Search NASA⌕ Search

SEARCH · Search NASA

Results for “storage resources”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Grid-Forming Storage Networks: Analytical Characterization of Damping and Design Insights

Grid-forming storage resources are critical to the operation of power grids with high renewable penetration. Over the years, there has been considerable emphasis on understanding the benefits these inverter-based storage resources bring towards managing volatility and enhancing grid reliability but little is studied about the supplementary advantages latent in their operation. This paper investigates one such application in which we explore the impact of grid-forming distributed storage in damping low-frequency inter-area oscillations. We present a detailed analysis characterizing the impact of inverter-droop and storage size on the slower eigenvalues, highlighting potential design considerations for enhancing system stability.

Chatterjee, Kaustav [BATTELLE (PACIFIC NW LAB)] (O↗

Managing Subsurface Pressure Buildup and Interference in Commercial-Scale CO 2 Storage Project with Proximal Injection Wells

Large-scale decarbonization using carbon capture and storage (CCS) is likely to involve many commercial-scale CO 2 storage projects located in close proximity to each other. This close proximity raises concerns over pressure interference among the storage projects. Pressure interference between injection and storage efforts can reduce the practicable CO 2 storage resource and force wells to inject CO 2 at a lower rate to avoid the fracture pressure thresholds per United States Environmental Protection Agency (EPA) Class VI well regulations to preserve injection and confining zone integrity and potentially mitigate against inducing seismic activity. These analyses employ numerical full-physics reservoir modeling to evaluate how pressure buildup fronts and CO 2 plumes evolve under commercial-scale injection volumes of CO 2 in which multiple storage sites located in close proximity occur in tandem. The simulation models mimic injection at pseudo basin-scale and assume homogeneous saline formation(s) as storage targets with a pair of upper and lower homogeneous seal layer/s. These analyses specifically investigate the efficacy of two basin-wide reservoir pressure management strategies in addressing the technical challenges associated with pressure buildup and CO 2 plume commingling. The strategies explored include: 1) enlarging the area of injection well spacing (WS) and 2) storing CO 2 in a stacked sequence (SSS) of saline formations compared to a single formation. The storage and confining zones properties assumed were held common across the scenarios, unless specified otherwise. Analyses results show that after injecting 4 million tons per year for 30 years using 4 separate wells (each injecting 1 million metric tons per year), the radius of CO 2 plume extends to a mere 3 km or less from injection wells. Meanwhile, the radius of pressure buildup ranges on the order of tens to a few hundreds of kilometers, depending on the magnitude of pressure buildup threshold that one would use to define the front. CO 2 plume commingling from different injection wells appears to occur 50 years post-injection, especially under scenarios with narrowly spaced (i.e., < 5 km apart) injection well locations. Findings from sensitivity cases on the well spacing suggest that storage formations modeled would require different well spacing to avoid fracture pressure thresholds. For instance, modeled storage formations with high fracture gradients (i.e., 0.8 psi/ft) would need less than 5–km well spacing, whereas those with lower fracture gradients (i.e., 0.7 psi/ft) would need approximately 20–km well spacing, based on assumed modeling parameters. Under stacked injection, the pressure challenges (described above) still exist but are more alleviated due to distributing the same injection volume across more available reservoir volume. These analyses demonstrate that stacked-sequence storage can effectively address the challenges, while still providing the same target CO 2 storage volumes and allowing a large number of storage projects to be deployed in the same basin by better utilizing the available storage resource across different reservoir depths. Among cases modeled, the resulting pressure buildup front is most suppressed when each storage project distributes injection volumes over several wells, each of which injects a portion of the total CO 2 across the stacked sequence. This strategy results in the smallest CO 2 aerial footprint amongst scenarios evaluated but also shows the largest reduction in the pressure buildup at the top of perforation at the injection wells (upwards of approximately 42 percent compared to the commercial-scale single-formation storage), the result of which is crucial to maintain caprock integrity. The findings presented by this research draw attention to the importance of greater coordination among storage operators and regulatory stakeholders to foster the upscaling and deployment of CCS. These analyses provide insights into required decision-making when considering multi-project deployment in a shared basin. Because these analyses evaluate a very specific geologic situation, they bear further investigations across other geologic situations.

