At least 55 records · Page 3

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

Investigating Benefits and Challenges of Converting Retiring Coal Plants into Nuclear Plants

A coal-to-nuclear (C2N) transition means siting a nuclear reactor at the site of a recently retired coal power plant. Three overarching questions from the C2N transition guide this research: where in the United States are retired coal facilities located and what factors make a site feasible for transition; what factors of technology, cost, and project timeline drive investor economics over such a decision; and how will C2N impact local communities? The study team evaluated the siting characteristics of recently retired plants and those operating coal-fired power plant sites run by a utility or an independent power producer utilizing publicly available data to screen U.S. coal power plant sites to nuclear-feasible locations. After screening all retired coal sites to a set of 157 potential candidates and screening operating sites to a set of 237 candidates, the study team estimates that 80% of retired and operating coal power plant sites that were evaluated have the basic characteristics needed to be considered amenable to host an advanced nuclear reactor. For the recently retired plant sites evaluated, this represents a capacity potential of 64.8 GWe to be backfit at 125 sites. For the operating plant sites evaluated, this represents a capacity potential of 198.5 GWe to be backfit at 190 sites. This report evaluates a case study for the detailed impacts and potential outcomes from a C2N transition. Based on the nuclear technology choices and sizes evaluated to replace a large coal plant of 1,200 MWe generation capacity at the case study site, nuclear overnight costs of capital could decrease by 15% to 35% when compared to a greenfield construction project, through the reuse of infrastructure from the coal facility. Nuclear replacement designs can have a lower capacity size because nuclear power plants run at higher capacity factors than coal power plants. In the case study replacing coal capacity with 924 GWe of nuclear capacity, the study team found regional economic activity could increase by as much as $\$275 million$ and add 650 new, permanent jobs to the region of analysis. The evaluated site choice in the report is hypothetical for analysis purposes only and based on available data and documented assumptions. Consequently, the findings only inform at a general level. A community, investor, or other interested stakeholder can use these results to set up a detailed, in-depth analysis for a specific application of interest, such as evaluating a C2N transition of a specific coal power plant and a specific nuclear technology design. The report was subjected to independent peer reviews by experts in systems engineering and regional economic modeling to evaluate analysis and assumptions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Section 110 Evaluation of Three Sites Associated with the Grable Test, Area 5, Nevada National Security Site, Nye County, Nevada

This report presents the results of a Section 110 recordation of the 280mm Atomic Gun emplacement and command post (CP) (26NY16244), an associated Flash Observation Point that was used to refine the gun’s firing range (26NY16243), and troop trenches used for Exercise Desert Rock V (26NY16242). All three of these resources are directly associated with the Grable test, a specific test in the Upshot-Knothole series of aboveground nuclear detonations. The Grable test occurred at 8:30 a.m. on May 25, 1953, in Area 5 of the Nevada National Security Site (NNSS). Desert Research Institute (DRI) recommends 26NY16244 and 26NY16242 eligible for listing in the National Register of Historic Places (NRHP) under a combination of the Secretary of the Interior’s Significance Criteria A and D at the national level of significance and related to the era of Nuclear Testing and the Cold War. All three of these resources are recommended as contributing elements to the Frenchman Flat Historic District (SHPO Resource No. D204).

280mm Atomic Gun↗

Data, model inputs, and analysis scripts associated with a manuscript on stream intermittency controls across spatial scales in Pacific Northwest watersheds

