Operational Probabilistic Tools for Solar Uncertainty (OPTSUN) (Final Project Report for DOE Solar Forecasting II Project)

Increasing levels of solar PV can challenge system operations and may require novel methods to operate the power system reliably and efficiently. Power system operating plans generally use deterministic forecasts, in which the variable energy resources are represented by the expected value for each interval of the decision horizon. Probabilistic forecasts are relatively new but have the potential to address the shortfalls of deterministic forecasts. However, understanding how best to use such forecasts is still a key gap in industry and was the focus of this project. The project had three workstreams. In a forecasting workstream, improvements were made to baseline probabilistic forecasts using a number of new approaches such as machine learning methods and improved input data. In a design workstream, advanced simulation tools used these forecasts to investigate newly proposed reserve determination methods. Lastly, in a demonstration workstream a scheduling management platform (SMP) was developed to leverage probabilistic forecasts in a modular and customizable manner. In order to study the benefits that could be accrued, the project team collaborated with three utility partners (Duke Energy, Southern Company and Hawaiian Electric) to deliver improved probabilistic forecasts for each region and to model each region in case studies using advanced production cost modeling tools. Different methods to determine operating reserve requirements from probabilistic forecasts were developed, simulated, and tested across each region. The benefits of using these newly proposed methods varied by utility, but, in general, using probabilistic forecasts as well as historical data to set the reserve requirements seems to improve reliability related results, with less risk of reserve or supply shortfalls. The cost implications were not always straightforward; in some cases the new methods could show a reduction in expected operating costs, but often the increase in reserves associated with better risk mitigation using probabilistic forecasts could result in an increase in operating costs in the simulations. The SMP tool was developed to process probabilistic forecasts from their initial receipt through to scheduling decisions. This open-source tool consists of several modules for scenario development, reserve requirements calculation, and visualization. The SMP tool was demonstrated to a wide range of operators and stakeholders at all three utilities and further improved based on their feedback. The tool will be available on www.epri.com/optsun. The proposed probabilistic information-based reserve determination approaches have the potential to be implemented by different regions to ensure an economic and reliable power system operation on power systems integrating increasing levels of variable renewable resources. The innovative yet practical methods developed in this project demonstrated tangible benefits from using probabilistic forecasts beyond just study-based assessments to include three unique balancing areas. The demonstrated benefits across the multiple utility environments, are expected to provide system operators in all regions the confidence required and a platform to adopt the new forecasting and operating methods.

14 SOLAR ENERGY↗

Enhanced Power Grid Maintenance Planning and Quantum-Inspired Combinatorial Prospects

Efficient and reliable scheduling of maintenance for power generation and transmission infrastructure is essential for minimizing operational costs and ensuring grid stability. This paper introduces an integrated optimization framework for coordinated maintenance scheduling of generators and transmission lines under resource and reliability constraints. The model minimizes a composite cost function including maintenance and generation costs, as well as penalties for delayed maintenance, while satisfying N−1 security constraints, operational limits, and crew availability. Case studies on the IEEE 300-bus test system demonstrate the effectiveness of the proposed approach in producing feasible and cost-effective maintenance schedules. To address scalability and combinatorial complexity, the model is mapped into a Quadratic Unconstrained Binary Optimization (QUBO) problem, enabling exploration of solution approaches based on Quantum Imaginary Time Evolution (QITE). While the QUBO reformulation provides a foundation for future quantum-inspired optimization, this study focuses primarily on the development and demonstration of the classical optimization framework and illustrates the potential applicability of QITE in large-scale maintenance scheduling.

