Search NASA⌕ Search

SEARCH · Search NASA

Results for “reference trajectory”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Sensitivity of the Asteroid Redirect Robotic Mission (ARRM) to Launch Date and Asteroid Stay Time

National Aeronautics and Space Administrations (NASAs) proposed Asteroid Redirect Mission (ARM) is being designed to robotically capture and then redirect an asteroidal boulder into a stable orbit in the vicinity of the moon, where astronauts would be able to visit and study it. The current reference trajectory for the robotic portion, ARRM, assumes a launch on a Delta-IV H in the end of the calendar year 2021, with a return for astronaut operations in cislunar space in 2026. The current baseline design allocates 245 days of stay time at the asteroid for operations and boulder collection. This paper outlines analysis completed by the ARRM mission design team to understand the sensitivity of the reference trajectory to launch date and asteroid stay time.

asteroid↗

Computation of minimum noise aircraft landing trajectories

Efforts to reduce aircraft noise perceived by residents during landing are reported. Steps in the development of the aircraft aerodynamic model, noise model, population model, performance index, and optimization procedure are reviewed. The optimal trajectories from the three main near-terminal entry points are presented via tables and graphs. The recommendation is that these minimal noise trajectories be tested as reference trajectories for the terminally configured aircraft to fly along.

Cook, G.↗

A ballistic mission to fly by Comet Halley

The paper describes the available options, ballistic trajectory opportunities, and a preliminary reference trajectory that were selected as a basis for spacecraft design studies and programmatic planning for a Halley ballistic intercept mission in 1986. The paper also presents trajectory, performance, and navigation data which support the preliminary selection.

Boain, R. J.↗

Mars Science Laboratory Navigation Results

The Mars Science Laboratory (MSL), carrying the Curiosity rover to Mars, was launched on November 26, 2011, from Cape Canaveral, Florida. The target for MSL was selected to be Gale Crater, near the equator of Mars, with an arrival date in early August 2012. The two main interplanetary navigation tasks for the mission were to deliver the spacecraft to an entry interface point that would allow the rover to safely reach the landing area, and to tell the spacecraft where it entered the atmosphere of Mars, so it could guide itself accurately to close proximity of the landing target. MSL used entry guidance as it slowed down from the entry speed to a speed low enough to allow for a successful parachute deployment, and this guidance allowed shrinking the landing ellipse to a 99% conservative estimate of 7 by 20 kilometers. Since there is no global positioning system in Mars, achieving this accuracy was predicated on flying a trajectory that closely matched the reference trajectory used to design the guidance algorithm, and on initializing the guidance system with an accurate Mars-relative entry state that could be used as the starting point to integrate the inertial measurement unit data during entry and descent. The pre-launch entry flight path angle (EFPA) delivery requirement was +/- 0.20 deg, but after launch a smaller threshold of +/- 0.05 deg was used as the criteria for late trajectory correction maneuver (TCM) decisions. The pre-launch requirement for entry state knowledge was 2.8 kilometers in position error and 2 meters per second in velocity error, but also smaller thresholds were defined after launch to evaluate entry state update opportunities. The biggest challenge for the navigation team was to accurately predict the trajectory of the spacecraft, so the estimates of the entry conditions could be stable, and late trajectory correction maneuvers or entry parameter updates could be waved off. As a matter of fact, the prediction accuracy was such that the last TCM performed was a small burn executed eight days before landing, and the entry state that was calculated just 36 hours after that TCM, and that was uploaded to the spacecraft the same day, did not need to be updated. The final EFPA was 0.013 deg shallower than the -15.5 deg target, and the on-board entry state was just 200 meters in position and 0.11 meters per second in velocity from the post-landing reconstructed entry state. Overall the entry delivery and knowledge requirements were fulfilled with a margin of more than 90% with respect to the pre-launch thresholds. This excellent accuracy contributed to a very successful and accurate entry, descent, and landing, and surface mission.

navigation↗

The Europa Mission: Multiple Europa Flyby Trajectory Design Trades and Challenges

With potential sources of water, energy and other chemicals essential for life, Europa is a top candidate for finding current life in our Solar System outside of Earth. This paper describes the current trajectory design concept for a multiple Europa flyby mission and discusses several trajectory design challenges. The candidate reference trajectory utilizes multiple Europa flybys while around Jupiter to enable near global coverage of Europa while balancing science requirements, radiation dose, propellant usage, and flight time. Trajectory design trades and robustness are also discussed.