NOTE: The manuscript associated with this data package is currently in review. The data may be revised based on reviewer feedback. Upon manuscript acceptance, this data package will be updated with the final dataset and additional metadata. This data package is associated with the manuscript "Hydroclimatic Memory and Watershed Template Shape Stream Intermittency: Multi-scale Attribution Using Process-based Simulation and Explainable ML" by Niroula et al. (2026), submitted to Water Resources Research (WRR). The study investigates the dominant controls on stream intermittency across local, reach, and watershed scales using a coupled process-based simulation and explainable machine-learning framework. Long-term daily simulations from the Advanced Terrestrial Simulator (ATS) were used to generate wetness states and ponded-depth responses over river-corridor cells. These ATS outputs were then aggregated across scales and used to train XGBoost (eXtreme Gradient Boosting) models. SHAP (SHapley Additive exPlanations) was applied to quantify the relative importance of hydroclimatic forcings, watershed template attributes, and antecedent-memory effects in shaping intermittency behavior. The analysis is carried out for three contrasting Pacific Northwest watersheds: Oak Creek (OCW), American River Watershed (ARW), and H.J. Andrews (HJA). Across these testbeds, the package contains ATS-ready watershed inputs, ATS run configuration and selected output files, model-evaluation data products, intermittency-analysis datasets, machine-learning target-feature tables, SHAP outputs, and notebooks used to organize, analyze, and visualize results. At a high level, the package documents a workflow in which ATS provides the physically based simulation backbone and explainable machine learning is used as a post-processing attribution tool. The contents are intended to support interpretation of the manuscript figures and results, provide context for how intermittency metrics were generated at multiple scales, and preserve the key artifacts needed to understand and reuse the analysis workflow. The package contains a high-level directory summary file (`summary.txt`) and four main content folders (1) `evaluation_plots` contains evaluation figures and supporting evaluation datasets; (2) `intermittency_plots` contains intermittency-focused analysis notebook and prepared datasets; (3) `ml-training-and-shap_values_plots` contains ML training inputs, SHAP outputs, and figure-generation notebooks; and (4) `watershed_mesh_and_ats_input` contains ATS model setup materials, forcing inputs, geometry, and selected run files. More specifically, the `evaluation_plots` folder contains the notebook used for ATS evaluation plotting and site-specific evaluation datasets. These include evapotranspiration and water-balance products for three watersheds, as well as an Oak Creek field-measurement discharge file. The `intermittency_plots` folder contains the notebook used for intermittency analysis and the prepared datasets used to analyze intermittent and non-intermittent wetness behavior across the study watersheds. The `ml-training-and-shap_values_plots` folder contains notebooks and outputs for the machine-learning and explainability workflow. This includes the main XGBoost and SHAP notebook(s), a beeswarm plotting notebook, target-feature tables for machine-learning training, SHAP summary tables, and per-sample SHAP value archives. The `watershed_mesh_and_ats_input` folder contains ATS-related watershed inputs and supporting materials. This includes mesh and shape products, ATS-readable LAI and meteorological forcing inputs, selected ATS spinup and transient-run files, and a watershed workflow example notebook. Subdirectories are organized by watershed where applicable.All files are .cpg (codepage files), .csv (comma-separated values), .dbf (database files), .exo (Exodus mesh format), .h5 (HDF5 format), .ipynb (Jupyter notebooks), .pkl (Python pickle), .prj (projection files), .sh (shell scripts), .shp (shapefile geometry), .shx (shapefile index), .txt (text files), or .xml (markup data).

Advanced Terrestrial Simulator↗

Nuclear Power Plant Infrastructure Evaluations for Removal of Spent Nuclear Fuel

This report provides evaluations of the NPP site infrastructure and near-site transportation infrastructure for removing spent nuclear from 16 (NPP) sites. The material to be removed from the NPP sites includes both the spent nuclear fuel (SNF) and the greater-than-Class C low level radioactive waste (GTCC waste) that is stored, or will be stored, at the sites.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Site Integration and Regulatory Considerations for a Nuclear Power Plant Colocated with Industrial Facilities: Colocation Studies for a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 HYDROGEN↗

Site Integration and Regulatory Considerations for an NPP Colocated with a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 - HYDROGEN↗

A Multi-Site Networked Hardware-in-Loop Platform for Evaluation of Interoperability and Distributed Intelligence at Grid-Edge

Electric power systems have experienced large increases in the number of intelligent, connected and controllable devices being deployed, leading to a high degree of distributed intelligence at the grid-edge. These devices, both utility-owned and consumer-owned, include but are not limited to: renewable generation sources, energy storage, remote switches, voltage regulators, and smart controllable loads such as electric vehicles. These new devices provide significant potential for increased operational flexibility that can be leveraged to achieve system reconfiguration, resiliency improvements, power quality improvements, and distribution system automation. However, there are two significant challenges that must be addressed before these assets can be leveraged for operations: interoperability and system level validation prior to deployment. Because of the complexity of distributed control systems, and their interactions with legacy centralized controls, a purely simulations-based approach for pre-deployment validation is not sufficient. It requires hardware-in-loop testing to emulate the operational hardware devices and evaluate their performance. Additionally, securely integrating multiple test facilities at utility operators and vendors might enable rapid scale-up of evaluation platforms, and remove the need for multiple expensive standalone installations. Presented in this paper, is the development of a multi-site evaluation platform that employs Advanced Distribution Management Systems (ADMS), distributed control devices, real-time hardware-in-loop assets, secure communication links, and protocol adapters. This platform uses standards-based approaches and open-source tools, and hence can serve as a template for other researchers and institutions to implement their multi-site evaluation frameworks for pre-deployment testing.

