Search NASA⌕ Search

SEARCH · Search NASA

Results for “software effort estimating tool”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Bayesian Analysis for Risk Assessment of Selected Medical Events in Support of the Integrated Medical Model Effort

The Exploration Medical Capability project is creating a catalog of risk assessments using the Integrated Medical Model (IMM). The IMM is a software-based system intended to assist mission planners in preparing for spaceflight missions by helping them to make informed decisions about medical preparations and supplies needed for combating and treating various medical events using Probabilistic Risk Assessment. The objective is to use statistical analyses to inform the IMM decision tool with estimated probabilities of medical events occurring during an exploration mission. Because data regarding astronaut health are limited, Bayesian statistical analysis is used. Bayesian inference combines prior knowledge, such as data from the general U.S. population, the U.S. Submarine Force, or the analog astronaut population located at the NASA Johnson Space Center, with observed data for the medical condition of interest. The posterior results reflect the best evidence for specific medical events occurring in flight. Bayes theorem provides a formal mechanism for combining available observed data with data from similar studies to support the quantification process. The IMM team performed Bayesian updates on the following medical events: angina, appendicitis, atrial fibrillation, atrial flutter, dental abscess, dental caries, dental periodontal disease, gallstone disease, herpes zoster, renal stones, seizure, and stroke.

Gilkey, Kelly M.↗

Comparison of Aircraft Conceptual Design Weight Estimation Methods to the Flight Optimization System

Weight estimation is critical in the aircraft conceptual design process. The Flight Optimization System (FLOPS) is an aircraft conceptual design tool that has been the primary aircraft synthesis software used by the Systems Analysis and Concepts Directorate at NASA Langley Research Center. FLOPS includes multiple modules that represent aircraft design disciplines. The FLOPS weight module includes estimation methods that are similar in nature to other regression based aircraft preliminary weight estimation methods, however the FLOPS methods were created to use a minimum number of input parameters to limit the effort required by the designer to apply it. As FLOPS has recently been made publically available, this work compares the FLOPS weight estimation methods with several similar methods with the goal of explaining the differences in FLOPS, providing conceptual designers with a brief introduction to the method before attempting to apply it, and providing a reference to inform the development of future weight estimating relationships. In this paper, the Boeing 737-200 is used as a test case to highlight to differences and similarities in the methods.

Horvath, Bryce L.↗

Software Development Cost: How Much? You Sure? Technical Summary

This slide presentation reports on findings from analyzing a NASA COCOMO 81 dataset with 93 records. The current tool is called COSEEKMO, using a methodology can be applied to any set of cost models and data. The effort was part of a research initiative funded by the NASA Office of Safety and Mission and Assurance (OSMA) aimed at improving software reliability.

software effort estimation↗

An approach to software cost estimation

A general procedure for software cost estimation in any environment is outlined. The basic concepts of work and effort estimation are explained, some popular resource estimation models are reviewed, and the accuracy of source estimates is discussed. A software cost prediction procedure based on the experiences of the Software Engineering Laboratory in the flight dynamics area and incorporating management expertise, cost models, and historical data is described. The sources of information and relevant parameters available during each phase of the software life cycle are identified. The methodology suggested incorporates these elements into a customized management tool for software cost prediction. Detailed guidelines for estimation in the flight dynamics environment developed using this methodology are presented.

