Search NASA⌕ Search

SEARCH · Search NASA

Results for “technology procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Semantic Interoperability to Enable Smart, Grid-Interactive Efficient Buildings

Achieving a widespread transition to grid-interactive, efficient buildings (GEBs) depends critically on there being sufficient interoperability among connected building systems. While many critical elements already exist at the technical interoperability level (TCP/IP, BACnet, etc.), a lack of interoperability in the semantic level hinders streamlined integration of interdependent applications. Semantics refers to expressing information about “things” in a way that can be consistently understood by applications. Key components of formalized semantics include identifying what a “thing” is (its “type”), defining general information about that “thing” (its characteristics or properties), and defining the appropriate relationships of that “thing” to other “things” (its function or role in a larger system). Although this might seem initially trivial, the success of smart building applications is highly dependent on maintaining consistent self-descriptive notions of the “things”. Without semantic interoperability, it is technically difficult, labor-intensive, and cost-prohibitive to enable three key objectives of GEBs: optimizing performance, automatically identifying and diagnosing faults, and delivering grid services. Industry, academia, and standards bodies have invested effort in developing information models to facilitate semantic interoperability, however, they have not been widely adopted across the U.S. commercial building portfolio. This paper will present a pathway to drive semantic interoperability through a three-pronged approach to be led by the DOE Building Technologies Office in partnership with NIST and multiple national laboratories comprising: 1) industry engagement and coordination across existing efforts; 2) a semantic interoperability standard that empowers building owners to identify and require interoperable attributes when procuring equipment and applications; 3) tools to assist in implementation and a test framework to verify compliance of products with semantic interoperability specifications. This approach is designed to accelerate the timeline for adoption of semantic interoperability specifications. The intent is to reduce soft costs associated with implementing advanced controls, fault detection and diagnostics, and other smart building technologies and use cases as a necessary step in achieving an energy efficient smart grid future.

Bergmann, Harry↗

Semantic Interoperability to Enable Smart, Grid-Interactive Efficient Buildings

Achieving a widespread transition to grid-interactive, efficient buildings (GEBs) depends critically on there being sufficient interoperability among connected building systems. While many critical elements already exist at the technical interoperability level (TCP/IP, BACnet, etc.), a lack of interoperability in the semantic level hinders streamlined integration of interdependent applications. Semantics refers to expressing information about “things” in a way that can be consistently understood by applications. Key components of formalized semantics include identifying what a “thing” is (its “type”), defining general information about that “thing” (its characteristics or properties), and defining the appropriate relationships of that “thing” to other “things” (its function or role in a larger system). Although this might seem initially trivial, the success of smart building applications is highly dependent on maintaining consistent self-descriptive notions of the “things”. Without semantic interoperability, it is technically difficult, labor-intensive, and cost-prohibitive to enable three key objectives of GEBs: optimizing performance, automatically identifying and diagnosing faults, and delivering grid services. Industry, academia, and standards bodies have invested effort in developing information models to facilitate semantic interoperability, however, they have not been widely adopted across the U.S. commercial building portfolio. This paper will present a pathway to drive semantic interoperability through a three-pronged approach to be led by the DOE Building Technologies Office in partnership with NIST and multiple national laboratories comprising: 1) industry engagement and coordination across existing efforts; 2) a semantic interoperability standard that empowers building owners to identify and require interoperable attributes when procuring equipment and applications; 3) tools to assist in implementation and a test framework to verify compliance of products with semantic interoperability specifications. This approach is designed to accelerate the timeline for adoption of semantic interoperability specifications. The intent is to reduce soft costs associated with implementing advanced controls, fault detection and diagnostics, and other smart building technologies and use cases as a necessary step in achieving an energy efficient smart grid future.