Essakiappan, Somasundaram↗

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection Description This dataset contains input and output data for the manuscript Mongird, K. et al. (under review) titled "Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection". Input data corresponds to gridded spatial siting attributes that are necessary to conduct a random forest machine learning analysis of siting feature importance. Output data includes SHAP feature analysis outputs, and classification report values. For data on power plant siting results referred to in the manuscript, please refer to the CERF: IM3 Projected Western US Power Plant Locations data download page. The downloadable data includes values for eight different future scenarios for the Western US. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 Technical Information The dataset includes two sets of data files: (1) CERF gridded siting parameters and (2) Feature analysis outputs and classification reports. All downloadable data is in csv file format. Files with x/y coordinate information use the Albers Equal Area Conic projection (ESRI:102003). 1. CERF Gridded Siting Parameters This directory provides a balanced sample of gridded CERF siting parameters data for eight different scenarios for the Western US through 2055, seven different technologies, and eight timesteps. This data serves as input to the feature analysis. It contains the following parameters. region_name - name of region (i.e., state) sited - binary value representing whether the grid cell received a siting of that technology type (1=True) rcp - binary value representing scenario resource concentration pathway (0 = RCP4.5, 1 = RCP8.5) ssp - binary value representing scenario shared socioeconomic pathway (0 = SSP3, 1 = SSP5) climate - binary value representing cooler (0) or hotter (1) GCM forcing tech_name - generation technology name sited_year - year that values correspond to transmission_cost - cost of transmission interconnection pipeline_cost - cost of natural gas pipeline interconnection interconnection_cost - total interconnection cost (sum of transmission cost and gas pipeline cost) lmp - associated locational marginal value ($/MWh) associated with the grid cell, timestep, scenario, and technology xcoord - x-coordinate of location ycoord - y-coordinate of location 2a. Feature Analysis Output The dataset includes the feature analysis shap output for locational marginal price and interconnection cost. It contains the following parameters. technology - generator technology name scenario - name of scenario feature - name of feature, either locational_marginal_price or interconnection_cost value - the mean of absolute value of SHAP values for given feature 2b. Feature Analysis Classification Report This download includes the classification report associated with each random forest model. The dataset contains the following parameters. technology - generation technology name scenario - name of scenario test - one of precision (the proportion of predicted positives that are actually correct), recall (the proportion of actual positives that were correctly identified), f1-score (the harmonic mean of precision and recall) 0.0 - value of test for classification of 0 (grid cell not chosen for siting) 1.0 - value of test for classification of 1 (grid cell chosen for siting) accuracy - accuracy of model (i.e., fraction of all predictions that were right) macro avg - Simple average of test values for all classes weighted avg - Weighted average of test values for all classes, weighted based on Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall [Pacific Northwest National Labor↗

Site demonstration and performance evaluation of MPC for a large chiller plant with TES for renewable energy integration and grid decarbonization

Thermal energy storage (TES) for a cooling plant is a crucial resource for load flexibility. Traditionally, simple, heuristic control approaches, such as the storage priority control which charges TES during the nighttime and discharges during the daytime, have been widely used in practice, and shown reasonable performance in the past benefiting both the grid and the end-users such as buildings and district energy systems. However, the increasing penetration of renewables changes the situation, exposing the grid to a growing duck curve, which encourages the consumption of more energy in the daytime, and volatile renewable generation which requires dynamic planning. The growing pressure of diminishing greenhouse gas emissions also increases the complexity of cooling TES plant operations as different control strategies may apply to optimize operations for energy cost or carbon emissions. This paper presents a model predictive control (MPC), site demonstration and evaluation results of optimal operation of a chiller plant, TES and behind-meter photovoltaics for a campus-level district cooling system. The MPC was formulated as a mixed-integer linear program for better numerical and control properties. Compared with baseline rule-based controls, the MPC results show reductions of the excess PV power by around 25%, of the greenhouse gas emission by 10%, and of peak electricity demand by 10%.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Comparison of RESRAD and GoldSim Models for Assessing Radiological Dose for a RCRA Landfill - 20418