Mcgarry, F.↗

In-Situ Resource Utilization Modeling of a Lunar Water Processing System

A key element of achieving a sustained surface presence, such as defined in NASA’s Artemis plan, is In-Situ Resource Utilization (ISRU). ISRU is the practice of using local resources to provide mission consumables that reduce system launch mass requirements, and regenerate resources (chiefly, water and oxygen) for propulsion and life support supporting both Lunar and Martian missions. ISRU systems require multiple complex processes, such as excavation, chemical reactors, and electrolysis subsystems that must operate in harmony to optimize the overall system process from beginning to end. The Mission Analysis and Integration Tool (MAIT) was previously developed with MATLAB in FY22 to connect individual subsystem models into a customized, flexible framework for the purpose of technology downselect, optimization, and end-to-end process planning. Beginning in FY24, MAIT was leveraged and evolved using MATLAB/Simulink due to its ability to communicate with a vast number of other programming languages and makes up the backbone of data flow between inputs and outputs to the subsystem models. MAIT initially evaluated a suite of ISRU-related technologies, including the water processing Lunar Auger Dryer for ISRU (LADI) system with integrated upstream excavation and downstream electrolysis subsystems. With individual models consolidated, the MAIT tool generated over 60,000 cases during its parametric sweeps; these system iterations produced valuable insight into the optimal LADI geometry for minimizing energy demands, estimating carbothermal reactor and radiator mass relationships, and calculated the power dynamics of the electrolysis unit. Advanced efforts with advanced models will include examining multiple production targets to demonstrate the ability to scale ISRU technologies supporting the Space Technology Mission Directorate’s (STMD) commercialization strategy, and increase the MAIT software capability to handle a wide array of ISRU system models beyond the Lunar environment, e.g. production of propellant for a Martian lander.

Avery Carlson↗

Applying Model-Based Reasoning to the FDIR of the Command and Data Handling Subsystem of the International Space Station

All of the International Space Station (ISS) systems which require computer control depend upon the hardware and software of the Command and Data Handling System (C&DH) system, currently a network of over 30 386-class computers called Multiplexor/Dimultiplexors (MDMs)[18]. The Caution and Warning System (C&W)[7], a set of software tasks that runs on the MDMs, is responsible for detecting, classifying, and reporting errors in all ISS subsystems including the C&DH. Fault Detection, Isolation and Recovery (FDIR) of these errors is typically handled with a combination of automatic and human effort. We are developing an Advanced Diagnostic System (ADS) to augment the C&W system with decision support tools to aid in root cause analysis as well as resolve differing human and machine C&DH state estimates. These tools which draw from sources in model-based reasoning[ 16,291, will improve the speed and accuracy of flight controllers by reducing the uncertainty in C&DH state estimation, allowing for a more complete assessment of risk. We have run tests with ISS telemetry and focus on those C&W events which relate to the C&DH system itself. This paper describes our initial results and subsequent plans.

Robinson, Peter↗

The Business Case for Automated Software Engineering

Adoption of advanced automated SE (ASE) tools would be more favored if a business case could be made that these tools are more valuable than alternate methods. In theory, software prediction models can be used to make that case. In practice, this is complicated by the 'local tuning' problem. Normally. predictors for software effort and defects and threat use local data to tune their predictions. Such local tuning data is often unavailable. This paper shows that assessing the relative merits of different SE methods need not require precise local tunings. STAR 1 is a simulated annealer plus a Bayesian post-processor that explores the space of possible local tunings within software prediction models. STAR 1 ranks project decisions by their effects on effort and defects and threats. In experiments with NASA systems. STARI found one project where ASE were essential for minimizing effort/ defect/ threats; and another project were ASE tools were merely optional.

