Irradiation Test Facility Assessment for Instrumentation Testing and Qualification [Slides]
Abstract not provided.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
The purpose of this review was to verify readiness for the TREAT restart of transient testing activity at the INL and inform the startup authorization authority decision-making for startup authorization by providing a deliberate and managed determination of the state of readiness preparation and determination of whether operations can be performed safely. Verification of readiness included assuring that equipment operability, procedure viability, and personnel knowledge, skills, and performance are adequate for operations. Because the TREAT (including restart of transient testing activity) is a hazard category-2 nuclear facility and because reactor operation and transient testing activities were suspended for programmatic and funding reasons in excess of a year, DOE O 425.1D required that both a contractor and DOE RA be satisfactorily completed prior to startup of the TREAT and restart of transient testing activity. To this end, DOE directed that a CRA and federal RA be conducted. The CRA IP defined the depth of the CRA through the objectives and CRADs, delineated in Appendix A of the IP; established roles and responsibilities for CRA team activities; and established processes, practices, and protocols for preparation, conduct, documentation, and reporting of the CRA. The approaches and methodologies identified in the IP were used to verify that the BEA management team has established SSCs, developed personnel capabilities and competencies, and implemented safety features, programs, and procedures in a manner that provides reasonable assurance for adequate protection of workers, the public, and the environment in preparation for and execution of the TREAT restart of transient testing activity. This CRA was intended to confirm that (1) the facility is in a state of readiness to safely conduct operations in accordance with the safety basis; and (2) the management control programs are in place to ensure safe operations can be sustained. This equated to mature implementation of the integrated safety management (ISM) in conjunction with implementation of the individual facility authorization basis. This CRA was structured to verify the readiness to conduct restart of transient testing activity safely, and that facility programs were in place to support the restart of transient testing activity.
Adding additional flow testing facilities has been considered as part of the High Flux Isotope Reactor (HFIR) Sustaining and Enhancing Neutron Science (SENSe) Initiative at Oak Ridge National Laboratory (ORNL) to support HFIR operations and experiments. This prospect has prompted many ideas and discussions regarding potential features, configurations, locations, and applications for the facilities. A working group of ORNL staff members was formed in fiscal year 2022 to recommend one or more configurations to best support future HFIR operations and scientific capacities and to develop order-of magnitude cost estimates and timing. The ideas discussed in this report include options ranging from upgrading existing small-scale testing facilities to building a full-scale HFIR mockup for detailed thermohydraulic testing and fuel assessment.
Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities managed and operated by Sandia Corporation (Sandia), a wholly owned subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Field Office (SFO), in Albuquerque, New Mexico, administers the contract and oversees contractor operations at TTR and KTF. Sandia manages and conducts operations at TTR in support of the DOE/NNSA’s Weapons Ordnance Program and has operated the site since 1957. Navarro Research and Engineering subcontracts to Sandia in administering most of the environmental programs at TTR. Sandia operates KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report summarizes data and the compliance status of the sustainability, environmental protection, and monitoring program at TTR and KTF through Calendar Year 2013. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, Environmental Restoration (ER) cleanup activities, and the National Environmental Policy Act. Sandia is responsible only for those environmental program activities related to its operations. The DOE/NNSA/Nevada Field Office retains responsibility for the cleanup and management of TTR ER sites. Environmental monitoring and surveillance programs are required by DOE Order 231.1B, Environment, Safety, and Health Reporting (DOE 2012).
Fermi National Accelerator Laboratory (Fermilab) has multiple cryogenic test facilities, undertaking testing of superconducting magnets, Superconducting Radio Frequency (SRF) cavities, SRF cryomodules and other helium cryogenic components. The test areas within Fermilab include: Meson Cryogenic Test facility (Meson), Industrial Building 1 (IB-1), Heavy Assembly Building/Illinois Accelerator Research Center (HAB/IARC), New Muon Lab, (NML) and the Cryomodule Test Facility (CMTF). Meson and HAB/IARC utilize repurposed Tevatron era reciprocating engine based cryogenic refrigerator systems, whereas CMTF and IB-1 utilize gas bearing turbine based coldboxes. Each of these test areas support the various Fermilab projects and collaborations including the Linear Coherent Light Source II (LCLS-II), Proton Improvement Plan II (PIP-II), High Luminosity Large Hadron Collider (HL-LHC), and Mu2e. This paper outlines the diverse and extensive cryogenic test capabilities within Fermilab.