US Ecology Idaho (USEI) operates a Resource Conservation and Recovery Act (RCRA) Subtitle C, Hazardous Waste Treatment, Storage, and Disposal (TSD) Facility on a 640-acre property in Owyhee County, Idaho. USEI accepts a wide variety of RCRA-exempt low activity radioactive wastes, including naturally occurring radioactive material (NORM) and technologically enhanced NORM (TENORM) (USEI 2009). The performance of the landfill with regard to radiological operating permit requirements was previously assessed using a model constructed with the residual radioactivity (RESRAD) computer program, developed by Argonne National Laboratory for the U.S. Department of Energy (DOE). RESRAD supports the evaluation of several environmental transport pathways related to a radionuclide-contaminated soil source term, but it was not conceived as a model for the evaluation of landfill radiological performance. A more comprehensive and realistic model is desired in order to better support submissions to both the State of Idaho's Department of Environmental Quality as well as the U.S. Nuclear Regulatory Commission. A Performance Assessment (PA) computer model was developed using GoldSim software for the USEI RCRA Subtitle C landfill. The RESRAD computer model was specifically developed for calculating soil cleanup criteria and radiological dose and cancer risk from residual radioactive material in soil. To evaluate site-specific conditions, users may select from among a number of available environmental transport and exposure pathways and modify 'default' parameter values. In GoldSim, a user must construct the model 'from scratch.' However, this modeling is facilitated by a number of specialized elements available in GoldSim to support a radiological mass transport model. These include elements for defining radiological decay and ingrowth, container failure and radiological release, advective and diffusive transport, and other processes. Advantages afforded by the use of RESRAD for modeling radiological dose for a RCRA Subtitle C landfill include ease of use and reasonable flexibility in specifying site-specific conditions. GoldSim allows for considerably more flexibility and site-specificity than RESRAD, including evaluation of potentially relevant environmental transport processes not supported in RESRAD. The probabilistic modeling capabilities of GoldSim also far exceed those of RESRAD. The pros and cons of RESRAD and GoldSim for this modeling problem are explored with a focus on identifying approaches and critical factors in identifying the appropriate platform. The capabilities of RESRAD and GoldSim for mathematically modeling the disposal system will be contrasted and compared. For example, the existing RESRAD radiological safety assessment evaluated potentially complete exposure pathways related to infiltration to groundwater and upwards diffusion of radon. Additional transport pathways identified in the USEI Idaho facility Conceptual Site Model include deposition of radon decay products in cover material, root uptake of radionuclides in disposed wastes by native plants, and mixing of cover material by burrowing animals. Results of the two models and how the different transport and dose pathways affect results will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TR acking A erosol C onvection Interations E xpe R iment ( TRACER ): Site Selection for the ARM TRACER Campaign

Three AMF Sites are needed: Main Site for the AMF1 Observatory, an 'ancillary site' to the SW of the city for measurement of air before crossing Houston. A radar site for the CSAPR between the main and ancillary sites, ideally no more than 50km from either site. We are making preliminary evaluations of sites for tethered balloon system (TBS) activities.

54 ENVIRONMENTAL SCIENCES↗

Improving Convection Trigger Functions in Deep Convective Parameterization Schemes Using Machine Learning

Abstract Deficiencies in convection trigger functions, used in deep convection parameterizations in General Circulation Models (GCMs), have critical impacts on climate simulations. A novel convection trigger function is developed using the machine learning (ML) classification model XGBoost. The large‐scale environmental information associated with convective events is obtained from the long‐term constrained variational analysis forcing data from the Atmospheric Radiation Measurement (ARM) program at its Southern Great Plains (SGP) and Manaus (MAO) sites representing, respectively, continental mid‐latitude and tropical convection. The ML trigger is separately trained and evaluated per site, and jointly trained and evaluated at both sites as a unified trigger. The performance of the ML trigger is compared with four convective trigger functions commonly used in GCMs: dilute convective available potential energy (CAPE), undilute CAPE, dilute dynamic CAPE (dCAPE), and undilute dCAPE. The ML trigger substantially outperforms the four CAPE‐based triggers in terms of the F 1 score metric, widely used to estimate the performance of ML methods. The site‐specific ML trigger functions can achieve, respectively, 91% and 93% F 1 scores at SGP and MAO. The unified trigger also has a 91% F 1 score, with virtually no degradation from the site‐specific training, suggesting the potential of a global ML trigger function. The ML trigger alleviates a GCM deficiency regarding the overprediction of convection occurrence, offering a promising improvement to the simulation of the diurnal cycle of precipitation. Furthermore, to overcome the black box issue of the ML methods, insights derived from the ML model are discussed, which may be leveraged to improve traditional CAPE‐based triggers.