42 ENGINEERING↗

Implementing Large-Scale CCS in Complex Geologic Reservoirs: Insights from Three Appalachian Basin Case Studies

This paper presents three design case studies for implementing large-scale geologic carbon storage in the Appalachian Basin region of the midwestern United States. While the Appalachian Basin has a challenging setting for carbon storage, the three case studies detailed in this article demonstrate that there are realistic options for implementing carbon storage in the basin. Carbonate rock formations, depleted hydrocarbon reservoirs, and moderate-porosity sandstones can be utilized as carbon-storage reservoirs in the Appalachian Basin. While these are not typical concepts for CO2 storage, the storage zones have advantages such as defined trapping mechanisms, multiple caprocks, and defined boundaries that are not always present in thick, permeable sandstones being targeted for many carbon-storage projects. The geologic setting, geotechnical parameters, and hydrologic setting for the three case studies are provided, along with the results of reservoir simulations of the CO2 injection-deployment strategies. The geological rock formations available for CO2 storage in the Appalachian Basin are more localized reservoirs with defined boundaries and finite storage capacities. Simulation results showed that accessing carbon-storage resources in these fields may require wellfields with 2–10 injection wells. However, these fields would have the capacity to inject 1–3 million metric tons of CO2 per year and up to 90 million metric tons of CO2 in total. The CO2 storage resources would fulfill decarbonization goals for many of the natural-gas power plants, cement plants, hydrogen plants, and refineries in the Appalachian Basin region.

Sminchak, Joel↗

Factors Determining Commercially Optimal Development Strategies for CO 2 Storage With and Without CO 2 -EOR

This report is a draft white paper on the factors determining commercially optimal development strategies for CO 2 storage with and without CO 2 -EOR. The draft report provides a summary of accomplishments during the first budget period of the Southeast Offshore Storage Resource Assessment for the Gulf of Mexico (SECARB Offshore GOM) project. It also identifies “Next Steps” to be undertaken during Budget Period II. A final white paper will be prepared at the end of Budget Period II. The goal of this draft white paper is to expand the knowledge base required for commercially viable, secure, longterm, large-scale carbon dioxide (CO 2 ) subsea storage in the U.S. Gulf of Mexico (GOM), both with and without enhanced hydrocarbon recovery. This effort supports the U.S. Department of Energy’s (DOE) long-term objective of ensuring a comprehensive assessment of the potential for offshore CO 2 subsea storage in the GOM. The groundwork that has been completed in the draft white paper advanced by expanding the membership of the Southern States Energy Board’s (SSEB) existing Southeast Offshore Storage Resource Assessment (DE-FE0026082) GOM government-industry partnership during the next budget period. Further, the team plans to consult with U.S. federal and state agencies to develop recommendations to remove barriers and streamline the regulatory process to encourage subsea CO 2 storage with or without enhanced hydrocarbon recovery.

02 PETROLEUM↗

Decentralized Voltage Control with Peer-to-peer Energy Trading in a Distribution Network

Utilizing distributed renewable and energy storage resources via peer-to-peer (P2P) energy trading has long been touted as a solution to improve energy system’s resilience and sustainability. Consumers and prosumers (those who have energy generation resources), however, do not have expertise to engage in repeated P2P trading, and the zero-marginal costs of renewables present challenges in determining fair market prices. To address these issues, we propose a multi-agent reinforcement learning (MARL) framework to help automate consumers’ bidding and management of their solar PV and energy storage resources, under a specific P2P clearing mechanism that utilizes the so-called supply-demand ratio. In addition, we show how the MARL framework can integrate physical network constraints to realize decentralized voltage control, hence ensuring physical feasibility of the P2P energy trading and paving ways for real-world implementations.

Feng, Chen↗

First Wave of Incentive-Driven CCS Projects in North Dakota

Conference poster presented at American Association of Petroleum Geologists (AAPG) Carbon Capture, Utilization, and Storage (CCUS) Conference, Houston, Texas, March 28–30, 2022. While the central interior of North America offers a tremendous storage resource, optimization will be key to meaningfully reducing the more than 2.6 billion tons of CO 2 emitted annually from large point sources in the United States. These initial projects tend to have the most favorable economics and are often able to take advantage of the best geology, with little to no competition for resource. This initial wave of projects is informing investment in and creating the opportunity for innovation that will enable the next wave of incentive-based CCS projects. Such innovation is critical for reducing costs, enhancing the design and operability of the next wave of CCS projects, and realizing more of the 250 billion tons of storage resource in North Dakota.