model evaluation↗

In-Situ Resource Utilization Modeling of a Lunar Water Processing System

A key element of achieving a sustained surface presence, such as defined in NASA’s Artemis plan, is In-Situ Resource Utilization (ISRU). ISRU is the practice of using local resources to provide mission consumables that reduce system launch mass requirements, and regenerate resources (chiefly, water and oxygen) for propulsion and life support supporting both Lunar and Martian missions. ISRU systems require multiple complex processes, such as excavation, chemical reactors, and electrolysis subsystems that must operate in harmony to optimize the overall system process from beginning to end. The Mission Analysis and Integration Tool (MAIT) was previously developed with MATLAB in FY22 to connect individual subsystem models into a customized, flexible framework for the purpose of technology downselect, optimization, and end-to-end process planning. Beginning in FY24, MAIT was updated and became the capital program in the Systems Engineering and Integration (SE&I) ISRU Modeling and Analysis (SIMA) project. Prior work was leveraged and evolved using MATLAB/Simulink due to its ability to communicate with a vast number of other programming languages and makes up the backbone of data flow between inputs and outputs to the subsystem models. MAIT initially evaluated a suite of ISRU-related technologies, including the water processing Lunar Auger Dryer for ISRU (LADI) system with integrated upstream excavation and downstream electrolysis subsystems. With individual models consolidated, the MAIT tool generated over 5,000 cases during its first round of parametric sweeps on the water processing architecture at multiple production targets; the system analysis produced valuable insight into the optimal LADI geometry that minimized energy demands, estimated effects to cold trap size and radiator requirements, and calculated the power dynamics of the electrolysis unit and liquid oxygen storage volume. Additional efforts are being made to demonstrate the ability to scale ISRU technologies supporting the Space Technology Mission Directorate’s (STMD) commercialization strategy and increase the MAIT software capability. Work is ongoing to handle a wide array of ISRU system models beyond the Lunar environment, e.g. production of propellant for a Martian lander.

Avery Carlson↗

In-Situ Resource Utilization Modeling of a Lunar Water Processing System

A key element of achieving a sustained surface presence, such as defined in NASA’s Artemis plan, is In-Situ Resource Utilization (ISRU). ISRU is the practice of using local resources to provide mission consumables that reduce system launch mass requirements, and regenerate resources (chiefly, water and oxygen) for propulsion and life support supporting both Lunar and Martian missions. ISRU systems require multiple complex processes, such as excavation, chemical reactors, and electrolysis subsystems that must operate in harmony to optimize the overall system process from beginning to end. The Mission Analysis and Integration Tool (MAIT) was previously developed with MATLAB in FY22 to connect individual subsystem models into a customized, flexible framework for the purpose of technology downselect, optimization, and end-to-end process planning. Beginning in FY24, MAIT was updated and became the capital program in the Systems Engineering and Integration (SE&I) ISRU Modeling and Analysis (SIMA) project. Prior work was leveraged and evolved using MATLAB/Simulink due to its ability to communicate with a vast number of other programming languages and makes up the backbone of data flow between inputs and outputs to the subsystem models. MAIT initially evaluated a suite of ISRU-related technologies, including the water processing Lunar Auger Dryer for ISRU (LADI) system with integrated upstream excavation and downstream electrolysis subsystems. With individual models consolidated, the MAIT tool generated over 5,000 cases during its first round of parametric sweeps on the water processing architecture at multiple production targets; the system analysis produced valuable insight into the optimal LADI geometry that minimized energy demands, estimated effects to cold trap size and radiator requirements, and calculated the power dynamics of the electrolysis unit and liquid oxygen storage volume. Additional efforts are being made to demonstrate the ability to scale ISRU technologies supporting the Space Technology Mission Directorate’s (STMD) commercialization strategy and increase the MAIT software capability. Work is ongoing to handle a wide array of ISRU system models beyond the Lunar environment, e.g. production of propellant for a Martian lander.

Avery Carlson↗

Ares I-X First Stage Separation Loads and Dynamics Reconstruction

The Ares I-X flight test provided NASA with the opportunity to test hardware and gather critical data to ensure the success of future Ares I flights. One of the primary test flight objectives was to evaluate the environment during First Stage separation to better understand the conditions that the J-2X second stage engine will experience at ignition [1]. A secondary objective was to evaluate the effectiveness of the stage separation motors. The Ares I-X flight test vehicle was successfully launched on October 29, 2009, achieving most of its primary and secondary test objectives. Ground based video camera recordings of the separation event appeared to show recontact of the First Stage and the Upper Stage Simulator followed by an unconventional tumbling of the Upper Stage Simulator. Closer inspection of the videos and flight test data showed that recontact did not occur. Also, the motion during staging was as predicted through CFD analysis performed during the Ares I-X development. This paper describes the efforts to reconstruct the vehicle dynamics and loads through the staging event by means of a time integrated simulation developed in TREETOPS, a multi-body dynamics software tool developed at NASA [2]. The simulation was built around vehicle mass and geometry properties at the time of staging and thrust profiles for the first stage solid rocket motor as well as for the booster deceleration motors and booster tumble motors. Aerodynamic forces were determined by models created from a combination of wind tunnel testing and CFD. The initial conditions such as position, velocity, and attitude were obtained from the Best Estimated Trajectory (BET), which is compiled from multiple ground based and vehicle mounted instruments. Dynamic loads were calculated by subtracting the inertial forces from the applied forces. The simulation results were compared to the Best Estimated Trajectory, accelerometer flight data, and to ground based video.

