At least 55 records · Page 3

Grid-Scale Ternary-Pumped Thermal Electricity Storage for Flexible Operation of Nuclear Power Generation under High Penetration of Renewable Energy Sources

In this work, the integration of a grid-scale ternary-Pumped Thermal Electricity Storage (t-PTES) with a nuclear power generation to enhance operation flexibility is assessed using physics-based models and digital real time simulation. A part of the electricity from the nuclear power generation is delivered to the grid, and the balance is used to power a heat pump that can be augmented by an auxiliary resistive load element to increase the charging rate of the thermal storage. This increases the thermal potential between hot and cold thermal stores (usually solid materials or molten salts inside large storage tanks). The thermal energy is transformed back into electricity by reversing the heat pump cycle. Different transient scenarios including startup, shutdown, and power change for grid-connected operation are simulated to determine the behavior of the hybrid nuclear-t-PTES system operating under variable loads that constitute a departure from conventional, baseload nuclear plant operation schemes. Ternary refers to the three modes operation: (i) heat pump (including heating coil), (ii) heat engine, and (iii) simultaneous operation of heat pump (including heating coil) and heat engine during changeover from pumping to generation or vice-versa. The controllability of t-PTES in the short timescales as a dynamic load is used to demonstrate operational flexibility of hybrid nuclear plants for flexible operation through advanced load management. The integration of t-PTES into nuclear power systems enhances the system flexibility and is an enabler for high penetration of renewable energy resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optical metrology for testing an all-composite 2-meter diameter mirror

The Herschel Space Observatory (formerly known as FIRST) consists of a 3.5 m space telescope designed for use in the long IR and sub-milimeter wavebands. To demonstrate the viability of a carbon fiber composite telescope for this application, Composite Optics Incorporated (COI) manufactured a fast (f/1), large (2 m), lightweight (10.1 kg/m squared) demonstration mirror. A key challenge in demonstrating the performance of this novel mirror was to characterize the surface accuracy at cryogenic (70 K) temperatures. A wide variety of optical metrology techniques were investigated and a brief survey of empirical test results and limitations of the various techniques will be presented in this paper. Two complementary infrared (IR)techniques operating at a wavelength of 10.6 microns were chosen for further development: (1) IR Twyman-Green Phase Shifting Interferometry (IR PSI) and (2) IR Shack-Hartmann (IR SH) Wavefront Sensing. Innovative design modifications made to an existing IR PSI to achieve high-resolution, scannable, infrared measurements of the composite mirror are described. The modified interferometer was capable of measuring surface gradients larger than 350 microradians. The design and results of measurements made with a custom-built IR SH Wavefrong Sensor operating at 10.6 microns are also presented. A compact experimental setup permitting simultaneous operation of both the IR PSI and IR SH tools is shown. The advantages and the limitations of the two key IR metrology tools are discussed.

IR metrology phase shifting interferometry Shack-H↗

Mach 4 Test Results of a Dual-Flowpath, Turbine Based Combined Cycle Inlet

An experimental study was conducted to evaluate the performance of a turbine based combined cycle (TBCC) inlet concept, consisting of a low speed turbojet inlet and high speed dual-mode scramjet inlet. The main objectives of the study were (1) to identify any interactions between the low and the high speed inlets during the mode transition phase in which both inlets are operating simultaneously and (2) to determine the effect of the low speed inlet operation on the performance of the high speed inlet. Tests were conducted at a nominal freestream Mach number of 4 using an 8 percent scale model representing a single module of a TBCC inlet. A flat plate was installed upstream of the model to produce a turbulent boundary layer which simulated the full-scale vehicle forebody boundary layer. A flowmeter/back pressure device, with remote actuation, was attached aft of the high speed inlet isolator to simulate the back pressure resulting from dual-mode scramjet combustion. Results indicate that the inlets did not interact with each other sufficiently to affect inlet operability. Flow spillage resulting from a high speed inlet unstart did not propagate far enough upstream to affect the low speed inlet. Also, a low speed inlet unstart did not cause the high speed inlet to unstart. The low speed inlet improved the performance of the high speed inlet at certain conditions by diverting a portion of the boundary layer generated on the forebody plate.

