Search NASA⌕ Search

SEARCH · Search NASA

Results for “replacement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Replacing non-biomedical concepts improves embedding of biomedical concepts

Embeddings are semantically meaningful representations of words in a vector space, commonly used to enhance downstream machine learning applications. Traditional biomedical embedding techniques often replace all synonymous words representing biological or medical concepts with a unique token, ensuring consistent representation and improving embedding quality. However, the potential impact of replacing non-biomedical concept synonyms has received less attention. Embedding approaches often employ concept replacement to replace concepts that span multiple words, such as non-small-cell lung carcinoma, with a single concept identifier (e.g., D002289). Also, all synonyms of each concept are merged into the same identifier. Here, we additionally leveraged WordNet to identify and replace sets of non-biomedical synonyms with their most common representatives. This combined approach aimed to reduce embedding noise from non-biomedical terms while preserving the integrity of biomedical concept representations. We applied this method to 1,055 biomedical concept sets representing molecular signatures or medical categories and assessed the mean pairwise distance of embeddings with and without non-biomedical synonym replacement. A smaller mean pairwise distance was interpreted as greater intra-cluster coherence and higher embedding quality. Embeddings were generated using the Word2Vec algorithm applied to a corpus of 10 million PubMed abstracts. Our results demonstrate that the addition of non-biomedical synonym replacement reduced the mean intra-cluster distance by an average of 8%, suggesting that this complementary approach enhances embedding quality. Future work will assess its applicability to other embedding techniques and downstream tasks. Python code implementing this method is provided under an open-source license.

algorithms↗

10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement

The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Titanium and/or Aluminum Rod-Replacement Experiments in Fully-Reflected Water-Moderated Square-Pitched U(6.90)O 2 Fuel Rod Lattices with 0.67 Fuel to Water Volume Ratio (0.800 CM Pitch)

The US Department of Energy (DOE) Nuclear Energy Research Initiative funded the design and construction of the Seven Percent Critical Experiment (7uPCX) at Sandia National Laboratories. The start-up of the experiment facility and the execution of the experiments described here were funded by the DOE Nuclear Criticality Safety Program. The 7uPCX is designed to investigate critical systems with fuel for light water reactors in the enrichment range above 5% 235 U. The 7uPCX assembly is a water-moderated and -reflected array of aluminum-clad square-pitched UO2 fuel rods. The uranium is enriched to 6.90% by mass. Sets of 36 titanium and aluminum experiment rods with the same nominal outside diameter as the fuel rods were fabricated and used as replacements for fuel rods in the array. The twenty-four 7uPCX critical experiments reported here compare the effects of the titanium and aluminum replacement rods on nearly critical fuel rod arrays. The fuel used in these experiments was fabricated using unirradiated UO 2 fuel pellets from fuel elements designed to be used in the internal nuclear superheater section of the Pathfinder boiling water reactor operated in South Dakota by the Northern States Power Company in the 1960s. The fuel elements were obtained from The Pennsylvania State University where they had been stored for many years. The fuel pellets in those fuel elements were removed from the original Incoloy cladding and reclad in 3003 aluminum tubes and end caps for use in the experiments reported here. The nominal outside diameter of the fuel pellets is 0.207 in (0.52578 cm). The nominal outside diameter of the fuel rod cladding is 0.250 in (0.635 cm). The distance between the fuel rods in the square-pitched array is 0.315 in (0.8001 cm). This geometry gives a fuel-to-water volume ratio of 0.67 in the array. The twenty-four critical experiments in this series were performed in 2015 and 2016 at the Sandia Critical Experiments Facility. The first of the experiments had no replacement rods in the array and was intended to provide a baseline against which the experiments containing replacement rods could be compared. Eight critical experiments had titanium replacement rods in various numbers and arrangements near the center of the fuel array. Eight critical experiments had aluminum replacement rods in the same numbers and arrangements as in the eight experiments containing titanium experiment rods. In the final four experiments, fuel rods were removed from a central region of the array so that the pitch of the fuel rods in this part of the array was effectively doubled. This softened the neutron spectrum in the central part of the fuel array. Thirty-six replacement rods in different combinations of titanium and/or aluminum were placed in the interstices created in the center of the array. All twenty-four critical experiments are judged to be acceptable as benchmark experiments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Main Bearing Replacement and Damage - A Field Data Study on 15 Gigawatts of Wind Energy Capacity

