Search NASASearch

SEARCH · Search NASA

Results for “security verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

41 records · Page 3

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2023

Pacific Northwest National Laboratory (PNNL), one of the U.S. Department of Energy (DOE) Office of Science’s 10 national laboratories, provides innovative science and technology development in the areas of energy and the environment, fundamental and computational science, and national security. There are three DOE offices within the Richland area. Two are responsible for the Hanford Site, whereas the Pacific Northwest Site Office oversees PNNL. PNNL prepares an Annual Site Environmental Report to meet the requirements of DOE Order 231.1B, Environment, Safety and Health Reporting, and DOE Order 458.1, Radiation Protection of the Public and the Environment, thus assuring that the public is informed of any PNNL-Richland campus or PNNL-Sequim campus event that could adversely affect the health and safety of the public, site staff, or the environment. The report provides a synopsis of ongoing environmental management performance and compliance activities for operations that occur at the PNNL-Richland campus in Richland, Washington, and at the PNNL-Sequim campus near Sequim, Washington. It describes the location of and background for each facility; addresses compliance with applicable DOE, federal, state, and local regulations, and site-specific permits; documents environmental monitoring efforts and their status; presents potential radiation doses to staff and the public in the surrounding areas; and describes DOE-required data quality assurance methods used for data verification. The ASER report describes Compliance with Federal, State, and Local Laws and Regulations in 2023, Environmental Sustainability, Environmental monitoring and dose assessment, Natural and Cultural Resource Management, and Quality Assurance activities that took place during Calendar Year 2023.

40 CFR 61 Subpart H

A new HALEU isotopic certified reference material

Candidate certified reference material (CRM) U196 was prepared by gravimetrically mixing and dissolving NNSA NRMP CRM 112-A (natural uranium metal) and CRM 116-A (highly enriched 93.2% 235 U metal) to achieve a high-assay low-enriched uranium (HALEU) isotopic abundance reference material. CRM U196 will be certified for the 233 U/ 238 U, 234 U/ 238 U, 235 U/ 238 U, and 236 U/ 238 U ratios. Gravimetrically determined uranium isotope amount ratios and values derived from the isotope data were calculated from the buoyancy corrected mass data and from certified values for the metal CRMs used to create the solution. The 235 U isotope amount fraction (·100) and expanded uncertainty is 19.5846 ± 0.0028. For attribute verification, total evaporation and modified total evaporation isotope ratio measurements were performed. In conclusion, the reference material is to be distributed as a unit containing 5 mg uranium as dry uranyl nitrate.

High-assay low-enriched uranium

Energy Improvements of Fire Station 71

Since 2018, the City of Shawnee, Kansas has completed two phases of the State of Kansas Facility Conservation Improvement Program (FCIP), an initiative that guarantees operational cost and energy savings through targeted construction improvements on City facilities and infrastructure. The City is currently in the third phase of this FCIP, where one of the projects included an investment in energy improvements for Fire Station 71 (FS 71). The City partnered with Navitas, an Energy Service Company (ESCO), to implement a Photovoltaic Solar Array on FS71. The purpose of this project was to invest in sustainable building improvements with Energy Conservation Measures (ECM) to bring cost savings to the City and to provide sustainable benefits to the residents of Shawnee. In the first task of the project, Navitas collaborated with the City of Shawnee and the Community Development Department to determine the optimal layout and schedule for the installation of the solar array on FS 71. In the second task of the project, Navitas installed the 99.8 kW DC Photovoltaic solar array system. This system installation comprised of racking, inverters, optimizers, load center, and disconnect, which were all installed at a total ECM price of $\$$247,948. The third task focused on start-up and commissioning of the array. Navitas installed a real-time data analytics information management system integrated with utility meters, which evaluates the operations of the utility system and verifies operation of equipment and ensures optimum operation for energy efficiency. In the final task of this project, this analytics system was used for monitoring and verification, which will continue to be used to evaluate the success of the project for the coming years. The primary goal of the project was to install the 99.8 kW DC PV solar array at FS 71 to demonstrate the viability of solar energy systems in essential municipal facilities. Fire stations are energy demanding structures, as they require a constant intake of power and have a high baseline energy usage. The success of solar arrays on a fire station exemplifies their energy efficiency and effectiveness and displays their potential for application on other city facilities. By installing a solar array at such a facility, the City sought not only to offset electricity usage but also to serve as a model for ECMs in other municipal facilities and infrastructure projects. From an economic standpoint, this project demonstrates the feasibility of renewable energy at the municipal level. The total project cost of $\$$247,948 was split evenly between city funds and award funding, minimizing financial risk while ensuring guaranteed long-term savings. Any excess savings that are beyond the guaranteed minimums remain with the city, which enables future investment in sustainable energy initiatives. This project provides many benefits to the public. In addition to reducing the environmental footprint of city operations, it lowers taxpayer-funded utility spending and improves the energy security of a critical facility. The knowledge gained from this implementation motivates the City to focus on similar efforts across other public facilities in future FCIP phases and other City projects.

