1) the facility mission time (the time required to control the plant until safe), (2) the attacker timeline (the time to potential sabotage), and (3) the response timeline (the time to counter the facility attack). The modeling capabilities also are extended to include facility physical phenomena such as thermal-hydraulics and heat transfer to capture realistic representation of dynamic changes to a facility. While the plant models and examples are hypothetical and do not represent a real facility, these modeling approaches could be used for future security-by-design engineering in advanced reactors. The outputs and insights from the modeling approach may be used to modify and optimize the security posture of a facility by efficiently making modifications to the model and seeing the overall impact from the modification. Lastly, use of the approach described in this report can also provide the technical basis for a physical protection program, describing how the facility and security strategy will cope with off-normal events.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Investigating Benefits and Challenges of Converting Retiring Coal Plants into Nuclear Plants

A coal-to-nuclear (C2N) transition means siting a nuclear reactor at the site of a recently retired coal power plant. Three overarching questions from the C2N transition guide this research: where in the United States are retired coal facilities located and what factors make a site feasible for transition; what factors of technology, cost, and project timeline drive investor economics over such a decision; and how will C2N impact local communities? The study team evaluated the siting characteristics of recently retired plants and those operating coal-fired power plant sites run by a utility or an independent power producer utilizing publicly available data to screen U.S. coal power plant sites to nuclear-feasible locations. After screening all retired coal sites to a set of 157 potential candidates and screening operating sites to a set of 237 candidates, the study team estimates that 80% of retired and operating coal power plant sites that were evaluated have the basic characteristics needed to be considered amenable to host an advanced nuclear reactor. For the recently retired plant sites evaluated, this represents a capacity potential of 64.8 GWe to be backfit at 125 sites. For the operating plant sites evaluated, this represents a capacity potential of 198.5 GWe to be backfit at 190 sites. This report evaluates a case study for the detailed impacts and potential outcomes from a C2N transition. Based on the nuclear technology choices and sizes evaluated to replace a large coal plant of 1,200 MWe generation capacity at the case study site, nuclear overnight costs of capital could decrease by 15% to 35% when compared to a greenfield construction project, through the reuse of infrastructure from the coal facility. Nuclear replacement designs can have a lower capacity size because nuclear power plants run at higher capacity factors than coal power plants. In the case study replacing coal capacity with 924 GWe of nuclear capacity, the study team found regional economic activity could increase by as much as $\$275 million$ and add 650 new, permanent jobs to the region of analysis. The evaluated site choice in the report is hypothetical for analysis purposes only and based on available data and documented assumptions. Consequently, the findings only inform at a general level. A community, investor, or other interested stakeholder can use these results to set up a detailed, in-depth analysis for a specific application of interest, such as evaluating a C2N transition of a specific coal power plant and a specific nuclear technology design. The report was subjected to independent peer reviews by experts in systems engineering and regional economic modeling to evaluate analysis and assumptions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reference Fuel Development for Non-Aluminum Spent Nuclear Fuel Management

The Savannah River Site (SRS) L Area Facility provides for the safe receipt, storage, handling, and shipping of spent nuclear fuel (SNF) and has received more than 47,000 SNF assemblies since 1964. In order to consolidate receipt and storage analysis, L Area criticality safety has historically used several aluminum-clad “reference fuels” to establish bounding storage, handling, and cask loading limits and then applied a reactivity comparison approach to demonstrate that candidate fuels may be processed under the reference fuel limits. Currently, only aluminum-clad SNF from off-site research reactors are transferred on-site. The Accelerated Basin De-Inventory (ABD) program will begin the removal of bundled Non-Aluminum Spent Nuclear Fuel (NASNF) from the L Area disassembly basin for dissolution and disposition, which has driven the need for a non-aluminum reference fuel. This paper discusses the process and results of creating a new fictional homogenous NASNF highly enriched uranium reference fuel, “MITZ,” to be used in nuclear criticality safety evaluations for upcoming SNF disposition operations. Data demonstrating the relationship between neutron multiplication behavior and fuel spacing is generated for the new reference fuel MITZ as well as existing reference fuels representing several types of SNF assemblies.