01 COAL, LIGNITE, AND PEAT↗

Acoustic Impedance Inversions for Offshore CO 2 Storage: South Georgia Embayment, United States

This study builds and expands on previous CO 2 storage resource assessment studies of the southeastern offshore Atlantic margin by providing a detailed evaluation on how rock porosities and permeabilities are distributed across the Upper Cretaceous strata restricted to the South Georgia Embayment (SGE). Using legacy industry two-dimensional seismic reflection and well data, this assessment is the first application of multiple seismic inversion techniques in this area. This workflow provides a reliable and repeatable model-based inversion which gives an improved image to discriminate lithology and predict porosity. The workflow is applicable to future CO 2 storage resource assessment studies elsewhere. The inversion results indicate that distinct porosity and permeability regimes are present and distributed in the Upper Cretaceous strata within the SGE. The impedance and porosity relationships show well-founded and reliable correlation. These relationships reveal low impedance coincident to the high porosity intervals which are proposed as potential reservoir intervals for CO 2 storage. In addition, the result shows that the Upper Cretaceous strata have two main potential reservoirs in the lower part. These are overlain by a thick impermeable interval, mostly shale, which has high impedance, low porosity, and low permeability and extends within the SGE. This result is in agreement with a previous study that also proposed two significant storage reservoirs for CO 2 in the Upper Cretaceous strata. Since porosity distribution is estimated using multiple methods, it follows the trends of seismic signature and structures of the Upper Cretaceous strata. The extracted values of porosity, ranging from 15 to 36%, and permeability, ranging from 1 to 100 mD, are close to the measured values from the well core data at the Upper Cretaceous strata interval.

54 ENVIRONMENTAL SCIENCES↗

Developing a roadmap for carbon capture, and storage in Oklahoma by assessing the viability of stacked storage

Abstract The Intergovernmental Panel on Climate Change concludes that CO 2 capture and storage (CCS) is critical for climate‐stabilizing energy transitions. In CCS, captured CO 2 is sequestered in saline aquifers within sedimentary basins. The CO 2 storage capacity and the rate of injection are functions of the geology of the saline aquifer, which is uncertain. To minimize impacts of this uncertainty, CCS projects could include backup plans, such as co‐locating geologic CO 2 storage (GCS) sites with or near existing CO 2 ‐enhanced oil recovery (CO 2 ‐EOR) operations. These “stacked storage” projects could hedge against uncertainty in the saline formation performance because captured CO 2 could be injected into either location in the event of unexpected events (e.g., the injectivity decreases). Here, we investigate the possibility and ramifications of developing CCS networks in Oklahoma that are amendable to stacked storage. We find that stacked storage is possible in Oklahoma but the counties with the lowest‐cost saline storage resources do not have existing CO 2 ‐EOR operations. At the systems level, we find it is slightly more expensive (e.g., $1/tCO 2 to $5/tCO 2 ) to site GCS in counties with CO 2 ‐EOR projects. This increased expense is largely due to increased CO 2 transportation costs because hundreds of km of additional pipeline is required to capture CO 2 from the lowest‐cost sources. Overall, our results suggest that it is optimal to build more pipelines and avoid injecting CO 2 in some of the lowest‐cost saline storage resources, to enable capturing CO 2 from the least‐cost sources. © 2023 Society of Chemical Industry and John Wiley & Sons, Ltd.

42 ENGINEERING↗

Overview of the distributed image processing infrastructure to produce the Legacy Survey of Space and Time

The Vera C. Rubin Observatory is preparing to execute the most ambitious astronomical survey ever attempted, the Legacy Survey of Space and Time (LSST). Currently the final phase of construction is under way in the Chilean Andes, with the Observatory’s ten-year science mission scheduled to begin in 2025. Rubin’s 8.4-meter telescope will nightly scan the southern hemisphere collecting imagery in the wavelength range 320–1050 nm covering the entire observable sky every 4 nights using a 3.2 gigapixel camera, the largest imaging device ever built for astronomy. Automated detection and classification of celestial objects will be performed by sophisticated algorithms on high-resolution images to progressively produce an astronomical catalog eventually composed of 20 billion galaxies and 17 billion stars and their associated physical properties. In this article we present an overview of the system currently being constructed to perform data distribution as well as the annual campaigns which reprocess the entire image dataset collected since the beginning of the survey. These processing campaigns will utilize computing and storage resources provided by three Rubin data facilities (one in the US and two in Europe). Each year a Data Release will be produced and disseminated to science collaborations for use in studies comprising four main science pillars: probing dark matter and dark energy, taking inventory of solar system objects, exploring the transient optical sky and mapping the Milky Way. Also presented is the method by which we leverage some of the common tools and best practices used for management of large-scale distributed data processing projects in the high energy physics and astronomy communities. We also demonstrate how these tools and practices are utilized within the Rubin project in order to overcome the specific challenges faced by the Observatory.

79 ASTRONOMY AND ASTROPHYSICS↗

Frequency Control and Disturbance Containment Using Grid-Forming Embedded Storage Networks

The paper presents a distributed approach for operating a network of inverter-based energy storage resources embedded in a bulk power system. Departing from their traditional role of steady-state reserves, the storage assets in the network are utilized as frequency-responsive resources shaping system dynamics. The power electronics converter systems interfacing the storage resources are equipped with local controllers designed to respond under transient disturbances. To this end, a safety-constrained distributed control strategy is explored. The paper compares the performance of converter-interfaced grid-forming and grid-following storage networks for fast frequency control and disturbance containment/localization. Sensitivity studies are performed to study the impact of storage size, steady-state dispatch, and controller design on dynamic performance. The findings are presented through case studies with results from the IEEE test systems.

Chatterjee, Kaustav (ORCID:0000000153273860)↗

Basin-scale study of CO 2 storage in stacked sequence of geological formations

Commercial scale decarbonization through carbon capture and storage may likely involve many CO 2 storage projects located in close proximity. The close proximity could raise concerns over caprock integrity associated with reservoir pressure buildup and interference among adjacent projects. Commercial-scale injection will also require large prospective CO 2 storage resource and high injectivity in the targeted storage formations. To accommodate the need for both large resource and high injectivity, project operators could consider injecting CO 2 into a stacked sequence of formations. This analysis investigates the benefits of injecting CO 2 into a vertically stacked sequence of saline formations, over injecting the same amount of CO 2 into a single saline formation, in addressing these challenges. Our analysis shows that injecting into the stacked sequence mitigates the extent of pressure buildup among the stacked formations, while still achieving the same or greater target CO 2 storage volumes. Among cases modeled, the resulting pressure buildup front is most reduced when each storage site distributes injection volumes over several wells, each of which injects a portion of the total CO 2 mass across the stacked sequence. This favorable case not only results in the smallest CO 2 aerial footprint, but also shows the largest reduction in the pressure buildup at the top of perforation at the injection wells (upwards of approximately 46% compared to the single-formation storage), the result of which is crucial to maintain caprock integrity. This analysis provides insights into required decision-making when considering multi-project deployment in a shared basin.

42 ENGINEERING↗

Regional Geology Capstone Report for the Midwestern Regional Carbon Sequestration Partnership (Volume V)

The Midwest Regional Carbon Sequestration Partnership (MRCSP) was founded in 2003 as part of the U.S. Department of Energy’s (DOE’s) Regional Carbon Sequestration Partnership initiative. Since its founding, MRCSP has made significant strides toward making CCUS a viable option for states in the region. The public/private consortium, funded through the DOE Regional Carbon Sequestration Initiative, brings together nearly 40 industry partners and 10 states. Battelle, as the project lead, oversees research, development and operations and coordinates activities among the partners. The incremental, phased approach has built a valuable knowledge base for the industry and paved the way for commercial-scale adoption of CCUS technologies. From 2008 to 2020, MRCSP Phase III focused on the development of large-scale injection projects. This report is part of a series of reports prepared under the Midwestern Regional Carbon Sequestration Partnership (MRCSP) Phase III (Development Phase). These reports summarize and detail the findings of the work conducted under the Phase III project. The MRCSP regional geology Capstone report summarizes the regional characterization of geologic storage subtasks performed under MRCSP Phase III. The regional characterization work was completed by the state geological surveys of Delaware, Indiana, Kentucky, Maryland, New York, Ohio, Pennsylvania, and West Virginia along with Western Michigan University and Rutgers University. Building on the Phases I and II, the Phase III research was focused on key research topics identified in previous MRCSP efforts: [1] Regional Geologic Cross Sections for Potential Storage and Containment Zones; [2] Appalachian Basin: Enhanced Recovery Opportunities; [3] Michigan Basin: Assessment of Enhanced Oil Recovery Using Carbon Dioxide in Silurian Pinnacle Reefs; [4] Mid-Atlantic Coastal Plain and Adjacent Offshore Region: Characterization of Carbon Storage Targets; [5] Ordovician-Cambrian Units: Hierarchical Evaluation of Geologic Carbon Storage Resource Estimates; [6] Upper Silurian to Middle Devonian Strata of Ohio: Structural Characterization of Potential CO 2 Reservoirs and Adjacent Strata; [7] Triassic Rift Basins: Preliminary Study of Long-Term CO 2 Storage Potential Together, the regional characterization effort developed useful products to support project developers, policy makers and other stakeholders in the MRCSP region seeking to understand where potential storage exists relative to large stationary sources of CO 2 emissions.

