Results of the Short-Term Analyses of the Salt (Macro) Batch 5 Tank 41H Qualification Sample (Resample)

Savannah River National Laboratory (SRNL) analyzed samples from Tank 41H in November 2021 in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 5. This document reports the short-term results of the analyses of samples of Tank 41H. Analysis of the Tank 41H Salt Batch 5 sample indicates that the material does not display any unusual characteristics or observations, such as floating solids, the presence of large amounts of solids, or unusual colors. Further sample results will be reported in a future document. This report satisfies part of Deliverable 3 of the Technical Task Request (TTR). After a data review it was found that the original results reported in the revision 0 of this document were actually from Salt Batch 4 (Tank 21H). A new set of samples was sent for analysis to satisfy deliverable 3 of the TTR. The results from the original analyses have been replaced with the recent analyses of the actual Salt Batch 5 sample.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of the Short-Term Analyses of the Salt (Macro) Batch 5 Tank 41H Qualification Sample (Resample)

Savannah River National Laboratory (SRNL) analyzed samples from Tank 41H in November 2021 in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 5. This document reports the short-term results of the analyses of samples of Tank 41H. Analysis of the Tank 41H Salt Batch 5 sample indicates that the material does not display any unusual characteristics or observations, such as floating solids, the presence of large amounts of solids, or unusual colors. Further sample results will be reported in a future document. This report satisfies part of Deliverable 3 of the Technical Task Request (TTR). After a data review it was found that the original results reported in the revision 0 of this document were actually from Salt Batch 4 (Tank 21H). A new set of samples was sent for analysis to satisfy deliverable 3 of the TTR. The results from the original analyses have been replaced with the recent analyses of the actual Salt Batch 5 sample.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Increased Fissile Loading Flowsheet Review

A request was made by H-Canyon Process Engineering to assess the impact of blending dissolved, neutralized Spent Nuclear Fuel (SNF) with future sludge batches and their impact on downstream processing facilities including the Concentration, Storage and Transfer Facilities (CSTF), the Salt Waste Processing Facility (SWPF), the Defense Waste Processing Facility (DWPF), Saltstone, and the Effluent Treatment Facility (ETF). The purpose of this change is to accelerate the deinventory of SNF which is currently stored in the L-Area Disassembly Basin. The addition of SNF increases the mass of fissiles in each future sludge batch, due to their high enrichment. This high enrichment has the potential to complicate the programs to eliminate criticality events in the downstream processing facilities and will increase the number of canisters produced by DWPF because of the SNF mass increase. A separate report addressed the impacts to glass. The review and subsequent calculations were based on average predicted compositions of Accelerated Basin Deinventory (ABD) slurry, average compositions for predicted future sludge batches, average past salt batches and average past recycle batches to predict the feeds that will be processed in SWPF, DWPF, Saltstone, the 2H evaporator and ETF. Each of the processes was evaluated for potential issues.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Assessment of the Materials of Construction for the Transfer Lines and Unit Operations Equipment Associated with the Recycle Diversion Process

The Defense Waste Processing Facility (DWPF) processes and vitrifies radioactive waste that it receives from the Concentration, Storage, and Transfer Facility (CSTF) and Salt Waste Processing Facility (SWPF). As a result of the evaporation of water during both the melter feed preparation and the melter feed vitrification steps in DWPF, a recycle waste stream is generated, neutralized, and sent back to the CSTF. The recycle waste is a dilute water stream originating from the collection of condensate liquids containing some minor sludge and frit solids and other waste components primarily resulting from entrainment into the condensate during foam-over events. The recycle stream volume is significant and is expected to approach 3 million gallons per year once the SWPF reaches full operation. Diverting the bulk of the recycle waste stream from the CSTF is essential for the eventual closure of the waste tanks, and hence the completion of the SRS liquid waste mission.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges and Solutions in Operation and Lay-Up of the Modular Caustic- Side Solvent Extraction Unit - 20078

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impacts of Fast Critical Assembly Fuel Discards on Liquid Waste Processes