This study seeks to establish a comprehensive baseline of knowledge for the replacement and damage of main bearings in wind turbines. The purpose of this report is to provide a high-level summary of the data set, methodology, and results of this work. Full technical details and an extended analysis will be made available in a future publication. We collected data on main bearing replacements and reported damage from industrial partners based in Europe and the United States. In total, we obtained data for 167 wind power plants, with a combined capacity of 15.3 gigawatts (GW). Most of the data set was comprised of land-based, three-point mount, spherical roller bearings. Within this data set were 689 instances of main bearing replacement. Analysis was undertaken in two parts: first, a statistical analysis of the main bearing time-to-replacement data using survival analysis techniques; second, quantitative and qualitative analyses of the obtained damage information. Our results showed that 10% of a fixed main bearing population would be expected to have been replaced by 10.5 years. This is close to half of the 20-year design value. Fitted parametric distributions then indicated that by year 20, between 22% and 25% of main bearings are expected to have been replaced. Analysis of the damage reports revealed spalling to be the main type of damage listed. The additional presence of surface damage in the collected data indicates that at least part of the spalling cases are likely due to surface-initiated rolling contact fatigue. At this stage is not clear what proportion of spalling cases result from "wear induced", surface-initiated and subsurface-initiated rolling contact fatigue. While this work provides important insights into the current state of main bearing replacements and damage, many questions remain. An ongoing and expanding data collection and analysis effort focused on wind turbine main bearings is therefore recommended.

17 WIND ENERGY↗

Experimental Performance of R-1234yf and R-1234ze as Drop-in Replacements for R-134a in Domestic Refrigerators

Concerns about anthropogenic climate change have generated an interest in low global warming potential (GWP) refrigerants and have spawned policies and regulations that encourage the transition to low GWP refrigerants. Recent research has largely focused on hydrofluoroolefins (HFOs), including R-1234yf (GWP = 4) as a replacement for R-134a (GWP = 1430) in automotive air-conditioning applications. While R-1234yf and R-1234ze (GWP = 6) have been investigated theoretically as a replacements for R-134a in domestic refrigeration, there is a lack of experimental evidence. This paper gives experimental performance data for R-1234yf and R-1234ze as drop-in replacements for R134a in two household refrigerators one baseline and one advanced technology. An experiment was conducted to evaluate and compare the performance of R-134a to R-1234yf and R-1234ze, using AHAM standard HRF-1 to evaluate energy consumption. These refrigerants were tested as drop-in replacements, with no performance enhancing modifications to the refrigerators. In Refrigerator 1 and 2, R-1234yf had 2.7% and 1.3% higher energy consumption than R-134a, respectively. This indicates that R-1234yf is a suitable drop-in replacement for R-134a in domestic refrigeration applications. In Refrigerator 1 and 2, R-1234ze had 16% and 5.4% lower energy consumption than R-134a, respectively. In order to replace R-134a with R-1234ze in domestic refrigerators the lower capacity would need to be addressed, thus R-1234ze might not be suitable for drop-in replacement.

Karber, Kyle M↗

Replacing The Engine In Your Car While You Are Still Driving It [PowerPoint]

The scope of the project included the following: install new network backbone, replace 201 MHz rf tubes, replace low-level rf system, replace timing system, replace industrial I/O system, replace beam synchronous data acquisition system, replace fast protect reporting system, new wire scanner hardware, and new beam position/phase monitor hardware--all of this to be done while continuing to deliver beam to users. Lessons learned, for anyone contemplating a similarly ambitious upgrade: You can’t replace the whole system at once. Some compatibility must be maintained between the old and new systems. Always have a way to fall back. Have sympathy for the operations staff. You will be surprised.

