Search NASA⌕ Search

SEARCH · Search NASA

Results for “sequencing test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

A Simulation Based Investigation of High Latency Space Systems Operations

This study was the first in a series of planned tests to use physics-based subsystem simulations to investigate the interactions between a spacecraft's crew and a ground-based mission control center for vehicle subsystem operations across long communication delays. The simulation models the life support system of a deep space habitat. It contains models of an environmental control and life support system, an electrical power system, an active thermal control system, and crew metabolic functions. The simulation has three interfaces: 1) a real-time crew interface that can be use to monitor and control the subsystems; 2) a mission control center interface with data transport delays up to 15 minute each way; and 3) a real-time simulation test conductor interface used to insert subsystem malfunctions and observe the interactions between the crew, ground, and simulated vehicle. The study was conducted at the 21st NASA Extreme Environment Mission Operations (NEEMO) mission. The NEEMO crew and ground support team performed a number of relevant deep space mission scenarios that included both nominal activities and activities with system malfunctions. While this initial test sequence was focused on test infrastructure and procedures development, the data collected in the study already indicate that long communication delays have notable impacts on the operation of deep space systems. For future human missions beyond cis-lunar, NASA will need to design systems and support tools to meet these challenges. These will be used to train the crew to handle critical malfunctions on their own, to predict malfunctions, and to assist with vehicle operations. Subsequent more detailed and involved studies will be conducted to continue advancing NASA's understanding of space systems operations across long communications delays.

Li, Zu Qun↗

Integrated sequence display device

Device integrates a planned test sequence with real-time changes indicated on a visual display which includes a record of both planned and unplanned events related to a time base. Motor driven paper chart can be advanced or reversed to display the time span of interest.

Rosine, D. R.↗

First heated jettison test on the Centaur standard shroud

The first in a planned series of heated jettison tests on the Centaur Standard Shround was conducted at NASA Plum Brook Station's Space Power Facility on November 19, 1973. The first 250-second portion of the test sequence involved heating the shroud with a specially-built fixture designed to provide a simulation of the heating environment encountered by the shroud during its ascent through the earth's atmosphere. The two heater halves, which were mounted on a rail system, were then retracted. This was followed by the jettison of the two shroud halves into catch nets positioned at 90 deg to the heater rails. The condition which made this test unique compared to the planned subsequent tests was the location of the maximum thermal line at 32 deg from the shroud separation plane. Information on the test hardware, configuration, and sequence is presented. Shroud thermal and deflection data encountered during the heating portion of the test sequence is compared with free-skin design temperatures in various graphical formats.

Source record↗

Second heated jettison test on the Centaur standard shroud

The second in a planned series of heated jettison tests on the Centaur Standard Shroud was conducted on January 16, 1974. The first 250-second portion of the test sequence involved heating the shroud with a specially-built fixture designed to provide a simulation of the heating environment encountered by the shroud during its ascent through the earth's atmosphere. The two heater halves, which were mounted on a rail system, were then retracted. This was followed by the jettison of the two shroud halves into catch nets positioned at 90 deg to the heater rails. The condition which made this test unique compared to the others in the test series was the alignment of the maximum thermal line with the shroud separation plane. Information on the test hardware, configuration, and sequence is presented. Shroud thermal and deflection data encountered during the heating portion of the test sequence are compared with free-skin design temperatures in various graphical formats.