14 SOLAR ENERGY

CLimate Impact: Determining Etiology thRough pAthways (CLDERA)

Climate impacts have broad economic, health, political, and national security ramifications. Societally relevant impacts are typically farther downstream, are the product of multiple interacting processes, and can arise over small regions and timeframes because their sources are short-term and localized. Short-term forcings (as can be seen in volcanic eruptions, climatic tipping points (e.g., the collapse of rainforests or the disappearance of sea ice), or in increasingly plausible climate interventions) fundamentally possess low signal-to-noise and could benefit from accounting for the multiple conditional processes through which a downstream impact arises. Under the Grand Challenge LDRD CLDERA (CLimate impacts: Discovering Etiology thRough pAthways), we have developed tools to enable downstream impact attribution from geographically and temporally localized source forcings in the climate. CLDERA developed methods that can distinguish how a localized source drives the climate system to respond with particular impacts. The how is embodied in pathways – the spatio-temporally evolving chain of physical processes that connects a source to a series of increasingly distant impacts. Novel analytic methods in pursuit of downstream impact attribution were developed and demonstrated on simulations and observations of the 1991 eruption of Mt. Pinatubo in the Philippines. As described within this report we have • developed stratospheric expertise and aerosol modeling capabilities in E3SM, • created original methods to detect and model pathways from source-to-impact, and • advanced climate attribution through novel methods, cases, and approaches. Further, CLDERA developed a tiered verification process consisting of controlled datasets to prototype, verify, and refine the original method development. CLDERA increased Sandia’s footprint in the climate analytics community and developed new climate collaborations whilst also creating a cadre of climate analysts at Sandia. The products from CLDERA have been extensive with a total of 9 journal articles published, 12 articles submitted and under review, and an additional 8 articles in preparation. We have produced 1750 simulated years and developed 9 code-bases. This report details these accomplishments and serves as a summary of the work completed during the CLDERA Grand Challenge.

54 ENVIRONMENTAL SCIENCES

Thermal Reservoir Networks for Modularly Expandable Thermal Microgrids

The Department of Defense (DoD) faces the substantial challenge of cost-effectively retrofitting one to two installations per month, each comprising approximately 1,000 buildings, to improve resilience, reduce energy consumption, and enhance energy supply security. Achieving these objectives requires optimal system selection and effective risk mitigation during system integration. To address this need, we introduce Platform-Based Design (PBD), a structured, hierarchical methodology adapted from other industrial sectors to the domain of energy system retrofits. We demonstrate the effectiveness of PBD through a techno-economic feasibility study comparing geothermal-coupled thermal energy networks (TENs) with conventional energy systems for heating, cooling, and powering 17 buildings at Joint Base Andrews (JBA) in Maryland. Our analysis illustrates that the PBD approach enables rigorous, data-driven, sequential decision making, resulting in a family of Pareto-optimal systems, among which the TEN emerged as the most promising solution. The selected TEN design integrates geothermal borefields, heat recovery heat pumps, photovoltaic (PV) arrays, and battery storage. Compared to the baseline system – gas heating combined with air-source chillers – the proposed TEN reduces annual imported energy by 74% and peak electricity demand by 45%, achieves a levelized cost of energy of $\$0.210$/kWh, and substantially enhances resilience. Life-cycle costs increase by approximately 6%, and initial investment costs are about 2.5 times higher than the baseline. However, if central plant infrastructure, district loops, and utility-scale PV and battery systems are privately funded and operated, the initial investment would fall below the baseline system cost. Critical to achieving these significant performance improvements were detailed nonlinear dynamic simulations coupling geothermal heat transfer, energy system operation, and realistic feedback control logic. These simulations identified essential design modifications and control strategy refinements that substantially reduced energy use, peak demand, and compressor shortcycling, thereby improving durability and reliability—issues that would have been significantly more expensive to resolve during operation. Additionally, the verification step highlighted sensitivities to key design parameters that could reduce initial investment by approximately $\$2$ million and reduce annual life-cycle costs more than $\$300,000$. We recommend adopting the PBD methodology for future feasibility studies and TEN pilot projects to gain valuable operational experience. Furthermore, we recommend that DoD invest in transferring and scaling the PBD methodology to other installations. This entails developing standardized computational frameworks and component libraries as well as training industry in conducting PBD. Such investments would enable rapid, robust, reliable, and cost-effective retrofits, supporting DoD’s ambitious energy system modernization goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI