Search NASA⌕ Search

SEARCH · Search NASA

Results for “relicensing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

43 records · Page 3

U.S. Hydropower Market Report (2025 update)

This slide deck complements the fourth complete edition of the U.S. Hydropower Market Report (2024 update) and builds on the 2024 update. This update focuses on data and trends in 2024 and contextualizes this information compared to evolving high-level trends over the past 10–20 years. It contains information on U.S. hydropower (and pumped storage hydropower) development pipeline, relicenses, license surrenders, performance metrics, and supply chain.

Johnson, Megan [ORNL] (ORCID:0000000290141741)↗

U.S. Hydropower Market Report Data and Metadata (2025 update)

This database complements the U.S. Hydropower Market Report (2025 update). This update focuses on data and trends in 2024 and contextualizes this information compared to evolving high-level trends over the past 10–20 years. It contains data on U.S. hydropower (and pumped storage hydropower) development pipeline, relicenses, license surrenders, performance metrics, and supply chain.

Johnson, Megan [ORNL] (ORCID:0000000290141741)↗

Hydropower Market Report Story Map

This story map complements the fourth complete edition of the U.S. Hydropower Market Report (2024 update) and builds on the 2024 update. This update focuses on data and trends in 2024 and contextualizes this information compared to evolving high-level trends over the past 10–20 years. It contains information on U.S. hydropower (and pumped storage hydropower) development pipeline, relicenses, license surrenders, performance metrics, and supply chain.

Schmidt, Erik [ORNL] (ORCID:0000000244541330)↗

Hydropower Licensing Timeline and Cost Dataset

This dataset provides timeline dates, lengths, project characteristics, license characteristics, and costs of hydropower licensing and relicensing for 107 randomly selected hydropower projects that have been issued licenses since 1 October 2005. Projects included in this dataset were licensed but not necessarily constructed. These data were analyzed and presented in Chapters 3 (timeline data) and 5 (cost data) of the Levine et al. (2021) report

13 HYDRO ENERGY↗

Methodology for Exploring Water and Hydropower Operating Criteria That Simultaneously Improve Economic and Environmental Considerations

Despite the reliability and flexibility of hydropower, the operation of hydroelectric power plants may have significant impacts on the downstream river system, including its water stage, sediment transport, and water temperature, ultimately affecting the ecology. To address these challenges, there is a need to identify water scheduling patterns that improve both hydropower economics and the environment relative to current operations. This paper presents a new methodology to explore promising operational criteria/rules that can achieve such improvements. Typical environmental impact statements and relicensing processes generally perform detailed site-specific analyses of a few alternatives that focus on reservoir water release operating rules and their associated environmental impacts. In contrast, the methodology presented in this article uses a widely applicable approach that explores a much larger solution space. This large set of potential alternatives can be represented in a multidimensional space for which one axis represents the economic value and the other axis quantify individual environmental impacts (e.g., sediment transport and fish growth), and they are explored via two approaches: a Monte Carlo simulation that identifies “win–win” alternatives and a multi-objective optimization problem that identifies Pareto-optimal alternatives.

13 HYDRO ENERGY↗

Fatigue Test Result for High Burnup Pressurized Water Reactor Rods

The High Burnup Spent Fuel Data Project, sponsored by DOE-NE, is focused on understanding the effects of long-term storage and transportation on high burnup (HBU) (>45 gigawatt days per metric ton uranium) light water reactor fuel. The experiment includes 32 HBU spent nuclear fuel (SNF) assemblies that will be stored in a typical Independent Spent Fuel Storage Installation (ISFSI) and 25 sister rods - nine SNF rods that were removed from the fuel assemblies prior to insertion to the ISFSI and 16 SNF rods removed from similar HBU assemblies. The sister rods provide a baseline of the condition of the HBU rods prior to loading, drying, and long-term dry storage. Destructive examinations of the sister rods are focused on understanding overall SNF rod strength and durability. Both composite fuel and empty cladding will be tested to derive material properties. While the data generated can be used for multiple purposes, a primary goal of the sister rod PIE data and associated measured mechanical properties is to support existing fuel storage licensing and relicensing activities by addressing identified knowledge gaps, and enhance the technical basis for post-storage transportation, handling, and consolidation activities. Fatigue tests of HBU M5-clad, ZIRLO-clad, Zircaloy-4, and low tin Zircaloy-4 segments have been completed using ORNL’s Cyclic Integral Reversible Fatigue Tester (CIRFT). This is the first time ZIRLO-clad rods have been tested. Some of the segments were heat-treated to understand the effects of thermal transients such as those encountered during dry storage vacuum drying on the fatigue lifetime. This paper presents results of the fatigue tests obtained to date and discusses planned future tests.

Montgomery, Rose↗

Cost of Mitigating the Environmental Impacts of Hydropower Projects

The "Cost of Mitigating the Environmental Impacts of Hydropower Projects Database" compiles data on environmental impacts mitigation costs for 182 hydropower projects based on documents obtained from the U.S. Federal Energy Regulatory Commission (FERC).

13 HYDRO ENERGY↗