43 PARTICLE ACCELERATORS↗

Molecular replacement: tricks and treats

To be successful, molecular replacement relies on the quality of the model and of the crystallographic data. Some tricks that could be applied to the models or to the crystal to increase the success rate of MR are discussed here. Molecular replacement is the method of choice for X-ray crystallographic structure determination provided that suitable structural homologues are available in the PDB. Presently, there are ∼80 000 structures in the PDB (8074 were deposited in the year 2012 alone), of which ∼70% have been solved by molecular replacement. For successful molecular replacement the model must cover at least 50% of the total structure and the C{sub α} r.m.s.d. between the core model and the structure to be solved must be less than 2 Å. Here, an approach originally implemented in the CaspR server (http://www.igs.cnrs-mrs.fr/Caspr2/index.cgi) based on homology modelling to search for a molecular-replacement solution is discussed. How the use of as much information as possible from different sources can improve the model(s) is briefly described. The combination of structural information with distantly related sequences is crucial to optimize the multiple alignment that will define the boundaries of the core domains. PDB clusters (sequences with ≥30% identical residues) can also provide information on the eventual changes in conformation and will help to explore the relative orientations assumed by protein subdomains. Normal-mode analysis can also help in generating series of conformational models in the search for a molecular-replacement solution. Of course, finding a correct solution is only the first step and the accuracy of the identified solution is as important as the data quality to proceed through refinement. Here, some possible reasons for failure are discussed and solutions are proposed using a set of successful examples.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors

The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the 50-year-old obsolescent marine diesels with commercial power that is backed with safety related emergency diesel generators, switchgear, and uninterruptible power supply (UPS). The second project, the subject of this major modification determination, will replace the four, obsolete, original primary coolant pumps (PCPs) and motors. Completion of this and the two other age-related projects (replacement of the ATR diesel bus [E-3] and switchgear and replacement of the existent emergency firewater injection system) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification: 1. Evaluation Criteria #3 (Change of existing process). The proposed strategy for equipping the replacement PCPs with VFDs and having the PCPs also function as ECPs will require significant safety basis changes requiring DOE approval. 2. Evaluation Criteria #4 (Use of new technology). The use of VFD and VFD “pump catcher” technology for the PCPs is not currently in use and has not been previously formally reviewed/approved by DOE for ATR. It is noted that VFD technology has several decades of commercial use and experience. However, the ATR probabilistic risk assessment will have to be updated, reflecting the changes for supplying ECP flows including VFD reliability, to confirm that the proposed activity maintains or reduces the CDF for the ATR. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). It is expected that the proposed activity will result in a revised list of safety-related SSCs. Specifically, as currently proposed, the existing ECPs will be deleted from the list. The PCPs and their associated components, picking up the ECP function, will be classified as safety-related active Seismic Category I.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Simulation Analyses in Support of DOE’s Fossil Fuel Rule for Single Component Equipment and Lighting Replacements