Albertson, Cindy w.↗

Aeroservoelastic Control Law Development for the Integrated Adaptive Wing Technology Maturation Wind-Tunnel Test

The NASA Advanced Air Transport Technology (AATT) Project seeks to “explore and develop technologies and concepts for improved energy efficiency and environmental compatibility for fixed wing subsonic transports” [1]. The IAWTM project is a subproject within AATT and is a joint Boeing/NASA effort to, in part, demonstrate the active control systems necessary to employ high-aspect ratio wings for improved aerodynamic efficiency. The aircraft configuration under study for the IAWTM project is a generic jet transport based on the NASA Common Research Model (CRM) whose wing aspect ratio has been increased to 13.5 (as opposed to nominal CRM aspect ratio of 9) and whose development is given in Ref. [2]. A semi-span model of the high-aspect-ratio CRM with 10 trailing edge control surfaces is currently being fabricated and will be delivered to the NASA Langley Transonic Dynamics Tunnel (TDT). There, several tests will be conducted to demonstrate maneuver load alleviation (MLA), gust load alleviation (GLA), active flutter suppression (AFS), and drag reduction, all at transonic conditions. A layout of the wind tunnel model is shown in Fig. 1. The wind-tunnel model is a spar/pod wing design with a relatively rigid fuselage attached to a mounting structure (seen in Fig. 1), which in turn is attached to a load balance behind the tunnel wall. Shims exist that can be attached to force the load to go through the fuselage rather than through the balance so as not to damage the balance in the event of flutter. The spar/pod design is similar to that used in the Boeing truss-braced wing aeroelastic model tested in the TDT in 2013 [3]. There is a central spar running the span of the wing to which the pods are attached that form the aerodynamic shape of the wing. The pods are constructed of ribs for attachment to the spar and skins to create the outer mold line. There are ten active control surfaces that will be used for the test objectives discussed above. Three of these (two outboard ailerons and one inboard aileron) are high-speed electrohydraulic actuators, and the remaining seven are low-speed mini-plane flaps, which have slower servo motors that will be used primarily for drag and maneuver load reductions. Control laws must be developed for each test (MLA, GLA, AFS, and drag reduction) and must be able to work in tandem when two or more control strategies are being tested simultaneously (e.g., when control laws to mitigate maneuver loads and gust loads operate simultaneously). The development of these control laws requires accurate mathematical representations of the aerodynamics, structural dynamics, and control surface dynamics of the system. Taken together, this mathematical representation—which is often in state-space form— is the ASE model. Three low-order ASE models of differing fidelities were developed for the IAWTM test and will be presented here. The differences in fidelity appeared in the aerodynamic modeling—one model assumed purely linear aerodynamics, while the other two models used different techniques to linearize the aerodynamics about a nonlinear mean. Furthermore, simple observer-based full-state feedback controllers for each test (MLA, GLA, AFS, and drag reduction) were designed from these low-order ASE models and implemented in a higher-order, nonlinear computational ASE simulation to assess the effectiveness of each controller. Observers were designed from each of the three lower-order ASE models, and each (linear) observer was then used as an estimate of the nonlinear dynamics of the system. Using the estimated states and the full-state feedback controller, control surface commands were fed back to the higher-order, nonlinear ASE system. The insight gained during this development will be applied to control law development for the physical IAWTM wind-tunnel test.

Josiah M Waite↗

Heat engine requirements for advanced solar thermal power systems

Requirements and constraints are established for power conversion subsystems, including heat engine, alternator and auxiliaries, of dish concentrator solar thermal power systems. In order to be competitive with conventional power systems, it is argued that the heat engine should be of less than 40 kW rated output, in a subsystem with an efficiency of at least 40% at rated output and at least 37% at half power. An interval between major overhauls of 50,000 hours is also desirable, along with minor maintenance and lubrication not more than four times a year requiring no more than one man-hour each time, and optimal reliability. Also found to be important are the capability for hybrid operation using heat from a solar receiver, fuel-fired combustor or both simultaneously, operation at any attitude, stability to transients in input power and output loading, operation at ambient temperatures from -30 to 50 C, and compatibility with environmental and safety requirements. Cost targets include a price of $180/kWe, and operation, maintenance and replacement costs averaging $0.001/kWh for 30 years of operation.

