Search NASA⌕ Search

SEARCH · Search NASA

Results for “structural mount”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Peripheral end face attachment of exposed copper layers of a first printed circuit board to the surface of a second printed circuit board by surface mount assembly

A printed circuit board (PCB) structure and mounting assembly for joining two PCBs. A first PCB has a top and bottom surface faces and a peripheral end face separating the top and bottom surface. The first PCB has one or more conductive wire ends exposed at a surface of the peripheral end face; the exposed conductive wire ends forming multiple separate electrical contacts across the thickness and length of the PEF surface. A second PCB has a top surface face and one or more conductive pads exposed at the top surface at locations corresponding to locations of the multiple electrical contacts. A surface mount solder material is disposed on one or more exposed conductive pads for electrically connecting with corresponding the multiple electrical contacts. The disposed solder material stably joins the PEF surface of the first PCB to the top surface of the second PCB in a relative perpendicular orientation.

Takken, Todd E.↗

Mechanical Performance of the LARP Nb3Sn Quadrupole Magnet LQS01

As part of the effort towards the development of Nb{sub 3}Sn magnets for future LHC luminosity upgrades, the LHC Accelerator Research Program (LARP) has fabricated and tested the quadrupole magnet LQS01. The magnet implements 3.4 m long Nb{sub 3}Sn coils contained in a support structure characterized by an external aluminum shell segmented in four sections. The room temperature pre-load of the structure is obtained by shimming load keys through bladders, pressurized during the loading operations and removed before cool-down. Temperature compensated strain gauges, mounted on structure components and coil poles, monitor the magnet's mechanical behavior during assembly, cool-down and, excitation. During the first test, LQS01 reached the target gradient of 200 T/m; the gauge data indicated that the aluminum shell was pre-tensioned to the target value estimated by numerical models, but a lack of pre-load was measured in the coil inner layer during ramping. As a result, the test was interrupted and the magnet disassembled, and inspected. A second test (LQS01b) was then carried out following a re-loading of the magnet. The paper reports on the strain gauge results of the first test and the analysis performed to identify corrective actions to improve the coil pre-stress distribution. The mechanical performance of the magnet during the second cool-down and test is then presented and discussed.

43 PARTICLE ACCELERATORS↗

Edge multi-energy soft x-ray diagnostic in Experimental Advanced Superconducting Tokamak

A multi-energy soft x-ray (ME-SXR) diagnostic has been built for electron temperature profile in the edge plasma region in Experimental Advanced Superconducting Tokamak (EAST) after two rounds of campaigns. Originally, five preamplifiers were mounted inside the EAST vacuum vessel chamber attached to five vertically stacked compact diode arrays. A custom mechanical structure was designed to protect the detectors and electronics under constraints of the tangential field of view for plasma edge and the allocation of space. In the next experiment, the mechanical structure was redesigned with a barrel structure to absolutely isolate it from the vacuum vessel. Multiple shielding structures were mounted at the pinhole head to protect the metal foils from lithium coating. The pre-amplifiers were moved to the outside of the vacuum chamber to avoid introducing interference. Twisted copper cooling tube was embedded into the back-shell near the diode to limit the temperature of the preamplifiers and diode arrays during vacuum vessel baking when the temperature reached 150 °C. Electron temperature profiles were reconstructed from ME-SXR measurements using neural networks.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Light shielding apparatus

A light shielding apparatus for blocking light from reaching an electronic device, the light shielding apparatus including left and right support assemblies, a cross member, and an opaque shroud. The support assemblies each include primary support structure, a mounting element for removably connecting the apparatus to the electronic device, and a support member depending from the primary support structure for retaining the apparatus in an upright orientation. The cross member couples the left and right support assemblies together and spaces them apart according to the size and shape of the electronic device. The shroud may be removably and adjustably connectable to the left and right support assemblies and configured to take a cylindrical dome shape so as to form a central space covered from above. The opaque shroud prevents light from entering the central space and contacting sensitive elements of the electronic device.

42 ENGINEERING↗

Sensing, interlocking solar module system and installation method

A solar module system is coupled directly to a fixed structure either individually or collectively as an array. Universal mounting brackets attached to the back of each solar panel module each connect to one or more other brackets of adjacent solar panels and/or to mounting feet that anchor to the fixed structure. Mounting brackets interlock with mounting brackets on adjacent solar modules and include a flexible snap coupling mechanism including a locking feature to selectively flexibly connect to and disconnect from other mounting brackets of adjacent solar panels.