01 COAL, LIGNITE, AND PEAT↗

Multi factor Assessment for Decarbonization via Technically Viable Carbon Storage

Final poster presenting research under EDX4CCS portfolio, Task 21, on multi-factor assessment for technically viable carbon storage. To date, carbon storage viability assessments have focused on the technically recoverable storage resources to estimate the volume of carbon storage in reservoirs targeted for geologic carbon sequestration. The Carbon Storage Technical Viability Approach (CS TVA) was developed to account for all factors determining the viability of carbon storage at a given site, including socioeconomic and environmental aspects in addition to the classic subsurface geologic assessment. Abstract accepted to the American Geophysical Union Fall Meeting 2023.

Mark-Moser, Mackenzie K.↗

Electricity Markets Design Challenge [Slides]

Electricity markets are at a crossroads - join the U.S. Department of Energy and the National Renewable Energy Laboratory for an exclusive one-hour workshop where you'll engage directly with the project team and help shape the rules for a potential prize. This competition could redefine how electricity markets support renewables and storage resources and create innovative solutions for the challenges ahead. NREL has also issued a Request for Information (RFI) to gather feedback and gauge interest in this potential prize. Whether or not you attend the workshop, we encourage you to review the brief presentation and share your thoughts through the RFI.

16 TIDAL AND WAVE POWER↗

Federated Access from DOE Labs to Distributed Storage in the EIC Era of Computing

The Electron Ion Collider (EIC) collaboration and future experiment is a unique scientific ecosystem within Nuclear Physics as the experiment starts right off as a crosscollaboration between Brookhaven National Lab (BNL) & Jefferson Lab (JLab). As a result, this muti-lab computing model tries at best to provide services accessible from anywhere by anyone who is part of the collaboration. While the computing model for the EIC is not finalized, it is anticipated that the computational and storage resources will be made accessible to a wide range of collaborators across the world. The use of federated ID seems to be a critical element to the strategy of providing such services, allowing seamless access to each lab site computing resources. However, providing Federated access to a Federated storage is not a trivial matter and has its share of technical challenges. In this contribution, we focus on the steps we took towards the deployment of a distributed object storage system that integrates with Amazon S3 and Federated ID. We will first cover for and explain the first stage storage solutions provided to the EIC during the detector design phase. Our initial test deployment consisted of Lustre storage using MinIO, hence providing an S3 interface. High Availability load balancers were added later to provide the initial scalability it lacked. Performance of that system will be shown. While this embryonic solution worked well, it had many limitations. Looking ahead, the Ceph object storage is considered a top-of-the-line solution in the storage community - since the Ceph Object Gateway is compatible with the Amazon S3 API out of the box, our next phase will use a native S3 storage. Our Ceph deployment will consist of erasure coded storage nodes to maximize storage potential along with multiple Ceph Object Gateways for redundant access. We will compare performance of our next stage implementations. Finally, we will present how to leverage OpenID Connect with the Ceph Object Gateway’s to enable Federated ID access. We hope this contribution will serve the community needs as we move forward with cross-lab collaborations and the need for Federated ID access to distributed compute facilities.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Financial Case Study on the Use of Cloud Resources in HEP Computing

An all-inclusive analysis of costs for on-premises and public cloudbased solutions to handle the bulk of HEP computing requirements shows that dedicated on-premises deployments of compute and storage resources are still the most cost-effective. Since the advent of public cloud services, the HEP community has engaged in multiple proofs of concept to study the technical viability of using cloud resources; however, the financial viability of using cloud resources for HEP computing and storage is of greater importance. We present the results of a study comparing the cost of providing computing resources in a public cloud and a comprehensive estimate for the cost of an on-premises solution for HEP computing. Like previous studies, the fundamental conclusion is that for the bulk of HEP computing needs, on premises is significantly more cost effective than public clouds.

99 GENERAL AND MISCELLANEOUS↗