Demory, Lee↗

The MERMAID project

The tendency for software development projects to be completed over schedule and over budget was documented extensively. Additionally many projects are completed within budgetary and schedule target only as a result of the customer agreeing to accept reduced functionality. In his classic book, The Mythical Man Month, Fred Brooks exposes the fallacy that effort and schedule are freely interchangeable. All current cost models are produced on the assumption that there is very limited scope for schedule compression unless there is a corresponding reduction in delivered functionality. The Metrication and Resources Modeling Aid (MERMAID) project, partially financed by the Commission of the European Communities (CEC) as Project 2046 began in Oct. 1988 and its goal were as follows: (1) improvement of understanding of the relationships between software development productivity and product and process metrics; (2) to facilitate the widespread technology transfer from the Consortium to the European Software Industry; and (3) to facilitate the widespread uptake of cost estimation techniques by the provision of prototype cost estimation tools. MERMAID developed a family of methods for cost estimation, many of which have had tools implemented in prototypes. These prototypes are best considered as toolkits or workbenches.

Cowderoy, A. J. C.↗

Software Certification and Software Certificate Management Systems

Incremental certification and re-certification of code as it is developed and modified is a prerequisite for applying modem, evolutionary development processes, which are especially relevant for NASA. For example, the Columbia Accident Investigation Board (CAIB) report 121 concluded there is "the need for improved and uniform statistical sampling, audit, and certification processes". Also, re-certification time has been a limiting factor in making changes to Space Shuttle code close to launch time. This is likely to be an even bigger problem with the rapid turnaround required in developing NASA s replacement for the Space Shuttle, the Crew Exploration Vehicle (CEV). Hence, intelligent development processes are needed which place certification at the center of development. If certification tools provide useful information, such as estimated time and effort, they are more likely to be adopted. The ultimate impact of such a tool will be reduced effort and increased reliability.

Denney, Ewen↗

Model for Simulating a Spiral Software-Development Process

A discrete-event simulation model, and a computer program that implements the model, have been developed as means of analyzing a spiral software-development process. This model can be tailored to specific development environments for use by software project managers in making quantitative cases for deciding among different software-development processes, courses of action, and cost estimates. A spiral process can be contrasted with a waterfall process, which is a traditional process that consists of a sequence of activities that include analysis of requirements, design, coding, testing, and support. A spiral process is an iterative process that can be regarded as a repeating modified waterfall process. Each iteration includes assessment of risk, analysis of requirements, design, coding, testing, delivery, and evaluation. A key difference between a spiral and a waterfall process is that a spiral process can accommodate changes in requirements at each iteration, whereas in a waterfall process, requirements are considered to be fixed from the beginning and, therefore, a waterfall process is not flexible enough for some projects, especially those in which requirements are not known at the beginning or may change during development. For a given project, a spiral process may cost more and take more time than does a waterfall process, but may better satisfy a customer's expectations and needs. Models for simulating various waterfall processes have been developed previously, but until now, there have been no models for simulating spiral processes. The present spiral-process-simulating model and the software that implements it were developed by extending a discrete-event simulation process model of the IEEE 12207 Software Development Process, which was built using commercially available software known as the Process Analysis Tradeoff Tool (PATT). Typical inputs to PATT models include industry-average values of product size (expressed as number of lines of code), productivity (number of lines of code per hour), and number of defects per source line of code. The user provides the number of resources, the overall percent of effort that should be allocated to each process step, and the number of desired staff members for each step. The output of PATT includes the size of the product, a measure of effort, a measure of rework effort, the duration of the entire process, and the numbers of injected, detected, and corrected defects as well as a number of other interesting features. In the development of the present model, steps were added to the IEEE 12207 waterfall process, and this model and its implementing software were made to run repeatedly through the sequence of steps, each repetition representing an iteration in a spiral process. Because the IEEE 12207 model is founded on a waterfall paradigm, it enables direct comparison of spiral and waterfall processes. The model can be used throughout a software-development project to analyze the project as more information becomes available. For instance, data from early iterations can be used as inputs to the model, and the model can be used to estimate the time and cost of carrying the project to completion.