Chen, Yang [ORNL] (ORCID:0000000271693874)↗

COCPIT: Collaborative Activity Planning Software for Mars Perseverance Rover

Since landing on the Martian surface, the Perseverance rover has relied on a distributed team to generate commands for exploring its new environment each sol(Martian day). The team uses a complex suite of software tools to accomplish this challenging task in time for the next window of opportunity to send commands to the rover. A key piece of this software ecosystem is COCPIT (Component-based Campaign Planning, Implementation, and Tactical). COCPIT is part of the next generation of planning and scheduling software tools developed by NASA's Jet Propulsion Laboratory in partnership with NASA's Ames Research Center. COCPIT is a web-based application that allows users to collaboratively view and update the Perseverance rover's activity plans, continuously verify that the plan satisfies constraints, assign targets for directing scientific instruments, document science intent, and model power and data resources. Mars Surface Operations requires diverse expertise from team members within the Engineering, Science, Robotic, and Instrument Operations groups, distributed across North America and Europe. In order to improve efficiency and reduce risk, all teams are able to review and edit their activities simultaneously and see the effects on the plan in its entirety. As part of the Ground Data System (GDS) tool suite, COCPIT is responsible for the activity plan. It provides specialized views that allow operators to understand where there may be room for additional observations, see whether any planning constraints are being violated, and confirm that energy usage and data generation are within the defined limits. It contains details such as which filters a camera will use for a given observation, what the resolution of the images should be, where to store the data onboard, and how long the observation is expected to take. It predicts when specific data will be downlinked from the rover to a passing orbiter, so that the team knows when to expect that data on Earth for evaluation in future planning. Ultimately the information from the COCPIT plan is translated to sequences that will be bundled and radiated to Perseverance for execution. The COCPIT tool is used throughout all planning phases.

activity planning↗

COCPIT: Collaborative Activity Planning Software for Mars Perseverance Rover

Since landing on the Martian surface, the Perseverance rover has relied on a distributed team to generate commands for exploring its new environment each sol(Martian day). The team uses a complex suite of software tools to accomplish this challenging task in time for the next window of opportunity to send commands to the rover. A key piece of this software ecosystem is COCPIT (Component-based Campaign Planning, Implementation, and Tactical). COCPIT is part of the next generation of planning and scheduling software tools developed by NASA's Jet Propulsion Laboratory in partnership with NASA's Ames Research Center. COCPIT is a web-based application that allows users to collaboratively view and update the Perseverance rover's activity plans, continuously verify that the plan satisfies constraints, assign targets for directing scientific instruments, document science intent, and model power and data resources. Mars Surface Operations requires diverse expertise from team members within the Engineering, Science, Robotic, and Instrument Operations groups, distributed across North America and Europe. In order to improve efficiency and reduce risk, all teams are able to review and edit their activities simultaneously and see the effects on the plan in its entirety. As part of the Ground Data System (GDS) tool suite, COCPIT is responsible for the activity plan. It provides specialized views that allow operators to understand where there may be room for additional observations, see whether any planning constraints are being violated, and confirm that energy usage and data generation are within the defined limits. It contains details such as which filters a camera will use for a given observation, what the resolution of the images should be, where to store the data onboard, and how long the observation is expected to take. It predicts when specific data will be downlinked from the rover to a passing orbiter, so that the team knows when to expect that data on Earth for evaluation in future planning. Ultimately the information from the COCPIT plan is translated to sequences that will be bundled and radiated to Perseverance for execution. The COCPIT tool is used throughout all planning phases.

activity planning↗

COCPIT: Collaborative Activity Planning Software for Mars Perseverance Rover

Since landing on the Martian surface, the Perseverance rover has relied on a distributed team to generate commands for exploring its new environment each sol (Martian day). The team uses a complex suite of software tools to accomplish this challenging task in time for the next window of opportunity to send commands to the rover. A key piece of this software ecosystem is COCPIT (Component-based Campaign Planning, Implementation, and Tactical). COCPIT is part of the next generation of planning and scheduling software tools developed by NASA's Jet Propulsion Laboratory in partnership with NASA's Ames Research Center. COCPIT is a web-based application that allows users to collaboratively view and update the Perseverance rover's activity plans, continuously verify that the plan satisfies constraints, assign targets for directing scientific instruments, document science intent, and model power and data resources. Mars Surface Operations requires diverse expertise from team members within the Engineering, Science, Robotic, and Instrument Operations groups, distributed across North America and Europe. In order to improve efficiency and reduce risk, all teams are able to review and edit their activities simultaneously and see the effects on the plan in its entirety. As part of the Ground Data System (GDS) tool suite, COCPIT is responsible for the activity plan. It provides specialized views that allow operators to understand where there may be room for additional observations, see whether any planning constraints are being violated, and confirm that energy usage and data generation are within the defined limits. It contains details such as which filters a camera will use for a given observation, what the resolution of the images should be, where to store the data onboard, and how long the observation is expected to take. It predicts when specific data will be downlinked from the rover to a passing orbiter, so that the team knows when to expect that data on Earth for evaluation in future planning. Ultimately the information from the COCPIT plan is translated to sequences that will be bundled and radiated to Perseverance for execution. The COCPIT tool is used throughout all planning phases.