Jaffe, L. D.↗

Test and training simulator for ground-based teleoperated in-orbit servicing

For the Post-IOC(In-Orbit Construction)-Phase of COLUMBUS it is intended to use robotic devices for the routine operations of ground-based teleoperated In-Orbit Servicing. A hardware simulator for verification of the relevant in-orbit operations technologies, the Servicing Test Facility, is necessary which mainly will support the Flight Control Center for the Manned Space-Laboratories for operational specific tasks like system simulation, training of teleoperators, parallel operation simultaneously to actual in-orbit activities and for the verification of the ground operations segment for telerobotics. The present status of definition for the facility functional and operational concept is described.

Schaefer, Bernd E.↗

Demand Capacity Balancing at Vertiports for Initial Strategic Conflict Management of Urban Air Mobility Operations

Urban Air Mobility (UAM) is a new transportation concept that enables highly automated, cooperative, passenger or cargo-carrying air transportation services in and around urban areas. To achieve the high level of operational density and complexity desired by the UAM community, an airspace system that allows UAM operators to readily access and operate safely and efficiently in the airspace is needed. This airspace system will require air traffic management designed to reduce the risk of conflicts and loss of separation between UAM flights. In general, strategic conflict management is considered as the first layer of conflict management for safe flight operations to condition the traffic to reduce the need for airborne separation provision, the second layer of conflict management. Demand Capacity Balancing (DCB) is one of the concept components to achieve strategic conflict management. DCB strategically evaluates traffic demand and resource capacities to allow UAM operators to determine when, where and how they operate, while mitigating conflicting needs for airspace and vertiport capacity. DCB can be applied whenever UAM demand exceeds the capacity in airspace or at vertiports. As the UAM ecosystem evolves with advanced technologies and matured operational procedures, more complicated conflict management will likely be needed. In the current UAM ‘Concept of Operation (ConOps) 1.0’ operational stage defined by FAA, however, it will be meaningful to explore the demand capacity balancing at vertiports only, as an initial strategic conflict management approach for UAM operations because vertiport capacity seems to be a bottleneck of UAM traffic. For this research, we developed a demand-capacity imbalance detection and resolution service for UAM. This DCB service identifies the demand from operators and compares the demand to a given capacity at the shared resources (i.e., vertiports) over the upcoming time horizon which is divided into time bins having a constant interval. When a new flight plan is submitted, the algorithm embedded in the DCB service checks the available time bins based on the desired departure time and estimated arrival time at origin and destination vertiports, respectively. If the time bins for the originally desired times are already occupied by other flights (i.e., demand is at or above capacity), the algorithm finds the next available time bins for takeoff and landing and shifts the conflicting departure time to the earliest time that satisfies the capacity constraints at both origin and destination vertiports. The details of the algorithm will be described in the final manuscript. Figure 1 shows that the proposed DCB algorithm works well for a sample traffic scenario. In this example, a total of 144 flights, split between two operators, are planned over 2 hours, traveling 10 routes between five vertiports. In the heatmaps, the horizontal axis shows 12 time bins where each bin represents a 12-minute interval, and the vertical axis shows five vertiports. The number in each cell shows the number of operations, counting both departures and arrivals, at a specific vertiport in each time bin. For the given capacity of 2 operations/vertiport/bin, Figure 1 shows that the original demand sometimes exceeds the capacity, but the modified demand is reduced to the given capacity after resolving demand-capacity imbalances. When UAM flights are operated, it is expected that many practical issues would arise in the federated system architecture with multiple operators. UAM operators may experience a time synchronization issue due to communication delay between operator and vehicle. UAM vehicles would fly at different flight speeds, depending on vehicle models. Actual departure and arrival times can have large variations, compared to the schedule. The lead time from flight plan submission to desired departure time can vary by service type (e.g., regular shuttle service vs. on-demand service). Using the proposed DCB algorithm, we also investigated how the actual flight schedule and DCB performance are affected by these uncertainties such as unsynchronized times between operators, flight speed differences, lead time differences, and departure time errors. The final manuscript will include the background of this research work, the description of the DCB algorithm and its use cases with traffic scenarios. It will also provide the analytical results about the impact of various uncertainties that can occur in actual UAM operations on the DCB at vertiports, in terms of demand distribution changes, number of simultaneous operations, and delay propagation.