Mizell, Carolyn↗

Working and Learning with Knowledge in the Lobes of a Humanoid's Mind

Humanoid class robots must have sufficient dexterity to assist people and work in an environment designed for human comfort and productivity. This dexterity, in particular the ability to use tools, requires a cognitive understanding of self and the world that exceeds contemporary robotics. Our hypothesis is that the sense-think-act paradigm that has proven so successful for autonomous robots is missing one or more key elements that will be needed for humanoids to meet their full potential as autonomous human assistants. This key ingredient is knowledge. The presented work includes experiments conducted on the Robonaut system, a NASA and the Defense Advanced research Projects Agency (DARPA) joint project, and includes collaborative efforts with a DARPA Mobile Autonomous Robot Software technical program team of researchers at NASA, MIT, USC, NRL, UMass and Vanderbilt. The paper reports on results in the areas of human-robot interaction (human tracking, gesture recognition, natural language, supervised control), perception (stereo vision, object identification, object pose estimation), autonomous grasping (tactile sensing, grasp reflex, grasp stability) and learning (human instruction, task level sequences, and sensorimotor association).

Ambrose, Robert↗

Error Analysis System for Spacecraft Navigation Using the Global Positioning System (GPS)

The Flight Dynamics Division (FDD) at the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) is currently developing improved space-navigation filtering algorithms to use the Global Positioning System (GPS) for autonomous real-time onboard orbit determination. In connection with a GPS technology demonstration on the Small Satellite Technology Initiative (SSTI)/Lewis spacecraft, FDD analysts and programmers have teamed with the GSFC Guidance, Navigation, and Control Branch to develop the GPS Enhanced Orbit Determination Experiment (GEODE) system. The GEODE system consists of a Kalman filter operating as a navigation tool for estimating the position, velocity, and additional states required to accurately navigate the orbiting Lewis spacecraft by using astrodynamic modeling and GPS measurements from the receiver. A parallel effort at the FDD is the development of a GPS Error Analysis System (GEAS) that will be used to analyze and improve navigation filtering algorithms during development phases and during in-flight calibration. For GEAS, the Kalman filter theory is extended to estimate the errors in position, velocity, and other error states of interest. The estimation of errors in physical variables at regular intervals will allow the time, cause, and effect of navigation system weaknesses to be identified. In addition, by modeling a sufficient set of navigation system errors, a system failure that causes an observed error anomaly can be traced and accounted for. The GEAS software is formulated using Object Oriented Design (OOD) techniques implemented in the C++ programming language on a Sun SPARC workstation. The Phase 1 of this effort is the development of a basic system to be used to evaluate navigation algorithms implemented in the GEODE system. This paper presents the GEAS mathematical methodology, systems and operations concepts, and software design and implementation. Results from the use of the basic system to evaluate navigation algorithms implemented on GEODE are also discussed. In addition, recommendations for generalization of GEAS functions and for new techniques to optimize the accuracy and control of the GPS autonomous onboard navigation are presented.