14 SOLAR ENERGY↗

Development of a Co-Axial Hot Cathode for Magnetized Ion Source Plasma

Directly heated high temperature cathodes of refractory metals such as tungsten run electric current of more than several tens of amperes. The electric current makes magnetic field around the cathode wire, and the magnetic field causes inhomogeneous emission of electrons from the cathode. To solve this problem we have designed the cathode having a co-axial heater current flow structure, and mounted it in a Bernas-type ion source. A plasma produced by co-axial hot cathode showed a clearer column along the external magnetic field and less displacement in the direction perpendicular to the field than that produced by a hair-pin filament. Stable discharge current as high as 5000 mA was obtained for Ar and BF{sub 3} gases with the co-axial cathode. Boron and phosphorus ion beams were extracted from the source on an actual ion implanter. The ion beam currents were 1.5 times as large as those obtained with a hair-pin filament.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Flat TBPS Integration Testing for the CMS Outer Tracker Upgrade

The upcoming High-Luminosity (HL) LHC will significantly increase luminosity, introducing more demanding operating conditions for the CMS detector. To meet these challenges, CMS is undergoing major upgrades, including a complete replacement of its tracking detector. This poster presents recent integration testing efforts conducted at Fermilab on the Flat Tracker Barrel with pixel-strip (PS) modules integration test stand, a subcomponent of the outer tracker located in the central barrel region. In this region, PS modules are mounted on structures that provide mechanical support and cooling, called planks. The testing focuses on validating the integrated system’s thermal and electrical performance. Results from these tests will be discussed, highlighting their importance for ensuring reliable tracker operation in the HL-LHC era.

Salazar Segovia, Itzelli [UC, Davis]↗

Method of making a modular off-axis solar concentrator

A method of making a solar concentrator may include forming a receiving wall having an elongated wall, a first side wall and a second side wall; attaching the first side wall and the second side wall to a reflecting wall to form a housing having an internal volume with an opening; forming a lip on the receiving wall and the reflecting wall; attaching a cover to the receiving wall and the reflecting wall at the lip to seal the opening into the internal volume, thereby creating a rigid structure; and mounting at least one receiver having at least one photovoltaic cell on the elongated wall to receive solar radiation entering the housing and reflected by the receiving wall, the receiver having an axis parallel with a surface normal of the photovoltaic cell, such that the axis is disposed at a non-zero angle relative to the vertical axis of the opening.

14 SOLAR ENERGY↗

Photovoltaic module mounting system

A solar array mounting system having unique installation, load distribution, and grounding features, and which is adaptable for mounting solar panels having no external frame. The solar array mounting system includes flexible, pedestal-style feet and structural links connected in a grid formation on the mounting surface. The photovoltaic modules are secured in place via the use of attachment clamps that grip the edge of the typically glass substrate. The panel mounting clamps are then held in place by tilt brackets and/or mid-link brackets that provide fixation for the clamps and align the solar panels at a tilt to the horizontal mounting surface. The tilt brackets are held in place atop the flexible feet and connected link members thus creating a complete mounting structure.

14 SOLAR ENERGY↗

Photovoltaic module mounting system

A solar array mounting system having unique installation, load distribution, and grounding features, and which is adaptable for mounting solar panels having no external frame. The solar array mounting system includes flexible, pedestal-style feet and structural links connected in a grid formation on the mounting surface. The photovoltaic modules are secured in place via the use of attachment clamps that grip the edge of the typically glass substrate. The panel mounting clamps are then held in place by tilt brackets and/or mid-link brackets that provide fixation for the clamps and align the solar panels at a tilt to the horizontal mounting surface. The tilt brackets are held in place atop the flexible feet and connected link members thus creating a complete mounting structure.

14 SOLAR ENERGY↗

Damping device for onshore and offshore wind turbines

A damping device for a wind turbine tower is disclosed having at least one upper mount extending from a tower structure, at least one lower mount extending from one of the tower structure or a tower foundation, at least one damping device extending only in a substantially vertical direction, the damping device having an upper connector coupled with the upper mount and a lower connector coupled with the lower mount, and at least one damper coupled between the upper connector and the lower connector.