Source record↗

Environmental Testing of the NEXT PM1R Ion Engine

The NEXT propulsion system is an advanced ion propulsion system presently under development that is oriented towards robotic exploration of the solar system using solar electric power. The subsystem includes an ion engine, power processing unit, feed system components, and thruster gimbal. The Prototype Model engine PM1 was subjected to qualification-level environmental testing in 2006 to demonstrate compatibility with environments representative of anticipated mission requirements. Although the testing was largely successful, several issues were identified including the fragmentation of potting cement on the discharge and neutralizer cathode heater terminations during vibration which led to abbreviated thermal testing, and generation of particulate contamination from manufacturing processes and engine materials. The engine was reworked to address most of these findings, renamed PM1R, and the environmental test sequence was repeated. Thruster functional testing was performed before and after the vibration and thermal-vacuum tests. Random vibration testing, conducted with the thruster mated to the breadboard gimbal, was executed at 10.0 Grms for 2 min in each of three axes. Thermal-vacuum testing included three thermal cycles from 120 to 215 C with hot engine re-starts. Thruster performance was nominal throughout the test program, with minor variations in a few engine operating parameters likely caused by facility effects. There were no significant changes in engine performance as characterized by engine operating parameters, ion optics performance measurements, and beam current density measurements, indicating no significant changes to the hardware as a result of the environmental testing. The NEXT PM1R engine and the breadboard gimbal were found to be well-designed against environmental requirements based on the results reported herein. The redesigned cathode heater terminations successfully survived the vibration environments. Based on the results of this test program and confidence in the engineering solutions available for the remaining findings of the first test program, specifically the particulate contamination, the hardware environmental qualification program can proceed with confidence

Snyder, John S.↗

Taurus II Stage Test Simulations: Using Large-Scale CFD Simulations to Provide Critical Insight into Plume Induced Environments During Design

This paper describes the use of targeted Loci/CHEM CFD simulations to evaluate the effects of a dual-engine first-stage hot-fire test on an evolving integrated launch pad/test article design. This effort was undertaken as a part of the NESC Independent Assessment of the Taurus II Stage Test Series. The underlying conceptual model included development of a series of computational models and simulations to analyze the plume induced environments on the pad, facility structures and test article. A pathfinder simulation was first developed, capable of providing quick-turn around evaluation of plume impingement pressures on the flame deflector. Results from this simulation were available in time to provide data for an ongoing structural assessment of the deflector. The resulting recommendation was available in a timely manner and was incorporated into construction schedule for the new launch stand under construction at Wallops Flight Facility. A series of Reynolds-Averaged Navier-Stokes (RANS) quasi-steady simulations representative of various key elements of the test profile was performed to identify potential concerns with the test configuration and test profile. As required, unsteady Hybrid-RANS/LES simulations were performed, to provide additional insight into critical aspects of the test sequence. Modifications to the test-specific hardware and facility structures thermal protection as well as modifications to the planned hot-fire test profile were implemented based on these simulation results.

Struzenberg, L. L.↗

Space Telescope precision pointing control system

The Hubble Space Telescope has the most stringent pointing requirements imposed on any spacecraft to date. The overall HST stability shall not exceed 0.007 arc-seconds rms. The Pointing Control System utilizes fine guidance sensors and rate gyros for attitude reference and rate information. Control torques are provided by reaction wheels. A digital computer collects the sensor data, performs the control law computations, and sends torque commands to the reaction wheels. To attain this precision pointing, improvements were made to the rate gyros to lower their noise characteristics and to the reaction wheels to reduce their emitted vibration levels. The control system design was validated in a test sequence which progressed from model verification tests on an air-bearing to operations-oriented, closed loop testing on the assembled vehicle. A test system is described which allowed the simultaneous production of test case command loads for the flight computer and plots of predicted profiles to assist in test data analysis. Workarounds were required during system test to accommodate gyro biases and noise introduced into the closed loop system. Testing and analysis indicate that the HST will provide the capability to meet the requirements for precision pointing.