The Savannah River Nuclear Solutions (SRNS) Fast Critical Assembly (FCA) mission is reestablishing the electrolytic dissolver for processing of Pu and Pu-U materials clad in stainless steel (SS). H-Canyon is planning to dissolve and neutralize FCA fuel without recovering the special nuclear material (i.e., Pu) prior to discarding to the Concentration, Storage, and Transfer Facilities (CSTF) operated by the Savannah River Mission Completion (SRMC) Liquid Waste (LW) Organization. The FCA discards will be combined with sludge in the CSTF after Low Temperature Aluminum Dissolution (LTAD) if needed. The combined waste will be washed, concentrated, and vitrified at the Defense Waste Processing Facility (DWPF). The high level waste canisters produced will be temporarily stored in the Glass Waste Storage Buildings prior to transfer to a future federal repository. Decants from LTAD and sludge washing will be combined with DWPF recycle and dissolved salt cake to prepare salt batches for processing in the Salt Waste Processing Facility. The resulting decontaminated salt solution will be processed in the Saltstone Production Facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Density of Next-Generation Caustic-Side Solvent Extraction Solvent

This report recommends the appropriate modifier concentration to employ in the Next Generation Solvent (NGS) to be used in the Salt Waste Processing Facility (SWPF) at the Savannah River Site for removal of cesium from legacy tank waste. The Next Generation Caustic-Side Solvent Extraction (NG-CSSX) process employing the NGS is a marked improvement over the original Caustic-Side Solvent Extraction (CSSX) process, as it provides more effective removal of cesium from highly alkaline radioactive wastes and concentrates this removed cesium into an aqueous solution that is easy to vitrify for final disposal. Considerable effort has been devoted to optimizing the chemistry and process conditions of both systems, and their effectiveness has been demonstrated at the pilot scale at the Modular CSSX Unit (MCU). Due to the success of the demonstration and pilot-scale tests, the Salt Waste Processing Facility (SWPF) has been built to process larger volumes of waste with the CSSX process. To accelerate the waste-processing rate of the SWPF beyond its design throughput, plans call for the replacement of the CSSX process by the NG-CSSX process. To implement the NG-CSSX process in equipment optimized for CSSX, adjusting the density of the NGS to match the CSSX solvent density of 0.851 ± 0.0008 g/mL is considered advisable to obtain comparable hydraulic performance. Toward this objective, the density of the NGS has been measured at different temperatures and modifier concentrations to determine that a concentration of 0.650 M Cs-7SB modifier provides the best match for the desired density.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternative Treatment of Defense Waste Processing Facility Recycle via Reuse of Existing Liquid Waste Facilities - 20097

The Defense Waste Processing Facility (DWPF) at Savannah River Site (SRS) has been immobilizing high level waste since 1996. The chemical process within DWPF generates a large volume of condensate, which is recycled to the SRS H-Area Tank Farm. The recycle stream includes a small quantity of sludge solids, as well as soluble cesium that is volatilized during melter operation. The recycle waste is currently received into a large, underground waste tank that separates insoluble solids via decanting. The supernate is treated by an evaporator with a concentrate stream that is stored for future processing. The evaporator overheads are collected and sent to the Effluent Treatment Project (ETP) for final polishing and testing prior to discharge to local surface water. Recycle storage and treatment as described above complicates the overall mission within the tank farms, which are primarily engaged in waste retrieval and preparation activities that support sludge and salt disposition, as well as tank characterization and closure. The need to devote a portion of available storage space to recycle treatment limits operational flexibility, and ultimately the DWPF recycle stream must be diverted to fully close all the SRS waste tanks. An alternative treatment process is being explored to decouple the recycle stream from the tank farm. The proposed treatment process will accomplish solids separation via crossflow filtration and will utilize a wiped film evaporator to volume-reduce the filtrate stream. Evaporator overheads will continue to be further processed in ETP while the solids stream and evaporator concentrate stream will be returned for reprocessing with the DWPF and Salt Waste Processing Facility (SWPF). This process will utilize existing facilities within DWPF and the tank farm that were previously dedicated to Interim Salt Disposition (ISD), but no longer have an identified mission with the startup of SWPF. The reuse of these facilities will remove several constraints from the current Liquid Waste (LW) System Plan without expanding the current footprint of Department of Energy Environmental Management (EM) infrastructure within LW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis and Testing of Parsons NGS Solvent Formulation