Jupiter↗

LIFT CONTROL DURING ATMOSPHERE ENTRY FROM SUPERCIRCULAR VELOCITY

This paper presents an analysis of a guidance method which uses a reference trajectory. The four state variables needed to prescribe the trajectory are used as follows : Velocity is made the independent variable, and the errors in the rate-of-climb, acceleration, and range variables away from the reference are used to govern the lift. A linearized form of the motion equations is used to show that this represents a third-order control system. First- and second- order control terms (rate of climb and acceleration inputs) are shown to determine the entry corridor depth by stabilizing the trajectory so that the vehicle does not skip back out of the atmosphere or does not exceed a specified acceleration limit. The destabilizing effect that range input (the third-order control term) can have is illustrated and the results indicate that a low value of range input gain must be used at the high supercircular velocities while larger values of range input gain can be used at lower velocities. The usable corridor depth and range capability with this guidance system are demonstrated for a lifting capsule (L/D = 0.5). The practical applications of this system are illustrated with a fixed trim configuration wherein roll angle is used to command the desired lift. The results show that the guidance system requires only one reference trajectory for abort entry conditions as well as for entry conditions near the design values.

Atmosphere↗

EPOXI Trajectory and Maneuver Analyses

The EPOXI mission is a NASA Discovery Mission of Opportunity combining two separate investigations: Extrasolar Planet Observation and Characterization (EPOCh) and Deep Impact eXtended Investigation (DIXI). Both investigations reused the DI instruments and spacecraft that successfully flew by the comet Tempel-1 (4 July 2005). For EPOCh, the goal was to find exoplanets with the high resolution imager, while for DIXI it was to fly by the comet Hartley 2 (4 Nov 2010). This paper documents the navigation experience of the earlier ma-neuver analyses critical for the EPOXI mission including statistical ?V analyses and other useful analyses in designing maneuvers. It also recounts the trajectory design leading up to the final reference trajectory to Hartley 2.

trajectory design↗

Preliminary Error Characterization and Parametric Error Model for the Automatic Dependent Surveillance - Contract Extended Projected Profile Message

A critical component of Trajectory-Based Operations (TBO) is the ability for a consistent and accurate 4-dimensional trajectory (4DT) to be shared and synchronized between airborne and ground systems as well as amongst various ground automation systems. The Aeronautical Telecommunication Network—Baseline 2 (ATN-B2) standard defines the Extended Projected Profile (EPP) trajectory that can be sent via Automatic Dependent Surveillance-Contract (ADS-C) from an aircraft to ground automation. The EPP trajectory message contains a representation of the reference trajectory from an aircraft’s Flight Management System (FMS). In this work, a set of scenarios were run in a high-fidelity aircraft and FMS simulation to perform an initial characterization of EPP trajectory errors under a given set of conditions. The parameters investigated were the route length, route type, wind magnitude error, wind direction error, and with and without a required time-of-arrival (RTA) constraint. In addition, linear regression was used to identify a set of EPP error models for the cross-track, vertical, and time errors.

Guerreiro, Nelson M.↗

Understanding Extended Projected Profile (EPP) Trajectory Error Using a Medium-Fidelity Aircraft Simulation

A critical component of Trajectory-Based Operations is the ability for a consistent and accurate 4-dimensional trajectory to be shared and synchronized between airborne and ground systems as well as amongst various ground automation systems. The Aeronautical Telecommunication Network—Baseline 2 standard defines the Extended Projected Profile (EPP) trajectory that can be sent via Automatic Dependent Surveillance-Contract from an aircraft to ground automation. The EPP trajectory message contains a representation of the reference trajectory from an aircraft’s Flight Management System (FMS). In this work, a set of scenarios were run in a medium-fidelity aircraft and FMS simulation to perform an initial characterization of EPP trajectory errors under a given set of conditions. The parameters investigated were the route length, route type, wind magnitude error, wind direction error, and with and without a required time-of-arrival constraint.