Beals, G. A.↗

A Summary of Airframe Results from a Fokker F28 Full-Scale Crash Test

On June 20, 2019, a full-scale crash test was conducted on a Fokker F28 MK1000 aircraft as a part of a joint NASA / Federal Aviation Administration (FAA) research effort to investigate the crashworthiness characteristics of a Transport Category Aircraft (TCA), as defined by 14 Code of Federal Regulations, Part 25. The test was conducted at NASA Langley Research Center’s Landing and Impact Research Facility and was the third in a test series to further understand TCA crashworthiness characteristics. The test article featured 24 Anthropomorphic Test Devices (ATDs, a.k.a. crash test dummies), and over 700 channels of instrumentation covering major aircraft structures such as the wings, tail, nose, cockpit and cabin, along with recording seat, overhead bin and ATD accelerations. Five different U.S. Government agencies collaborated on the test including: NASA, the FAA, the U.S. Army Research Laboratory, the National Transportation Safety Board (NTSB) and the National Highway Traffic Safety Administration (NHTSA). This report will covertest article build up, which includes weight and balance measurements and pre-test laser scans. It will also cover the events of the test, which includes the test sequence of events and post-test damage inspections. Finally, it will show airframe level accelerations at all positions measured, with discussion on correlation to the airframe damage witnessed. The test build up consisted of outfitting the main cabin section of the aircraft with 24 ATDs seated in 12 rows of seats, overhead mass and the under floor cargo area with foam representing the luggage. The main cabin also included all of the onboard data system pallets, which recorded711 channels of data from the test. All major portions of the aircraft were instrumented, including locations at the floor / frame junction locations in the cabin where the ATDs were located along with other major exterior components such as the nose, the tail, each engine cowling, and at overhead hat rack ballast locations. The aircraft impacted a soil surface at65.3 ft/s horizontal and 31.8 ft/s vertical velocities. The aircraft plowed through the soil and slid a distance of 32.5 feet from the initial impact location. There was a secondary impact occurring 0.9 s due to the “slap down” of the nose during the post-impact response. The duration of the event from impact to rest was1.62 seconds. There was major structural damage in the lower fuselage areas around the Wingbox and Aft Fuselage sections. The Aft Fuselage section deformation caused some cabin intrusion from the keel beams pushing the aft cabin floor into the cabin. Other structural deformations occurred around the tail and at transition regions in the aircraft structure; mainly in locations of differing overall stiffness. The data obtained showed average vertical accelerations between 12 and 16 g with spikes reaching almost 40 g at certain floor locations. Average horizontal accelerations were approximately 10 g for all floor locations measured with spikes reaching approximately 25 g in some locations. The report includes a full set of results on aircraft deformation and accelerations along with discussions as to the effect on the aircraft structure.

Justin D Littell↗

Technology development and demonstration of a low thrust resistojet thruster

Three thrusters were fabricated to definitized thruster drawings using new rhenium vapor deposition technology. Two of the thrusters were operated using ammonia as propellant and one was operated using hydrogen propellant for performance determination. All demonstrated consistent operational specific impulse performance while demonstrating thermal performance better than the development units from which they evolved. Two of the thrusters were subjected to environmental structural testing including vibration, acceleration and shock loading to specifications. Both of the thrusters subjected to the environmental tests passed all required tests. The third, spare, thruster was introduced into the life test portion of the program. Two thrusters were then subjected to a life cycling test program under typical spacecraft operating power levels. During the life test sequence, the hydrogen thruster accrued 720 operating life test cycles, more than 370 on-off cycles and 365 hours of powered up time. The ammonia accrued approximately 380 on-off cycles and 392.2 on time hours of operation during the 720 cycling hour test. Both thrusters completed the scheduled operational life test in reasonably good condition, structurally integral and capable of indefinite further operation.

Pfeifer, G. R.↗

Continuation of surge life of transient voltage suppressor

Efforts expended in testing, analyzing and the development of a meaningful definition of the mean number of peak pulses before failure (mp2bf) levels of a family of transient voltage suppressor devices were documented. Tests were done to determine the ability of the transient suppressor to effectively and reliably protect against severe short term, millisecond range, and transient voltages of the types resulting from inductive load switching and induced lightning. Existing pulse testing instrumentation was utilized, interfaced to an automatic sequencing test rack accommodating up to 50 devices. Tests were performed in step stress increments of 25% beginning at 25% and extending thru 100% rated I(pp) for each voltage category. The four voltage types test were the 6.8V, 33V, 91V, and 190V. Engineering efforts addressed the problem of improving the reliability of the 190V types.