Three drums containing solvent used during the Next Generation Solvent Test (NGST) conducted by Parsons in 2014-2015 were received at SRNL. After homogenization, samples from each drum were removed, and a composite sample prepared. This composite was analyzed to determine current SRNL characterization method efficacy, and to determine if the 1,3-dicyclohexyl-2- (isotridecyl) guanidine (DCiTG) suppressor could be selectively removed. The results of this work indicate that the titration analytical method currently employed at SRNL is effective at quantitating the DCiTG. The nuclear magnetic resonance (NMR) method at SRNL can detect the DCiTG, as well its amine and urea decomposition products. However, further development work will be required to allow the 1 H NMR method to quantitate these species. A series of three washing tests were performed on composite samples of the solvent. The results show that up to 67% of the DCiTG was removed from the solvent by simple washing, at multiple ratios of solvent: aqueous phase. This may indicate that a simple pathway exists to wash out the DCiTG and reclaim the solvent (~150 gallons) for future use at the Salt Waste Processing Facility (SWPF).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 23: Start-up of Three Major DOE Treatment Facilities - SWPF, IWTU and DFLAW

This panel focused on the DOE-EM planning to complete construction and start up three major treatment facilities in the next 18 months. This included the Salt Waste Processing Facility (SWPF) at Savannah River, the Integrated Waste treatment Unit (IWTU) at Idaho and the Direct Feed Low-Activity Waste (DFLAW) at Hanford. DOE Site Managers from SC, ID and WA introduced each facility then the DOE Contractor provided the details on their biggest challenges in regulatory issues, construction, start-up and operations of each facility. Panelists with presentations: Lessons in Managing Risks in First of a Kind Nuclear Construction and Start-Up (Pamela Marks); Integrated Waste Treatment Unit (Connie Flohr); IWTI-Fluor (Frederick Hughes); Startup and Commissioning (Tom Fletcher)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank 50H Mixing Pump Run Time Reassessment

Tank 50H is required to operate a single rotating standard slurry pump for 4.5 hours prior to transfers to the Salt Solution Receipt Tanks (SSRTs) in the Saltstone Production Facility (SPF). This mixing time is required to adequately mix miscible and immiscible liquids within Tank 50H and meet the Saltstone Waste Acceptance Criteria (WAC). The miscible liquids are aqueous solutions of dissolved salts, while the immiscible liquids include organic droplets such as Isopar® L. To support the accelerated salt processing rates from the Salt Waste Processing Facility (SWPF), a desire to reduce the transfer time of Decontaminated Salt Solution (DSS) downstream of SWPF was identified. This document describes the analysis performed to reassess the technical basis for the 4.5 hour mixing requirement for Tank 50H.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Literature Review Investigating Adsorbents for Mercury Removal from Salt Batch Feed Material

The Savannah River Site (SRS) Liquid Waste System (LWS) contains mercury that originated from decades of canyon processing where it was used as a catalyst for dissolving aluminum cladding of reactor fuel. Since the start of radioactive operations, the Salt Waste Processing Facility (SWPF) has experienced processing difficulties due to the presence of mercury-laden solids. In response to these challenges, Savannah River National Laboratory (SRNL) has been requested by Savannah River Mission Completion (SRMC)/Salt Waste Processing Facility (SWPF) personnel to perform a literature review to assess the feasibility of chemical strikes to salt waste-containing tanks at the SRS as an option to reduce mercury introduction into SWPF. The literature review should evaluate known technologies and chemistries for decreasing mercury concentration and the anticipated efficacy of each technology on various mercury species known to exist in SRS waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Precipitate Reactor Feed Tank (PRFT) Batches 15, 22, and 26 from the Defense Waste Processing Facility (DWPF)

The Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) processes a Monosodium Titanate/Sludge Solids (MST/SS) waste stream received from the Salt Waste Processing Facility (SWPF) via the Precipitate Reactor Feed Tank (PRFT). During processing, DWPF is required to provide evidence of compliance with the Waste Acceptance Product Specifications (WAPS) to ensure acceptance of their vitrified high-level waste (HLW) into the Civilian Radioactive Waste Management System. Production Records must document the constituents of the MST/SS material in the PRFT from each salt batch (StB) processed at SWPF. Savannah River Mission Completion (SRMC) has requested Savannah River National Laboratory (SRNL) to analyze PRFT samples representing each SWPF salt batch for thirty-two radionuclides. Additionally, elemental analysis of PRFT slurry and MST/SS solids was performed to aid SRMC in further refinement of the inputs and assumptions used in future frit development and Material Tracking Program calculations. The analyses of PRFT Batches 15, 22, and 26, which corresponds to material from the processing of StB4, StB5, and StB7, respectively, are reported herein. The unwashed dried solids of the PRFT batches were found to be 86-87% MST. Additionally, the total sulfur values are well below the assumed 982 mg of sulfate/kg of PRFT slurry used in Material Tracking Program calculations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating Liquid Waste Transfers and their Impacts to the SRS Tank Farm to Support Operations and Closure