The test facilities at Oak Ridge National Laboratory s Holifield Radioactive Ion Beam Facility (HRIBF) devoted to testing radioactive ion beam targets and ion sources are described. Beginning in 1992 various capabilities have been developed to support the RIB research mission of HRIBF. These facilities provide direct measurements of release efficiency from target materials, yields (ions/sec and efficiency) and hold up times from target/ion source configurations. In addition, target/ion source configurations can be easily tested and retested after configuration changes to provide optimized operating parameters for new target materials and ion sources.
For next-generation power plants to achieve high cycle efficiencies consistent with the Department of Energy's 65% efficiency target, turbomachinery capable of operating within high-temperature power cycles must be demonstrated. Pairing additively manufactured superalloy turbines with the supercritical carbon dioxide (sCO 2 ) power cycle could enable turbine inlet temperatures approaching 1300 °C while providing flexibility in turbine cooling strategies. Development of test facilities to characterize and validate such systems is crucial. In this study, a turbine test facility capable of achieving inlet conditions of 800 °C, 11 MPa, and 0.43 kg/s while accommodating complex auxiliary cooling flow requirements has been designed and constructed to support future testing of a Haynes 282 additively manufactured 30 kW turbine-generator system with advanced cooling channels. This facility enables characterization of aerodynamic performance, leakage, and windage losses. Details of the facility's construction and operation are presented, along with experimental validation tests using an orifice as an expansion device in place of the turbine. These tests confirm that the facility can reach the required conditions, distinguish regions of achievable steady and pseudo-steady conditions, and identify the heater power required for each point in the upcoming turbine campaign. The campaign confirmed that ISO 5167-2 can reliably predict orifice mass flow rates in extreme supercritical carbon dioxide conditions with deviations of 0.5–7.5%.
The Federal Aviation Administration (FAA) is contemplating new regulations mandating testing of the vulnerability of flight-critical avionics to single event effects (SEE). A limited number of high-energy neutron test facilities currently serve the SEE industrial and institutional research community. The FAA recognizes that existing facilities have insufficient test capacity to meet new demand from such mandates; it desires more flexible irradiation capabilities to test complete, large systems and would like capabilities to address greater concerns for thermal neutrons. For this reason, the FAA funded this study by Spallation Neutron Source (SNS) staff with the ultimate aim of developing options for SEE test facilities using high-energy neutrons at the SNS complex. After an investigation of current SEE test practices and assessment of future testing requirements, three concepts were identified covering a range of test functionality, neutron flux levels, and fidelity to the atmospheric neutron spectrum. The costs and times required to complete each facility were also estimated. SEE testing is generally performed by accelerating the event rate to a point where the effects are still dominated by single events and double event causes of failures are negligible. In practice, acceleration factors of as high as 10 6 are applicable for component testing, whereas for systems testing acceleration factors of 10 4 seem to be the upper limit. It is strongly desirable that the irradiation facility be tunable over a large range of high-energy neutron fluxes of 10 2 - 10 4 n/cm²/s for systems testing and from 10 4 - 10 7 n/cm²/s for components testing. The most capable, most flexible, and highest-test-capacity option is a new stand-alone target station named the High-Energy neutron Test Station (HETS). It is also the most expensive option, with a cost to complete of approximately $100 million. Dual test enclosures would allow for simultaneous testing activity effectively doubling overall test capacity per HETS operating hour. Using about 1 kilowatt (kW) of proton power extracted from the accelerator before injection in the accumulator ring, its operation would be unnoticeable by neutron scattering users at the SNS target station. The H beam laser stripping technique would allow for control of beam power on the HETS target independent from power delivered to the SNS. Large systems with frontal areas of up to 1 x 2 m² could be accommodated with integral high-energy flux values (above 10 megaelectron-volt, or MeV) to at most 10 4 n/cm²/s; components could also be tested with flux levels to at most 10 7 n/cm²/s on beam sizes of up to 0.2 x 0.2 m². Selectable moderating material and neutron filters would allow tailoring of the neutron spectrum to user demands; charged particle deflectors could be switched to allow or deflect protons, pions, and muons. It is estimated that HETS would take 5 years to complete after award of contract, including engineering design and construction. Commissioning would take at least another 6 months. Interference with SNS principal operations was not considered in the construction time estimate; connection of the proton transport line and tunnel from the accelerator high energy beam transport (HEBT) and construction around existing site utilities would require careful planning and coordination with beam operations at the SNS. A high-energy (HE) neutron test facility using an available beam line on the SNS target station is a technically and financially attractive option. Inspired by the new ChipIR instrument on the ISIS TS 2 