Kanefsky, Bob↗

Development of a Test-Bed for Testing and Refining EarthEn’s Supercritical CO 2 Based Energy Storage System

EarthEn’s energy storage concept leverages supercritical carbon dioxide (sCO 2 ) as a working fluid and relies on compact, high-performance components operating at elevated pressures and temperatures. To accelerate component development and reduce technical risk prior to larger-scale demonstrations, Oak Ridge National Laboratory (ORNL) developed a 100 kW-scale sCO 2 test-bed under a Cooperative Research and Development Agreement with EarthEn (CRADA NO. NFE-24-10050). The objective of the work was to design and construct a flexible experimental facility capable of reproducing key thermodynamic state points and heat-transfer conditions relevant to EarthEn’s thermal energy storage (TES) cycle, with particular emphasis on enabling development and evaluation of next-generation heat exchangers and TES concepts. The test-bed consists of a closed-loop sCO 2 circulation system housed within an open-topped enclosure. In its as-installed configuration, dense-phase sCO 2 is recirculated through a printed circuit recuperator, an electrically heated section, a throttling device used to simulate turbine expansion, and a water-cooled printed circuit heat exchanger that rejects heat to the building chilled-water system before returning to the pump. The pump is driven by a variable frequency drive, enabling controlled adjustment of flow and operating point. A comprehensive instrumentation suite was integrated to support both safe operation and high-quality data collection. Installed sensors include Coriolis flow meters for sCO 2 flow rate and density, resistance temperature detectors and thermocouples distributed throughout the loop (including the heated section and key heat exchanger ports), and pressure transducers for absolute and differential pressure measurements. The facility was designed to support high-pressure (19 MPa nominal) and high-temperature (575°C nominal) operation with credited overpressure protection provided by a rupture disk. Nominal operating conditions were selected to support 100 kW-class testing while maintaining flexibility for non-heated and heated shakedown, control development, and future integration of advanced TES test sections. In parallel with facility development, a system-level thermal-hydraulic model was created using Modelica-based tools to support component sizing, anticipate performance over targeted test conditions, and establish a framework for future model calibration against experimental data. At the conclusion of the project performance period, the facility was in final assembly, and the pressure boundary was nearly completed. However, several practical challenges associated with high-pressure/high-temperature systems and specialized component procurement impacted schedule and prevented initial pump-driven operation and full commissioning within the available resources. This report documents the as-built design, operating capabilities, and instrumentation, and it summarizes key lessons learned related to heater fabrication and testing, first-of-a-kind assembly factors, specialty flange supply constraints, and fill pump corrective actions. Finally, it outlines a phased plan for future commissioning and experimental campaigns, including control and instrumentation shakedown, heater characterization, model calibration, and testing at state points representative of EarthEn’s TES cycle.