At the request of the US Department of Energy’s (DOE) Federal Energy Management Program (FEMP), Pacific Northwest National Laboratory (PNNL) conducted a series of building energy simulations using a large office model to investigate the potential savings that could be accrued from a typical chiller, boiler, or lighting replacement in a Federal office building. FEMP’s interest was in knowing whether or not single component replacements like these would have any chance of achieving the fossil- fuel-based energy consumption reduction requirements specified in Section 433 of the Energy Independence and Security Act (EISA) of 20071. Specifically, FEMP was interested in whether an older Federal building, built in the 1980s or 1990s and designed to meet energy standards in place at the time the building was designed, could meet the requirements of Section 433 of EISA for renovations. Many single component renovations like chiller replacements, boiler replacements, and lighting retrofits may meet the minimum cost requirement of Section 433 of EISA but may not offer any opportunity to achieve fossil-fuel-generated energy consumption reductions on the order of 55% or more. If single component renovations such as these would not achieve the necessary reductions, then FEMP would consider modifying rules based on Section 433 of EISA to exempt these types of single component renovations from the overall fossil-fuel-generated energy consumption reduction provisions. FEMP would instead require Federal agencies to ensure that these renovations use FEMP-designated efficiencies for chillers and boilers or the lighting power density requirements found in ASHRAE Standard 90.1-2010. The results of PNNL’s analysis indicated that it is unlikely that a combined boiler and chiller replacement, or an individual boiler or chiller replacement in an older existing Federal building would meet the requirements of Section 433 of EISA. While buildings can achieve up to 34% reduction in cooling and 11% reduction in heating load with this type of retrofit, these savings fall well short of the minimum savings specified in Section 433 of EISA. Similarly, a lighting retrofit in an older existing Federal building would also not likely meet the requirements of Section 433 of EISA. While buildings can save up to 52% on lighting loads, the whole buildings savings would be well short of the minimum savings specified in Section 433 of EISA.

Halverson, Mark A.↗

Meal Replacement Mass Reduction and Integration Acceptability Study

NASA, in planning for long-duration missions, has an imperative to provide a food system with the necessary nutrition, acceptability, and safety to ensure sustainment of crew health and performance. The Orion Multi-Purpose Crew Vehicle (MPCV) and future exploration missions are mass constrained; therefore the team is challenged to reduce the mass of the food system by 10% while maintaining product safety, nutrition, and acceptability. Commercially available products do not meet the nutritional requirements for a full meal replacement in the spaceflight food system, and it is currently unknown if daily meal replacements will impact crew food intake and psychosocial health over time. The purpose of this study was to develop a variety of nutritionally balanced breakfast replacement bars that meet spaceflight nutritional, microbiological, sensorial, and shelf-life requirements, while enabling a 10% savings in food mass. To date, six nutrient-dense meal replacement bars (approximately 700 calories per bar) have been developed, using traditional methods of compression as well as novel ultrasonic compression technologies developed by Creative Resonance Inc. (Phoenix, AZ). The four highest rated bars were evaluated in the Human Exploration Research Analog (HERA) to assess the frequency with which actual meal replacement options may be implemented. Specifically, overall impact of bars on mood, satiety, digestive discomfort, and satisfaction with food. These factors are currently being analyzed to inform successful implementation strategies where crew maintain adequate food intake. In addition, these bars are currently undergoing shelf-life testing to determine long-term sensory acceptability, nutritional stability, qualitative stability of analytical measurements (i.e. water activity and texture), and microbiological compliance over two years of storage at room temperature and potential temperature abuse conditions to predict long-term acceptability. It is expected that this work will enable a successful meal replacement strategy to be implemented that will maintain crew food consumption and health, while informing exploration missions with appropriate mass savings expectations.