spallation source in the UK, a similar facility could be placed on an unused beam line in the SNS instrument hall [e.g., on beam line 8 (both A and B channels would be needed) or on beam line 10]. The performance would approach that of an HETS (~80%), but it would be operationally more limited, with only a single user at a time. Space is more limited, so the maximum system size would be about half of that in an HETS. Flexibility to tailor the spectrum would be somewhat more limited. While this concept was not as fully developed and characterized, preliminary work indicates very high HE flux levels should be possible, with ample thermal neutrons as well. Flux control would be more difficult than at HETS because proton power on target be whatever the SNS was operating at for neutron scattering. Neutron attenuation devices would have to be employed with as-yet undetermined control resolution. However, no new buildings would be needed, and the necessary utilities are already present in the SNS Experiment Hall. The estimated cost for a beam line option is around $15 million; the time to complete would be 3 years after award of contract, plus at least 6 months for commissioning. Interference of construction activities with SNS operations should be negligible. This option would require negotiation with the Department of Energy Basic Energy Sciences (BES) office -- the primary stakeholder of SNS -- for an application outside the usual scope of neutron scattering sciences. Furthermore, these presently open beam lines are highly desirable locations for proposed neutron scattering instruments and obtaining one of them for an SEE test facility will come only with persuasive and timely arguments to SNS leadership and the DOE BES. The third option is a tunnel extension/target cave facility providing the most basic system-level irradiation capability with minimal flexibility. Again not as well developed a concept as HETS, it would use a laser-stripping technique like an HETS, redirecting protons to a tunnel similar to the initial HETS proton transport tunnel. Indeed, this concept is intended to be upgradable to a full HETS facility. Only a small fraction of a watt of proton power would be used in this basic configuration, though. An uncooled target and primitive shielding arrangement would provide beam on modestly sized systems that must be placed in close proximity to the target. The neutron fluence would be less uniform over the system than with the HETS or the beam line option. A data acquisition room and support area would be located on the ground level; access to the target cave would be via elevator and/or stairway. As a result of the required excavation, new tunnel construction, shielding, data acquisition building, utilities, and other items, the estimated cost is $30 million. The time to complete is expected be more than 3 years; here again construction interference with SNS operations has not been accounted for, but it could have a significant impact.
The Natural convection Shutdown heat removal Test Facility (NSTF) is a large scale thermal hydraulics test facility that has been built at Argonne National Laboratory (ANL). The facility was constructed in order to carry out highly instrumented experiments that can be used to validate the performance of passive safety systems for advanced reactor designs. The facility has principally been designed for testing of Reactor Cavity Cooling System (RCCS) concepts that rely on natural convection cooling for either air or water-based systems. Standing 25-m in height, the facility is able to supply up to 220 kW at 21 kW/m 2 to accurately simulate the heat fluxes at the walls of a reactor pressure vessel. A suite of nearly 400 data acquisition channels, including a sophisticated fiber optic system for high density temperature measurements, guides test operations and provides data to support scaling analysis and modeling efforts. Measurements of system mass flow rate, air and surface temperatures, heat flux, humidity, and pressure differentials, among others; are part of this total generated data set. The following report provides an introduction to the top level-objectives of the program related to passively safe decay heat removal, a detailed description of the engineering specifications, design features, and dimensions of the test facility at Argonne. Specifications of the sensors and their placement on the test facility will be provided, along with a complete channel listing of the data acquisition system.
The SuperCDMS dark matter experiment is commissioning a new test facility at Fermilab, NEXUS, capable of testing a new suite of detectors that promise to push to lower dark matter masses than has previously been achieved. These detectors use silicon and germanium, cooled to tens of mK, to measure small vibrations in the crystal lattice caused by very tiny energy deposits. A core capability of NEXUS test facility is to use a commercial neutron generator, coupled to an array of detectors behind the test facility, to calibrate the nuclear recoil energy scale of these detectors through neutron scattering. The response of silicon and germanium to nuclear recoils below 1 keV energy transfer is largely unknown. For dark matter models which are primarily interacting with the nucleus, calibration of this response will completely determine the dark matter sensitivity of the experiment. In this context, the proper design of the neutron tagging detector to be used in the test facility needs to be found. This work will include simulation of the detector behavior and work towards an optimization of the detector geometry based on measurement resolution and detection rate. In addition, prototype scintillators and photodetectors will be studied as candidate detector elements.