30 DIRECT ENERGY CONVERSION↗

Moving the Mission Forward with Renewable Energy

Presentation gives an overview of proven examples of renewable energy technologies. Learn how to properly utilize renewable energy technologies; research, select, fund, and deploy renewable technologies; best operate and maintain the federal government’s fleet of on-site solar photovoltaic (PV) systems; and learn best practices to detect and address performance issues with a PV system.

distributed energy↗

Semantic Interoperability to Enable Smart, Grid-Interactive Efficient Buildings

Achieving a widespread transition to grid-interactive, efficient buildings (GEBs) depends critically on there being sufficient interoperability among connected building systems. While many critical elements already exist at the technical interoperability level (TCP/IP, BACnet, etc.), a lack of interoperability in the semantic level hinders streamlined integration of interdependent applications. Semantics refers to expressing information about “things” in a way that can be consistently understood by applications. Key components of formalized semantics include identifying what a “thing” is (its “type”), defining general information about that “thing” (its characteristics or properties), and defining the appropriate relationships of that “thing” to other “things” (its function or role in a larger system). Although this might seem initially trivial, the success of smart building applications is highly dependent on maintaining consistent notions of the “things” being self-descriptive. Without semantic interoperability, it is technically difficult, labor-intensive, and cost-prohibitive to enable three key objectives of GEBs: optimizing performance, identifying faults, and delivering grid services. Industry, academia, and standards bodies have invested effort in developing information models to facilitate semantic interoperability, however, they have not been widely adopted across the U.S. commercial building portfolio. This paper will present a pathway to drive semantic interoperability through a three-pronged approach to be led by the DOE Building Technologies Office in partnership with NIST and multiple national laboratories comprising: 1) industry engagement and coordination across existing efforts; 2) a semantic interoperability standard that empowers building owners to identify and require interoperable attributes when procuring equipment and applications; 3) tools to assist in implementation and a test framework that can verify compliance of products with semantic interoperability specifications. This strategic approach is designed to accelerate the timeline for adoption of semantic interoperability standards. The intent is to reduce soft costs associated with implementing advanced controls, fault detection and diagnostics, and other smart building technologies as a necessary step in achieving an energy efficient smart grid future.

semantic interoperability, Semantic modeling, inte↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

Grid Communications: Digital Assurance and Supply Chain Challenges and Emerging Regulation Session Two

The TADA Grid Communications Workshops are designed to strengthen cybersecurity and digital assurance across the energy sector by focusing on secure deployment and management of grid communications technologies. These workshops bring together state energy offices, utilities, and technology suppliers to explore the intersection of communications infrastructure, supply chain risks, and emerging regulatory requirements. Participants will apply Cyber-Informed Engineering (CIE) principles to reduce risks in communications systems, engage with INL’s procurement guidance, and explore future tools. Through scenario-based exercises and peer exchange, attendees will develop risk-based security strategies and actionable compliance roadmaps tailored to their grid communications projects. The workshops also help participants navigate evolving regulatory frameworks such as FEOC rules in the OBBB, NERC CIP-013, and NDAA 2024, while identifying compliance gaps in mixed-technology environments. A key outcome is the formation of a practitioner network with ongoing access to INL expertise and resources, fostering long-term resilience in the digital energy ecosystem. This is Session 2 of 3 (Full Version).

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Grid Communications: Cybersecurity and Supply Chain Challenges and Emerging Regulation Session Three

The TADA Grid Communications Workshops are designed to strengthen cybersecurity and digital assurance across the energy sector by focusing on secure deployment and management of grid communications technologies. These workshops bring together state energy offices, utilities, and technology suppliers to explore the intersection of communications infrastructure, supply chain risks, and emerging regulatory requirements. Participants will apply Cyber-Informed Engineering (CIE) principles to reduce risks in communications systems, engage with INL’s procurement guidance, and explore future tools. Through scenario-based exercises and peer exchange, attendees will develop risk-based security strategies and actionable compliance roadmaps tailored to their grid communications projects. The workshops also help participants navigate evolving regulatory frameworks such as FEOC rules in the OBBB, NERC CIP-013, and NDAA 2024, while identifying compliance gaps in mixed-technology environments. A key outcome is the formation of a practitioner network with ongoing access to INL expertise and resources, fostering long-term resilience in the digital energy ecosystem. This is Session 3 of 3 (Full Version).