54 ENVIRONMENTAL SCIENCES↗

CLEAP Project: OR-SAGE Analysis for MT, UT, and CO States

The OR-SAGE tool is designed to use industry-accepted practices in screening sites and then employ the proper array of data sources through the considerable computational capabilities of GIS technology available at ORNL. The tool was developed to screen the potential for NPP siting on a national and regional basis. However, because of the tool granularity, it is often focused specifically on the immediate area around user sites of interest. If data center siting parameters can be added to OR-SAGE, the ability to evaluate data center siting on a localized scale will be beneficial.1 More than 60 data sets have been collected and processed by ORNL to develop exclusionary, avoidance, and suitability criteria for screening sites for a variety of power generation types, including nuclear power plants. Available site evaluation parameters include population density, slope, seismic activity, proximity to cooling-water sources, proximity to hazard facilities, avoidance of protected lands and floodplains, susceptibility to landslide hazards, and many others. All siting parameters should be considered as flags to inform siting decisions and should not be used to rule in or rule out any NPP site. Once data center siting parameters are identified, appropriate data sets will be collected and processed. The OR-SAGE process is very versatile. Essentially, OR-SAGE is a visual, relational database. The database partitions the contiguous United States, a total of 720 million hectares (~1.8 billion acres), into 100-m by 100-m (1 hectare or ~2.5 acre) cells. The database is tracking just under 700 million individual land cells. Successive suitability criterion is applied to each cell in the database. User-specified thresholds can be applied to each siting parameter data layer. In this manner, a variety of scenarios can be quickly and thoroughly evaluated. Data can be added and/or revised within OR-SAGE to address user interests. Siting security assessment capability is currently being added to OR-SAGE. Security is expected to be of concern at data centers whether it is collocated with a nuclear power generating technology or not. If data center is collocated with a nuclear power generating source, the security threat attractiveness level of both will likely increase. It will be of additional benefit if a potential data center site is also assessed for security vulnerability.

97 MATHEMATICS AND COMPUTING↗

Time-Lapse Gravity Monitoring of CO2 Migration Based on Numerical Modeling of a Faulted Storage Complex

In this study, the performance of both surface and borehole time-lapse gravity monitoring to detect CO2 leakage from a carbon storage site is evaluated. Several hypothetical scenarios of CO2 migration in a leaky fault, and thief zones at different depths at the Kimberlina site (California, USA) constitute the basis of the approach. The CO2 displacement is simulated using the TOUGH2 simulator applied to a detailed geological model of the site. The gravity responses to these CO2 plumes are simulated using forward modeling with sensors at ground surface and in vertical boreholes. Results of inversion on one scenario are also presented. The surface-based gravity responses obtained for the different leakage scenarios demonstrate that leakage can be detected at the surface in all the scenarios but the time to detection is highly variable (10 to 40 years) and dependent on the detection threshold considered. Borehole measurements of the vertical component of gravity provide excellent constrains in depth when they are located in proximity of the density anomaly associated with the presence of CO2, thus discriminating multiple leaks in different thief zones. Joint inversion of surface and borehole data can bring valuable information of the occurrence of leakages and their importance by providing a reasonable estimate of mass of displaced fluids. This study demonstrates the importance of combining multiphase flow simulations with gravity modeling in order to define if and when gravity monitoring would be applicable at a given storage site.

Time-lapse gravity monitoring, leak detection, CCS↗

Community Solar Potential Analysis for Lawrence, Massachusetts

This report was prepared as part of the U.S. Department of Energy's Communities Local Energy Action Program (Communities LEAP) pilot competitive technical assistance for the Lawrence Massachusetts Stakeholder Coalition (LSC). In accordance with Technical Assistance Area 1 (Community Solar Analysis) and in coordination with the LSC, the UMass Clean Energy Extension (CEE) research team conducted a high-level geographic information system (GIS) evaluation of potential community solar (CS) development sites within Lawrence, and its three bordering towns of Andover, North Andover, and Methuen.