Here, the Solenoid Test Facility at Fermilab was built using a large vacuum vessel for testing of conduction-cooled superconducting solenoid magnets, and was first used to determine the performance of the MICE Coupling Coil. The facility was modified recently to enable testing of solenoid magnets for the Mu2e experiment, which operate at much higher current than the Coupling Coil. One pair of low current conduction-cooled copper and NbTi leads was replaced with two pairs of 10 kA HTS leads cooled by heat exchange with liquid nitrogen and liquid helium. The new design, with additional control and monitoring capability, also provides helium cooling of the superconducting magnet leads by conduction. A high current power supply with energy extraction was added, and several improvements to the quench protection and characterization system were made. Here we present details of these changes and report on performance results from a test of the Mu2e prototype Transport Solenoid (TS) module. Progress on additional improvements in preparation for production TS module testing will be presented.
With the large number of superconducting radiofrequency (RF) cryomodules to be tested for the former LEP and the present LHC accelerator a RF test facility was erected early in the 1990’s in the largest cryogenic test facility at CERN located at Point 18. This facility consisted of four vertical test stands for single cavities and originally one and then two horizontal test benches for RF cryomodules operating at 4.5 K in saturated helium. CERN is presently working on the upgrade of its accelerator infrastructure, which requires new superconducting cavities operating below 2 K in saturated superfluid helium. Consequently, the RF test facility has been renewed in order to allow efficient cavity and cryomodule tests in superfluid helium and to improve its thermal performances. The new RF test facility is described and its performances are presented.
A new superconducting radio frequency (SRF) cavities test facility is now operational at Fermilab's Meson Detector Building (MDB). The Cryogenic Test Facility (CTF), located in a separate building 500 m away, supplies the facility with cryogens. The design incorporates ambient temperature pumping for superfluid helium production, as well as three 0.6 kW at 4.5 K refrigerators, five screw compressors, a helium purifier, helium and nitrogen inventory, cryogenic distribution system, and a variety of test cryostats.To control and monitor the vastly distributed cryogenic system, a flexible scheme has been developed. Both commercial and experimental physics tools are used. APACS+, a process automation control system from Siemens-Moore, is at the heart of the design. APACS+ allows engineers to configure an ever evolving test facility while maintaining control over the plant and distribution system. APACS+ nodes at CTF and MDB are coupled by a fiber optic network. DirectLogic205 PLCs by KOYO are used as the field level interface to most I/O.The top layer of this system uses EPICS (Experimental Physics and Industrial Control System) as a SCADA/HMI. Utilities for graphical display, control loop setting, real time/historical plotting and alarming have been implemented by using the world-wide library of applications for EPICS.OPC client/server technology is used to bridge across each different platform.This paper presents this design and its successful implementation.
The negative ion source test facility ELISE (Extraction from a Large Ion Source Experiment) is in operation since beginning of 2013 at the Max-Planck-Institut für Plasmaphysik (IPP) in Garching bei München. The large radio frequency driven ion source of ELISE is about 1×1 m{sup 2} in size (1/2 the ITER source) and can produce a plasma for up to 1 h. Negative ions can be extracted and accelerated by an ITER-like extraction system made of 3 grids with an area of 0.1 m{sup 2}, for 10 s every 3 minutes. A total accelerating voltage of up to 60 kV is available, i.e. a maximum ion beam power of about 1.2 MW can be produced. ELISE is equipped with several beam diagnostic tools for the evaluation of the beam characteristics. In order to evaluate the beam properties with a high level of detail, a sophisticated diagnostic calorimeter has been installed in the test facility at the end of 2013, starting operation in January 2014. The diagnostic calorimeter is split into 4 copper plates with separate water calorimetry for each of the plates. Each calorimeter plate is made of 15×15 copper blocks, which act as many separate inertial calorimeters and are attached to a copper plate with an embedded cooling circuit. The block geometry and the connection with the cooling plate are optimized to accurately measure the time-averaged power of the 10 s ion beam. The surface of the blocks is covered with a black coating that allows infrared (IR) thermography which provides a 2D profile of the beam power density. In order to calibrate the IR thermography, 48 thermocouples are installed in as many blocks, arranged in two vertical and two horizontal rows. The paper describes the beam calorimetry in ELISE, including the methods used for the IR thermography, the water calorimetry and the analytical methods for beam profile evaluation. It is shown how the maximum beam inhomogeneity amounts to 13% in average. The beam divergence derived by IR thermography ranges between 1° and 4° and correlates relatively well with the values measured by beam emission spectroscopy with up to 30% difference. It has also been observed that the beam inhomogeneity decreases with lower beam divergence.