Clark, O. M.↗

Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Engineering Test Report: AMSU-A1 EOS Instrument, (S/N 202) Qualification Level Vibration Tests of August/September 1998, (S/O 565632, OC-417) Plus Addendum A

The purpose of this report is to present a qualification level vibration testing performed on the S/N 202, EOS AMSU-A1 Instrument was vibration tested to qualification levels per the Ref. 1 shop order. The instrument withstood the 8 g sine sweep test, the 7.5 Grms random vibration test, and the 18.75 g sine burst test in each of the three orthogonal axes. Some loss of transmissibility, however, is seen in the lower reflector after Z-axis random vibration. The test sequence was not without incidence. Failure of Channel 7 in the Limited Performance Test (LPT) performed after completion of the 1 st (X-axis) axis vibration sequence, required replacement of the DRO and subsequent re-testing of the instrument. The post-vibration comprehensive performance test (CPT) was successfully run after completion of the three axes of vibration with the replacement component installed in the instrument. Passing the CPT signified the successful completion of the S/N 202 A1 qualification vibration testing.

Heffer, R.↗

Permanent and separable aerospace tubing/ fitting evaluation program, volume 1

The tube fitting evaluation program was conducted to develop a standard overall test program including methods, procedures, and equipment as well as recommended test sequences for qualifying fitting/tubing assemblies. The program consisted of testing the MS flareless (separable) fitting and utilizing the results as baseline data from which all other fittings will be evaluated. Five separable designs and five permanent designs were tested in three sizes with two types of tubing materials. The basic design requirements were 4,000 psi operating pressure within the temperature range of minus 65 F to plus 450 F while also being compatible with 21-6-9 and titanium 3Al-2.5V tubing alloys.

Ursell, C. R.↗

Acceptance and qualification test results of the 20 km electromechanical tether for TSS-1

Acceptance and qualification tests have been performed on the TSS-1 flight tether and its associated qualification tether. Acceptance testing during production included periodic measurement of conductor resistance, off-line breakstrength tests on strength member samples, continuous measurement of the insulation layer voltage withstand capability, and a continuous mechanical proof-loading procedure during the tether jacketing operation. The qualification test sequence consisted of thermal vacuum, voltage withstand and breakstrength tests on samples taken from the production runs for both the qualification and flight tethers. This paper will analyze the acceptance and qualification test data, respectively. Results indicate that the completed flight tether exceeds the design requirements for the TSS-1 mission.

Marshall, L. S.↗

Thermal verification testing of commercial printed-circuit boards for spaceflight

A method developed to verify commercial printed-circuit boards for a Shuttle orbital flight is discussed. The test sequence is based on early fault detection, desire to test the final assembly, and integration with other verification testing. A component thermal screening test is performed first to force flaws in design, workmanship, parts, processes, and materials into observable failures. Temperature definition and vibration tests are performed next. Final assembly testing is performed to simulate the Shuttle flight. An abbreviated thermal screening test is performed as a check after the vibration test, and then a complete thermal operational test is performed. The final assembly test finishes up with a burn-in of 100 h of trouble-free operation. Verification is successful when all components and final assemblies have passed each test. This method was very successful in verifying that commercial printed-circuit boards will survive in the Shuttle environment.

Foster, William M., II↗

Post-test data report for the space shuttle full-scale AFRSI sequence of environments test (OS-305-1 to -5) in the NASA/Ames Research Center 11x11-foot wind tunnel

The Advanced Flexible Reusable Surface Insulation (AFRSI) test article was wind tunnel tested. The AFRSI was exposed to a simulated ascent airloads environment and data was obtained which could be used to support the AFRSI certification program. The AFRSI sequence of environments also included radiant heating (1500 degrees Fahrenheit) and wind/rain environments. The test article was wind/rain conditioned before each wind tunnel entry and was thermally conditioned after each wind tunnel entry. The AFRSI failed and the test was aborted before reaching the ascent environment. The AFRSI test article sequentially exposed to 50 wind/rain and 49 simulated entry thermal missions, as well as four wind tunnel entries equivalent to 40 ascent missions.