Truong, S. H.↗

Integration Process for the Habitat Demonstration Unit

The Habitat Demonstration Unit (HDU) is an experimental exploration habitat technology and architecture test platform designed for analog demonstration activities The HDU project has required a team to integrate a variety of contributions from NASA centers and outside collaborators and poses a challenge in integrating these disparate efforts into a cohesive architecture To complete the development of the HDU from conception in June 2009 to rollout for operations in July 2010, a cohesive integration strategy has been developed to integrate the various systems of HDU and the payloads, such as the Geology Lab, that those systems will support The utilization of interface design standards and uniquely tailored reviews have allowed for an accelerated design process Scheduled activities include early fit-checks and the utilization of a Habitat avionics test bed prior to equipment installation into HDU A coordinated effort to utilize modeling and simulation systems has aided in design and integration concept development Modeling tools have been effective in hardware systems layout, cable routing and length estimation, and human factors analysis Decision processes on the shell development including the assembly sequence and the transportation have been fleshed out early on HDU to maximize the efficiency of both integration and field operations Incremental test operations leading up to an integrated systems test allows for an orderly systems test program The HDU will begin its journey as an emulation of a Pressurized Excursion Module (PEM) for 2010 field testing and then may evolve to a Pressurized Core Module (PCM) for 2011 and later field tests, depending on agency architecture decisions The HDU deployment will vary slightly from current lunar architecture plans to include developmental hardware and software items and additional systems called opportunities for technology demonstration One of the HDU challenges has been designing to be prepared for the integration of presently unanticipated systems Results of the HDU field tests will influence future designs of habitat systems.

Gill, Tracy↗

NASA Software Engineering Benchmarking Study

To identify best practices for the improvement of software engineering on projects, NASA's Offices of Chief Engineer (OCE) and Safety and Mission Assurance (OSMA) formed a team led by Heather Rarick and Sally Godfrey to conduct this benchmarking study. The primary goals of the study are to identify best practices that: Improve the management and technical development of software intensive systems; Have a track record of successful deployment by aerospace industries, universities [including research and development (R&D) laboratories], and defense services, as well as NASA's own component Centers; and Identify candidate solutions for NASA's software issues. Beginning in the late fall of 2010, focus topics were chosen and interview questions were developed, based on the NASA top software challenges. Between February 2011 and November 2011, the Benchmark Team interviewed a total of 18 organizations, consisting of five NASA Centers, five industry organizations, four defense services organizations, and four university or university R and D laboratory organizations. A software assurance representative also participated in each of the interviews to focus on assurance and software safety best practices. Interviewees provided a wealth of information on each topic area that included: software policy, software acquisition, software assurance, testing, training, maintaining rigor in small projects, metrics, and use of the Capability Maturity Model Integration (CMMI) framework, as well as a number of special topics that came up in the discussions. NASA's software engineering practices compared favorably with the external organizations in most benchmark areas, but in every topic, there were ways in which NASA could improve its practices. Compared to defense services organizations and some of the industry organizations, one of NASA's notable weaknesses involved communication with contractors regarding its policies and requirements for acquired software. One of NASA's strengths was its software assurance practices, which seemed to rate well in comparison to the other organizational groups and also seemed to include a larger scope of activities. An unexpected benefit of the software benchmarking study was the identification of many opportunities for collaboration in areas including metrics, training, sharing of CMMI experiences and resources such as instructors and CMMI Lead Appraisers, and even sharing of assets such as documented processes. A further unexpected benefit of the study was the feedback on NASA practices that was received from some of the organizations interviewed. From that feedback, other potential areas where NASA could improve were highlighted, such as accuracy of software cost estimation and budgetary practices. The detailed report contains discussion of the practices noted in each of the topic areas, as well as a summary of observations and recommendations from each of the topic areas. The resulting 24 recommendations from the topic areas were then consolidated to eliminate duplication and culled into a set of 14 suggested actionable recommendations. This final set of actionable recommendations, listed below, are items that can be implemented to improve NASA's software engineering practices and to help address many of the items that were listed in the NASA top software engineering issues. 1. Develop and implement standard contract language for software procurements. 2. Advance accurate and trusted software cost estimates for both procured and in-house software and improve the capture of actual cost data to facilitate further improvements. 3. Establish a consistent set of objectives and expectations, specifically types of metrics at the Agency level, so key trends and models can be identified and used to continuously improve software processes and each software development effort. 4. Maintain the CMMI Maturity Level requirement for critical NASA projects and use CMMI to measure organizations developing software for NASA. 5.onsolidate, collect and, if needed, develop common processes principles and other assets across the Agency in order to provide more consistency in software development and acquisition practices and to reduce the overall cost of maintaining or increasing current NASA CMMI maturity levels. 6. Provide additional support for small projects that includes: (a) guidance for appropriate tailoring of requirements for small projects, (b) availability of suitable tools, including support tool set-up and training, and (c) training for small project personnel, assurance personnel and technical authorities on the acceptable options for tailoring requirements and performing assurance on small projects. 7. Develop software training classes for the more experienced software engineers using on-line training, videos, or small separate modules of training that can be accommodated as needed throughout a project. 8. Create guidelines to structure non-classroom training opportunities such as mentoring, peer reviews, lessons learned sessions, and on-the-job training. 9. Develop a set of predictive software defect data and a process for assessing software testing metric data against it. 10. Assess Agency-wide licenses for commonly used software tools. 11. Fill the knowledge gap in common software engineering practices for new hires and co-ops.12. Work through the Science, Technology, Engineering and Mathematics (STEM) program with universities in strengthening education in the use of common software engineering practices and standards. 13. Follow up this benchmark study with a deeper look into what both internal and external organizations perceive as the scope of software assurance, the value they expect to obtain from it, and the shortcomings they experience in the current practice. 14. Continue interactions with external software engineering environment through collaborations, knowledge sharing, and benchmarking.