17 WIND ENERGY↗

Mount pad

According to one implementation a mount pad is provided that includes a plurality of arcuate flexure members disposed between and connected to top and bottom plates. According to some implementations a majority or all of the arcuate flexure members have a semi-circular cross-section and are arranged to form a plurality of radially spaced-apart concentric rings. Concave surfaces of the arcuate flexure members face radially inward toward a center of the concentric rings. Circumferential adjacent arcuate flexure members in each of the concentric rings are circumferentially spaced apart from one another so that a gap exists between them. According to some implementations the mount pad further includes a coupling unit prolonging from one of the top and bottom plates, the coupling unit facilitating a connection of the mount pad to a support structure. According to some implementations the mount pad is a monolithic structure. According to some implementations the monolithic structure is made using an additive manufacturing method.

36 MATERIALS SCIENCE↗

Opportunities and challenges for structural health monitoring of radioactive waste systems and structures

Radioactive waste systems and structures (RWSS) are safety-critical facilities in need of monitoring over prolonged periods of time. Structural health monitoring (SHM) is an emerging technology that aims at monitoring the state of a structure through the use of networks of permanently mounted sensors. SHM technologies have been developed primarily within the aerospace and civil engineering communities. This paper addresses the issue of transitioning the SHM concept to the monitoring of RWSS and evaluates the opportunities and challenges associated with this process. Guided wave SHM technologies utilizing structurally-mounted piezoelectric wafer active sensors (PWAS) have a wide range of applications based on both propagating-wave and standing-wave methodologies. Hence, opportunities exist for transitioning these SHM technologies into RWSS monitoring. However, there exist certain special operational conditions specific to RWSS such as: radiation field, caustic environments, marine environments, and chemical, mechanical and thermal stressors. In order to address the high discharge of used nuclear fuel (UNF) and the limited space in the storage pools the U.S. the Department of Energy (DOE) has adopted a 'Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste' (January 2013). This strategy endorses the key principles that underpin the Blue Ribbon Commission's on America's Nuclear Future recommendations to develop a sustainable program for deploying an integrated system capable of transporting, storing, and disposing of UNF and high-level radioactive waste from civilian nuclear power generation, defense, national security, and other activities. This will require research to develop monitoring, diagnosis, and prognosis tools that can aid to establish a strong technical basis for extended storage and transportation of UNF. Monitoring of such structures is critical for assuring the safety and security of the nation's spent nuclear fuel until a national policy for closure of the nuclear fuel cycle is defined and implemented. In addition, such tools can provide invaluable and timely information for verification of the predicted mechanical performance of RWSS (e.g. concrete or steel barriers) during off-normal occurrence and accident events such as the tsunami and earthquake event that affected Fukushima Daiichi nuclear power plant. The ability to verify the conditions, health, and degradation behavior of RWSS over time by applying nondestructive testing (NDT) as well as development of nondestructive evaluation (NDE) tools for new degradation processes will become challenging. The paper discusses some of the challenges associated to verification and diagnosis for RWSS and identifies SHM technologies which are more readily available for transitioning into RWSS applications. Fundamental research objectives that should be considered for the transition of SHM technologies (e.g., radiation hardened piezoelectric materials) for RWSS applications are discussed. The paper ends with summary, conclusions, and suggestions for further work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Petrologic and Petrophysical Evaluation of the Dallas Center Structure, Iowa, for Compressed Air Energy Storage in the Mount Simon Sandstone

The Iowa Stored Energy Plant Agency selected a geologic structure at Dallas Center, Iowa, for evaluation of subsurface compressed air energy storage. The site was rejected due to lower-than-expected and heterogeneous permeability of the target reservoir, lower-than-desired porosity, and small reservoir volume. In an initial feasibility study, permeability and porosity distributions of flow units for the nearby Redfield gas storage field were applied as analogue values for numerical modeling of the Dallas Center Structure. These reservoir data, coupled with an optimistic reservoir volume, produced favorable results. However, it was determined that the Dallas Center Structure cannot be simplified to four zones of high, uniform permeabilities. Updated modeling using field and core data for the site provided unfavorable results for air fill-up. This report presents Sandia National Laboratories' petrologic and petrophysical analysis of the Dallas Center Structure that aids in understanding why the site was not suitable for gas storage.