In July 2010 funding for an award was made available under contract DE-EE0004200 which is the focus of this report. Under this funding, The U.S. Department of Energy’s (USDOE) designated Florida Atlantic University’s (FAU) state of Florida marine renewable energy focused Center of Excellence for Ocean Energy Technology as the Southeast National Marine Renewable Energy Center (SNMREC). The award was advertised in 2008, when the USDOE Wind and Water Program issued a funding opportunity announcement (DE-PS36-08GO98030) to establish university-led National Marine Renewable Energy Centers (NMRECs). Although FAU was selected for this opportunity, funding did not become available until 2010 at which time three of the original five years of performance remained and scope was adjusted accordingly. This award was divided into two phases. The first phase focused on marine energy turbine system enhancement and research while the second phase aimed to advance offshore capabilities and testing opportunities for small-scale demonstration turbines. The project’s objective was to increase the nation’s capabilities, knowledge, and competitiveness with respect to ocean current energy technology. This project successfully achieved these goals by advancing marine energy technology testing opportunities and capabilities. This report details these accomplishments by phase and task. Descriptions include any relevant results, challenges, achievements, and outcomes. Additional intellectual products and publications are listed in the Appendix where detailed technical explanations can be found. Further, because this award designated SNMREC as a USDOE center, it challenges FAU to continue providing value for the marine energy sector in the long term. The direct accomplishments of this project, though noteworthy, are also the seeds for a greater partnership between the USDOE and FAU. SNMREC, leveraging its designation as an NMREC under this award, will expand these contributions for decades to come as a coordinated sustainable program that can serve the marine energy sector’s needs as they arise.
HTTF Facility Selected test RELAP5-3D model Paul Bayless' model Recent model changes Ongoing work status Few preliminary results Outlook What is the plan going forward?
A new aerothermal test facility was constructed for the purpose of studying film cooling performance in an environment that accurately simulates conjugate heat transfer characteristics that exist in engine operation. Here, this paper details the design of the facility and the plan for conducting steady state film cooling experiments to improve the understanding of conjugate heat transfer scaling from laboratory to engine conditions. The test facility consists of two separate low channels (hot gas/coolant) and each gas path has a flow conditioning section, a convergent nozzle and a test section/channel with viewports. Numerical simulations were conducted to predict flow field characteristics supporting the design of the flow loop facility. Preliminary experiments were conducted to characterize the flow field using velocity and temperature profile measurements. In addition, infrared (IR) thermography methods were developed to measure surface temperatures on the hot side of the test plate. The IR measurement methods including calibration of the IR camera is explained in detail. It was concluded that appropriate hot gas path flow conditioning could be achieved using a strainer-like tube, a perforated plate, and a honeycomb-mesh screen system upstream of the test section. Flow field measurements from preliminary experiments showed that the boundary layer profile follows the law of the wall.
Project Objective: The Massachusetts Clean Energy Center (CEC) will design, construct, and ultimately have responsibility for the operation of the Large Wind Turbine Blade Test Facility, which is an advanced blade testing facility capable of testing wind turbine blades up to at least 90 meters in length on three test stands. Background: Wind turbine blade testing is required to meet international design standards, and is a critical factor in maintaining high levels of reliability and mitigating the technical and financial risk of deploying massproduced wind turbine models. Testing is also needed to identify specific blade design issues that may contribute to reduced wind turbine reliability and performance. Testing is also required to optimize aerodynamics, structural performance, encourage new technologies and materials development making wind even more competitive. The objective of this project is to accelerate the design and construction of a large wind blade testing facility capable of testing blades with minimum queue times at a reasonable cost. This testing facility will encourage and provide the opportunity for the U.S wind industry to conduct more rigorous testing of blades to improve wind turbine reliability.