Urban Air Mobility↗

Provider of Services for Urban Air Mobility (PSU) Prototype Simulation (X5) Final Report

Urban Air Mobility (UAM) is a new air transportation service concept to carry passengers or cargo in metropolitan areas, leveraged by innovative aircraft and air traffic automation technologies. NASA has conducted a series of simulations, called the X-series simulation, to evaluate the UAM concept of operations and support the development of airspace procedures and services for UAM operations. The simulation called “X5” was conducted in 2023 to test a Provider of Services for UAM (PSU) prototype developed by NASA for UAM flight planning, strategic conflict management support, and data exchange between UAM operators. In this simulation, two strategic conflict management capabilities, Demand-Capacity Balancing and Sequencing and Scheduling, were further investigated. This document describes the UAM system architecture modeled, the X5 simulation environment to be executed (e.g., traffic scenario and UAM airspace construct), and the strategic conflict management processes developed and evaluated in this study. Then, the simulation results are provided using several system performance metrics, such as the number of operations planned and activated, demand-capacity imbalances detected and resolved, and pre-departure delays. Based on these metrics, the test findings and lessons learned from this simulation are discussed. NASA developed a PSU prototype as part of a reference implementation of UAM system architecture and evolved strategic conflict management capabilities for UAM operations from the previous collaborative simulations with industry partners. Below is the summary of the achievements: - Aligned NASA’s UAM reference architecture with the FAA’s UAM ConOps notional architecture - Extended UAM airspace management capabilities to include 1) Demand-Capacity Balancing (DCB) to ensure operators coordinate planned usage of shared vertiports, and 2) Sequencing and Scheduling (S&S) at UAM corridor entry and exit points to help facilitate an orderly flow of traffic - Defined the PSU information exchange APIs and requirements towards informing industry standards - Developed and tested a NASA PSU prototype as reference implementation to validate the requirements and APIs - Developed a prototype service connecting NASA’s PSU and the FAA system for testing future PSU-ATM interface requirements - Tested NASA-developed assumptions for UAM operations such as airspace design, procedures, vehicle performance, and strategic conflict management methods to inform future Cooperative Operating Practices (COPs) development with industry - Evaluated system performance metrics such as number of simultaneous operations and ground delays that can help define system-level requirements. The simulation results showed that the UAM traffic demand could be managed to minimize the needs of tactical separation provision with ground delays assigned by DCB and S&S. These accomplishments and the lessons learned from the PSU Prototype X5 simulation activities will be valuable inputs for the Air Mobility Pathfinders (AMP) project, which is NASA’s new project to create and evaluate a reference architecture for safe, secure, and scalable UAM operations.

Simulation↗

BOREAS Level-0 C-130 Aerial Photography

For BOReal Ecosystem-Atmosphere Study (BOREAS), C-130 and other aerial photography was collected to provide finely detailed and spatially extensive documentation of the condition of the primary study sites. The NASA C-130 Earth Resources aircraft can accommodate two mapping cameras during flight, each of which can be fitted with 6- or 12-inch focal-length lenses and black-and-white, natural-color, or color-IR film, depending upon requirements. Both cameras were often in operation simultaneously, although sometimes only the lower resolution camera was deployed. When both cameras were in operation, the higher resolution camera was often used in a more limited fashion. The acquired photography covers the period of April to September 1994. The aerial photography was delivered as rolls of large format (9 x 9 inch) color transparency prints, with imagery from multiple missions (hundreds of prints) often contained within a single roll. A total of 1533 frames were collected from the C-130 platform for BOREAS in 1994. Note that the level-0 C-130 transparencies are not contained on the BOREAS CD-ROM set. An inventory file is supplied on the CD-ROM to inform users of all the data that were collected. Some photographic prints were made from the transparencies. In addition, BORIS staff digitized a subset of the tranparencies and stored the images in JPEG format. The CD-ROM set contains a small subset of the collected aerial photography that were the digitally scanned and stored as JPEG files for most tower and auxiliary sites in the NSA and SSA. See Section 15 for information about how to acquire additional imagery.