25 ENERGY STORAGE↗

Demonstrations of System-Level Autonomy for Spacecraft

System-level autonomy refers to autonomously meeting the crosscutting needs of a system through awareness and coordinated control spanning the system's breadth of capabilities. In contrast to function-level autonomy, which focuses on capabilities required to achieve a specific function such as surface navigation or image recognition, system-level autonomy addresses the needs to coordinate and manage activities and resources, and estimate the state, across subsystems. This paper describes demonstrations that were conducted on a spacecraft workstation testbed. The autonomy was provided by system-level planning and execution integrated with system-level estimators of orbit knowledge and spacecraft hardware health. These components are embedded in a system-level framework defining how goals are formed and executed, which elements exist, and how control authority is distributed among components. The planning and execution system at the heart of the framework has the capability to schedule, execute and monitor completion of tasks, as well as plan around unexpected events including new science opportunities and anomalies. The planning and scheduling system is the Multi-mission EXECutive (MEXEC), supported by the system-level health state estimator Model-Based Off-Nominal State Identification and Detection (MONSID), and Autonomous Navigation (AutoNav) algorithms, which determine the orbital system state based on optical observation of other targets. These components are applicable to many kinds of missions on different platforms. These demonstrations were elaborations of earlier experiments conducted on the ASTERIA (Arcsecond Space Telescope Enabling Research In Astrophysics) CubeSat, described in a companion submission [1]. The spacecraft’s extended mission served as an in-flight test platform, during which some individual autonomous capabilities were flown successfully. The autonomy experiments described here were performed on the ASTERIA workstation testbed.

Prather, Maurice↗

Cyber-Physical Dynamic System (CPDS) Modeling for Frequency Regulation and AGC Services of Distributed Energy Resources

The substantial integration of renewable energy brings significant challenges to balance the system in real time because of the variability and intermittency of renewable power. For the reliable system operation, the frequency regulation service is used to stabilize the system frequency through automatically balancing the system generation and load. On one hand, with the substantially increasing deployment of renewable energy in electricity system, the requirement of frequency regulation (FR) services increases significantly. On the other hand, the current main resource of FR services, the controllable conventional generation, is continuously decreasing in the system generation mix. This means that in the future high renewable penetration power system, additional and alternative reliable FR services providers such as distributed energy storage (DES) resources should be explored. Although the capability of utility-scale energy storage to provide FR services has been demonstrated, the integrated control and dynamic modeling of distributed energy resource (DER) providing frequency regulation grid services has been rarely explored. There are several challenges to adopt DERs to provide reliable grid services as illustrated in FERC 755. First, the distributed installation of DES requires a comprehensive cyber-physical dynamic system (CPDS) modeling to fully consider the impacts of the communication latency variability on its real time FR provision capability. Unlike the conventional generators, there are two-layer communication between DERs and system operators which increase the communication delay. Second, unlike the conventional generators whose dynamic models have been comprehensively studied, the difference among individual DER components' power-dynamic characteristic brings challenges in the accurate dynamic AGC modeling of its power-frequency relationship. Third, the temporal dependent state of charge uncertainty of DERs challenges DERs' power and frequency regulation capacities scheduling in the look-ahead generation scheduling. Therefore, the aggregator should optimize the frequency regulation provision from individual DER in real time. To overcome these challenges, this project proposes a cyber-physical dynamic system (CPDS) model to handle the uncertainty of DERs two-layer communication latency and power dynamics. The variability of DERs' communication delay and dynamic constraints will be comprehensively modeled. The DERs' AGC model with communication delay is designed to validate DESs' frequency regulation services. Like current performance-based frequency regulation evaluation, the delivery of DERs' frequency regulation will be assessed through post-analysis of the actual AGC response with respect to the AGC control signal from system operators. Consequently, the reliability improvement with DERs providing reliable frequency regulation services can be evaluated from a comprehensive perspective considering all the dynamics of communication and power.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact, a Tool Suite for Crew Health and Performance System Trade Analyses and Decision Support - Status of Development