Sirmons, T.↗

DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR THE SAVANNAH RIVER SITE'S DEFENSE WASTE PROCESSING FACILITY

The Savannah River Site's (SRS) Defense Waste Processing Facility (DWPF) requested development of tooling for remote replacement of gaskets in mechanical Hanford connectors. The facility has compressed air supply, two master-slave manipulators (MSM's) and a lightweight robotic arm for operation of the remote tools. The Savannah River National Laboratory (SRNL) developed and tested multiple tools to perform the gasket replacement tasks. Separate pneumatic snap-ring removal tools that use the connector skirt as a reaction surface were developed for removal of the snap ring and spent gasket on both vertical and horizontal Hanford connectors. A pneumatic tool that clamps and centers on the jumper pipe ID was developed to simultaneously install the new gasket and snap ring. A pneumatic snap-ring-loading tool was developed that compresses the snap ring and places it in a groove in the installation tool. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and vents the tools as needed. The entire system has been successfully tested using MSM's to manipulate the various tools. Deployment of the entire system is expected during FY08. The Hanford connector gasket replacement tooling has been successfully tested using MSM's to manipulate the various tools. Nitric acid is used in many of the decontamination processes performed in the REDC, where the tooling will be deployed. Although most of the tool components were fabricated/purchased with nitric acid and radioactive service in mind, some of the prototype parts must be replaced with parts that are more compatible with nitric acid/radioactive service. Several modifications to the various tools are needed to facilitate maintenance and replacement of failed components. Development of installation tools for replacement of 1-inch, 2-inch and multi-hole gaskets is being considered. Deployment of the existing system in the DWPF REDC is expected during FY08.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerating Photovoltaic Market Entry with Module Replacement

Today's approach to deploying solar photovoltaics (PV) implicitly assumes that module technology is fixed. Solar panels are installed and expected to operate for the system life of 30 years or more. However, many PV technologies are improving rapidly along several dimensions, including cost, power conversion efficiency, and reliability. Periodic module replacement or planned repowering takes advantage of this technological improvement and counteracts predictable degradation. Here, we show that a module replacement strategy allows a competitive levelized cost of electricity to be achieved with an initial module lifetime of less than 15 years, assuming backward compatibility with the original system design. We also assess the life-cycle environmental impacts of module replacement and find that all commercial PV technologies offer benefits in the majority of impact categories, regardless of the replacement strategy, compared to today's electric generation mix. Module replacement can thus accelerate the market introduction and decarbonization impact of emerging PV technologies that have achieved a competitive module efficiency (=20%), cost (=$0.30/W), and lifetime (=10 years) and have the potential to improve further on all three metrics but lack decades-long field deployment experience.

14 SOLAR ENERGY↗

Grain boundary widening controls siderite (FeCO3) replacement of limestone (CaCO3)

Abstract The microstructure of minerals and rocks can significantly alter reaction rates. This study focuses on identifying transport paths in low porosity rocks based on the hypothesis that grain boundary widening accelerates reactions in which one mineral is replaced by another (replacement reaction). We conducted a time series of replacement experiments of three limestones (CaCO 3 ) of different microstructures and solid impurity contents using FeCl 2 . Reacted solids were analyzed using chemical imaging, small angle X-ray and neutron scattering and Raman spectroscopy. In high porosity limestones replacement is reaction controlled and complete replacement was observed within 2 days. In low porosity limestones that contain 1–2% dolomite impurities and are dominated by grain boundaries, a reaction rim was observed whose width did not change with reaction time. Siderite (FeCO 3 ) nucleation was observed in all parts of the rock cores indicating the percolation of the solution throughout the complete core. Dolomite impurities were identified to act as nucleation sites leading to growth of crystals that exert force on the CaCO 3 grains. Widening of grain boundaries beyond what is expected based on dissolution and thermal grain expansion was observed in the low porosity marble containing dolomite impurities. This leads to a self-perpetuating cycle of grain boundary widening and reaction acceleration instead of reaction front propagation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

ARP/wARP and molecular replacement: the next generation

A systematic test shows how ARP/wARP deals with automated model building for structures that have been solved by molecular replacement. A description of protocols in the flex-wARP control system and studies of two specific cases are also presented. Automatic iterative model (re-)building, as implemented in ARP/wARP and its new control system flex-wARP, is particularly well suited to follow structure solution by molecular replacement. More than 100 molecular-replacement solutions automatically solved by the BALBES software were submitted to three standard protocols in flex-wARP and the results were compared with final models from the PDB. Standard metrics were gathered in a systematic way and enabled the drawing of statistical conclusions on the advantages of each protocol. Based on this analysis, an empirical estimator was proposed that predicts how good the final model produced by flex-wARP is likely to be based on the experimental data and the quality of the molecular-replacement solution. To introduce the differences between the three flex-wARP protocols (keeping the complete search model, converting it to atomic coordinates but ignoring atom identities or using the electron-density map calculated from the molecular-replacement solution), two examples are also discussed in detail, focusing on the evolution of the models during iterative rebuilding. This highlights the diversity of paths that the flex-wARP control system can employ to reach a nearly complete and accurate model while actually starting from the same initial information.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Advances in Rosetta structure prediction for difficult molecular-replacement problems