Newcomer, Jeffrey A.↗

Preliminary Human-in-the-Loop Assessment of Procedures for Very-Closely-Spaced Parallel Runways

Demand in the future air transportation system concept is expected to double or triple by 2025 [1]. Increasing airport arrival rates will help meet the growing demand that could be met with additional runways but the expansion airports is met with environmental challenges for the surrounding communities when using current standards and procedures. Therefore, changes to airport operations can improve airport capacity without adding runways. Building additional runways between current ones, or moving them closer, is a potential solution to meeting the increasing demand, as addressed by the Terminal Area Capacity Enhancing Concept (TACEC). TACEC requires robust technologies and procedures that need to be tested such that operations are not compromised under instrument meteorological conditions. The reduction of runway spacing for independent simultaneous operations dramatically exacerbates the criticality of wake vortex incursion and the calculation of a safe and proper breakout maneuver. The study presented here developed guidelines for such operations by performing a real-time, human-in-the-loop simulation using precision navigation, autopilot-flown approaches, with the pilot monitoring aircraft spacing and the wake vortex safe zone during the approach.

Verma, Savita↗

Surface Development and Test Facility (SDTF) New R&D Simulator for Airport Operations

A new simulator, the Surface Development and Test Facility (SDTF) is under construction at the NASA Ames Research Center in Mountain View, California. Jointly funded by the FAA (Federal Aviation Administration) and NASA, the SDTF will be a testbed for airport surface automation technologies of the future. The SDTF will be operational in the third quarter of 1998. The SDTF will combine a virtual tower with simulated ground operations to allow evaluation of new technologies for safety, effectiveness, reliability, and cost benefit. The full-scale level V tower will provide a seamless 360 degree high resolution out-the-window view, and a full complement of ATC (air traffic control) controller positions. The imaging system will be generated by two fully-configured Silicon Graphics Onyx Infinite Reality computers, and will support surface movement of up to 200 aircraft and ground vehicles. The controller positions, displays and consoles can be completely reconfigured to match the unique layout of any individual airport tower. Dedicated areas will accommodate pseudo-airport ramp controllers, pseudo-airport operators, and pseudo-pilots. Up to 33 total personnel positions will be able to participate in simultaneous operational scenarios. A realistic voice communication infrastructure will emulate the intercom and telephone communications of a real airport tower. Multi-channel audio and video recording and a sophisticated data acquisition system will support a wide variety of research and development areas, such as evaluation of automation tools for surface operations, human factors studies, integration of terminal area and airport technologies, and studies of potential airport physical and procedural modifications.

Dorighi, Nancy S.↗

Single Carrier Modulation Resource Allocation for Massive MIMO with Virtual Antennas

Today’s Massive MIMO cellular operation is dominated by orthogonal frequency division multiplexing (OFDM) modulation. One of the advantages of OFDM is the flexibility to carve up the available spectrum into resource blocks (RBs) that can operate adjacent to one another. Massive MIMO adds spatial multiplexing layers on top of the RBs, enabling the simultaneous operation of dozens of UEs. Cyclic prefixed single carrier modulation (CP-SCM) is an alternative to OFDM that also benefits from massive MIMO and is useful as an OFDM alternative in specific scenarios. However, until recently, no resource allocation method has been proposed for CP-SCM. In this paper, we present a CP-SCM resource allocation scheme using virtual antennas in a massive MIMO time domain duplexed scenario. By creating several virtual antennas for each physical antenna, the benefits of massive MIMO are achieved with a smaller physical antenna count. Resources are quantized into data streams, and each user can be assigned a variable number of simultaneous streams. This paper presents a detailed development and analysis of multi-stream processing (MSP) for both uplink detection and downlink precoding. We also introduce heterogeneous MSP, where CP-SCM and OFDM signals can be processed in the same MSP framework.

5G and beyond communications↗

[Instrument Designs for SOFIA: FOCUS and FORCAST]