14 SOLAR ENERGY↗

Risk to ecological resources following remediation can be due mainly to increased resource value of successful restoration: A case study from the Department of Energy's Hanford Site

Several nations are faced with the need to remediate large contaminated sites following World War II, the Cold War, and abandoned industrial sites, and to return them to productive land uses. In the United States, the Department of Energy (DOE) has the largest cleanup challenge, and its Hanford Site in the state of Washington has the most extensive and most expensive cleanup task. Ideally, the risk to ecological resources on remediation sites is evaluated before, during, and after remediation, and the risk from, or damage to, ecological resources from contaminants should be lower following remediation. In this paper, we report the risk to ecological resources before, during, and as a consequence of remediation on contaminated units requiring cleanup, and then examine the causes for changes in risk by evaluating 56 cleanup evaluation units (EUs) at the Hanford Site. In this case, remediation includes a restoration phase. In general, the risk to ecological and eco-cultural resources is currently not discernible or low at most contaminated units, increases during remediation, and decreases thereafter. Remediation often causes physical disruption to ecosystems as it reduces the risk from exposure to contaminants. Most new remediation projects at the Hanford Site include ecological restoration. Ecological restoration results in the potential for the presence of higher quality resources after remediation than currently exists on these contaminated lands and facilities. Although counter-intuitive, our evaluation of the risk to ecological resources following remediation indicated that a significant percentage of units (61%) will be at increased risk in the post-remediation period. This increased risk is due to DOE's successful remediation and restoration that results in a higher percent of native vegetation and higher ecological value on the sites in the post-remediation period than before. These newly-created resources can then be at risk from post-remediation activities. Risks to these new higher quality resources include the potential for spread of invasive species and of noxious grasses used in previous cleanup actions, disruption of ecosystems (including those with state or federally listed species and unique ecosystems), compaction of soil, use of pesticides to control invasive species, and the eventual need for continued monitoring activities. Thus, by greatly improving the existing habitat and health of eco-receptors, and maintaining habitat corridors between high quality habitats, the ecological resources in the post-remediated units are at risk unless care is taken to protect them. Many of the negative effects of both remediation and future monitoring (or other future land uses) can be avoided by planning and management early in the remediation process. We suggest DOE and other agencies convene a panel of managers, remediation scientists, regulators, environmental and ecological scientists, Native Americans, economists, and the public to develop a generic list of performance metrics for the restoration phase of remediation, including evaluation of success, which could be applied across the DOE complex.

54 ENVIRONMENTAL SCIENCES↗

Geomechanical and Hydrogeological Evaluation of a Shallow Hydraulic Fracture at the Devine Fracture Pilot Site, Medina County, Texas

UT-Austin’s Devine Fracture Pilot Site, 50 miles southwest of San Antonio, Texas, has been targeted for a comprehensive, multidisciplinary development of fracture diagnostic techniques that are cross-validated by ground-truth data acquisition near a recently created, 175-ft-deep, horizontal hydraulic fracture (Ahmadian et al. 2018 Demonstration of proof of concept of electromagnetic geophysical methods for high resolution illumination of induced fracture networks. In Proceedings of the SPE Hydraulic Fracturing Technology Conference and Exhibition, The Woodlands, Texas, USA, 23–25 January 2018. SPE-189858-MS.). To evaluate the fracture diagnostic methods at this site, we conducted injection tests with a predefined volumetric flow-rate profile, resembling a diagnostic fracture injection test on September 2020. Subsequently, we developed hydrogeological and geomechanical models based on flow-rate and bottomhole-pressure measurements. History-matching efforts using a simplified layer-cake hydrogeological model resulted in the field-scale formation permeability of 9.87 × 10 –15 m 2 (10 mD) and Darcy-scale fracture permeability. The analysis of the bottomhole pressure and injection-rate history showed that (1) the newly created horizontal fracture was closed adjacent to the injection well pre-injection and (2) the initial pump-pressure increase at a nominal volumetric injection rate led to near-well fracture reopening, fluid conductivity increase, and abrupt injection-rate increase. To overcome hydrogeological-model limitations of predicting fracture reopening throughout injection, we extended the modeling to a finite-element, poroelastic analysis of horizontal-fracture growth using a cohesive-zone model. Using this fracture-reopening model, we improved the history match of the transient-pressure response during the experiment by adjusting the hydromechanical properties. Furthermore, post-injection pressure transient analyses helped reduce uncertainty in the overburden-stress gradient, and the initial hydraulic-fracturing simulation verified the plausibility of achieving the surveyed propped fracture area.

02 PETROLEUM↗