Search NASASearch

SEARCH · Search NASA

Results for “resource allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

The Myth of Fungible FTE: A Quantitative Assessment of Matrixed Resource Allocation

Matrix organizations allow scientific facilities to share specialized personnel across projects, operations, maintenance, and strategic initiatives. Nominal staffing allocations, however, may not capture the schedule consequences of fragmented individual commitments, limited access to specialist groups, and intermittent availability of key decision makers. We developed a stochas- tic, daily-time-step simulation of a hypothetical medium-sized accelerator-facility project com- prising sequential phases and parallel tasks. Each task requires role-specific work measured in FTE-days. Ordinary personnel may be unavailable because they contribute concurrently to other institutional activities, while designated key roles have independently specified daily un- availability probabilities. An organization-wide priority factor scales the number of people from each functional group who can effectively contribute to the project. It is interpreted as a composite proxy for project access and workforce fragmentation across competing commit- ments. We examined project completion time as a function of this factor and Project Lead unavailability using 100 Monte Carlo runs per condition. Increasing priority factor from 0.1 to 1.0 reduced median completion time from 1708.5 days (interquartile range 1681.5–1735.25) to 390 days (interquartile range 379–399). At priority factor = 0.1, increasing Project Lead unavailability from 0.5 to 0.9 increased median completion time from 1713.5 days (interquartile range 1691–1733.25) to 4,417 days (interquartile range 4271.75–4550.5). The model quantifies the commonly expected sensitivity of project schedules to fragmented resource commitments and limited coordination availability. Within this model, the results also indicate a possible threshold regime in which small increases in workforce availability yield only modest sched- ule improvements until sufficient capacity becomes accessible, after which project performance improves sharply. With further validation and calibration, this quantitative framework could support resource-allocation decisions during initial project planning and subsequent schedule rebaselining.

Bai, Mei [SLAC National Accelerator Laboratory (SL

Software for Allocating Resources in the Deep Space Network

TIGRAS 2.0 is a computer program designed to satisfy a need for improved means for analyzing the tracking demands of interplanetary space-flight missions upon the set of ground antenna resources of the Deep Space Network (DSN) and for allocating those resources. Written in Microsoft Visual C++, TIGRAS 2.0 provides a single rich graphical analysis environment for use by diverse DSN personnel, by connecting to various data sources (relational databases or files) based on the stages of the analyses being performed. Notable among the algorithms implemented by TIGRAS 2.0 are a DSN antenna-load-forecasting algorithm and a conflict-aware DSN schedule-generating algorithm. Computers running TIGRAS 2.0 can also be connected using SOAP/XML to a Web services server that provides analysis services via the World Wide Web. TIGRAS 2.0 supports multiple windows and multiple panes in each window for users to view and use information, all in the same environment, to eliminate repeated switching among various application programs and Web pages. TIGRAS 2.0 enables the use of multiple windows for various requirements, trajectory-based time intervals during which spacecraft are viewable, ground resources, forecasts, and schedules. Each window includes a time navigation pane, a selection pane, a graphical display pane, a list pane, and a statistics pane.

Wang, Yeou-Fang

Assessing Effects of Climate and Technology Uncertainties in Large Natural Resource Allocation Problems

The productivity of the world's natural resources is critically dependent on a variety of highly uncertain factors, which obscure individual investors and governments that seek to make long-term, sometimes irreversible, investments in their exploration and utilization. These dynamic considerations are poorly represented in disaggregated resource models, as incorporating uncertainty into large-dimensional problems presents a challenging computational task. In this paper, we apply the SCEQ algorithm (Cai and Judd, 2023) to solve a large-scale dynamic stochastic global land resource use problem with stochastic crop yields due to adverse climate impacts and limits on further technological progress. For the same model parameters and bounded shocks, the range of land conversion is considerably smaller for the dynamic stochastic model than for deterministic scenario analysis.

numerical methods

Optimizing resource allocation in Miscanthus breeding via sparse testing designs for genomic prediction