Modeling advances using Rosetta structure prediction to aid in solving difficult molecular-replacement problems are discussed. Recent work has shown the effectiveness of structure-prediction methods in solving difficult molecular-replacement problems. The Rosetta protein structure modeling suite can aid in the solution of difficult molecular-replacement problems using templates from 15 to 25% sequence identity; Rosetta refinement guided by noisy density has consistently led to solved structures where other methods fail. In this paper, an overview of the use of Rosetta for these difficult molecular-replacement problems is provided and new modeling developments that further improve model quality are described. Several variations to the method are introduced that significantly reduce the time needed to generate a model and the sampling required to improve the starting template. The improvements are benchmarked on a set of nine difficult cases and it is shown that this improved method obtains consistently better models in less running time. Finally, strategies for best using Rosetta to solve difficult molecular-replacement problems are presented and future directions for the role of structure-prediction methods in crystallography are discussed.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

On-line replacement of program modules using AdaPT

One purpose of our research is the investigation of the effectiveness and expressiveness of AdaPT(1), a set of language extensions to Ada 83, for distributed systems. As a part of that effort, we are now investigating the subject of replacing, e.g., upgrading, software modules while the software system remains in operation. The AdaPT language extension provide a good basis for this investigation for several reasons: (1) they include the concept of specific, self-contained program modules which can be manipulated; (2) support for program configuration is included in the language; and (3) although the discussion will be in terms of the AdaPT language, the AdaPT to Ada 83 conversion methodology being developed as another part of this project will provide a basis for the application of our findings to Ada 83 systems. The purpose of this investigation is to explore the basic mechanisms to the replacement process. Thus, while replacement in the presence of real-time deadlines, heterogeneous systems, and unreliable networks is certainly a topic of interest, we will first gain an understanding of the basic processes in the absence of such concerns. The extension of the replacement process to more complex situations can be made later. This report will establish an overview of the on-line upgrade problem, and present a taxonomy of the various aspects of the replacement process.

Waldrop, Raymond S.↗

Structural Evaluation of the RSRM Nozzle Replacement Adhesive

This paper describes the structural performance evaluation of a replacement adhesive for the Reusable Solid Rocket Motor (RSRM) nozzle utilizing finite element analysis. Due to material obsolescence and industrial safety issues, the two current structural adhesives, EA 913 and EA 946 are to be replaced with a new adhesive. TIGA 321. The structural evaluation in support of the adhesive replacement effort includes residual stress, transportation, and flight analyses. Factors of safety are calculated using the stress response from each analysis. The factors of safety are used as the limiting criteria to compare the replacement adhesive against the current adhesives. Included in this paper are the analytical approach, assumptions and modeling techniques as well as the results of the evaluation. An important factor to the evaluation is the similarity in constitutive material properties (elastic modulus and Poisson's ratio) between TIGA 321 and EA 913. This similarity leads to equivalent material response from the two adhesives. However, TIGA 321 surpasses EA 913's performance due to higher material capabilities. Conversely, the change in stress response from EA 946 to TIGA 321 is more apparent: this is primarily attributed to the difference in the modulii of the two adhesives, which differ by two orders of magnitude. The results of the bondline evaluation indicate that the replacement adhesive provides superior performance than the current adhesives with only minor exceptions. Furthermore, TIGA 321 causes only a minor chance in the response of the phenolic and metal components.

Batista-Rodriguez, A.↗