Search NASA⌕ Search

SEARCH · Search NASA

Results for “siting considerations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

A Ground-Based Network for Improved Validation of Satellite Carbon Dioxide and Methane Observations Over the Eastern United States

Satellite observations of greenhouse gases (GHGs), notably carbon dioxide and methane, over the Eastern United States, are currently only validated indirectly and/or sporadically. There are only four existing routine, ground-based remote sensing locations in the United States suitable for validation of satellite GHG observations: Edwards and Pasadena, CA, Lamont, OK, and Park Falls, WI as part of the Total Carbon Column Observing Network (TCCON). Among other efforts, e.g. the Network for the Detection of Atmospheric Composition Change (NDACC) and EM27/SUN deployments led by the University of Toronto, the only sites west of the Mississippi River are Park Falls, WI and Toronto, ON. The only remaining validation tools, vicarious calibration and airborne campaigns, are sporadic in space and/or time and thus coincide with only a small subsample of available soundings and conditions. As a result, satellite GHG observations over the east coast of the United States, home to more than half of its population, lack a consistent, widespread means of validation. We describe an ongoing effort to position 8 EM27/SUN spectrometers along the Eastern Seaboard over the next two years. The goals of this effort are to improve both satellite validation and our understanding of human and natural influences on the carbon cycle of the Eastern US, the former enabling the latter. This work is intended to augment past, ongoing, and future inter-agency programs, e.g., the NIST Urban Testbed, routine aircraft and aircore sampling by NOAA, and NASA’s Atmospheric Carbon and Transport (ACT)-America sub-orbital campaign, in particular by offering information on broader time and spatial scales than what is already available while maintaining the high-accuracy constraints of in situ data. We will present early analysis including siting considerations to capture local and/or background conditions and comparison to NASA’s Goddard Earth Observing System (GEOS) modeling and assimilation systems. This includes a 40-day, 3-km horizontal resolution global simulation of early 2020 and a 50-km retrospective analysis of Orbiting Carbon Observatory 2 (OCO-2) observations over 2015-present. Both are valuable tools for analyzing expected and observed signals and are useful boundary conditions for yet higher-resolution studies.

Brad Weir↗

Siting Issues for Solar Thermal Power Plants with Small Community Applications

Technologies for solar thermal plants are being developed to provide energy alternatives for the future. Implementation of these plants requires consideration of siting issues as well as power system technology. While many conventional siting considerations are applicable, there is also a set of unique siting issues for solar thermal plants. Early experimental plants will have special siting considerations. The siting issues associated with small, dispersed solar thermal power plants in the 1 to 10 MWe power range for utility/small community applications are considered. Some specific requirements refer to the first 1 MWe engineering experiment for the Small Power Systems Applications (SPSA) Project. The siting issues themselves are discussed in three categories: (1) system resource requirements, (2) environmental effects on the system, and (3) potential impact of the plant on the environment. Within these categories, specific issues are discussed in a qualitative manner. Examples of limiting factors for some issues are taken from studies of other solar systems.

Holbeck, J. J.↗

The Confluence of Gangis and Eos Chasmas (5-12 deg S, 31-41 deg W): Geologic, Hydrologic, and Exobiologic Considerations for Landing Site at the East End of Valles Marineris

Over its 3,500 km length, Valles Marineris exhibits an enormous range of geologic and environmental diversity. At its western end, the canyon is dominated by the tectonic complex of Noctis Labyrinthus; while in the east it grades into an extensive region of chaos where scoured channels and streamlined islands provide evidence of catastrophic floods that spilled into the northern plains. In the central portion of the system, debris derived from the massive interior layered deposits of Candor and Ophir Chasmas spills into the central trough. In other areas, 6 km-deep exposures of Hesperian and Noachian-age canyon wall stratigraphy have collapsed in massive landslides that extend many tens of kilometers across the canyon floor. Ejecta from interior craters, aeolian sediments, and possible volcanics emanating from structurally controlled vents along the base of the scarps, further contribute to the canyon's geologic complexity. Following the initial rifting that gave birth to Valles Marineris, water appears to have been a principal agent in the canyon's geomorphic development an agent whose significance is given added weight by its potential role in both sustaining and preserving evidence of past life. In this regard, the interior layered deposits of Candor, Ophir, and Hebes Chasmas, have been identified as possible lucustrine sediments that may have been laid down in long-standing ice-covered lakes. The potential survival and growth of native organisms in such an environment, or in the aquifers whose disruption gave birth to the chaotic terrain and outflow channels to the north and east of the canyon, raises the possibility that fossil indicators of life may be present in the local sediment and rock. Because of the enormous distances over which these diverse environments occur, identifying a single landing site that maximizes the opportunity for scientific return is not a simple task. However, given the fluvial history and narrow geometry of the canyon, the presence of a single exit at its eastern end provides an opportunity for sampling that appears unequaled elsewhere in the system.