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Grid Communications Supply Chain & Emerging Regulation Challenges Session 1

The TADA Grid Communications Workshops are designed to strengthen cybersecurity and digital assurance across the energy sector by focusing on secure deployment and management of grid communications technologies. These workshops bring together state energy offices, utilities, and technology suppliers to explore the intersection of communications infrastructure, supply chain risks, and emerging regulatory requirements. Participants will apply Cyber-Informed Engineering (CIE) principles to reduce risks in communications systems, engage with INL’s procurement guidance, and explore future tools. Through scenario-based exercises and peer exchange, attendees will develop risk-based security strategies and actionable compliance roadmaps tailored to their grid communications projects. The workshops also help participants navigate evolving regulatory frameworks such as FEOC rules in the OBBB, NERC CIP-013, and NDAA 2024, while identifying compliance gaps in mixed-technology environments. A key outcome is the formation of a practitioner network with ongoing access to INL expertise and resources, fostering long-term resilience in the digital energy ecosystem.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Engineering Scale Testing of Transformational Non-Aqueous Solvent-Based CO 2 Capture Process at Technology Center Mongstad

Progress is reported for the period from August 8, 2018 to June 30, 2023. This final report involves work performed under ten tasks spanning two budget periods. The tasks are Task 1 Project Management, Task 2 TCM EH&S Risk Evaluation and Permitting, Task 3 Solvent Qualification, Task 4 Preliminary Design of NAS Optimized System, Task 5 TCM Amine Plant Equipment Procurement, Modification and Commissioning, Task 6 Solvent Production, Task 7 NAS Modified Amine Plant Test Plan Development, Testing, and Data Analysis, Task 8 Decommissioning and Waste Handling, Task 9 Final Techno-Economic Assessment and EH&S Risk Assessment, and Task 10 Cost Benefit Analysis and Technology Maturation Planning.

01 COAL, LIGNITE, AND PEAT↗

Development of High Temperature (>700°C) Molten Salt Pump Technology for Generation 3 Solar Power Tower Systems

Bearings are required for long-shafted pumps historically used in concentrating solar thermal power applications. For molten chloride salts, bearings for such service conditions are not commercially available, nor has a design been demonstrated to work. Therefore, a project was sponsored by the Department of Energy’s Solar Energy Technologies Office for the development and demonstration of a submerged bearing for use in chloride salt pumps. This project’s tasks covered the tribological testing of candidate materials and the design, fabrication, testing, and post-test analysis of full-scale salt-compatible bearings. This work expands upon previous work. The effects of potential particulate in the salt were investigated through tribological bench testing. Through 11 tests, the MgO particulate size and concentration in a molten chloride salt were varied, and the effects on friction, wear rate, and wear characteristics were recorded. Novel journal bearings for chloride salt service were designed and fabricated based on these results. The bearings were of a relevant scale (i.e., for a 1.5 in. pump shaft) to demonstrate the technology with respect to further scale-up. The bearings were made of Haynes 244 and Yttria Partially Stabilized Zirconia. A custom bearing test rig, salt tanks, and associated infrastructure (e.g., heaters, tanks, transfer lines, gas flow control) were designed, procured, and installed. A few issues were encountered in the system fabrication process, resulting in delay of the project schedule. The system was successfully fabricated and assembled. Heating, cover gas, and pump motor systems were integrated into the control logic. This progress of the bearing test system represents a significant step forward towards demonstrating this promising technology. Nevertheless, the project ended before testing of the full-scale bearings could be performed.

14 SOLAR ENERGY↗

Status of the LCLS-II-HE Project at Jefferson Lab

The Linac Coherent Light Source II High Energy (LCLS-II-HE) upgrade at the SLAC National Accelerator Laboratory is being constructed in partnership with the Thomas Jefferson National Accelerator Facility (JLab) and the Fermi National Accelerator Laboratory (FNAL). The cryomodule production scope consists of the design, procurement, construction, and acceptance testing of 24 eight-cavity, 1.3 GHz cryomodules, as well as R&D activities necessary to develop the required technology. To achieve this, JLab and FNAL are also contributing to SLAC’s effort to develop the cavity recipe and production processes necessary to meet the LCLS-II-HE goal of 20.8 MV/m and average Q₀ of 2.7·10¹⁰. This paper details the JLab scope, focusing on the project initiation phase, in particular technology development and prototyping, project development and planning, and implementation of lessons learned from LCLS-II.

Wilson, K. M.↗

2020 Energy Storage Pricing Survey

The annual Energy Storage Pricing Survey (ESPS) series is designed to provide a standardized reference system price for various energy storage technologies across a range of different power and energy ratings. This is an essential first step in comparing systems of the different technologies’ usage costs and total cost of ownership. The final system prices are developed based on data from an extensive set of interviews with representatives across the manufacturing and project development value chain, plus available published data. This information is incorporated into a consistent methodology structure that will allow pricing information to be incorporated at whatever level it was obtained, ranging from component to fully installed system. The ESPS system pricing methodology breaks down the cost of an energy storage system into the following component categories: the storage module; the balance of system; the power conversion system; the energy management system; and the engineering, procurement, and construction costs. By evaluating each of the different component costs separately, a more accurate system cost can be developed that provides internal pricing consistency between different project sizes using the same technology, as well as between different technologies that utilize similar components.