Mission planners, systems engineers, and clinicians that support crew health and performance face very difficult choices on upcoming exploration missions. Given that there will be a heavily constrained mass and volume allocation for a medical system on these missions, what medical capability should be manifested to minimize both medical risk and mission risk? Given that not all promising research and technology proposals can be funded, how can proposals be prioritized so that those funded research investments produce the maximum benefit in reducing overall medical risk? The Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) project seeks to answer these kinds of questions and others to support upcoming exploration missions. IMPACT enables risk-informed and evidence-based trade space analysis for future space vehicles, missions, and systems. This presentation will discuss the long-term HRP and ExMC vision for the larger ecosystem of tools, which include an updated medical database (consisting of an Evidence Library for medical conditions and a medical item database (MedID) for medical resources), dynamic Probabilistic Risk Assessment (PRA) capabilities, System Modeling Language (SysML) models, and contextual data visualizations of output data. IMPACT is the result of a multi-center collaborative effort. The trade space analyses performed by IMPACT can directly inform mission, vehicle, and habitat development by quantifying medical risk, given a design reference mission, crew attributes and a set of medical capabilities. This presentation will update the audience on the development status of the tool suite, its constituent parts and the plans for when it will deploy as an operational product, currently scheduled for the end of FY22. Recent development successes on the IMPACT project include the ability to cluster medical resources into medical capabilities and mutually-dependent bundles, the ability to perform trade analyses on different medical sets, different DRMs, and different crew complements, and the ability to specify mission segments as periods of time assigned to one or more members of the crew during which unique mission events occur (e.g., extravehicular activities, surface operations, gravity well adaptations, etc.). IMPACT is gearing up for its verification and validation phase to compile the data package necessary for a successful Transition to Operations (TtO), per the guidance in NPR 8900.1B .

IMPACT↗

Project Management Using Modern Guidance, Navigation and Control Theory

The idea of control theory and its application to project management is not new, however literature on the topic and real-world applications is not as readily available and comprehensive in how all the principals of Guidance, Navigation and Control (GN&C) apply. This paper will address how the fundamental principals of modern GN&C Theory have been applied to NASA's Constellation Space Suit project and the results in the ability to manage the project within cost, schedule and budget. A s with physical systems, projects can be modeled and managed with the same guiding principles of GN&C as if it were a complex vehicle, system or software with time-varying processes, at times non-linear responses, multiple data inputs of varying accuracy and a range of operating points. With such systems the classic approach could be applied to small and well-defined projects; however with larger, multi-year projects involving multiple organizational structures, external influences and a multitude of diverse resources, then modern control theory is required to model and control the project. The fundamental principals of G N&C stated that a system is comprised of these basic core concepts: State, Behavior, Control system, Navigation system, Guidance and Planning Logic, Feedback systems. The state of a system is a definition of the aspects of the dynamics of the system that can change, such as position, velocity, acceleration, coordinate-based attitude, temperature, etc. The behavior of the system is more of what changes are possible rather than what can change, which is captured in the state of the system. The behavior of a system is captured in the system modeling and if properly done, will aid in accurate system performance prediction in the future. The Control system understands the state and behavior of the system and feedback systems to adjust the control inputs into the system. The Navigation system takes the multiple data inputs and based upon a priori knowledge of the input, will develop a statistical-based weighting of the input to determine where the system currently is located. Guidance and Planning logic of the system with the understanding of where it is (provided by the navigation system) will in turn determine where it needs to be and how to get there. Lastly, the system Feedback system is the right arm of the control system to allow it to affect change in the overall system and therefore it is critical to not only correctly identify the system feedback inputs but also the system response to the feedback inputs. And with any systems project it is critical that the objective of the system be clearly defined for not only planning but to be used to measure performance and to aid in the guidance of the system or project.

Hill, Terry↗

IMPACT, a Tool Suite for Crew Health and Performance System Trade Analyses and Decision Support - Status of Development

Mission planners, systems engineers, and clinicians that support crew health and performance face very difficult choices on upcoming exploration missions. Given that there will be a heavily constrained mass and volume allocation for a medical system on these missions, what medical capability should be manifested to minimize both medical risk and mission risk? Given that not all promising research and technology proposals can be funded, how can proposals be prioritized so that those funded research investments produce the maximum benefit in reducing overall medical risk? The Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) project seeks to answer these kinds of questions and others to support upcoming exploration missions. IMPACT enables risk-informed and evidence-based trade space analysis for future space vehicles, missions, and systems. This presentation will discuss the long-term HRP and ExMC vision for the larger ecosystem of tools, which include an updated medical database, consisting of an Evidence Library for medical conditions and a medical item database (MedID) for medical resources, dynamic Probabilistic Risk Assessment (PRA) capabilities, System Modeling Language (SysML) models, and contextual data visualizations of output data. IMPACT is the result of a multi-center collaborative effort. The trade space analyses performed by IMPACT can directly inform mission, vehicle, and habitat development by quantifying medical risk, given a design reference mission, crew attributes and a set of medical capabilities. This presentation will update the audience on the development status of the tool suite as it nears its System Acceptance Review (SAR). It will review IMPACT’s constituent parts, briefly discuss typical outputs and outline the plans for transitioning to operations, currently scheduled for later in FY23. Recent development successes on the IMPACT project include the integration of the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) v2.0 to accommodate segmented missions with multiple carriers and medical systems, full onboarding of the IMPACT Medical Database (IMPACT-MD), clustering medical resources and skills into medical capabilities and mutually-dependent bundles, and the ability to perform trade analyses on different medical sets, different design reference missions (DRM), with different crew complements and extra-vehicular activity (EVA) schedule.