The Liquid Waste (LW) contractor at the Savannah River Site, Savannah River Mission Completion (SRMC), supports the storage, processing, and safe disposition of legacy, radioactive liquid waste. The LW Tank Farms contain approximately 127 million liters (33.5 million gallons) of liquid waste within 43 active, underground waste tanks. To meet mission critical milestones for the closure of waste tanks and processing of 34 million liters (9 million gallons) of salt waste per year by the LW Salt Waste Processing Facility (SWPF), an increase in Tank Farm operations, including waste tank transfers, is required. Waste is compiled in salt and sludge batches in the Tank Farms and transferred to SWPF and the Defense Waste Processing Facility (DWPF) for treatment. All waste tank transfers, such as waste removal and batch compilation transfers, must be pre-evaluated to ensure Documented Safety Analysis (DSA) requirements are met via Evaluated Transfer Approval Forms (ETAFs). Facility conditions and configurations may change as a result of a waste transfer. These changes must be reflected in the Tank Farms Emergency Response Datasheet (ERD), which contains data utilized for operation and emergency situations.

Peterson, Shelby R.↗

Evaluation of a Sulfate Solubility Limit Greater Than 0.65 Weight Percent in Sludge Batch 10 Glasses

Previous laboratory-scale crucible testing with batch chemicals confirmed that the sulfate (SO 4 2- ) limit for Sludge Batch 10 (SB10) was 0.65 weight percent (wt.%) in glass. This limit signifies that 0.65 wt.% SO 4 2- can be retained in the glass without the formation of a sulfate phase. The Defense Waste Processing Facility imposes this constraint in the Material Tracking Program. Based on preliminary calculations to support the Material Tracking Program, it was anticipated that transfer volumes of the monosodium titanate/sludge solids (MST/SS) stream from the Salt Waste Processing Facility (SWPF) may need to be reduced to maintain projected sulfate concentrations below 0.65 wt.% in glass. Savannah River Mission Completion requested that the Savannah River National Laboratory perform additional sulfate testing to determine whether a sulfate solubility limit greater than 0.65 wt.% is feasible for SB10, which could allow for higher transfer volumes of the MST/SS stream. This report documents the results of the testing at higher sulfate concentrations for the glass composition region defined by the most recent SB10 projection (November 2022) and Frits 473 and 625. Frit 473 was recommended for SB10 and Frit 625 was used during SB9 processing and the SB9 to SB10 transition. A total of twenty-one glass compositions were developed based on the expected compositional variables, which include sludge-only (SO) and coupled processing with the SWPF, waste loading (WL), and frit composition. The target sulfate concentrations were varied from 0.65-0.85 wt.% at 32 and 40% WL. Each glass was prepared from reagent grade chemicals and melted at 1150 °C. Visual observations were used to confirm the presence of a sulfate salt phase on the cooled glass surfaces. Representative samples of each glass were submitted for chemical composition analysis by inductively coupled plasma-optical emission spectroscopy and Cs analysis by inductively coupled plasma-mass spectrometry. Overall the majority of mean measured values are consistent with the target values for each major oxide of interest with less than 5% error. The percent errors for the measured SO 4 2- concentrations are generally less than 10%, which is comparable with previous sulfate solubility study measurements and acceptable. Only the SO glasses based on Frit 625 formed a sulfate phase at a 0.80 wt.% SO 4 2- target concentration at both 32 and 40% WL. The remainder of the glasses did not form a sulfate layer. Due to the formation of the sulfate phase, the limit is conservatively set at 0.70 wt.% based on the measured sulfate concentrations of 0.71 wt.% and 0.75 wt.% for these two glasses. None of the SO or coupled operation glasses based on Frit 473 formed a sulfate salt phase, which supports a sulfate limit of 0.80 wt.%. The following SO 4 2- concentration limits are recommended during SO and coupled SB10 processing: (1) 0.70 wt.% during processing with Frit 625, and (2) 0.80 wt.% during processing with Frit 473.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Savannah River Site FY22 Salt Waste Qualification Data