25 ENERGY STORAGE↗

Tailored Fiber Placement for Complex Preforms

Tailored Fiber Placement (TFP) offers a novel approach to optimize fiber architecture for the fabrication of complex, structural parts not traditionally suitable for advanced composites. This technology not only offers new routes for weight reduction via metal substitution, it also offers cost reduction through minimization of material scrap and reduced labor. This reduction in component weight leads to increased fuel efficiency, and reduced production energy consumption, thereby, helping to achieve the stated IACMI technical goals. This technology leverages centuries of manufacturing development in support of the textile and embroidery industry. One major drawback to this technology is the lack of commercial or non- proprietary structural performance data and robust analytical tools used to optimize fiber architecture and predict performance. This project was structured to utilize common sub-element features to validate analytical performance tools, generate performance data, and gather cost and performance data on components of interest. This project was designed to give industry sponsors the confidence and ability to take full advantage of TFP to fabricate primary, highly loaded structure and integrate features such as metallic fasteners. The project focused principally on the use of high strength carbon fiber, such as T700, and the use of aerospace epoxy resin matrix to primarily support development of new composite applications in vehicle, aerospace, and industrial markets. This project applied previously developed analytical tools to predict the performance of TFP produced parts. This work focused on developing the pipeline to characterize material in order to accurately predict component performance when modifying the TFP print paths and stitch density. This focused on experimental characterization via standardized ASTM testing, alongside experimental testing of more representative service components by testing curved beam strength, beam shear performance, a large scale TFP lug, and ultimately designing a fully TFP clip bracket that reduced weight and cost compared to a traditional metallic component. The new knowledge gained from this program included: 1) development and demonstration of novel analytical tools applied to analysis of TFP preforms; 2) development and demonstration of a building block approach using coupons and sub-elements to optimize the design of a more complex component; 3) demonstration that optimized fiber orientation using TFP can exceed performance of conventional textile composite materials and can open new applications currently limited to metallic components; 4) Demonstration of performance and cost benefits of the TFP process as compared to metallic and conventional textile composites. Recommendations for follow-on work include development of design allowables to assess the impact of high temperature/moisture exposure or saturation during loading, tracking the impact of stitching needle wear on the performance of parts and ability to stitch thicker preforms, using TFP preforms as local reinforcement at areas of bearing or complex loading, and topology optimization of components by tow steering. The expertise developed during the course of this project can be leveraged to provide commercial engineering design and fabrication services using TFP. UDRI is in the process of formalizing their partnership with Spintech, who will serve as the commercialization partner for this technology and provide molding services and deliver finished components to the end user. UDRI will continue to produce the preforms until the economics allow Spintech to procure its own TFP equipment or lease UDRI equipment, at which point UDRI will step away from manufacture and serve as the engineering and design lead on product development.

36 MATERIALS SCIENCE↗

Customizable Technical Specifications for Lithium-Ion Battery Storage Projects

Learn how to navigate the FEMP Lithium-ion Battery Storage Technical Specifications, a key resource for federal agencies developing onsite energy storage projects. This webinar, led by technical experts, will provide a step-by-step walkthrough of the specifications, supplemented with a real-world case study. Gain practical insights to support successful battery storage project development and implementation.

25 ENERGY STORAGE↗

Flux Sensor Measurement and Calibration Requirements for High-Intensity Heat Flux Applications: A Trade Study

Stakeholders of CSP and non-CSP high-intensity broadband flux measurements were surveyed and interviewed to obtain flux sensor design and calibration requirements. Existing sensor technologies and existing calibration facilities were then compared against this standard. Stakeholders require a flux sensor designed for >5,000 kW/m2 flux measurements, >1,000 life cycles, <500 ms response time, >60-minute exposure at maximum flux, and <5% measurement uncertainty. Stakeholders also require a sensor with minimal cost, short procurement lead time, and a high-intensity broadband flux calibration. Commercial CSP stakeholders primarily rely on infrared (IR) temperature measurements of receiver equipment to control CSP plant process operation, whereas CSP research and development (R&D) and non-CSP stakeholders rely on accurate flux gauge measurements for a variety of applications. It was determined that existing flux sensor technologies and calibration facilities do not comprehensively meet stakeholder needs. This study suggests a more robust circular foil gauge with a high-intensity solar flux calibration comprehensively meets stakeholder flux measurement needs. Improved circular foil gauge designs and an improved flux sensor calibration facility are discussed.