George, J. A.↗

Selection of the Mars Pathfinder Landing Site

The Mars Pathfinder spacecraft will land on a depositional fan near the mouth of the catastrophic outflow channel, Ares Vallis (19.5 deg N, 32.8 deg W). This site offers the prospect of analyzing a variety of rock types from the ancient cratered highlands, intermediate-age ridged plains, and reworked channel deposits. Analyses of these rocks by Pathfinder instruments will enable first-order scientific questions to be addressed, such as differentiation of the crust, the development of weathering products, and the nature of the early environment, as well as their subsequent evolution on Mars. Constraints imposed by: (1) spacecraft and rover designs (which are robust), (2) entry, descent, and landing, (3) scientific potential at various sites, and (4) safety were important considerations in site selection. Engineering constraints require a 70 km by 200 km smooth, flat (low slopes) area located between 10 deg and 20 deg N that is below 0 km elevation, with average radar reflectivity, little dust, and moderate rock abundance. Three regions on Mars are between 10 deg and 20 deg N and below 0 km elevation: Chryse, Amazonis, and Isidis-Elysitun. Science considerations favor sites at the mouths of outflow channels (grab bag sites offer an assay of rock types on Mars), highland sites (early crustal differentiation and climate), and sites covered with dark (unoxidized) material. Sites are considered safe if they are clearly below 0 km elevation, appear acceptably free of hazards in high-resolution (less than 50 m/pixel) Viking orbiter images and have acceptable reflectivity and roughness at radar wavelengths, thermal inertia, rock abundance, red to violet ratio, and albedo. Recent 3.5-cm wavelength radar observations were used to verify elevation, reflectivity, and roughness within the landing ellipses. Three sites meet all of these criteria: Ares Vallis, Tritonis Lacus, and Isidis. Although Isidis appears to be safer than Tritonis and Ares, the greater scientific potential at Ares Vallis resulted in its selection. Comparisons of the Grand Coulee (channel) and the depositional Ephrata Fan of the Channeled Scabland in eastern Washington, with Ar-es Vallis and its depositional fan also suggest the Ares Vallis landing site is safe and scientifically interesting.

Golombek, M. P.↗

Optimizing Mars Sphere of Influence Maneuvers for NASA's Evolvable Mars Campaign

NASA's Human Spaceflight Architecture Team is refining human exploration architectures that will extend human presence to the Martian surface. For both Mars orbital and surface missions, NASA's Evolvable Mars Campaign assumes that cargo and crew can be delivered repeatedly to the same destination. Up to this point, interplanetary trajectories have been optimized to minimize the total propulsive requirements of the in-space transportation systems, while the pre-deployed assets and surface systems are optimized to minimize their respective propulsive requirements separate from the in-space transportation system. There is a need to investigate the coupled problem of optimizing the interplanetary trajectory and optimizing the maneuvers within Mars's sphere of influence. This paper provides a description of the ongoing method development, analysis and initial results of the effort to resolve the discontinuity between the interplanetary trajectory and the Mars sphere of influence trajectories. Assessment of Phobos and Deimos orbital missions shows the in-space transportation and crew taxi allocations are adequate for missions in the 2030s. Because the surface site has yet to be selected, the transportation elements must be sized to provide enough capability to provide surface access to all landing sites under consideration. Analysis shows access to sites from elliptical parking orbits with a lander that is designed for sub-periapsis landing location is either infeasible or requires expensive orbital maneuvers for many latitude ranges. In this case the locus of potential arrival perigee vectors identifies the potential maximum north or south latitudes accessible. Higher arrival velocities can decrease reorientation costs and increase landing site availability. Utilizing hyperbolic arrival and departure vectors in the optimization scheme will increase transportation site accessibility and provide more optimal solutions.