As a result of these studies a proposal for FORCAST was submitted to the SOFIA Announcement of Opportunity for Instruments. FORCAST, a facility instrument, was one of the winning proposals. A short description of FORCAST follows: (1) FORCAST is a dual-channel, high-sensitivity, wide-field camera designed to perform continuum imaging in the mid-infrared (4-8 microns) and far-infrared (16-40 microns). The pixels map to 0.75 sec. on the sky and the total field-of-view is 3.2 min. During normal operation a cold MgO dichroic allows imaging in two bands (16-25 and 25-40 microns) enabling high efficiency, simultaneous observations. For imaging at shorter wavelengths (4-8 microns), a mirror replaces the dichroic. FORCAST simultaneously operates two 256 x 256 Si BIB hybrid arrays from Boeing (formerly Rockwell). A Si:As BIB array is used for lambda less than 25 microns while a Si:Sb BIB array is use for lambda greater than 25 microns, FORCAST allows selection of the bandpass independently for each channel via filter wheels. Several specific filters are needed for the Pi science program. Selection of other filters will be based on input from the SOFIA science community. These can include filters to cover specific lines or dust features (such as the PAH features in the 4-8 microns regime). Future upgrades could include a polarimetric capability. The Pi team has extensive experience with all of the technologies used in FORCAST. FORCAST uses mature, low-risk, state-of-the-art technology ensuring highly reliability. In addition, FORCAST will be easy to set up for an observing run and easy to operate (with an intuitive graphical interface). We feel that we can virtually guarantee success on the first flight with FORCAST. FORCAST is designed to complement SIRTF (ISO will no longer be functional). While it cannot achieve the sensitivity levels of SIRTF, FORCAST covers sections of phase space not planned for SIRTF (30-40 microns imaging) and has significantly higher spatial resolution than SIRTF at all wavelengths.

Source record↗

High-Temperature Switched-Reluctance Electric Motor

An eight-pole radial magnetic bearing has been modified into a switched-reluctance electric motor capable of operating at a speed as high as 8,000 rpm at a temperature as high as 1,000 F (=540 C). The motor (see figure) is an experimental prototype of starter-motor/generator units that have been proposed to be incorporated into advanced gas turbine engines and that could operate without need for lubrication or active cooling. The unique features of this motor are its electromagnet coils and, to some extent, its control software. Heretofore, there has been no commercial-off-the-shelf wire capable of satisfying all of the requirements for fabrication of electromagnet coils capable of operation at temperatures up to 1,000 F (=540 C). The issues addressed in the development of these electromagnet coils included thermal expansion, oxidation, pliability to small bend radii, micro-fretting, dielectric breakdown, tensile strength, potting compound, thermal conduction, and packing factor. For a test, the motor was supported, along with a rotor of 18 lb (.8-kg) mass, 3-in. (.7.6-cm) diameter, 21-in. (.53-cm) length, on bearings packed with high-temperature grease. The motor was located at the mid span of the rotor and wrapped with heaters. The motor stator was instrumented with thermocouples. At the time of reporting the information for this article, the motor had undergone 14 thermal cycles between room temperature and 1,000 F (.540 C) and had accumulated operating time >27.5 hours at 1,000 F (=540 C). The motor-controller hardware includes a personal computer equipped with analog-to-digital input and digital-to-analog output cards. The controller software is a C-language code that implements a switched-reluctance motor-control principle: that is, it causes the coils to be energized in a sequence timed to generate a rotating magnetic flux that creates a torque on a scalloped rotor. The controller can operate in an open- or closed-loop mode. In addition, the software has been modified to enable the simultaneous operation of the prototype motor or another, similar apparatus as both a motor and a magnetic bearing. Combined bearing/motor operation has been demonstrated at room temperature but had not yet been demonstrated at high temperature at the time of reporting the information for this article.

Montague, Gerald↗

Acousto-optic/CCD real-time SAR data processor

The SAR processor which uses an acousto-optic device as the input electronic-to-optical transducer and a 2-D CCD image sensor, which is operated in the time-delay-and-integrate (TDI) mode is presented. The CCD serves as the optical detector, and it simultaneously operates as an array of optically addressed correlators. The lines of the focused SAR image form continuously (at the radar PRF) at the final row of the CCD. The principles of operation of this processor, its performance characteristics, the state-of-the-art of the devices used and experimental results are outlined. The methods by which this processor can be made flexible so that it can be dynamically adapted to changing SAR geometries is discussed.