Guerreiro, Nelson M.↗

Modifications to Encke's method for long arc orbit determination solutions

An expanded model is developed that permits the extrapolation of Encke's method for the determination of orbits with long arcs, and the model is used to determine a solution for the Lageos trajectory. Encke's method is reviewed emphasizing the nature of the growth of the Encke ratio and the reliability of extrapolated reference trajectories. The reference-orbit formulation is improved by including parameters that accommodate drag and large-amplitude perodic variations in the orbital elements. The proposed Long Arc Model is expected to provide a maximum Encke ratio that is an order of magnitude more reliable than that given by the secularly precessing ellipse. The computational cost of using the Long Arc Model is shown to compare favorably with that of the true force model, and the long arc solutions are useful for current orbit-determination needs.

Lundberg, J. B.↗

Maneuver design overview of the 2018 InSight Mars lander mission

Launched on May 5, 2018, the Interior Exploration using Seismic Investigations, Geodesy, and Heat Transport (InSight) spacecraft landed safely on Mars on November 26, 2018. To deliver the lander accurately to the landing site, six trajectory correction maneuvers (TCMs) were planned along the reference trajectory from Earth launch to Mars entry. For the last two TCMs, there were two corresponding contingency TCMs planned that could be executed in the event that the corresponding nominal one failed. There were also twenty pre-designed menu TCMs available for execution at the time of the last contingency TCM, about 8 hours before the Mars entry, descent, and landing. This navigation paper overviews the maneuver design of each TCM, as well as how each one actually performed during operations.

Wallace, Mark↗

Trajectory Operations of the Artemis I Mission

This paper describes the operational design and execution of the Artemis I trajectory. It was an operationally complex trajectory with powered lunar flybys and insertion into a Distant Retrograde Orbit (DRO). A joint team of trajectory analysts at the NASA Johnson Space Center (JSC) were responsible for the design and operation of nominal and off-nominal in-space trajectories. A process was developed to convert optimized reference trajectories into Orion burn plans that could be uplinked to the vehicle. During the mission, the joint flight controller and engineering team continuously evaluated upcoming translational burns using actual vehicle conditions, monitored the trajectory for opportunities to re-optimize the trajectory in order to reduce propellant usage, and prepared for potential off-nominal scenarios. Overall Orion in-space trajectory performance is compared tomission designs to demonstrate the success of the design and operations work-flows.

Artemis I↗

Simulation and analysis of a geopotential research mission

Computer simulations were performed for a Geopotential Research Mission (GRM) to enable the study of the gravitational sensitivity of the range rate measurements between the two satellites and to provide a set of simulated measurements to assist in the evaluation of techniques developed for the determination of the gravity field. The simulations were conducted with two satellites in near circular, frozen orbits at 160 km altitudes separated by 300 km. High precision numerical integration of the polar orbits were used with a gravitational field complete to degree and order 360. The set of simulated data for a mission duration of about 32 days was generated on a Cray X-MP computer. The results presented cover the most recent simulation, S8703, and includes a summary of the numerical integration of the simulated trajectories, a summary of the requirements to compute nominal reference trajectories to meet the initial orbit determination requirements for the recovery of the geopotential, an analysis of the nature of the one way integrated Doppler measurements associated with the simulation, and a discussion of the data set to be made available.