Merrill, Raymond G.↗

Site Integration and Regulatory Considerations for an NPP Colocated with a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 - HYDROGEN↗

Site Integration and Regulatory Considerations for a Nuclear Power Plant Colocated with Industrial Facilities: Colocation Studies for a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 HYDROGEN↗

Mineralogy Considerations for 2003 MER Site Selection and the Importance for Astrobiology

Much of the discussion of site selection on Mars is based on interesting images of the surface combined with safety issues. I argue that the two rovers should be sent to mineralogically distinct regions. Compositional information is still poorly constrained on Mars; however, the instruments on the 2003 Mars Exploration Rovers (MERs) will provide a unique opportunity for detailed characterization including mineral identification. There is strong motivation for sending one rover to a "typical" region on Mars to be used as a ground truth for the Thermal Emission Spectrometer (TES), while the other rover should be sent to a site where water and chemical alteration are likely to have occurred. Determining the mineralogy of the Martian surface material provides information about the past and present environments on Mars which are an integral aspect of whether or not Mars was suitable for the origin of life. Understanding the mineralogy of terrestrial samples from potentially Mars-like environments is essential to this effort.

Bishop, J. L.↗

NASA Super Pressure Balloon

NASA is in the process of qualifying the mid-size Super Pressure Balloon (SPB) to provide constant density altitude flight for science investigations at polar and mid-latitudes. The status of the development of the 18.8 million cubic foot SPB capable of carrying one-tonne of science to 110,000 feet, will be given. In addition, the operating considerations such as launch sites, flight safety considerations, and recovery will be discussed.

Balloon↗

NASA Super Pressure Balloon

NASA is in the process of qualifying the mid-size Super Pressure Balloon (SPB) to provide constant density altitude flight for science investigations at polar and mid-latitudes. The status of the development of the 18.8 million cubic foot SPB capable of carrying one-tone of science to 110,000 feet, will be given. In addition, the operating considerations such as launch sites, flight safety considerations, and recovery will be discussed.

Super Pressure Balloon↗

A Component-Level Bottom-Up Cost Model for Pumped Storage Hydropower

Pumped Storage Hydropower (PSH) is currently the largest source of utility-scale electricity storage in the U.S. and worldwide. As the accelerating deployment of variable renewable technologies creates opportunity and value for energy storage, it has become increasingly important to characterize PSH costs to understand how it competes. Site-specific considerations and limited cost data in the public domain make it difficult to estimate capital costs for potential new PSH sites. This report documents a spreadsheet-based tool that addresses this challenge and creates a component-level bottom-up cost model for PSH that can be made publicly available for widespread use. It uses detailed site-level physical characteristics and design specifications to calculate key performance and cost parameters for individual components and the project as a whole. The model was developed in consultation with HDR, Inc. and Small Hydro Consulting to ensure it aligns with industry expectations. It enables PSH cost exploration across a wide range of system assumptions and could be customized or extended for the needs of a variety of users.

cost model↗

Project-specific considerations for retrofitting carbon capture technology to power generating and industrial facilities

The National Energy Technology Laboratory (NETL) has previously reported on learnings from 7 FEED studies examining retrofitting power plants with capture. This presentation builds on this effort by highlighting learnings from 3 additional FEED studies examining retrofitting power plants with capture and 7 FEED and pre-FEED studies examining retrofitting industrial plants with capture. This includes a discussion of the design, performance, and cost implications associated with (1) site-specific considerations such as water availability, land availability, and site accessibility, and (2) host-plant-specific factors such as flue gas specifications, operational mode, and allowable degree of integration between the capture system and host plant.