Psaltis, D.↗

Evaluation of Dual Pressurized Rover Operations During Simulated Planetary Surface Exploration

Introduction: A pair of small pressurized rovers (Space Exploration Vehicles, or SEVs) is at the center of the Global Point-of-Departure architecture for future human planetary exploration. Simultaneous operation of multiple crewed surface assets should maximize productive crew time, minimize overhead, and preserve contingency return paths. Methods: A 14-day mission simulation was conducted in the Arizona desert as part of NASA?s 2010 Desert Research and Technology Studies (DRATS). The simulation involved two SEV concept vehicles performing geological exploration under varied operational modes affecting both the extent to which the SEVs must maintain real-time communications with mission control ("Continuous" vs. "Twice-a-Day") and their proximity to each other ("Lead-and-Follow" vs. "Divide-and-Conquer"). As part of a minimalist lunar architecture, no communications relay satellites were assumed. Two-person crews consisting of an astronaut and a field geologist operated each SEV, day and night, throughout the entire 14-day mission, only leaving via the suit ports to perform simulated extravehicular activities. Standard metrics enabled quantification of the habitability and usability of all aspects of the SEV concept vehicles throughout the mission, as well as comparison of the extent to which the operating modes affected crew productivity and performance. Practically significant differences in the relevant metrics were prospectively defined for the testing of all hypotheses. Results and Discussion: Data showed a significant 14% increase in available science time (AST) during Lead-and-Follow mode compared with Divide-and-Conquer, primarily because of the minimal overhead required to maintain communications during Lead-and-Follow. In Lead-and-Follow mode, there was a non-significant 2% increase in AST during Twice-a-Day vs. Continuous communications. Situational awareness of the other vehicle?s location, activities, and contingency return constraints were enhanced during Lead-and-Follow and Twice-a-Day communications modes due to line-of-sight and direct SEV-to-SEV communication. Preliminary analysis of Scientific Data Quality and Observation Quality metrics showed no significant differences between modes.

Abercromby, Andrew F. J.↗

Implementation and Initial Validation of a 100-Kilowatt Class Nested-Channel Hall Thruster

The X3 is a 100-kilowatt class nested-channel Hall thruster developed by the Plasmadynamics and Electric Propulsion Laboratory at the University of Michigan in collaboration with the Air Force Research Laboratory and NASA. The cathode, magnetic circuit, boron nitride channel rings, and anodes all required specific design considerations during thruster development, and thermal modeling was used to properly account for thermal growth in material selection and component design. A number of facility upgrades were required at the University of Michigan to facilitate operation of the X3. These upgrades included a re-worked propellant feed system, a completely redesigned power and telemetry break-out box, and numerous updates to thruster handling equipment. The X3 was tested on xenon propellant at two current densities, 37% and 73% of the nominal design value. It was operated to a maximum steady-state discharge power of 60.8 kilowatts. The tests presented here served as an initial validation of thruster operation. Thruster behavior was monitored with telemetry, photography and high-speed current probes. The photography showed a uniform plume throughout testing. At constant current density, reductions in mass flow rate of 18% and 26% were observed in the three-channel operating configuration as compared to the superposition of each channel running individually. The high-speed current probes showed that the thruster was stable at all operating points and that the channels influence each other when more than one is operating simultaneously. Additionally, the ratio of peak-to-peak AC-coupled discharge current oscillations to mean discharge current did not exceed 51% for any operating points reported here, and did not exceed 17% at the higher current density.

High Power↗

Field intercomparison of a novel optical sensor for formaldehyde quantification

A one-week in situ intercomparison campaign was completed on the Rice University campus for measuring HCHO using three different techniques, including a novel optical sensor based on difference frequency generation (DFG) operating at room temperature. Two chemical derivatization methods, 2,4-dinitrophenylhydrazine (DNPH) and o-(2,3,4,5,6-pentafluorobenzyl) hydroxylamine (PFBHA), were deployed during the daylight hours for three- to four-hour time-integrated samples. A real-time optical sensor based on laser absorption spectroscopy was operated simultaneously, including nighttime hours. This tunable spectroscopic source based on difference frequency mixing of two fiber-amplified diode lasers in periodically poled LiNb03 (PPLN) was operated at 3.5315 micrometers (2831.64 cm 1) to access a strong HCHO ro-vibrational transition free of interferences from other species. The results showed a bias of -1.7 and -1.2 ppbv and a gross error of 2.6 and 1.5 ppbv for DNPH and PFBHA measurements, respectively, compared with DFG measurements. These results validate the DFG sensor for time-resolved measurements of HCHO in urban areas.

NASA Discipline Life Sciences Technologies↗