Schutz, B. E.↗

First In-Orbit Experience of TerraSAR-X Flight Dynamics Operations

TerraSAR-X is an advanced synthetic aperture radar satellite system for scientific and commercial applications that is realized in a public-private partnership between the German Aerospace Center (DLR) and the Astrium GmbH. TerraSAR-X was launched at June 15, 2007 on top of a Russian DNEPR-1 rocket into a 514 km sun-synchronous dusk-dawn orbit with an 11-day repeat cycle and will be operated for a period of at least 5 years during which it will provide high resolution SAR-data in the X-band. Due to the objectives of the interferometric campaigns the satellite has to comply to tight orbit control requirements, which are formulated in the form of a 250 m toroidal tube around a pre-flight determined reference trajectory (see [1] for details). The acquisition of the reference orbit was one of the main and key activities during the Launch and Early Orbit Phase (LEOP) and had to compensate for both injection errors and spacecraft safe mode attitude control thruster activities. The paper summarizes the activities of GSOC flight dynamics team during both LEOP and early Commissioning Phase, where the main tasks have been 1) the first-acquisition support via angle-tracking and GPS-based orbit determination, 2) maneuver planning for target orbit acquisition and maintenance, and 3) precise orbit and attitude determination for SAR processing support. Furthermore, a presentation on the achieved results and encountered problems will be addressed.

Kahle, R.↗

Flight design system level C requirements. Solid rocket booster and external tank impact prediction processors

The prediction of the SRB and ET impact areas requires six separate processors. The SRB impact prediction processor computes the impact areas and related trajectory data for each SRB element. Output from this processor is stored on a secure file accessible by the SRB impact plot processor which generates the required plots. Similarly the ET RTLS impact prediction processor and the ET RTLS impact plot processor generates the ET impact footprints for return-to-launch-site (RTLS) profiles. The ET nominal/AOA/ATO impact prediction processor and the ET nominal/AOA/ATO impact plot processor generate the ET impact footprints for non-RTLS profiles. The SRB and ET impact processors compute the size and shape of the impact footprints by tabular lookup in a stored footprint dispersion data base. The location of each footprint is determined by simulating a reference trajectory and computing the reference impact point location. To insure consistency among all flight design system (FDS) users, much input required by these processors will be obtained from the FDS master data base.

Seale, R. H.↗

Overview of the Lunar Transit Trajectory Performed by the Power and Propulsion Element of NASA’s Gateway

NASA has committed to returning to the moon, landing the first woman and the next man on its surface. To support a sustained lunar presence, NASA is designing an orbital platform to be assembled in an orbit near the moon called the Near Rectilinear Halo Orbit (NRHO). This platform is known as the Gateway and its purpose it to support missions primarily to the lunar south pole. As NASA continues to study ways to reduce the cost of lunar exploration, a simplification implemented in 2020combinedthe first two elements of the Gateway, the Power and Propulsion Element (PPE) and NASA’s Habitation and Logistics Outpost (HALO), onto a single commercial launch vehicle (CLV). When launched together, the PPE and HALO make up the first two elements of NASA’s Gateway and exceed the performance capacity of commercially available launch vehicles to deliver directly to the moon. The delivery of the Gateway is enabled by and takes advantage of the high efficiency of the PPEs high-power Solar Electric Propulsion (SEP) system to transfer a significant starting mass from an initial Earth orbit to final insertion into the NRHO. The PPE is a 50-kW class high power solar electric propulsion stage comprised of two different types of electric thruster strings. The SEP system is operated in two different modes, a high thrust and high Isp (specific impulse), to both maximize the final delivered mass and attempt to minimize the time spent in the Van Allen Belts early in the transit trajectory. Additionally, this SEP system brings the capability to the assembled Gateway for transfer between orbits in cislunar space. This paper captures the preliminary low thrust lunar transfer reference trajectory to be flown by the PPE it delivers itself and HALO via a spiral trajectory from launch vehicle insertion to insertion into the NRHO as well as a preliminary reference round trip transfer of the Gateway from the NRHO to a Distant Retrograde Orbit (DRO) using the PPE. Once in its final NRHO, the Gateway is being designed to enable long duration human and robotic exploration of the lunar south pole as a precursor to Mars. The Gateway’s low thrust lunar transit trajectory is envisioned to prove out the application of and flight of a high-power SEP system as a demonstration of technologies applicable to the enabling of future human space exploration.

human exploration↗