IMPACT↗

Impact, A Tool Suite for Crew Health and Performance System Trade Analyses and Decision to Support - Transition to Operations

Mission planners, systems engineers, and clinicians that support crew health and performance face very difficult choices on upcoming exploration missions. Given that there will be a heavily constrained mass and volume allocation for a medical system on these missions, what medical capability should be manifested to minimize both medical risk and mission risk? Given that not all promising research and technology proposals can be funded, how can proposals be prioritized so that those funded research investments produce the maximum benefit in reducing overall medical risk? The Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) project seeks to answer these kinds of questions and others to support upcoming exploration missions. IMPACT enables risk-informed and evidence-based trade space analysis for future space vehicles, missions, and systems. This presentation will discuss the long-term HRP and ExMC vision for the larger ecosystem of tools, which include an updated medical database, consisting of an Evidence Library for medical conditions and a medical item database (MedID) for medical resources, dynamic Probabilistic Risk Assessment (PRA) capabilities, System Modeling Language (SysML) models, and contextual data visualizations of output data. IMPACT is the result of a multi-center collaborative effort. The trade space analyses performed by IMPACT can directly inform mission, vehicle, and habitat development by quantifying medical risk, given a design reference mission, crew attributes and a set of medical capabilities. This presentation will update the audience on the development status of the IMPACT tool suite as it comes out of its System Acceptance Review (SAR) and nears Transition to Operations (TTO). It will review IMPACT’s constituent parts, briefly discuss typical outputs, and outline the plans for transitioning to operations, currently scheduled for later in FY24. Recent development successes on the IMPACT project include the integration of the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) v2.0 to accommodate segmented missions with multiple carriers and medical systems, full onboarding of the IMPACT Medical Database (IMPACT-MD), clustering medical resources and skills into medical capabilities and mutually-dependent bundles, verification of IMPACT-MD, and the ability to perform trade analyses on different medical sets, different design reference missions (DRM), with different crew complements and extra-vehicular activity (EVA) schedules.

IMPACT↗

IMPACT, A Tool Suite for Crew Health and Performance System Trade Analyses and Decision Support- Transition to Operations

Mission planners, systems engineers, and clinicians that support crew health and performance face very difficult choices on upcoming exploration missions. Given that there will be a heavily constrained mass and volume allocation for a medical system on these missions, what medical capability should be manifested to minimize both medical risk and mission risk? Given that not all promising research and technology proposals can be funded, how can proposals be prioritized so that those funded research investments produce the maximum benefit in reducing overall medical risk? The Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) project seeks to answer these kinds of questions and others to support upcoming exploration missions. IMPACT enables risk-informed and evidence-based trade space analysis for future space vehicles, missions, and systems. This presentation will discuss the long-term HRP and ExMC vision for the larger ecosystem of tools, which include an updated medical database, consisting of an Evidence Library for medical conditions and a medical item database (MedID) for medical resources, dynamic Probabilistic Risk Assessment (PRA) capabilities, System Modeling Language (SysML) models, and contextual data visualizations of output data. IMPACT is the result of a multi-center collaborative effort. The trade space analyses performed by IMPACT can directly inform mission, vehicle, and habitat development by quantifying medical risk, given a design reference mission, crew attributes and a set of medical capabilities. This presentation will update the audience on the development status of the IMPACT tool suite as it comes out of its System Acceptance Review (SAR) and nears Transition to Operations (TTO). It will review IMPACT’s constituent parts, briefly discuss typical outputs, and outline the plans for transitioning to operations, currently scheduled for later in FY24. Recent development successes on the IMPACT project include the integration of the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) v2.0 to accommodate segmented missions with multiple carriers and medical systems, full onboarding of the IMPACT Medical Database (IMPACT-MD), clustering medical resources and skills into medical capabilities and mutually-dependent bundles, verification of IMPACT-MD, and the ability to perform trade analyses on different medical sets, different design reference missions (DRM), with different crew complements and extra-vehicular activity (EVA) schedules.