Reference Fuel↗

Reference Fuel Development for Non-Aluminum Spent Nuclear Fuel Management

The Savannah River Site (SRS) L Area Facility provides for the safe receipt, storage, handling, and shipping of spent nuclear fuel (SNF) and has received more than 47,000 SNF assemblies since 1964. In order to consolidate receipt and storage analysis, L Area criticality safety has historically used several aluminum-clad “reference fuels” to establish bounding storage, handling, and cask loading limits and then applied a reactivity comparison approach to demonstrate that candidate fuels may be processed under the reference fuel limits. Currently, only aluminum-clad SNF from off-site research reactors are transferred on-site. The Accelerated Basin De-Inventory (ABD) program will begin the removal of bundled Non-Aluminum Spent Nuclear Fuel (NASNF) from the L Area disassembly basin for dissolution and disposition, which has driven the need for a non-aluminum reference fuel. This paper discusses the process and results of creating a new fictional homogenous NASNF highly enriched uranium reference fuel, “MITZ,” to be used in nuclear criticality safety evaluations for upcoming SNF disposition operations. Data demonstrating the relationship between neutron multiplication behavior and fuel spacing is generated for the new reference fuel MITZ as well as existing reference fuels representing several types of SNF assemblies.

Reference Fuel↗

Review of Potential Wigner Effect Impacts on the Irradiated Graphite in Decommissioned Hanford Reactors

This review of is motivated by the need to consider future disposal of the nine surplus Hanford Site production reactors (B, C, D, DR, F, H, KE, KW, and N) that are decommissioned as part of the Hanford Site Composite Analysis. The B Reactor has been designated as a museum. The other eight reactors will be evaluated in a future performance assessment before a final disposal facility can be authorized to construction or to receive this waste form. After a performance assessment is available, then the Hanford Site Composite Analysis would be updated to account for this additional source term. Disposal is currently assumed to occur in calendar year 2070 by one-piece removal to a projected disposal facility in the 200 West Area of the Hanford Site Central Plateau. The N Reactor core may also be disposed analogously to the single-pass reactors. It will further assume that the B Reactor will remain a museum permanently. The U.S. Department of Energy studied at least five decommissioning alternatives for long-term, safe management of radionuclide-contaminated materials inside the eight single-pass reactors (DOE/EIS-0119-FEIS, Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integrating the Safety Evaluation for a Molten Salt Reactor Operation and Fuel Cycle Facility Application

Molten salt reactor (MSR) sites may include additional elements of the nuclear fuel cycle beyond those of the existing fleet. In the existing fleet, the individual elements of the fuel cycle typically have been located on different sites and licensed separately. Providing robust separation between hazards remains a useful safety practice for MSRs. Although the different elements of the fuel cycle at a nuclear site that includes MSRs may transfer material between processes more frequently than prior practices, providing adequate separation between distinct facilities avoids the potential for adverse interactions. Additionally, some elements of the MSR fuel cycle, such as fuel salt preparation or waste stabilization, may be more efficient to share among multiple nearby reactors, and nuclear sites that include MSRs may also include other reactor classes. Hence, discrete MSR fuel cycle facilities located at a common site could be physically separated with robust barriers—albeit potentially connected by piping—and licensed individually. This report describes the hazards of individual elements of representative MSR fuel cycle facilities, including their relationship to overall site level hazards. The report maps the regulatory compliance aspects of the individual MSR fuel cycle elements (e.g., fuel salt preparation, reactor, waste stabilization) to existing and developing regulations, as well as describes current and developing site-level regulations from an MSR perspective.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Accelerating nuclear-integrated data center pursuits in the USA: SWOT analysis, power-thermal management strategies and demonstration plan

Here, this study explores the increasing interest in leveraging nuclear power to meet the escalating energy demands of data centers in the United States (U.S.) by focusing on key factors that contribute to accelerated deployment. The study highlights the importance of N+1/N+2 power supplies (where N is the required number of units), outlines research and innovations in nuclear-integrated data center thermal management and demonstration plan. It also provides updates about status and costing of various reactor system designs. A summarized strengths, weaknesses, opportunities, and threats (SWOT) analysis shows the potential options for grid connectivity, reactors, and site selection. Suitable site discussions consider land and water availability, grid access, and optical fiber connectivity, and the study presents graded prospects for Department of Energy (DOE) sites with a specific example. Community engagement and partnerships are emphasized, particularly the roles of local government, federal agencies, utilities, and data center industry partners, which are crucial for accelerating deployment, business outreach, and approvals. The study provides actionable insights for stakeholders to accelerate the deployment of nuclear-powered data centers.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Next Generation System Analysis Model: Recently Added Features and Future Plans

To better enable informed decision-making regarding the back-end of the nuclear fuel cycle, the Integrated Waste Management System (IWMS) program within the U.S. Department of Energy, Office of Nuclear Energy (DOE-NE) has been sponsoring the development and application of system analysis tools capable of analyzing various system options for the management of spent nuclear fuel (SNF) and high-level radioactive waste (HLW).With these tools, IWMS architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). The Next Generation System Analysis Model (NGSAM) is an agent-based simulation software tool expressly designed to be capable of modeling features within various IWMS architectures. NGSAM imports data from Oak Ridge National Laboratory (ORNL)’s unified database (e.g., historic assembly information, thermal profiles for assembly heat, and at-reactor dry storage loadings) to ensure that each simulation initializes with a realistic representation of the state of commercial SNF in the U.S. Recent major enhancements implemented into NGSAM in the period since NGSAM was last presented at the WM2019 conference include: • Tracking of railroad escort car acquisition and buffer car acquisition • The addition of heavy haul truck (HHT) and barge routes for some sites, as well as support for user-defined inter-modal routes • Updates to the logic that checks the transportation cask thermal limit maps prior to package transport • An allocation method that predicts when reactor sites would pack assemblies from their spent fuel pools for dry storage, and prioritizes shipments directly from the pools of those reactor sites in the preceding periods (before the predicted loadings to dry storage), thus reducing the number of casks loaded into dry storage at reactor sites • The addition of “reactor site family” operational limits to restrict the number of loads of SNF taken from the pool and from dry storage at a given reactor site each year • Added support for multiple canister loading map options and packages with multiple compatible transportation overpacks • Updates to the handling of non-commercial SNF, including a new database that contains data to support the updates • Updates to allow analysis of hypothetical scenarios which include repackaging at reactor sites, e.g., for possible comparative analysis with other scenarios • Implementation of additional output reports, or modification of existing ones • The ability to generate and implement user edits via the NGSAM website • The ability to model loading SNF from pool storage at an interim storage facility (ISF) into dry storage at the ISF • The ability to model consolidating SNF from different existing storage containers at a DOE site into the same DOE standard canister • The ability to model transferring SNF casks from one transportation mode to another, e.g., from HHT to rail, referred to as transloading. These new features have improved NGSAM capabilities and users’ experience with the model. Preliminary NGSAM requirements for modeling advanced reactor fuels, reprocessing, treatment, and conditioning were considered, and this paper describes them at a high level. Other nuclear fuel cycle system analysis tools developed under sponsorship of DOE-NE, like the VISION code developed at Idaho National Laboratory, might be better suited for initial high-level analysis of those technologies and advanced fuel cycles. As technologies are developed and system concepts evolve, NGSAM could provide value by providing more detailed modeling of transport, storage, and disposal of spent fuel and wastes from advanced reactors and advanced fuel cycles at the fuel element and waste container level.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FFTF Acceptance and Startup Testing for GAIN

The Fast Flux Test Facility (FFTF) is the most recent liquid metal reactor (LMR) to be designed, constructed, and operated by the U.S. Department of Energy (DOE). The 400-MWt sodium-cooled, fast-neutron flux reactor plant was designed for irradiation testing of nuclear reactor fuels and materials for liquid metal fast breeder reactors. Following the demise of the breeder reactor program in the United States, FFTF continued to play a key role in providing a test bed for demonstrating performance of advanced fuel designs and demonstrating operation, maintenance, and safety of advanced liquid metal reactors. FFTF operations ceased in April 1992 after a determination by DOE that no combination of proposed missions was financially feasible over a ten-year period. The reactor is currently deactivated and in a long-term surveillance and maintenance (S&M) mode. This report provides information on the extensive and rigorous process that was used to conduct turnover from construction followed by acceptance and startup testing of the FFTF. This paper is in support of the Gateway for Accelerated Innovation in Nuclear (GAIN), which provides the nuclear energy community with access to the technical, regulatory, and financial support necessary to move new or advanced nuclear reactor designs toward commercialization while ensuring the continued safe, reliable, and economic operation of the existing nuclear fleet. The information obtained from the design, startup, and operation of the FFTF provides valuable insight for follow-on reactor projects, such as the Versatile Test Reactor (VTR), in the areas of plant system and component design, component fabrication, fuel design and performance, prototype testing, site construction, reactor startup and operations, and reactor deactivation and decommissioning (D&D). The focus of this report is on the process used to startup the FFTF and to ensure that operations could be conducted efficiently and safely. A reference section is provided of documents detailing the successful turnover and testing process implemented for startup of the reactor and its supporting systems. The documents listed can be retrieved upon request and are believed useful for future reactor startup endeavors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Competitiveness Assessment of Decarbonizing Electricity and Process Heat Supply to a Campus with a Small Nuclear Reactor

This paper analyzes the competitiveness of siting a small nuclear reactor to support decarbonization of sites requiring tens of MW of electricity and/or process heat to support centralized heating and cooling system. This paper focuses on campuses as representative of sites with collections of buildings and research facilities with decarbonization needs represented by buildings heating, and electricity consumption by electrical loads which may include cooling via chilled water (e.g., for air conditioning and to cool down computer clusters). A nuclear reactor can be considered to decarbonize a site’s high-temperature steam generation used mostly for building heating needs, climate control, and hot water, by supplying process heat capabilities, while electricity decarbonization would be achieved mostly by the grid. However, a secondary application can be considered to maximize reactor utilization and avoid ramping down the reactor if the steam demand varies significantly throughout the year. Chilled water generation through steam-driven systems was identified as an attractive secondary option for the site analyzed, due to potential for plant design simplification, while electricity generation could be considered as well to reduce electricity purchases for a wider range of site applications. For a campus with peak 60MW thermal power demand, a small nuclear reactor with similar thermal power rating would almost eliminate CO2 emissions from steam generation and reduce electricity imports for chilled water production. A preliminary techno-economic feasibility study shows that a small nuclear reactor design that is optimized to support process heat can represent an economically feasible option when compared with other decarbonization alternatives.

Stauff, Nicolas E.↗

PORFLOW Implementation of Vadose Zone Conceptual Model for Naval Reactor Component Disposal Areas in the E-Area Low Level Waste Facility Performance Assessment

PORFLOW models have been developed to implement the proposed conceptual models for the two Naval Reactor Component Disposal Areas (NRCDAs), 643-7E and 643-26E, for the purpose of evaluating dose impacts and producing disposal limits for the E-Area Low-Level Facility (LLWF). New NRCDA conceptual models were proposed by Wohlwend and Butcher (2019) for two areas within/adjacent to the E-Area LLWF used as storage/disposal sites for reactor components from the U.S. Navy since 1987. Naval Reactor (NR) waste is comprised of highly radioactive components consisting of activated corrosion-resistant metal alloy contained within welded thick-walled steel casks, and auxiliary equipment primarily contaminated with lower levels of Activated Corrosion Products (ACPs) residing on the metal surfaces and contained within thinner-walled bolted containers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