Marshall, B. A.↗

Solar Airplanes and Regenerative Fuel Cells

A solar electric aircraft with the potential to "fly forever" has captured NASA's interest, and the concept for such an aircraft was pursued under Aeronautics Environmental Research Aircraft and Sensor Technology (ERAST) project. Feasibility of this aircraft happens to depend on the successful development of solar power technologies critical to NASA's Exploration Initiatives; hence, there was widespread interest throughout NASA to bring these technologies to a flight demonstration. The most critical is an energy storage system to sustain mission power during night periods. For the solar airplane, whose flight capability is already limited by the diffuse nature of solar flux and subject to latitude and time of year constraints, the feasibility of long endurance flight depends on a storage density figure of merit better than 400-600 watt-hr per kilogram. This figure of merit is beyond the capability of present day storage technologies (other than nuclear) but may be achievable in the hydrogen-oxygen regenerative fuel cell (RFC). This potential has led NASA to undertake the practical development of a hydrogen-oxygen regenerative fuel cell, initially as solar energy storage for a high altitude UAV science platform but eventually to serve as the primary power source for NASAs lunar base and other planet surface installations. Potentially the highest storage capacity and lowest weight of any non-nuclear device, a flight-weight RFC aboard a solar-electric aircraft that is flown continuously through several successive day-night cycles will provide the most convincing demonstration that this technology's widespread potential has been realized. In 1998 NASA began development of a closed cycle hydrogen oxygen PEM RFC under the Aeronautics Environmental Research Aircraft and Sensor Technology (ERAST) project and continued its development, originally for a solar electric airplane flight, through FY2005 under the Low Emissions Alternative Power (LEAP) project. Construction of the closed loop system began in 2002 at the NASA Glenn Research Center in Cleveland, Ohio. System checkout was completed, and testing began, in July of 2003. The initial test sequences were done with only a fuel cell or electrolyzer in the test rig. Those tests were used to verify the test apparatus, procedures, and software. The first complete cycles of the fully closed loop, regenerative fuel cell system were successfully completed in the following September. Following some hardware upgrades to increase reactant recirculation flow, the test rig was operated at full power in December 2003 and again in January 2004. In March 2004 a newer generation of fuel cell and electrolyzer stacks was substituted for the original hardware and these stacks were successfully tested at full power under cyclic operation in June of 2004.

Bents, David J.↗

Space Launch System Core Stage Green Run Base Heating: Anomaly, Mitigation and Flight Redesign

The NASA Space Launch System (SLS) vehicle is composed of four RS-25 liquid oxygen and hydrogen rocket engines in the Core Stage (CS). The SLS Core Stage went through Green Run hot-fire testing at NASA Stennis Space Center’s B-2 test facility in 2021. The main goal of this testing was to confirm Core Stage tanking, propulsion and thrust vector control systems operations and performance to verify with predicted models. Two hot-fire (HF) test sequences were performed with the first one (HF1) in January for a test duration of 70 seconds and the second (HF2) testing completed in March for a test duration of 500 seconds. This paper focuses on the base heating anomalies observed during HF1 and HF2 where an extensive fire was observed along the Core Stage base heat shield during test operations. This environment was not anticipated and led to extensive unplanned damage to the thermal protection system which was augmented for flight. Green Run observations also led to a reassessment of flight environments for Artemis I. This paper discusses the potential cause of the anomalies, the flow physics, the reconstructed base environments, and mitigation plans for HF2 and flight.

aerothermodynamics↗