FEED Studies↗

Andean tectonics: Implications for Satellite Geodesy

Current knowledge and theories of large scale Andean tectonics as they relate to site planning for the NASA Crustal Dynamics Program's proposed high precision geodetic measurements of relative motions between the Nazca and South American plates are summarized. The Nazca Plate and its eastern margin, the Peru-Chile Trench, is considered a prototype plate marked by rapid motion, strong seismicity and well defined boundaries. Tectonic activity across the Andes results from the Nazca Plate subducting under the South American plate in a series of discrete platelets with different widths and dip angles. This in turn, is reflected in the tectonic complexity of the Andes which are a multitutde of orogenic belts superimposed on each other since the Precambrian. Sites for Crustal Dynamics Program measurements are being located to investigate both interplate and extraplate motions. Observing operations have already been initiated at Arequipa, Peru and Easter Island, Santiago and Cerro Tololo, Chile. Sites under consideration include Iquique, Chile; Oruro and Santa Cruz, Bolivia; Cuzco, Lima, Huancayo and Bayovar, Peru; and Quito and the Galapagos Islands, Ecuador. Based on scientific considerations, Santa Cruz, Huancayo (or Lima), Quito and the Galapagos Islands should be replaced by Isla San Felix, Chile; Brazilia or Petrolina, Brazil; and Guayaquil, Ecuador. If resources permit, additional important sites would be Buenaventura and Villavicencio or Puerto La Concordia, Colombia; and Mendoza and Cordoba, Argentina.

Allenby, R. J.↗

Lunar South Pole Illumination: Review, Reassessment, and Power System Implications

This paper reviews past analyses and research related to lunar south pole illumination and presents results of independent illumination analyses using an analytical tool and a radar digital elevation model. The analysis tool enables assessment at most locations near the lunar poles for any time and any year. Average illumination fraction, energy storage duration, solar/horizon terrain elevation profiles and illumination fraction profiles are presented for various highly illuminated sites which have been identified for manned or unmanned operations. The format of the data can be used by power system designers to develop mass optimized solar and energy storage systems. Data are presented for the worse case lunar day (a critical power planning bottleneck) as well as three lunar days during lunar south pole winter. The main site under consideration by present lunar mission planners (on the Crater Shackleton rim) is shown to have, for the worse case lunar day, a 0.71 average illumination fraction and 73 to 117 hours required for energy storage (depending on power system type). Linking other sites and including towers at either site are shown to not completely eliminate the need for energy storage.

Fincannon, James↗

ORBIT: Offshore Renewables Balance-of-System and Installation Tool

This report describes the Offshore Renewables Balance-of-system Installation Tool ("ORBIT"), a new model developed by the National Renewable Energy Laboratory (NREL) to evaluate the balance-of-system (BOS) costs associated with offshore wind projects. In the context of wind energy projects BOS costs encompass all expenses required to construct a project other than the capital expenditures (CapEx) of the turbines and towers, including the procurement costs for all other components (such as substructures, cables, and electrical infrastructure), offshore and land-based construction costs, port costs, site surveying fees, permitting fees, and leasing fees are all categorized as BOS costs. BOS costs significantly contribute to the levelized cost of energy (LCOE) for offshore wind, typically comprising over 50\% of the CapEx for a fixed-bottom offshore wind project and 60\% for a floating project. In addition, technology solutions and installation methods vary drastically between projects as they are impacted by factors such as vessel availability, geographic considerations and site geotechnical conditions. These effects require a model with appropriate fidelity to understand how these costs scale as turbine rating increases and the offshore wind supply chain, particularly offshore construction vessels, is expanded. For offshore wind, cost savings attributed to increased turbine rating are primarily realized through BOS procurement and project installation as fewer substructures and less cable are required. BOS costs represent both a modeling challenge, as well as an opportunity, for project developers to optimize solutions to reduce costs. It is critical to understand how these costs are affected by novel technologies, innovative installation processes, and operational constraints in order identify meaningful cost reductions for offshore wind energy.

17 WIND ENERGY↗

Where on the moon - An Apollo systems engineering problem.

Approaches used in the selection of lunar landing sites are discussed, giving attention to a survey of major constraints affecting site selection. The science objectives of lunar exploration are considered, taking into account exploration goals, the acquisition of required data, mission science planning, orbital science, lunar surface traverse capability, the mare basalts, lunar interior composition, regolith, breccias, lunar chronology, lunar surface processes, and the origin of the moon. Subjects examined in connection with Apollo system capabilities include the Apollo missions, development missions, lunar exploration missions, mission design requirements, navigation, launch vehicle considerations, methods of determining accessibility, lunar module descent considerations, landing site redesignation, and questions of landability.

Source record↗