Rarick, Heather L.↗

Evaluation of a Human Modeling Software Tool in the Prediction of Extra Vehicular Activity Tasks for an International Space Station Assembly Mission

The difficulty of accomplishing work in extravehicular activity (EVA) is well documented. It arises as a result of motion constraints imposed by a pressurized spacesuit in a near-vacuum and of the frictionless environment induced in microgravity. The appropriate placement of foot restraints is crucial to ensuring that astronauts can remove and drive bolts, mate and demate connectors, and actuate levers. The location on structural members of the foot restraint sockets, to which the portable foot restraint is attached, must provide for an orientation of the restraint that affords the astronaut adequate visual and reach envelopes. Previously, the initial location of these sockets was dependent upon the experienced designer's ability to estimate placement. The design was tested in a simulated zero-gravity environment; spacesuited astronauts performed the tasks with mockups while submerged in water. Crew evaluation of the tasks based on these designs often indicated the bolt or other structure to which force needed to be applied was not within an acceptable work envelope, resulting in redesign. The development of improved methods for location of crew aids prior to testing would result in savings to the design effort for EVA hardware. Such an effort to streamline EVA design is especially relevant to International Space Station construction and maintenance. Assembly operations alone are expected to require in excess of four hundred hours of EVA. Thus, techniques which conserve design resources for assembly missions can have significant impact. We describe an effort to implement a human modelling application in the design effort for an International Space Station Assembly Mission. On Assembly Flight 6A, the Canadian-built Space Station Remote Manipulator System will be delivered to the U.S. Laboratory. It will be released from its launch restraints by astronauts in EVA. The design of the placement of foot restraint sockets was carried out using the human model Jack, and the modelling results were compared with actual underwater test results. The predicted locations of the sockets was found to be acceptable for 94% of the tasks attempted by the astronauts, This effort provides confidence in the capabilities of this package to accurately model tasks. It therefore increases assurance that the tool maybe used early in the design process.

Dischinger, H. Charles↗