McLaughlin, Luke (ORCID:0000000303711310)↗

Offshore Wind Market Report: 2023 Edition

The Offshore Wind Market Report: 2023 Edition provides detailed information on the U.S. and global offshore wind energy industries to inform policymakers, researchers, and analysts about technology, economic, and market trends. The scope of the report covers the status of over 293 global operating offshore wind energy projects as well as the broader global pipeline of projects in various stages of development through December 31, 2022. To provide up-to-date information and discussion on this emerging industry in the United States, this report tracks the significant U.S. domestic industry progress and events from January 1, 2022, through May 31, 2023. The U.S. offshore wind energy project development pipeline has reached a potential generating capacity of over 52 gigawatts, and the industry has seen strong support from state and federal governments (such as from the Inflation Reduction Act of 2022 and the announced Floating Offshore Wind Shot to reduce the cost of floating wind by 70%). There are contracts for over 17 gigawatts of the electricity from these offshore wind projects and state policies are in place to procure over 42 gigawatts by 2040. Although some projects are facing economic headwinds due to rising costs and higher interest rates (corresponding to project cost increases of 11% - 30% in 2022), there has still been significant investment in a domestic supply chain (including manufacturing facilities, new vessels, and upgraded or planned ports). Technologies continue to evolve as offshore wind turbines in the 15-megawatt class advance towards commercial production. Key offshore wind energy market indicators, such as commercial leasing, state energy planning targets, procurement policies, offtake agreements, and federal support for U.S. jobs and supply chain development, point toward sustained market growth when viewed together, but the macroeconomic hurdles facing the first generation of commercial projects could significantly stunt that growth.

17 WIND ENERGY↗

Smart Outlets: Wireless Meter and Control Systems for Plug and Process Loads

Smart outlets control the flow of power to devices plugged into them and measure their energy use. The energy use data can be accessed via an online dashboard or smartphone application, allowing the user to turn power to plug-in devices on or off based on a schedule established in the dashboard or application. This four-page resource is a fact sheet meant to educate commercial building owners on smart outlets: what they are, why we use them, and how to use them in a way that will achieve energy savings while maintaining occupant comfort. The resource also describe how to procure a smart outlet system and how to fully capture their benefits over time. This resource was developed to support the Better Buildings Alliance Plug and Process Loads Technology Research Team.

30 DIRECT ENERGY CONVERSION↗

ORBIT: Offshore Renewables Balance-of-System and Installation Tool

This report describes the Offshore Renewables Balance-of-system Installation Tool ("ORBIT"), a new model developed by the National Renewable Energy Laboratory (NREL) to evaluate the balance-of-system (BOS) costs associated with offshore wind projects. In the context of wind energy projects BOS costs encompass all expenses required to construct a project other than the capital expenditures (CapEx) of the turbines and towers, including the procurement costs for all other components (such as substructures, cables, and electrical infrastructure), offshore and land-based construction costs, port costs, site surveying fees, permitting fees, and leasing fees are all categorized as BOS costs. BOS costs significantly contribute to the levelized cost of energy (LCOE) for offshore wind, typically comprising over 50\% of the CapEx for a fixed-bottom offshore wind project and 60\% for a floating project. In addition, technology solutions and installation methods vary drastically between projects as they are impacted by factors such as vessel availability, geographic considerations and site geotechnical conditions. These effects require a model with appropriate fidelity to understand how these costs scale as turbine rating increases and the offshore wind supply chain, particularly offshore construction vessels, is expanded. For offshore wind, cost savings attributed to increased turbine rating are primarily realized through BOS procurement and project installation as fewer substructures and less cable are required. BOS costs represent both a modeling challenge, as well as an opportunity, for project developers to optimize solutions to reduce costs. It is critical to understand how these costs are affected by novel technologies, innovative installation processes, and operational constraints in order identify meaningful cost reductions for offshore wind energy.

17 WIND ENERGY↗