IMPACT↗

Investigation into Scalable and Detection-Enhanced Satellite Conjunction Assessment

Imaging opportunities (viewable conjunctions) of Resident Space Objects (RSOs) by satellites are not continuously discovered. We propose to continuously produce and report viewable conjunctions among objects in orbit. Viewable conjunctions are events in space and time when a satellite may favorably view a Resident Space Object (RSO). Favorability is defined by a set of constraints, e.g., solar illumination, distance between observer and target, orbital location for viewable event. Computing viewable conjunctions requires calculation of orbital propagation while considering constraints based on the state vectors of position, velocity, with covariance for both satellite and RSO. We propose two parallel lanes of effort: acceleration and research. The objective of acceleration is to avoid missed opportunities and reduce latency for satellite maneuver requests through continuous prediction and reporting of viewable conjunctions. The effort will begin by deploying currently available software on dedicated systems and continue with optimizing the code for high performance computing hardware. The research lane aims to expand RSO inspection and modeling capabilities. Among our current research ideas are spectral characterization of RSO materials and planning multiple observations to recover RSO 3D form. Computing resources at Oak Ridge National Laboratory (ORNL) are available for the acceleration work. Laika, Maxar conjunction prediction dashboard software, and Bluesim, Maxar orbital propagation software, are expected to be the first software in the acceleration lane. Laike and Bluesim are to be provided by the sponsor, and output will be made accessible through its dashboard. Deliverables will follow a gated schedule to the sponsor. ORNL will provide progressively more robust viewable conjunction assessments from both modelled and actual ephemerides.

97 MATHEMATICS AND COMPUTING↗

Automated and Adaptive Mission Planning for Orbital Express

The Orbital Express space mission was a Defense Advanced Research Projects Agency (DARPA) lead demonstration of on-orbit satellite servicing scenarios, autonomous rendezvous, fluid transfers of hydrazine propellant, and robotic arm transfers of Orbital Replacement Unit (ORU) components. Boeing's Autonomous Space Transport Robotic Operations (ASTRO) vehicle provided the servicing to the Ball Aerospace's Next Generation Serviceable Satellite (NextSat) client. For communication opportunities, operations used the high-bandwidth ground-based Air Force Satellite Control Network (AFSCN) along with the relatively low-bandwidth GEO-Synchronous space-borne Tracking and Data Relay Satellite System (TDRSS) network. Mission operations were conducted out of the RDT&E Support Complex (RSC) at the Kirtland Air Force Base in New Mexico. All mission objectives were met successfully: The first of several autonomous rendezvous was demonstrated on May 5, 2007; autonomous free-flyer capture was demonstrated on June 22, 2007; the fluid and ORU transfers throughout the mission were successful. Planning operations for the mission were conducted by a team of personnel including Flight Directors, who were responsible for verifying the steps and contacts within the procedures, the Rendezvous Planners who would compute the locations and visibilities of the spacecraft, the Scenario Resource Planners (SRPs), who were concerned with assignment of communications windows, monitoring of resources, and sending commands to the ASTRO spacecraft, and the Mission planners who would interface with the real-time operations environment, process planning products and coordinate activities with the SRP. The SRP position was staffed by JPL personnel who used the Automated Scheduling and Planning ENvironment (ASPEN) to model and enforce mission and satellite constraints. The lifecycle of a plan began three weeks outside its execution on-board. During the planning timeframe, many aspects could change the plan, causing the need for re-planning. These variable factors, ranging from shifting contact times to ground-station closures and required maintenance times, are discussed along with the flexibility of the ASPEN tool to accommodate changes to procedures and the daily or long-range plan, which contributed to the success of the mission. This paper will present an introduction to ASPEN, a more in-depth discussion on its use on the Orbital Express mission, and other relative work. A description of ground operations after the SRP deliveries were made is included, and we briefly discuss lessons learned from the planning perspective and future work.