Heath, Jason E.↗

Assembly and Loading of LQS01, a Shell-Based 3.7 m Long Nb3Sn Quadrupole Magnet for LARP

The LHC Accelerator Research Program (LARP) has been engaged in the fabrication of the 3.7 m long quadrupole magnet LQS01 in order to demonstrate that Nb{sub 3}Sn magnets are a viable option for future LHC Luminosity upgrades. The LQS01 design, a scale-up of the 1 m long Technology Quadrupole TQS, includes four 3.4 m long cos(theta) coils contained in a support structure based on four 1 m long aluminum shells pre-tensioned with water-pressurized bladders (shell-type structure). In order to verify assembly procedures and loading operations, the structure was pre-stressed around solid aluminum 'dummy coils' and cooled-down to 77 K. Mechanical behavior and stress variations were monitored with strain gauges mounted on the structure and on the dummy coils. The dummy coils were then replaced with Nb{sub 3}Sn coils in a second assembly and loading procedure, in preparation for the cool-down and test. This paper reports on the cool-down test with dummy coils and on the assembly and loading of LQS01, with a comparison between 3D finite element model predictions and strain gauge data.

43 PARTICLE ACCELERATORS↗

Measurement of Magnetic Field using Doppler-Free Saturation Spectroscopy (DFSS) in C-2W FRC Plasma

The Cooperative Research and Development Agreement (CRADA) between Oak Ridge National Laboratory (ORNL) and TAE Technologies (TAE) focused on implementing an existing mobile Doppler-free saturation spectroscopy (DFSS) diagnostic to determine the direction of the equilibrium magnetic field within TAE’s C-2W field-reversed configuration (FRC) fusion device. Non-perturbative measurements of magnetic fields in the core of FRCs can provide critical information needed to constrain equilibrium models and for the continued advancement of the fusion research program at TAE. DFSS is a well-established, laser-based absorption spectroscopy technique used to suppress inhomogeneous (Doppler) broadening and reveal the Zeeman fine structure of the target emission lines. The collaboration involved the use of ORNL’s recently constructed mobile DFSS diagnostic. The DFSS diagnostic was shipped and installed on C- 2W in February 2023. TAE’s expertise was used to design and construct the mechanic support structures required to mount the optical hardware on C-2W. Additionally TAE provide critical input to minimize the noise imposed on the DFSS signal by vibrations of the mechanic support structure during operations. DFSS data was obtained for over 500 C-2W shots and will continue until the expiration of this CRADA on September 30 th 2023. Over the course of this work, significant progress was made to maximize the signal to noise (SNR) ratio. Analysis of recently acquired data is on-going, however, initial indications are highly suggestive that a DFSS signal above background has been successfully acquired in C-2W.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

High-density percutaneous chronic connector for neural prosthetics

A high density percutaneous chronic connector, having first and second connector structures each having an array of magnets surrounding a mounting cavity. A first electrical feedthrough array is seated in the mounting cavity of the first connector structure and a second electrical feedthrough array is seated in the mounting cavity of the second connector structure, with a feedthrough interconnect matrix positioned between a top side of the first electrical feedthrough array and a bottom side of the second electrical feedthrough array to electrically connect the first electrical feedthrough array to the second electrical feedthrough array. The two arrays of magnets are arranged to attract in a first angular position which connects the first and second connector structures together and electrically connects the percutaneously connected device to the external electronics, and to repel in a second angular position to facilitate removal of the second connector structure from the first connector structure.

42 ENGINEERING↗

Micro/nano-mechanical test system employing tensile test holder with push-to-pull transformer

A micromachined or microelectromechanical system (MEMS) based push-to-pull mechanical transformer for tensile testing of micro-to-nanometer scale material samples including a first structure and a second structure. The second structure is coupled to the first structure by at least one flexible element that enables the second structure to be moveable relative to the first structure, wherein the second structure is disposed relative to the first structure so as to form a pulling gap between the first and second structures such that when an external pushing force is applied to and pushes the second structure in a tensile extension direction a width of the pulling gap increases so as to apply a tensile force to a test sample mounted across the pulling gap between a first sample mounting area on the first structure and a second sample mounting area on the second structure.

47 OTHER INSTRUMENTATION↗