The Savannah River National Laboratory analyzed samples from Savannah River Site Waste Tank 41H, 21H and 42H to support qualification of Salt Waste Processing Facility (SWPF) Waste Batches 5, 6, and 7 for processing (the FY22 Salt Batch Qualification samples). None of the samples displayed any unusual or unexpected characteristics such as large amounts of solids, floating solids, or unusual color. Characterization of these samples confirmed similar chemical composition and characteristics to previous salt waste batches. These results were initially provided to Savannah River Mission Completion (Liquid Waste Operations subcontractor) as External Sample Results LIMS Reports and the Tank 41H (Salt Batch 5 sample) was also summarized in two separate technical reports. The analytical results (both rapid and long term) are now summarized and discussed in this technical report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Precipitate Reactor Feed Tank (PRFT) Batches 44 and 49 from the Defense Waste Processing Facility (DWPF)

The Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) processes a Monosodium Titanate/Sludge Solids (MST/SS) waste stream received from the Salt Waste Processing Facility (SWPF) via the Precipitate Reactor Feed Tank (PRFT). During processing, DWPF is required to provide evidence of compliance with the Waste Acceptance Product Specifications (WAPS). Savannah River Mission Completion (SRMC) has requested Savannah River National Laboratory (SRNL) to analyze PRFT samples representing each SWPF salt batch for thirty-two radionuclides. Additionally, elemental analysis of PRFT slurry and MST/SS solids was performed to aid SRMC in further refinement of the inputs and assumptions used in future frit development and Material Tracking Program calculations. The analyses of PRFT Batches 44 and 49, which correspond to material from the processing of Salt Batches (StB) 12 and 11, respectively, are reported herein. The unwashed dried solids of the PRFT Batches 44 and 49 are predominately MST, ~63-59% MST. The two batches have a much higher amount of Fe, Mn, and Ni compared to all previous batches. For Batch 44 this appears to be due to the use of a sludge simulant filter aid during processing of StB 12 and for Batch 49, it is possibly due to the larger amount of insoluble solids for StB 11 in comparison to all previous salt batches. Like previous PRFT batches, a significant amount of the unwashed dried solids are alkaline earth metals. The total sulfate, in mg/kg of slurry, for PRFT Batches 44 and 49 is 119 and 139, respectively, which is well below the current sulfate concentration used in Material Tracking Program calculations and is in agreement with DWPF laboratory sulfate measurements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of potential causes of production limiting fouling within SWPF due to mercury solids formation during pH swings within the SWPF process

The Salt Waste Processing Facility (SWPF) goal to investigate the use a high sodium Salt Batch 5 Qualification sample as the radioactive salt solution for mixing tests meant to evaluate the propensity for solids formation between the 5.6 M sodium clarified salt solution (CSS) and scrub solutions (0.05 M HNO 3 and 0.025 M NaOH solutions) during pH changes has been completed at SRNL. The key results and conclusions from this investigation to evaluate the propensity for solids formation between CSS and scrub solutions because of pH fluctuations include the following: None of the 8 test matrices, involving the mixing/titrating of scrub solution with CSS and vice versa, showed any visible evidence for the formation of solids with pH changes. The average turbidity measurements for these 8 tests, excluding test 7, was 21.6 ± 0.4 NTU. This average turbidity value is within 2 sigma of the baseline turbidity value of 20.5 NTU for the CSS only without added scrub solutions. However, only in test 7, which involved the titrating of CSS into dilute nitric acid scrub solution (0.05 M HNO 3 solution), was a small measurable change in the turbidity of the mixture observed at 31.9 ºC. On the other hand, the equivalent test (instantaneous addition of CSS into 0.05 M HNO 3 ) gave an average turbidity measurement value of 21.6 ± 0.6 NTU at a temperature of 24.0 ºC. This difference in turbidity measurement has been attributed to either instrument performance errors or the effect of temperature. It is recommended that these CSS and scrub solution mixing tests be performed with corresponding simulant solutions in a non-radioactive environment. A simulant environment will aid in the full integration of a pH and turbidity meter equipment with the experimental set up. A new detection method, preferable a laser-based method, may be needed in detecting and confirming the precipitation of fine particulates at the right blending times and pH fluctuations in the solution mixtures. On the other hand, the differing free OH concentrations (~2 M in CSS), H + concentrations (0.05 M HNO 3 ) for the titrants and the bulk solutions, may make it almost impossible to observe a neutral pH or a pH in the range of 7-9, where the potential for solids formation is maximized and leads to possible precipitation of minerals like aluminum hydroxides.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