Phenotyping high-biomass perennial crops is laborious and the rate of genetic gain in conventional perennial crop breeding programs is typically low. So, it is especially important to identify methods that produce efficiency gains in the breeding process. Miscanthus is a C4 perennial grass with favorable characteristics for producing biomass as a feedstock for biofuels and diverse bio-based products. Increasing biomass yield will increase profitability and environmental benefits, so it is a key target for Miscanthus breeding. In addition, the identification of well-adapted genotypes across a wide range of environmental conditions requires the establishment of multi-environment trials (METs). Sparse testing is a genomic prediction-based strategy that reduces the phenotyping costs in METs by selecting a subset of genotypes to evaluate in a subset of environments and then predicts the performance of the unobserved genotype-environment combinations. A Miscanthus sacchariflorus (MSA) population comprising 336 genotypes observed across three environments was analyzed implementing sparse testing designs. Three prediction models considering main effects (environments, genotypes, genomic) and interaction effects (genotype-by-environment; G×E interaction) were implemented for forecasting dry biomass yield (YDY), total culm (TCM), average internode length (AIL), and culm node number (CNN). Multiple calibration sets based on different compositions and sizes were considered to evaluate performance in terms of the predictive ability (PA) and the mean square error (MSE) for a fixed testing set size. The training set size ranged from 52 to 112 to predict a fixed set of 224 unobserved genotypes across all three environments. The results showed that the model accounting for G×E interaction consistently presented the highest PA and the lowest MSE: for CNN (PA: ~0.77, MSE: ~0.5) and YDY (PA: ~0.70, MSE: ~1.3) while for TCM and AIL these ranged from ~0.28 to 0.41 and ~1.3 to 4.3, respectively. Overall, varying training sets and allocation strategies did not affect PA and MSE, with 52 non-overlapping and 0 overlapping genotypes per environment as the optimal cost-effective allocation framework. This suggests that implementing sparse testing designs could significantly reduce phenotyping costs by fivefold, without compromising PA in breeding programs for perennial crops such as Miscanthus.

Miscanthus sacchariflorus (MSA)

System-Availability And Resource-Allocation Program

ACARA analyzes availability, life-cycle cost, and scheduling of resources. Uses statistical Monte Carlo method to simulate capacity states of system as well as failure and repair of components. Failures of components modeled mathematically by use of combination of exponential and Weibull probability distributions. Schedules replacement of components to optimize performance of system. Made to comply with any constraints on production of components, capacities of resupply vehicles, spares kept on site, crews, and/or equipment. Written in APL2.

Viterna, L. A.

Linear modelling of attentional resource allocation

Eight subjects time-shared performance of two compensatory tracking tasks under conditions when both were of constant difficulty, and when the control order of one task (designated primary) was varied over time within a trial. On line performance feedback was presented on half of the trials. The data are interpreted in terms of a linear model of the operator's attention allocation system, and suggest that this allocation is strongly suboptimal. Furthermore, the limitations in reallocating attentional resources between tasks, in response to difficulty fluctuations were not reduced by augmented performance feedback. Some characteristics of the allocation system are described, and reasons for its limitations suggested.

Pierce, B.

JPL Resource Allocation Planning Scheduling Office (RAPSO) long range forecasting

The paper introduces the concept of the long range forecasting function, which is then used to identify periods of peak oversubscription of resources years before they actually happen, so that proper corrective actions (construction of additional antennas, reduction in support committment to the impacted projects) can be implemented.

RAPSO long range forecasting

Improving Learning Performance Through Rational Resource Allocation

This article shows how rational analysis can be used to minimize learning cost for a general class of statistical learning problems. We discuss the factors that influence learning cost and show that the problem of efficient learning can be cast as a resource optimization problem. Solutions found in this way can be significantly more efficient than the best solutions that do not account for these factors. We introduce a heuristic learning algorithm that approximately solves this optimization problem and document its performance improvements on synthetic and real-world problems.

resource optimization

Resource allocation planning with international components

Dumas, Briggs, Reid and Smith (1989) describe the need for identifying mutually acceptable methodologies for developing standard agreements for the exchange of tracking time or facility use among international components. One possible starting point is the current process used at the Jet Propulsion Laboratory (JPL) in planning the use of tracking resources. While there is a significant promise of better resource utilization by international cooperative agreements, there is a serious challenge to provide convenient user participation given the separate project and network locations. Coordination among users and facility providers will require a more decentralized communication process and a wider variety of automated planning tools to help users find potential exchanges. This paper provides a framework in which international cooperation in the utilization of ground based space communication systems can be facilitated.

Burke, Gene

Thematic Mapper data for forest resource allocation

A technique for classifying a Landsat Thematic Mapper image was demonstrated on the Wayne National Forest of southeastern Ohio. The classified image was integrated into a geographic information system database, and prescriptive forest land use allocation models were developed using the techniques of cartographic modeling. Timber harvest sites and accompanying haul roads were allocated.

Zeff, Ilene S.

A sustainable genetic algorithm for satellite resource allocation

A hybrid genetic algorithm is used to schedule tasks for 8 satellites, which can be modelled as a robot whose task is to retrieve objects from a two dimensional field. The objective is to find a schedule that maximizes the value of objects retrieved. Typical of the real-world tasks to which this corresponds is the scheduling of ground contacts for a communications satellite. An important feature of our application is that the amount of time available for running the scheduler is not necessarily known in advance. This requires that the scheduler produce reasonably good results after a short period but that it also continue to improve its results if allowed to run for a longer period. We satisfy this requirement by developing what we call a sustainable genetic algorithm.

Abbott, R. J.