scheduling↗

Quantitative Metrics for Grid Resilience Evaluation and Optimization

Power system resilience has become a critical topic in recent years because of the increasing trend of extreme events and the growing integration of intermittent renewable energy sources. To enhance grid resilience against high-impact, low-frequency events, two questions should be answered: how to quantify the resilience of a given grid and how to incorporate the quantification into power system planning, operation, and restoration. Here this paper develops a new set of quantitative metrics with clear physical interpretation to comprehensively evaluate power system resilience. Using microgrids as an example, an event-based corrective scheduling (ECS) model and an online model predictive control (OMPC) model are developed to integrate the proposed quantitative resilience metrics into power system optimization models for resilience enhancement. The ECS model employs extreme event data to investigate the optimal restoration solution and to help microgrid operators prepare to respond to similar events. The OMPC model provides online decision-making support for operators to handle ongoing outages in the most resilient fashion. The effectiveness and superiority of the proposed quantitative resilience metrics and the resilience enhancement models are demonstrated through simulations and comparative studies on an IEEE test feeder and a real distribution feeder in Southern California.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Process-Based Cost Estimation for Ramjet/Scramjet Engines

Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.

Singh, Brijendra↗

Stochastic Continuous-time Flexibility Scheduling and Pricing in Wholesale Electricity Markets

Large-scale integration of intermittent renewable energy sources (RES) is calling for additional flexibility resources as well as more advanced modeling and optimization techniques to account for the increasing uncertainty and variability in power systems operation. As the RES integration gains momentum, the magnitude and frequency of their variations increase, which may trigger ramping scarcity events in real-time power systems operation. This necessitates revisiting the present definition of power systems flexibility and reserve services to reflect their robustness and adequacy towards sub-interval variations of the load and RES, as well as adjusting the operation models to accommodate the new reserve services. This project took a fundamental approach and aimed at developing continuous-time scheduling and pricing model that accurately models the continuous-time variations of load and RES and efficiently deploys the ramping capability of flexible resources to compensate the sources of variability and uncertainty in the market. In this regard, this project pursued the following goals: Developing stochastic multi-fidelity continuous-time optimization models for scheduling of energy storage (ES) systems and flexible loads in wholesale energy markets; Developing the theory and practices of continuous-time locational marginal pricing for valuating energy storage systems and flexible loads in wholesale energy markets; Developing function space solution approach to convert the proposed stochastic multi-fidelity continuous-time optimization models into tractable mixed-integer linear optimization models; and Defining flexibility reserve as a new type of reserve in markets that would enable ultimate participation of energy storage devices in provision of services to compensate the variability and uncertainty of RES in electricity markets. This project successfully completed all five major tasks defined in the SOPO, and produced 8 high-impact journal papers, 6 conference papers, 3 published U.S. patents, and one web-based software for continuous-time operation optimization of power systems. The application of the proposed flexibility reserve and the stochastic multi-fidelity continuous-time operation scheduling models would modify the forward commitment and schedule of generating units, ES devices and flexible loads, and would line up the resources in such a way that the composition of available resources is better prepared to respond to the sub-hourly variations of the load and renewable resources in real-time operation. Therefore, this project paves the way to sustainable, reliable, and economic integration of renewable energy resources in power system, supporting the progress towards reaching the national targets on energy independence. Even if the proposed models offers a radically different point of view as compared to existing models, it does not alter fundamentally the architecture of power systems operations, nor the complexity of the scheduling problem, so the integration of this project in power systems is extremely practical.

24 POWER TRANSMISSION AND DISTRIBUTION↗